Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 1 of 12
UNITED STATES DISTRICT COURT
FOR THE DISTRICT OF COLUMBIA
| BLASKET RENEWABLE INVESTMENTS, LLC, |
) ) ) |
|
| Petitioner, | ) ) ) |
Case No. 22-cv-02403 (APM) |
| v. | ) ) |
|
| KINGDOM OF SPAIN, | ) ) |
|
| Respondent. | ) ) |
Petitioner Blasket Renewable Investments, LLC (“Blasket”) seeks to enforce against
Respondent Kingdom of Spain (“Spain”) an arbitration award of €22,006,000 with interest as
rendered by a tribunal of the International Centre for Settlement of Investment Disputes (“ICSID”).
The award arises out of Spain's breach of its commitments under the Energy Charter Treaty
("ECT"). Spain moved to dismiss for lack of jurisdiction or to stay these proceedings pending its
application to annul the award. After briefing concluded, the D.C. Circuit held in NextEra Energy
Global Holdings B.V. v. Kingdom of Spain, 112 F.4th 1088 (D.C. Cir. 2024), that (1) federal
district courts have jurisdiction under the Foreign Sovereign Immunities Act (FSIA) to enforce
ICSID awards arising out of ECT arbitrations and (2) forum non conveniens is not available in
proceedings to confirm a foreign arbitral award. The parties have since filed supplemental briefs
to reflect NextEra Energy. But Spain continues to maintain, as it has from the start, that no forum
has jurisdiction or authority to issue or enforce the arbitral award because European Union (EU)
[Page 2]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 2 of 12
law voids any agreement to arbitrate under the ECT as between an EU Member State and investors
of another EU Member State.
For the reasons that follow, Spain's Motion to Dismiss the Petition or Stay the Proceedings,
ECF No. 14, is denied.
The ECT is a multilateral investment treaty among 53 contracting parties established
"to promote long-term cooperation in the energy field." Pet. to Enforce Arbitral Award,
ECF No. 1 [hereinafter Pet.], Ex. 3, ECF No. 1-3 [hereinafter ECT], art. 2; Resp’t's Mot. to
Dismiss the Pet. or to Stay the Proceedings, ECF No. 14 [hereinafter Resp't's Mot.], Resp't's
Mem. of Law in Supp. of Resp’t's Mot., ECF No. 14-1 [hereinafter Resp't's Mem.], at 12–13.
Among the contracting parties are the EU; most EU Member States, including Spain and Germany;
and several non-EU states. Pet. ¶¶ 13–15; Resp’t's Mem. at 12–13. The ECT's purpose is to
protect investments in the territory of one contracting party by investors located or incorporated in
other contracting parties. ECT art. 26. As relevant here, Article 26 provides that such investments
are protected by each contracting party's “unconditional consent” to international arbitration in the
event of a covered dispute. Id. art. 26(3).
The ICSID is one forum in which parties seeking dispute resolution under the ECT may
arbitrate. Id. art. 26(4)(a). The ICSID Convention is a multilateral treaty “aimed at encouraging
and facilitating private foreign investment in developing countries.” Mobil Cerro Negro, Ltd. v.
Bolivarian Republic of Venezuela, 863 F.3d 96, 100 (2d Cir. 2017). Spain, Germany, the United
States, and over 100 other nations are ICSID Convention signatories. See Database of ICSID
Member States, ICSID, https://perma.cc/2CVA-8AZV. Signatories agree to recognize ICSID
2
[Page 3]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 3 of 12
awards “as binding” and to “enforce the pecuniary obligations imposed by that award” in their
courts. Pet., Ex. 2, ECF No. 1-2, art. 54(1). The United States' obligation to enforce ICSID awards
is codified at 22 U.S.C. § 1650a, which provides that “pecuniary obligations imposed by
[an ICSID] award shall be enforced and shall be given the same full faith and credit as if the award
were a final judgment of a court of general jurisdiction of one of the several States.” 22 U.S.C.
§ 1650a(a).
Just before the turn of the century, Spain began offering financial incentives to encourage
investments in renewable energy production within its territory. Pet. ¶ 11. The corporate
predecessors of BayWa r.e. AG (“BayWa”), a company incorporated in Germany, invested in
Spanish wind farms in reliance on these promised financial incentives. Id. ¶¶ 1, 11. But over a
decade later, Spain walked and clawed back the subsidies it had previously doled out. Id. ¶¶ 11, 17.
Believing this a violation of Spain's commitments under the ECT, BayWa sought arbitration with
Spain before the ICSID. Id. ¶ 17. A tribunal was convened, and it determined, among other things,
that (1) the tribunal had jurisdiction over the dispute and (2) Spain had breached its obligation to
BayWa under the ECT. Id. ¶¶ 18–20. It awarded BayWa €22,006,000 with interest at the six-
month EURIBOR rate, compounded semi-annually from July 13, 2013, to the date of payment.
Id. ¶ 21. Spain, in turn, applied to the ICSID for an annulment of the award. Resp’t's Mem. at 14.
Throughout the initial arbitration and in its application for annulment, Spain argued that
the ICSID tribunal lacked jurisdiction to issue an arbitral award because, under EU law, “Article 26
of the ECT does not apply to disputes between an EU Member State and investors of another
EU Member State (i.e., ‘intra EU-disputes')." Id.
3
[Page 4]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 4 of 12
BayWa petitioned for enforcement of the ICSID award in this court in 2022. See generally
Pet. Spain moved to dismiss the action or for a stay pending its annulment application.
See generally Resp't's Mot. As litigation progressed, BayWa assigned title to the award to
Blasket, who was substituted as the petitioner in this action. See Mot. for Substitution, ECF
No. 25, at 1; Minute Order, Aug. 17, 2023.
Several events transpired thereafter. After briefing concluded, the ICSID denied Spain's
application for annulment. Pet’r's Notice of Decision Den. Spain's Annulment Appl., ECF No. 24
[hereinafter Pet’r's Notice]. In doing so, the ICSID again rejected Spain's argument that it lacked
jurisdiction to issue the arbitral award. Pet’r's Notice, ECF No. 24, Ex. A, ECF No. 24-1
[hereinafter ICSID Annulment Decision], ¶¶ 169–195. But the matter was nevertheless stayed
pending resolution of three related appeals before the D.C. Circuit. See Order to Show Cause,
ECF No. 27; Minute Order, Aug. 24, 2023. Those appeals were decided in 2024 by NextEra
Energy Global Holdings B.V. v. Kingdom of Spain, 112 F.4th 1088 (D.C. Cir. 2024), where the
D.C. Circuit held, as relevant here, that (1) federal district courts have jurisdiction under the FSIA
to enforce ICSID awards arising out of ECT arbitrations and (2) forum non conveniens is not a
valid ground for dismissal in proceedings to confirm a foreign arbitral award. The parties then
filed supplemental briefs to reflect the developments of NextEra Energy. See Resp't's Suppl. Br.
in Supp. of Resp't's Mot., ECF No. 36 [hereinafter Resp't's Suppl.]; Pet'r's Suppl. Br.,
ECF No. 35 [hereinafter Pet'r's Suppl.].
Spain moves to dismiss under Federal Rules of Procedure 12(b)(1) and 12(b)(6).
See Resp't's Mem. at 15.
4
[Page 5]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 5 of 12
Under Rule 12(b)(1), the court must dismiss an action unless the plaintiff can establish by
a preponderance of the evidence that the court possesses subject matter jurisdiction. See Lujan v.
Defs. of Wildlife, 504 U.S. 555, 561 (1992). To make this determination, the court must “assume
the truth of all material factual allegations in the complaint and construe the complaint liberally,
granting plaintiff the benefit of all inferences that can be derived from the facts alleged." Am.
Nat'l Ins. Co. v. FDIC, 642 F.3d 1137, 1139 (D.C. Cir. 2011) (internal quotation marks omitted).
Under Rule 12(b)(6), the court must dismiss a complaint that does not “contain sufficient
factual matter, accepted as true, to ‘state a claim to relief that is plausible on its face.” Ashcroft
v. Iqbal, 556 U.S. 662, 678 (2009) (quoting Bell Atl. Corp. v. Twombly, 550 U.S. 544, 570 (2007)).
A claim is plausible on its face if it alleges “factual content that allows the court to draw the
reasonable inference that the defendant is liable for the misconduct alleged.” Id. The court must
look only to the complaint and “any documents either attached to or incorporated in the complaint
and matters of which the court may take judicial notice.” N. Am. Butterfly Ass’n v. Wolf, 977 F.3d
1244, 1249 (D.C. Cir. 2020) (cleaned up).
Spain originally made four arguments in support of its motion to dismiss: (1) the court does
not have subject matter jurisdiction over this enforcement action under the FSIA; (2) the foreign
sovereign compulsion doctrine bars enforcement; (3) the award is not entitled to full faith and
credit; and (4) the doctrine of forum non conveniens favors dismissal of the case. See generally
Resp't's Mem. Central to these arguments is Spain's unwavering contention that EU law voids
the ECT's arbitration provision as between an EU Member State and an investor from another
Member State such that no forum—including the ICSID tribunal and this court—has jurisdiction
5
[Page 6]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 6 of 12
or authority to issue or enforce an arbitral award arising out of BayWa's ECT dispute with Spain.
Id. at 1–3.
The court first addresses the issues of jurisdiction and forum non conveniens, which were
directly addressed by NextEra Energy, before turning to the remaining issues of full faith and credit
and the foreign sovereign compulsion doctrine. Though the court considers these arguments with
a clean slate, it notes that Spain has tried and failed to advance all four arguments before other
courts in this district numerous times on motions to dismiss and for summary judgment post-
NextEra Energy. See, e.g., Blasket Renewable Invs., LLC v. Kingdom of Spain, No. 23-cv-2701
(RC), 2024 WL 4298808 (D.D.C. Sept. 26, 2024); Blasket Renewable Invs. v. Kingdom of Spain,
No. 19-cv-3783 (CJN), 2025 WL 2320368 (D.D.C. Aug. 12, 2025); Infrastructure Servs. Lux.
S.A.R.L. v. Kingdom of Spain, No. 18-cv-1753 (LLA), 2025 WL 2320406 (D.D.C. Aug. 12, 2025);
Blasket Renewable Invs., LLC v. Kingdom of Spain, No. 20-cv-817 (JDB), 2025 WL 2336428
(D.D.C. Aug. 13, 2025); Cube Infrastructure Fund SICAV v. Kingdom of Spain, No. 20-cv-1708
(LLA), 2025 WL 2374517 (D.D.C. Aug. 14, 2025); Blasket Renewable Invs. LLC v. Kingdom of
Spain, No. 20-cv-1081 (BAH), 2025 WL 3516146 (D.D.C. Sept. 11, 2025); 9Ren Holdings
S.À.R.L. v. Kingdom of Spain, No. 19-cv-1871 (TSC), 2025 WL 2779795 (D.D.C. Sept. 29, 2025);
NextEra Energy Glob. Holdings B.V. v. Kingdom of Spain, No. 19-cv-1618 (TSC), 2025 WL
2779908 (D.D.C. Sept. 30, 2025).
Spain appears to concede that NextEra Energy settled—at least for now¹—the issue of the
court's subject matter jurisdiction. See Resp't's Suppl. at 9. It recognizes that the D.C. Circuit
held that "jurisdiction exists under the FSIA's arbitration exception because the ECT itself is an
¹ Spain has filed a petition for certiorari that remains pending. See Pet. for a Writ of Cert., Kingdom of Spain v. Blasket
Renewable Invs. LLC Docket, No. 24-1130 (U.S. May 1, 2025).
6
[Page 7]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 7 of 12
‘arbitration agreement' that is ‘for the benefit of private investors and therefore satisfies the
FSIA's requirement that an arbitration agreement exists.” Id.
The court agrees that it has subject matter jurisdiction under the FSIA to enforce the arbitral
award. For the arbitration exception of the FSIA to withdraw a foreign sovereign's presumptive
immunity, the court must establish three “jurisdictional facts”: (1) an arbitration agreement, (2) an
arbitration award, and (3) a treaty potentially governing award enforcement. NextEra Energy,
112 F.4th at 1100 (citing Chevron Corp. v. Ecuador, 795 F.3d 200, 204 & n.2 (D.C. Cir. 2015)).
As in NextEra Energy, Spain does not dispute the existence of an arbitration award or treaty
governing enforcement; it rather argues that there was no valid “arbitration agreement” between
Spain and BayWa because EU law voids the ECT's arbitration provision as between an
EU Member State and an investor from another Member State. Resp’t's Mem. at 17–21;
see NextEra Energy, 112 F.4th at 1101. But NextEra Energy unequivocally holds that, at least for
purposes of subject matter jurisdiction under the FSIA, an “arbitration agreement” exists, and ECT
signatories, including Spain, are not immune in federal district court from the enforcement of ECT
arbitration awards rendered by the ICSID. 112 F.4th at 1104–05. Spain's subject matter
jurisdiction argument is thus squarely foreclosed by NextEra Energy.
So too is Spain's forum non conveniens argument. Spain contends that, notwithstanding
any other determination, the court should dismiss the action under the doctrine of forum non
conveniens because there are adequate fora in the EU and the public interest will be served by the
district court's abstaining from ruling on an issue of EU law. Resp't's Mem. at 27–31. But
NextEra Energy resolves this issue, too. It states plainly that “binding circuit precedent dictates
that 'forum non conveniens is not available in proceedings to confirm a foreign arbitral award
because only U.S. courts can attach foreign commercial assets found within the United States.”
7
[Page 8]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 8 of 12
112 F.4th at 1105 (quoting LLC SPC Stileks v. Republic of Moldova, 985 F.3d 871, 876 n.1
(D.C. Cir. 2021)). Forum non conveniens therefore cannot be the basis of dismissal. See also
Blasket Renewable Invs., 2024 WL 4298808, at *11 (explaining that dismissal on forum non
conveniens grounds also is not warranted because the only issues for the court to consider are not
of foreign law but of the court's duty pursuant to 22 U.S.C. § 1650a).
Because the court has subject matter jurisdiction under the FSIA and there is no dispute
that Spain was properly served, see generally Resp't's Mem.; Return of Service, ECF No. 8, the
court also has personal jurisdiction over Spain. See Price v. Socialist People's Libyan Arab
Jamahiriya, 294 F.3d 82, 89 (D.C. Cir. 2002) (“If service of process has been made under
[28 U.S.C.] § 1608, personal jurisdiction over a foreign state exists for every claim over which the
court has subject matter jurisdiction."). So the court now turns to the merits.
The D.C. Circuit held in NextEra Energy that “the district courts have jurisdiction to
enforce these arbitration awards,” but it also specified that the holding “does not mean they must
or should do so.” 112 F.4th at 1104. It expressly chose not to “address the merits question whether
[the ECT]'s arbitration provision extends to EU nationals and thus whether Spain ultimately
entered into legally valid agreements with the companies.” Id. Spain therefore maintains its full
faith and credit and foreign sovereign compulsion doctrine arguments in its supplemental briefs.
Neither holds water.
Congress mandated that the “pecuniary obligations imposed by [an ICSID] award shall be
enforced and shall be given the same full faith and credit as if the award were a final judgment of
a court of general jurisdiction of one of the several States.” 28 U.S.C. § 1650a(a). But Spain
8
[Page 9]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 9 of 12
insists that the court should not give full faith and credit to this ICSID arbitral award because the
ICSID tribunal lacked jurisdiction to issue it. See Resp't's Mem. at 26–27; Resp’t's Suppl. at 10–
18. Spain expends considerable effort describing the primacy of EU law among EU Member
States, substantive EU case law, and the European Commission's views to drive this point home.
See Resp't's Mem. at 3–24; Resp't's Suppl. at 2–18.
But Spain does not contend with the fact that “the full faith and credit obligation owed final
judgments 'precludes any inquiry into the merits of the cause of action, the logic or consistency of
the decision, or validity of the legal principles on which the judgment is based." Valores
Mundiales, S.L. v. Bolivarian Republic of Venezuela, Ministerio del Poder Popular para
Relaciones Exteriores, 87 F.4th 510, 519 (D.C. Cir. 2023) (quoting Milliken v. Meyer, 311 U.S.
457, 462 (1940)). “[A] court may not deny a judgment full faith and credit because ‘it disagrees
with the reasoning underlying the judgment or deems it to be wrong on the merits.” Id. (quoting
V.L. v. E.L., 577 U.S. 404, 407 (2016)). That bar on relitigation extends “to questions of
jurisdiction." Id. at 520 (quoting Durfee v. Duke, 375 U.S. 106, 111 (1963)). The only thing for
this court to do is to satisfy itself that (1) “it has subject-matter and personal jurisdiction,” (2) “the
award is authentic,” and (3) “its enforcement order tracks the award.” Tethyan Copper Co. Pty
Ltd. v. Islamic Republic of Pakistan, 590 F. Supp. 3d 262, 268 (D.D.C. 2022).
The court is satisfied. It has already determined that it has subject matter and personal
jurisdiction. See supra Section IV.A. And the parties do not dispute the award's authenticity or
the court's ability to issue an enforcement order that tracks the award. The court therefore finds
that the ICSID's arbitral award is entitled to full faith and credit.
Spain may continue to disagree with the ICSID tribunal's jurisdictional determination.
But "a judgment is entitled to full faith and credit—even as to questions of jurisdiction—when the
9
[Page 10]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 10 of 12
second court's inquiry discloses that those questions have been fully and fairly litigated and finally
decided in the court which rendered the original judgment.” Durfee, 375 U.S. at 111. The ICSID
tribunal in this case considered and rejected Spain's jurisdictional arguments twice—once during
the initial arbitration and again during the annulment proceedings. See Resp't's Mem. at 14; ICSID
Annulment Decision ¶¶ 169–195. The question of the tribunal's jurisdiction thus has been “fully
and fairly litigated." See Durfee, 375 U.S. at 111. “Full faith and credit's bar against relitigation
is unyielding." Valores Mundiales, 87 F.4th at 519. Spain therefore cannot succeed on the merits
by "recycl[ing] a losing jurisdictional argument." See Tethyan, 590 F. Supp. 3d at 276; see also
Blasket Renewable Invs., 2024 WL 4298808, at *8 (“To the extent that the Arbitral Tribunal may
have erred in carrying out its responsibilities under the ECT and the ICSID Convention, Spain is
without remedy in this Court.").
Finally, Spain contends that the foreign sovereign compulsion doctrine “and the principles
of comity that underlie it” bar this court from enforcing the arbitral award. Resp't's Suppl. at 18–
20; see Resp't's Mem. at 25–26. Every court in this district to have considered this argument has
rejected it as to ICSID arbitral awards such as the one before this court. See Blasket Renewable
Invs., 2024 WL 4298808, at *12–14 (“The Court concludes that these comity principles
[underlying the foreign sovereign compulsion doctrine] do not favor barring enforcement of a
judgment... where Petitioner seeks recognition of an ICSID award. ... [I]t is 'the central precept
of comity' that ‘the decisions of foreign tribunals should be given effect in domestic courts, since
recognition fosters international cooperation and encourages reciprocity, thereby promoting
predictability and stability through satisfaction of mutual expectations.” (quoting Laker Airways
Ltd. v. Sabena, Belgian World Airlines, 731 F.2d 909, 937 (D.C. Cir. 1984))); Blasket Renewable
10
[Page 11]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 11 of 12
Invs., 2025 WL 2320368, at *5 (“To the contrary, international comity favors enforcement in this
context."); Infrastructure Servs., 2025 WL 2320406, at *6 (“[T]he D.C. Circuit has never applied
the foreign sovereign compulsion doctrine [in the ICSID arbitral award context], and Spain offers
no authority to support the application of the doctrine in this context.”); Blasket Renewable Invs.,
2025 WL 2336428, at *8–9 (“[C]omity does not provide a disgruntled party with a runaround of
§ 1650a. ... In probing for bona fide compulsion, courts have required defendants asserting the
foreign sovereign compulsion doctrine to show that non-compliance with foreign law portends a
significant risk of substantial sanctions. But it is uncertain that Spain's payment of the award here
would place Spain at substantial risk of sanctions.” (cleaned up)); Cube Infrastructure Fund, 2025
WL 2374517, at *3 (“Spain cannot now argue that it is being unfairly compelled to follow the
strictures of a treaty that it signed, which explicitly provides that final awards are binding and
unappealable."); Blasket Renewable Invs., 2025 WL 3516146, at *9 (“The ‘elusive concept' that
the United States should defer to EU courts out of respect for other sovereigns cannot overcome
the concrete comity requirements adopted in an international treaty to which the United States is a
party.”); 9Ren Holdings, 2025 WL 2779795, at *3 (“[E]ach court in this district that has considered
a similar argument has agreed that the doctrine is inapplicable as applied to these ICSID arbitral
awards."); NextEra Energy, 2025 WL 2779908, at *4 (same). Spain does not offer any novel
perspectives here. The court therefore adopts the reasons set forth in these decisions and holds
that neither the foreign sovereign compulsion doctrine nor its underlying principles of comity bar
the court from enforcing the ICSID's arbitral award against Spain.
For the foregoing reasons, Spain's Motion to Dismiss the Petition or Stay the Proceedings,
ECF No. 14, is denied. The parties shall meet and confer and by June 3, 2026, either (1) file a
11
[Page 12]
Case 1:22-cv-02403-APM Document 46 Filed 05/20/26 Page 12 of 12
Joint Status Report that proposes a schedule for summary judgment briefing, if necessary, or
(2) submit a proposed judgment, if the parties believe the merits of the confirmation are now
resolved.
Dated: May 20, 2026