EXPERT REPORT: DAMAGE CAUSED TO EEMSHAVEN BY THE COAL BAN
RWE AG and RWE Eemshaven Holding II BV vs.
Kingdom of the Netherlands
ICSID Case No. ARB/21/4
|
PREPARED BY Dan Harris |
PREPARED FOR RWE AG and RWE Eemshaven |
18 DECEMBER 2021
Brattle
[Page i]
This report was prepared for RWE AG and RWE Eemshaven Holding II B.V., in accordance with The Brattle Group's engagement terms with RWE Generation Holding B.V., and is intended to be read and used as a whole and not in parts.
The report reflects the analyses and opinions of the authors and does not necessarily reflect those of The Brattle Group's clients or other consultants.
There are no third party beneficiaries with respect to this report, and The Brattle Group does not accept any liability to any third party in respect of the contents of this report or any actions taken or decisions made as a consequence of the information set forth herein.
[Page ii]
[Page 1]
1. On 10 December 2019, the Dutch government approved a law to prohibit the use of coal for generating electricity by 2030 at the latest (the “Coal Ban”).¹ The law affects RWE AG and RWE Eemshaven Holding II B.V. (“RWE Eemshaven”, collectively “Claimant") because Claimant owns a Dutch coal-fired plant, Eemshaven, which will have to close at the end of 2029 as a result of the Coal Ban. RWE Eemshaven is a subsidiary and group company of RWE AG (when referring to the RWE group of companies, “RWE”). Without the Coal Ban, Eemshaven could technically continue operating until the end of 2054. Counsel for the Claimant, Luther Rechtsanwaltsgesellschaft mbH, has asked Brattle to estimate the damages the Claimant has suffered due to the change in the value of the Eemshaven plant as a result of its enforced early closure. Accordingly, Eemshaven is the object of our valuation.
2. In making our damage calculations, Counsel for Claimant have provided us with the following instructions:
1 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
2 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017. ↩
[Page 2]
3. Our names are Dan Harris and Serena Hesmondhalgh. Mr Harris has been a consultant focused on the energy sector for twenty years and Dr Hesmondhalgh for over thirty years. We are both experts in the economic and financial analysis of the energy sector, particularly in the analysis of large capital investments such as natural gas pipelines, power stations, electricity transmission lines, distribution networks, and refineries. We have both provided expert witness testimony on damages in many arbitrations and court cases concerning such energy sector investments. Between us, we have provided expert testimony in ECT, ICC, LCC, SCC, and UNCITRAL arbitrations. Appendix A contains our CVs.
4. We understand that our duty in this case is to inform the Court of our independent professional opinions, based on our experience and understanding of the facts in this case. We do not offer any opinion on the legal merits of the claims. We are committed to expressing our full opinions, even those aspects that might not favour the commercial interests of the Claimant. The Brattle Group has worked for subsidiaries of the RWE group, but not the Claimant specifically, on three occasions in the last ten years, but has no ongoing relationship with RWE, its subsidiaries, or its legal advisors other than the work we are doing for RWE in relation to the Coal Ban. RWE Generation Holding B.V. is compensating The Brattle Group for our analysis and for the work of our supporting team of economists. The compensation is based on The Brattle Group's standard hourly rates applied to the time dedicated to the analysis, and does not depend in any manner on the outcome of the dispute.
5. Section I.D summarises our findings and conclusions. The relevant factual background to the case is provided in Section II, whilst we provide an overview of our framework for estimating damages in Section III. The remaining sections, Sections IV to VII, go through each of the
[Page 3]
steps of our damages framework, and present damages calculations inclusive of interest. Finally, in section VIII, we comment briefly on the possibility of Eemshaven's remaining open after 2030 by converting to natural gas or 100% biomass.
6. Dr Hesmondhalgh has been primarily responsible for Sections IV and V and Mr Harris for Sections III.A to III.D, VI and VII. They are jointly responsible for the remaining sections.
7. To measure Eemshaven's loss in value as a result of the Coal Ban, we calculate the difference between the Fair Market Value of the plant “but-for” the Coal Ban, and the Fair Market Value with the Coal Ban in place, its “actual" value.
8. With the Coal Ban, Eemshaven can no longer burn coal from 1 January 2030.⁴ Hence, the plant will have to close by the end of 2029, since NERA finds that it would not be viable to continue operating using only unsubsidised biomass. Consequently, almost all the loss in value from the Coal Ban results from the Claimant's inability to operate Eemshaven beyond 2030.⁵
9. For both the actual and but-for cases, we determine the Fair Market Value of Eemshaven using the standard discounted cash flow (“DCF”) methodology. First, for each relevant year, we calculate free cash flows to the plant by subtracting fixed and variable operating costs, tax and capital expenditures from the plant's revenues.⁶ Second, we discount the free cash flows back to the valuation date, October 2017, using a discount rate that reflects the risk of the cash flows. Discounting reflects the fact that a euro today is worth more than a euro that is only available at some future date.⁷ The sum of the discounted free cash flows represents the Fair Market Value of the plant: what a willing and informed buyer would have been prepared to pay for Eemshaven as of the valuation date.
10. Eemshaven's free cash flows are, in essence, the difference between its revenues and its costs. In turn, Eemshaven's revenues depend on the level of electricity prices, which are
4 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
5 There are also some earlier cash flow effects, starting in 2020, which we take into account. These reflect different decisions regarding investments and tax payments between our but-for and actual cases. See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
6 Note that under our DCF approach, the cost of building Eemshaven is not relevant, since RWE has already incurred these costs i.e. they are "sunk". The capital costs therefore play no role in deciding whether to generate electricity on a given day or whether to continue operating the plant. ↩
7 For a more detailed explanation of discounting, see Section VI.C. ↩
[Page 4]
largely driven by the price of coal, gas and CO₂ (collectively “commodity prices”).⁸ The prices of coal and CO₂ are also the most significant drivers of Eemshaven's electricity production costs. Hence, with regard to both revenues and costs, commodity prices are the most important determinant of Eemshaven's free cash flows and value. Commodity prices fluctuate from day to day and, given the long time frame over which we have to forecast the free cash flows, we adopt a methodology which captures a full range of possible outcomes for commodity prices for that period so as to arrive at a robust damages estimate.
11. In more detail, we have carried out a probabilistic analysis of the likely development of commodity prices that is based on (a) our best estimate of future developments, (b) the volatility of each commodity price and (c) the historic correlation between movements in prices for the various commodities. Using this framework, we have created 100 different commodity price paths. This kind of exercise, also referred to as a Monte Carlo simulation, is a common way to capture a wide range of possible future outcomes.⁹
12. We have used these 100 commodity price paths to construct 100 'pairs' of free cash flow paths - each 'pair' consisting of one set of cash flows for the actual case (with the Coal Ban) and one for the but-for case (without the Coal Ban), both based on the same commodity price path. We then use a discount rate to calculate the present value of each pair of free cash flows, as of the valuation date. This results in 100 ‘pairs' of actual and but-for Fair Market Values, one ‘pair' for each commodity price path.
13. For each of the 100 commodity price paths, the loss in value of Eemshaven resulting from the Coal Ban is simply the difference between the Fair Market Value in the actual case, and the Fair Market Value of the but-for case. Hence, we calculate 100 estimates of loss in value that Eemshaven has suffered due to the Coal Ban. Note that, in the but-for case, if a commodity price path is unfavourable, it seems reasonable to suppose that the Claimant would curtail its losses by closing the plant. As a result, none of our estimates of the loss in value of Eemshaven is strongly negative.¹⁰ Hence, the value of the plant is not simply the average of a number of positive and negative cases, because the Claimant can largely eliminate negative outcomes by closing the plant. This ability to largely eliminate losses in cases with unfavourable commodity prices means that the loss in value for any commodity price path cannot be strongly negative and is generally either zero or positive.
8 See Sections IV.B and IV.C. ↩
9 See for example Exhibit BR-3, Levy, G., Computational Finance Using C and C#, Quantitative Finance Series, 2008, p. 37. Exhibit BR-4, Berk, J.B., DeMarzo, P.M., Corporate Finance, Third Edition, p. 1057. ↩
10 The loss in value can be negative because we assume that a decision to close the plant would only be made after two years of losses. ↩
[Page 5]
14. By construction, each of the 100 price paths is equally likely to occur. Hence, we could arrive at a final damages figure by simply taking the average of the plant's loss in value for each of the 100 price paths. However, a few of the price paths lead to a particularly high loss in value (damages). To ensure that the estimate of the loss in value is robust, we prefer to avoid a situation where a few cases have a very large effect on the damages claimed. Conservatively, we exclude from the average the price paths corresponding to the top and bottom 5% of the 100 damages outcomes. After removing these ‘outliers', then, we find that:
15. From an economic perspective, the Claimant's damages claim represents a reasonable cost for reducing carbon emissions. We calculate that, on average, closing Eemshaven at the end of 2029 will result in 210 million tons of avoided carbon emissions. ¹¹ Accordingly, the claim is equivalent to the Netherlands paying around €16 for each tonne of avoided carbon. ¹² This price is lower than the CO₂ price has been since mid-2018.¹³
11 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
12 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
[Page 6]
16. Eemshaven is the largest coal-fired plant in the Netherlands,¹⁴ with a nameplate net capacity of 1,560 MW, split between two identical 780 MW units (see Figure 1). The plant has an effective net capacity that varies by month [Redacted] depending on the external temperature.¹⁵ In normal operation, the Eemshaven plant requires around [Redacted] full-time equivalent staff.¹⁶
FIGURE 1: EEMSHAVEN POWER PLANT¹⁷
[Image of Eemshaven Power Plant]
14 Exhibit BR-5, Report of the Ministry of Economic Affairs, 2016. ↩
15 Harris-Hesmondhalgh Workpapers, Tables E.1 and E.2 – Dispatch Model, Tables E.1.2 and E.2.2. Note data in Workpapers represents one unit. ↩
16 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H29. ↩
17 Exhibit BR-6, Velatia Networks, Safe and Reliable, Goodbye to the Coal Power Plants in the Netherlands by 2030, dated 21 January 2019. ↩
[Page 7]
17. The maximum annual output of the plant is approximately [Redacted],¹⁸ enough to provide the electricity for around [Redacted] Dutch households,¹⁹ or roughly [Redacted] of the current Dutch population.
18. The plant opened in 2015 after [Redacted] years of construction works²⁰ and, in line with general industry expectations,²¹ it was expected that technically it could operate for 40 years – so until 2054. At present, Eemshaven operates using a mixture of hard coal and biomass.²² However, the plant's use of biomass is constrained by environmental permits which only allow Eemshaven to burn 800,000 tonnes of biomass per year.²³ The plant will only burn biomass when it expects it to be economically viable to do so. This is currently the case primarily because Eemshaven receives subsidies for any electricity it generates using biomass up to a limit of 1,788,889 MWh per year,²⁴ but these subsidies will cease after 2027.²⁵
19. In 2017, the total installed capacity of generating plants in the Netherlands was approximately 31.7 GW.²⁶ As shown in Figure 2, the majority of the plants (61%) were gas-fired, with coal-fired plants accounting for only 14.5% or 4.6 GW. Aside from one relatively small nuclear plant, the remaining plants produced electricity from renewable sources of various types.
18 This is based on average effective net capacity, [Redacted] days of maintenance per year and a forced outage rate of [Redacted]. See Harris-Hesmondhalgh Workpapers, Tables E.1 and E.2, Tables E.1.2 and E.2.2. ↩
19 According to Exhibit BR-7, CBS, Trends in the Netherlands 2018, Economy, the average consumption of electricity in Dutch households is over 2,900 kWh. ↩
20 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab 'Blad 1'. ↩
21 See, for example, Exhibit BR-8, International Energy Agency and Nuclear Energy Agency, Projected Costs of Generating Electricity, 2015 Edition, dated 30 September 2015, p.30. ↩
22 Exhibit BR-9, RWE, Eemshaven Power Plant ↩
23 Exhibit BR-10, RWE, Environmental Permit Eemshaven, dated 11 December 2007, pp. 90-92 for the granted request and Exhibit BR-11, KEMA Consulting, Application for Incorporation Permit, dated 20 December 2006, pp. 48-49 for the request details, see Table 3.1.2. ↩
25 Exhibit BR-12, National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy, dated 30 November 2016. We understand that, as of the valuation date, RWE expected that the subsidies would not start before May 2019 and that is what we have modelled. ↩
26 Harris-Hesmondhalgh Workpapers, Tables I - Other Supporting Analysis, Tab 'Breakdown of the Dutch Generation Capacity'. For more information visit: https://transparency.entsoe.eu. ↩
[Page 8]
FIGURE 2: BREAKDOWN OF DUTCH GENERATING CAPACITY IN 2017²⁷
[Pie Chart]
20. There were five operational coal-fired plants in the Netherlands in October 2017.²⁸ In addition to Eemshaven, RWE owned another coal plant, Amer-9. At that time, the other coal plants belonged to Uniper, Vattenfall, and ENGIE:
27 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. For more information visit: https://transparency.entsoe.eu, last accessed on 8 January 2021. ↩
28 Exhibit BR-13, Government of The Netherlands, The Future of Fossil Fuels. Prior to October 2017, additional coal-fired energy units operated in in the Netherlands. However, between 2016 and 2017, five units closed as a result of the Dutch Energy Agreement (Energieakkoord, 2013): Amer 8, Gelderland, Borssele, and Maasvlakte unit 1 and 2. See Exhibit BR-14, Final Report 2014-2019, Dutch Coal Covenant, pp. 10-13. ↩
29 Exhibit BR-15, Our power plants in the Netherlands - Uniper, last accessed on the 23 December 2020. ↩
30 Exhibit BR-16, Vattenfall, Vattenfall's Last Coal Power Plant in The Netherlands is Closing, dated 20 December 2019. ↩
[Page 9]
21. The possibility of a phase out of coal-fired plants was first raised in November 2015, when the Dutch parliament adopted a resolution calling on the cabinet to investigate such a phase out taking into consideration all the relevant advantages and disadvantages.³² However, the coal plant closure was opposed by the Dutch prime minister, who considered that it would result in electricity imports from brown coal plants, which would be more environmentally harmful than generating electricity from the modern Dutch hard coal plants, including Eemshaven.³³ As a follow up to the 2015 resolution, the Rutte II cabinet conducted an inquiry into the future of the Dutch coal plants, which considered several different possibilities. In January 2017, the cabinet concluded that closing the coal plants had many disadvantages and was not required to meet the CO₂-reduction aims set for 2020. It was only after the 2017 election and the formation of the Rutte III cabinet in October 2017 that a Coal Ban became sufficiently defined and probable that it would have affected the value of coal-fired plants in the Netherlands.³⁴
22. The political parties in the coalition released the Coalition Agreement on 10 October 2017, a document that reflects their policy priorities for the period 2017-2021. The Coalition Agreement includes a dedicated chapter on climate and energy that includes a commitment to close coal-fired power plants “by the end of 2030 at the latest".³⁵
23. On 20 December 2019, the prohibition on the use of coal for electricity generation came into force.³⁶ The law granted transitional periods for coal-fired plants during which they could continue to operate, with different transitional periods being specified according to the efficiency of the plant. For plants with an electrical efficiency above 44% - Eemshaven and
31 Exhibit BR-17, de Volkskrant, One of The Last Four Coal-Fired Power Stations in The Netherlands Wants to Close, dated 21 October 2020. ↩
32 Exhibit BR-18, Phys.Org, Dutch Lawmakers Approve Plan to Close Coal Power Plants, dated 26 November 2015. ↩
33 Exhibit BR-18, Phys.Org, Dutch Lawmakers Approve Plan to Close Coal Power Plants, dated 26 November 2015. ↩
34 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017pp. 42-43. ↩
35 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017pp. 42-43. ↩
36 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
[Page 10]
the two Maasvlakte plants – the transitional period extends until 31 December 2029.³⁷ For less efficient plants, such as Amer 9, the transitional period ends on 31 December 2024. Hemweg 8 closed on 1 January 2020 because, unlike Amer 9, it does not burn biomass and so does not produce renewable heat or electricity. In return for this early closure, Hemweg 8 received compensation of €52.5 million.³⁸
24. We understand that the Dutch State has not provided Claimant with any financial compensation for the loss in Eemshaven's value resulting from the Coal Ban.
37 Article 3 of the Coal Ban Law, Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
38 Based on its efficiency, the date by which Hemweg 8 could have originally expected to stop burning coal would have been the same as that for Amer-9, the end of 2024. However, the government brought forward its closure to 1 January 2020 and provided compensation to its owner, Vattenfall. Exhibit BR-19, European Commission Press Release, State Aid: Commission Approves Compensation for Early Closure of Coal Fired Power Plant in the Netherlands, Brussels, dated 12 May 2020. ↩
[Page 11]
25. As outlined above, we have been instructed to measure the change in the Fair Market Value of Eemshaven as a result of the Coal Ban. In this section, we:
26. We also outline the specific approach that we have taken to determining the cash flows used in the DCF model, including how we have accounted for risks and alternative future commodity price developments.
27. According to the International Valuation Standards, the Organisation for Economic Co-operation and Development (“OECD”) defines the “Fair Market Value” of an asset as “the price a willing buyer would pay a willing seller in a transaction on the open market.”³⁹ The International Valuation Standards also quote the definition of the United States Internal Revenue Service, which defines “Fair Market Value" as:
“the price at which the property would change hands between a willing buyer and a willing seller, neither being under any compulsion to buy or to sell and both having reasonable knowledge of relevant facts.”⁴⁰
28. Both definitions are substantively the same, and we adopt them in this report.
29. Alternatives to the FMV perspective include:⁴¹
39 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 23. ↩
40 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 23. ↩
41 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 21-22. ↩
[Page 12]
30. Hence, the relevant feature of adopting a FMV approach in this case is that we do not take into account any value associated with Eemshaven that is specific to it being owned by RWE, and would not accrue to a third-party buyer. Since operating a large coal-fired power plant like Eemshaven is a complex undertaking, we assume that a “willing buyer” in the case of Eemshaven would be a large sophisticated corporation, which also operates a number of other power plants. In our view, this is the most likely buyer profile. It would be very unlikely for a company that owns no other power plants to bid successfully for Eemshaven. We highlight where this criterion becomes relevant throughout the report.
31. As noted above, Counsel for Claimant have asked us to calculate the loss in value of Eemshaven resulting from the Coal Ban, on a FMV basis. We make this assessment using 9 October 2017 as the Valuation Date and adopting the following standard approach:
32. The most recent edition of the Global Arbitration Review Guide to Damages in International Arbitration (the “GAR Guide”), discusses this approach, noting that:
[Page 13]
“[t]he but-for premise considers the questions of what would have happened in the absence of the breach. To find an answer, the but-for premise compares the hypothetical situation without the breach and the actual situation with the breach".⁴²
33. There are three main methods for determining a FMV:⁴³
34. However, in our experience, the standard way of determining the FMV for a power plant is by applying a DCF model. When assisting with mergers and acquisitions and also when assessing damages in arbitrations, we have routinely applied DCF models to value power plants and similar assets for many years. It is also the approach that we see clients in the industry apply in their internal valuation exercises, and when considering asset acquisitions or divestments.
42 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 114. ↩
43 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 29. ↩
44 "The most common form of the income approach is to focus on cash (rather than an accounting measure like income) and use a discounted cash flow (DCF) method." Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 196. ↩
45 A multiples approach is where an analyst values a business based on a multiple or ratio such as profit to value. For example, suppose an analyst knows the profit to value ratio of business 'A' is 10, and also knows the profit of the business being valued (business 'B') is 2. If the ratio of profit to value is the same for both business A and B, the analyst can calculate the value of business B as 10 x 2 = 20. ↩
[Page 14]
35. Third-party presentations and academic articles mirror our experience.⁴⁶ Other authoritative sources also endorse the use of a DCF model to establish an asset's FMV.⁴⁷ The DCF method is also commonly used by financial analysts preparing reports for investors, and financial managers seem to prefer the DCF method over any other.⁴⁸ Hence, any prospective buyer of Eemshaven would include a DCF calculation when establishing the FMV of Eemshaven. Moreover, the DCF is based on fundamental and accepted principles of financial economics.⁴⁹
36. In the GAR Guide to Damages, the authors note that “[t]he income approach [implemented through a DCF valuation] is the usual starting point for the valuation”.⁵⁰ The authors point out that the income method, as implemented through a DCF model, allows the valuer to take into account the specific characteristics of the asset.
37. In another chapter of the GAR Guide, the author notes that:
46 For example, in a presentation on power plant economics, Alstom - a maker of equipment for the electricity sector – discussed alternative methods of evaluating power plant economics, and concluded that the DCF "method is preferred by economists and [power plant] developers". Exhibit BR-22, Alstom, Power Plant Economics, 2006, pp. 8-9. ↩
47 For example the chapter on 'Expropriation and unilateral alterations or termination of contracts' in the World Bank's 'Guidelines on the Treatment of Foreign Direct Investment note that "such determination [of FMV] will be deemed reasonable if conducted as follows: (a) for a going concern with a proven record of profitability, on the basis of the discounted cash flow value". See Exhibit BR-23, World Bank, "Guidelines on the Treatment of Foreign Direct Investment," Foreign Investment Law Journal, Chapter IV Expropriation and unilateral alterations or termination of contracts, 1992, p.304. ↩
48 Graham and Harvey (1999), for example, surveyed 392 Chief Financial Officers on the practices used to evaluate real asset investments and found that the two most popular techniques were the DCF and the Internal Rate of Return approaches. See Exhibit BR-24, Graham, J.R. and Campbell R.H., "The Theory and Practice of Corporate Finance: Evidence from the Field", Journal of Financial Economics, dated 10 December 1999, pp. 197-201. ↩
49 Leading corporate finance specialists support the DCF as the preferred valuation methodology for income-earning assets. For instance, Reilly and Brown (2004) recommend this valuation methodology stating: "These discounted cash flow valuation techniques are obvious choices for valuation because they are the epitome of how we describe value: that is, the present value of expected cash flows." See Exhibit BR-25, Reilly, F., Brown, K.C., Investment Analysis & Portfolio Management, Chapter 11: An Introduction to Security Valuation, Seventh Edition, Thomson Southwestern, 2003, p. 378 Similarly, Copeland, Koller and Murrin (1994), in their leading textbook on valuation, state that: "The DCF approach captures all the elements that affect the value of the company in a comprehensive yet straightforward manner. Furthermore, the DCF approach is strongly supported by research into how the stock markets actually value companies." See Exhibit BR-26, Copeland, T., Koller, T., Murrin, J., Valuation Measuring and Managing the Value of Companies, Second Edition, John Wiley & Sons, Inc., 1994, p. 70. ↩
50 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 198. ↩
[Page 15]
“In fact, the DCF method is the most common methodology used in valuation analyses involving assets in the energy and natural resources industries (as well as most other industries). First, it is widely supported by professional literature, and its workings are well understood. Indeed, most investors rely on a DCF analysis to determine whether or not to undertake a particular project. Second, the DCF approach is a widely accepted method to estimate damages and fair market valuations in international disputes; in many energy and mining cases panels have adopted the DCF method without hesitation.”⁵¹
38. With regard to the acceptance of DCF models by Tribunals and Courts, a 2015 ICSID award noted that "[T]he DCF method is widely accepted as the appropriate method to assess the [fair market value] of going concerns.”⁵²
39. A DCF method is particularly appropriate to establish the FMV of Eemshaven, because Eemshaven was, at the valuation date, an operating asset. Its technical characteristics, for example how costs vary with the level of electricity production – were well understood, as were its main revenue drivers. In particular, as we explain in more detail in Sections IV to VI below, the data needed to project its revenues and costs were readily available. In particular, to determine the plant's key revenues and costs, the forward prices and forecast prices of the relevant commodities were available, as was data on the volatility of prices of these commodities.
40. Given that, by construction, DCF models can integrate a wide array of assumptions, interactions, and probabilities, the DCF method permits us to account for all relevant value drivers in an objective and transparent manner, including the effect of different possibilities about the future development of commodity prices.
41. In this section, we explain the alternative methods for valuing Claimant's losses that we considered, but ultimately rejected.⁵³
51 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, pp. 358-359, emphasis added. The GAR Guide also notes that "[a]s has been discussed in other chapters of this book, the discounted cash flow (DCF) model has become an established tool in calculating damages claims in international arbitrations." (p.232). ↩
52 Exhibit BR-27, Quiborax S.A. v. Plurinational State of Bolivia, ICSID Case No. ARB/06/2, Award, dated 16 September 2015, ¶ 344. ↩
53 For a discussion of alternative valuation methods, see Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 29-49. ↩
[Page 16]
42. One sub-category of the “market” approach to valuation is to look at share price movements. RWE AG, the ultimate parent of RWE Eemshaven, has shares that are publicly traded, and the prices of which are readily available. Hence, looking at changes in the RWE AG share price around October 2017 could have been one way to measure the loss in value resulting from the Coal Ban. However, in the present case an analysis of RWE AG's share price will not yield a reliable estimate of loss for several reasons.
43. First, our instruction was to take a Valuation Date immediately before the Coal Ban had any effect on the value of Eemshaven and also to consider the full effect of the Coal Ban. In practice, the probability that the Coal Ban would become law, and, particularly, that there would be only very limited compensation for the early closure of Eemshaven, increased between October 2017 and the end of 2019. Hence, the effect of the Coal Ban on RWE's share price increased gradually over the period between October 2017 and the end of 2019, when the Coal Ban entered into law. During the period between October 2017 and January 2020 there were many other events that caused RWE's share price to change. These events mean that it is not possible to discern the effect of the Coal Ban on the share price over such an extended period.
44. Moreover, RWE AG is active in a wide range of geographic and product markets, and its share price represents the sum of the value of all of these diverse activities. Hence, untangling the various influences on RWE AG's share price over time would inevitably result in precisely the kind of DCF valuation exercise that we have undertaken.
45. Second, even if RWE AG's share price was only influenced by developments in the Dutch electricity market, its movements would have reflected not only the losses resulting from the Coal Ban, but also investors' expectations that the Dutch government might compensate the Claimant for its losses. If the market expected Eemshaven would receive some compensation, then any change in the share price would underestimate the losses resulting from the Coal Ban. For example, while RWE's 2017 financial accounts mentioned the Coal Ban for the first time, as of that date RWE could not be certain what, if any, compensation it would receive.⁵⁴ Accordingly, we conclude that an examination of changes in RWE AG’s share price is not informative for an evaluation of the Claimant's loss.
54 "In mid-October 2017, the new Dutch government concluded its coalition agreement. [...] One objective is for the country to stop generating electricity from coal completely by 2030. [...] At present, it is impossible to predict the ramifications of the coalition agreement for the energy sector, as a lot depends on the details of the climate protection package." See Exhibit BR-28, RWE, Annual Report 2017, p. 36. ↩
[Page 17]
46. Another sub-category of the “market” approach to valuation is to look at comparable transactions. A comparable transactions approach is only possible if assets similar to the asset being valued were sold around the valuation date.
47. In the current case, a comparable coal-fired plant would need to have been sold around October 2017. The ‘comparable' plant would need to have been recently completed, because otherwise it would be less efficient and have a shorter life than Eemshaven, leading to an underestimate of the loss in value. It would also need to have been located in the Netherlands or a market in which electricity prices were very similar to the Netherlands, as otherwise its future revenues, and therefore value, might differ significantly from those for Eemshaven. Similarly, a sale before or after the valuation date could mean that the value of the 'comparable' plant did not correspond to the value of Eemshaven as of the valuation date.
48. No sales of Dutch coal plants took place in the autumn of 2017. ENGIE sold its coal plants in the Netherlands and Germany in April 2019.⁵⁵ However, that sale took place eighteen months after the Coal Ban had been announced. Hence, the transaction price for the ENGIE plants will reflect the expected value of the plants with the Coal Ban in place as of April 2019 and may take into account some expectation of compensation. Accordingly, this transaction will not provide an accurate estimate of the loss in value for Eemshaven resulting from the Coal Ban.
49. We understand that in early December 2020, RWE AG accepted compensation from the German government for the expected early closure of the Westfalen and Ibbenbüren power plants in Germany. The Westfalen plant has a similar design and was completed at around the same time as Eemshaven. However, Ibbenbüren is significantly older than either Eemshaven or Westfalen, and so is not comparable to either.
50. This point aside, there are a number of reasons why it is not possible to estimate the Claimant's losses from the early closure of Eemshaven from the compensation it received for Westfalen/Ibbenbüren. We discuss three such reasons below.
51. First, Eemshaven operates in a different market than the Westfalen/Ibbenbüren plants, and Dutch wholesale prices have consistently differed from those in Germany.
52. Second, the years of lost production for Eemshaven and the German plants differ, and so are not comparable. Specifically, the compensation for lost electricity production in Germany
55 Exhibit BR-29, S&P Global Platts, Engie sells 2.3 GW German, Dutch Coal Plants to Riverstone Holdings, dated 26 April 2019. ↩
[Page 18]
was for the [Redacted]-year period [Redacted]. It is not meaningful to compare lost profits in this period to lost production for the 25-year period 2030 to 2054. It is clear from our modeling that prices develop very differently [Redacted]. The longer time horizon in our valuation creates the possibility for a wider range of outcomes, including higher value cases that are less likely to occur in the period [Redacted].
53. Third, due to differences between the valuation dates for Eemshaven (October 2017) and for Westfalen and Ibbenbüren ([Redacted]), values are also expected to be different due to a variety of factors, including developments in commodity prices.
54. These three examples illustrate why the compensation that RWE received for the closure of its German plants is not a good guide to the loss of value for Eemshaven as a result of the Coal Ban.
55. A third valuation approach would be to value Eemshaven based on its historical earnings – so in other words, to assume that past earnings are representative of future earnings.
56. Looking at historical profitability can be a useful guide to future profitability for a process with stable input and output prices. However, it makes little sense for a coal-fired power plant, where the prices of both inputs and outputs can vary very significantly, even over short periods. Hence, for coal-fired plants, past profits or losses provide only a limited guide to expected future profits or losses. Valuing Eemshaven based on past profits would be equivalent to assuming that future commodity and electricity prices will be the same as the average commodity prices over the last few years. There is no reason to think that this will be the case. A rational buyer would value a coal-fired power plant considering its future cash flows, not its historical profits.
57. We also note that, as of the October 2017 Valuation Date, Eemshaven had only been in operation for one complete year, calendar year 2016. It would be unreasonable to use data from a single year to benchmark projected operations for the following 37 years. Moreover, we understand that the typical teething issues associated with a new plant affected may have affected 2016 operations.⁵⁶ Specifically, as we explained in section VI.A.5, Eemshaven's total operating costs were higher in 2016 and 2017 than they were forecast to be in subsequent years.
56 We rely on historical information from 2016 and 2017 to allocate RWE's costs across subcategories, such as maintenance and staff. We expect the cost allocation to remain relatively similar over time. ↩
[Page 19]
58. A fourth valuation approach, the cost approach, would involve looking at the replacement cost of Eemshaven, or some other measure of cost such as its net book value (NBV).⁵⁷
59. The cost of replacing Eemshaven could provide a ceiling for damages.⁵⁸ However, in this case it will not provide an accurate measure of the loss in value. RWE spent around €3.2 billion in constructing Eemshaven.⁵⁹ Yet, RWE has recognised that the actual value of the plant – even absent the Coal Ban – was lower than its construction cost. Accordingly, to reflect this, RWE booked a tax-deductible impairment of [Redacted] in [Redacted].⁶⁰ In other words, even before the Coal Ban, the Eemshaven plant was worth significantly less than its replacement cost. Moreover, replacement value is more often used where there is a claim of direct expropriation. We understand that this is not the Claimant's claim.
60. RWE reached a bilateral agreement (“VSO” or “Vaststellingsovereenkomst”) with the Dutch Tax Authorities that the tax book value of Eemshaven was of [Redacted].⁶¹ This value would represent a more accurate estimate of the plant's value than the replacement cost.⁶² This is because the tax book value reflects the impairment discussed above. However a DCF model will result in a more accurate estimate of the loss in value than relying on book values. This is because, as outlined above, the DCF can account for the specific losses Claimant experienced as a result of the Coal Ban.
61. We also note that RWE recorded impairments for Eemshaven in [Redacted]. However, these impairments are not relevant to an assessment of Eemshaven's FMV in October 2017. An impairment is a one-off change in a plant's lifetime value. For example, some of the impairments that RWE recorded related to [Redacted].
57 Net book value refers to the value of a an asset recorded in the accounts, such as a plant or a building, after taking into account the building's loss of value due to economic obsolescence and technical depreciation. ↩
58 Analysts refer to this as the Depreciated Replacement Cost of DRC. The reference to depreciation means that the replacement asset should be in the same state or age as the original asset. So in the case of Eemshaven, as of October 2017 the plant would be about two years old. Hence, the DRC would be slightly lower than the New Replacement Value. Exhibit BR-30, Royal Institute of Chartered Surveyors (RICS). Depreciated Replacement Cost Method of Valuation for Financial Reporting, London: 1st Edition, November 2018, p. 4. ↩
59 Harris-Hesmondhalgh Workpapers, Tables G - Investments Model, Table G6. ↩
60 Harris-Hesmondhalgh Workpapers, Tables G - Investments Model, Tab 'Blad 1', Tax View Section. ↩
62 Eemshaven's book value was [Redacted] at the end of [Redacted]. See Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab 'Blad1'. Hence, the book value would be slightly higher as of the valuation date, as less deprecation would have occurred. ↩
[Page 20]
[Redacted]. Accordingly, impairments in [Redacted] do not imply that the value of Eemshaven will continue to decrease, or that future impairments will be needed. In our forecasts, we have already accounted for the circumstances as of October 2017 – [Redacted] – that were partially responsible for the impairments.
62. The International Valuation Standards set out the five key steps for a DCF model as follows:⁶³
63 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 37-38. ↩
64 Companies pay taxes based on current year, nominal cash flows. Moreover, depreciation, which is also calculated based on nominal investment values, impacts the taxable base of a company. ↩
65 'Explicit period' refers to the period over which cash flows are modelled explicitly – so there is a value calculated for each year - rather than being included in a terminal value calculation. ↩
66 Eemshaven would close by the end of 2054. However, we extend the analysis to consider 2055, because there are some expenses that a power plants needs to incur after ceasing operations. We discuss these expenses in more detail in Section VI.B below. In terms of modelling, we focus on the period from 2020 to 2055 since it is the period most relevant for the Claimant's damages. ↩
[Page 21]
63. Finally, all the discounted cash flows from all future years must be added together to determine their overall 'present value' and hence a value for Eemshaven on which informed and willing buyers and sellers could agree, namely the FMV.
64. To forecast cash flows as of October 2017, we start by forecasting so-called 'commodity margins' for each year. The commodity margin is the difference between the revenues the plant is expected to earn from generating and selling electricity, and the variable costs associated with generating that electricity.⁶⁸ The latter mainly consists of commodity costs, namely costs for coal, CO₂, and biomass. These commodity costs (plus those for gas) are also key factors influencing electricity prices, since they determine the costs of producing electricity for all the other fossil-fuel powered plants operating in the market.
65. The commodity margin of a plant in any given period typically determine when it will operate since, all other things being equal, it only makes sense to operate when the commodity margin is positive. We therefore use our forecasts of commodity margins to forecast how Eemshaven would operate i.e. at what times and what output levels it would be likely to be dispatched in each year. In this way, we determine the revenues and variable costs of the plant that are used in the financial model to determine the plant's FMV.
66. More specifically, as shown in Figure 3, to forecast Eemshaven's future cash flows as of October 2017 we adopt a three step process that we explain in more detail below.
67 See Section VI.C below. See also Harris-Hesmondhalgh Workpapers, Tables F - Cost of Capital. ↩
68 A variable cost is a cost that varies directly with output. For example, coal is a variable cost for Eemshaven, as every MWh of output requires a specific amount of coal to generate. ↩
[Page 22]
FIGURE 3: OUR THREE-STEP CALCULATION OF FREE CASH FLOWS
[Diagram showing a three-step process]
100 price paths for coal, gas and CO₂.
Step 1: Commodity price models (Price path simulation)
Step 2: European electricity market modelling, Plant Dispatch optimisation
Step 3: Financial modelling (Discounted free cash flows)
Commodity margin paths (100 in But-For and 100 in Actual)
67. First we forecast commodity prices, and specifically prices for gas, coal and CO₂ permits. We use market-based forward curves and third party price forecasts to derive future commodity prices. Section IV of our report describes this process.
68. We recognise that there is not only one plausible path describing the future development of commodity prices out to 2054. We also recognise that there are some plausible commodity price paths under which Eemshaven's costs would have been expected to be too high for it to operate profitably. Under these price paths, Eemshaven might close before 2054 even absent the Coal Ban. However, there are also many other plausible commodity price paths under which Eemshaven would generate significant profits but-for the Coal Ban. To quantify and bound this range of outcomes, we have modelled 100 alternative price paths for each commodity.
69. The generation of multiple commodity price paths is an example of a 'Monte Carlo' simulation. A Monte Carlo simulation is a mathematical technique that generates random variables for modelling risk or uncertainty of a given system – in this case future commodity prices in the Netherlands. We describe this method in further detail in Section V.
70. Monte Carlo simulations are a widely accepted way of simulating variables for which a range of plausible values exist. For example, in May 2020 the European Commission (EC) approved the compensation the Dutch government offered to Vattenfall for the early closure of the
[Page 23]
Hemweg plant.⁶⁹ The EC noted that “[t]he compensation amount has been calculated as the present value of the net expected annual cash flows”⁷⁰ and that:
“Expected gross margins have been estimated by multiplying the expected production volumes –based on past unplanned unavailability rate - with expected hourly power prices coming from Vattenfall internal Monte Carlo "BOFIT" model."⁷¹
71. The EC's decision underlines both that other large operators such as Vattenfall apply Monte Carlo simulations in their plant valuations, and that the EC, as well as the Dutch State, accepted this valuation methodology. Major corporate finance textbooks also confirm Monte Carlo simulation as a way to model a range of outcomes. For example, in a book on the computational aspects of financing, Prof. Levy notes that:
“Monte Carlo simulation and random number generation are techniques that are widely used in financial engineering as a means of assessing the level of exposure to risk. Typical applications include the pricing of financial derivatives and scenario generation in portfolio management.”⁷²
72. Second, we have to estimate what electricity prices result from those commodity prices, taking into account how the mix of power plants in the Dutch system will likely change over time and what the demand for electricity is likely to be. To do this, we use a computer model of the entire European electricity market, to predict the electricity prices that would result from the forecast commodity prices (see Section V). In essence, as explained above, the price of electricity at any moment depends in large part on the generating plant available, the demand for electricity, and the cost of the commodity inputs needed to generate the electricity. The model combines these factors to determine electricity prices over the relevant period. Given the electricity and commodity prices, we then model the revenues that Eemshaven would have earned, and the variable costs it would have incurred from generating electricity.
73. Third, we need to calculate Eemshaven's cash flows from our estimates of its future revenues – based on electricity prices and plant output – and operating and capital costs.
69 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020. ↩
70 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020, p. 3. ↩
71 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020, p. 4 emphasis added. ↩
72 Exhibit BR-3, Levy, G., Computational Finance Using C and C#, Quantitative Finance Series, 2008, p. 50. ↩
[Page 24]
We deduct fixed operating costs from the commodity margins, as well as investments and taxes, to arrive at cash flows. In this way, we create 100 cash flow paths and, hence, 100 simulations of the future profitability of Eemshaven.
74. Above, we noted that some commodity price paths might, at some point, result in potential losses for Eemshaven. However, it is important to recognise that Eemshaven can limit the effect of any negative commodity price paths by ceasing operations. It is reasonable to expect that RWE would do so in a scenario in which Eemshaven's operation is expected to result in continuing losses – although importantly, by closing the plant RWE would also terminate the option to enjoy positive profits at some future date, should commodity prices move in a favourable direction. Hence, the value of the plant is not simply the average of a number of positive and negative price paths, because we can largely eliminate negative outcomes by closing the plant.
75. For example, suppose that in 60% of simulations Eemshaven made a profit of 20 (arbitrary units), and in 40% of simulations the plant would, if it continued to operate until 2054, make a loss of 30. Without the option to close, the expected profit would be 40% x -30 + 60% x 20 = 0.
76. However, the losses in the unfavourable cash flow paths can largely be eliminated by closing Eemshaven before 2054.⁷³ Accordingly, the expected profit would actually be 40% x 0 + 60% x 20 = 12. The ability to largely eliminate losses in simulations with unfavourable cash flow paths means that Eemshaven suffers a loss in value as a result of the Coal Ban, even if the plant would make losses if it continued operating to 2054 in some of the simulations.
77. We discount the free cash flows to October 2017, to calculate their present value as of that date and, hence, the FMV of the plant. We calculate the cash flows and FMVs under the actual and but-for cases for each of the 100 commodity price paths. Section VI explains this process in more detail.
78. Finally, to calculate the loss of Fair Market Value, we compare the 100 pairs of FMVs for the actual and but-for cases and so determine 100 estimates of the loss in FMV as a result of the Coal Ban. We combine these 100 results into a single figure in a statistically robust manner (see Section VII).
73 We say 'largely eliminate', because as we discuss in section VI.B, the plant may tolerate losses for some years to preserve the option to produce electricity and make profits if commodity prices develop favourably in the future. ↩
[Page 25]
79. To measure the Fair Market Value of Eemshaven, we must forecast the relevant commodity and electricity prices up to and including 2054. As we explain in the rest of this section, we have generated 100 different price paths for coal, gas and CO₂ prices. We use these commodity price paths to create 100 paths for electricity prices and we use the combination of the commodity and electricity price paths to determine Eemshaven's revenues and costs and, hence, its cash flows. We provide a detailed description of our methodology in Appendix B.
80. A wide range of commodity price developments is possible in the period up to 2054, particularly given the inherent volatility of commodity prices. Accordingly, simply considering one "central" commodity price scenario would not, in our view, provide a reliable estimate of the FMV of Eemshaven. Instead, we take into account the full range of possible commodity price paths.
81. One possible way to deal with the range of future commodity prices is to employ scenarios. For example, it is common to see demand or prices forecasts that feature ‘high', 'base' and 'low' scenarios. In more detail, scenario analysis consists of creating a series of alternative, internally coherent sets of assumptions – scenarios – and then assigning a probability to each scenario to arrive at a final damages estimate. Such an approach is commonly used when assessing the benefits of a particular course of action – for example, the purchase of a power plant - where it is important to understand what might happen in a worst case, what a very good outcome would look like, and what it is most reasonable to expect would happen.
82. When it comes to assessing damages, however, there are two main drawbacks to using scenario analysis. First, it is only feasible to construct a relatively small number of scenarios and these may be very different from each other so that under one scenario there may be no damages and under another there may be high damages. Consequently, simply averaging the results from the scenarios may produce misleading results particularly as a large number of alternative, equally plausible sets of assumptions are ignored. Perhaps more importantly, any attempt to overcome this problem by calculating a probability-weighted average is problematic because there is inevitably a high degree of subjectivity in assigning probabilities to each scenario.
[Page 26]
83. Due to these drawbacks, we prefer to generate alternative commodity prices paths using a probabilistic or “stochastic” approach, known in the field as a “Monte Carlo” analysis.⁷⁴ A stochastic approach focuses on a smaller number of key drivers and considers these in much greater detail, taking into account the volatility in their values based on data available as of the valuation date.
84. We illustrate what we mean by a stochastic analysis by explaining in general terms how we create price paths for a single generic commodity, as shown in Figure 4. We first need to create a distribution of all the possible prices that the commodity could have at a given time period - these are the vertical lines shown in red in the figure, which represent the distribution of prices from highest to lowest.⁷⁵ We then pick a random price from the distribution of all possible prices, using a random number generator.
FIGURE 4: CREATING STOCHASTIC PRICE PATHS
[Chart showing price paths over time]
Y-Axis: Commodity price (€/unit)
X-Axis: Valuation date, month₁, month₂, month₃, month₄, month₅, month₆, month₇, month₈
Legend: Mean, Sample price draw
85. To facilitate the selection of a random price, rather than calculate the probability associated with each monthly price shown schematically in Figure 4, we express the probabilities of individual prices occurring as a cumulative price distribution. In a cumulative price distribution, there is a zero percent chance of the commodity price being lower than the lowest price and a 100% chance that it will be lower than the highest price. In between these
74 See Appendix B for details. ↩
75 The shading underneath each line is simply intended to highlight the region of the distribution where it is most probable that a price will lie. ↩
[Page 27]
extremes, each possible price level will be associated with a particular probability that prices will be no higher than that level. For example, there might be a 10% chance that the commodity price will be lower than 5 €/unit, a 50% chance that it will be lower than 15 €/unit and a 90% chance that it will be lower than 35 €/unit. We then pick a value between 0% and 100% at random. The randomly chosen figure determines what price we assume for that time period and price path. For example, if our random choice was 50%, then we would assume a price of 15 €/unit and so on.
86. We repeat this procedure for each month and, in this way, build up a 'path' of prices over time. In terms of Figure 4, we start from a price as of the Valuation Date. We then pick a price at random from the cumulative distribution of prices derived from the price distribution shown for Month 1. We then pick a price for Month 2, randomly choosing a price from the cumulative distribution of prices derived from the price distribution for Month 2, and so on.
87. Based on the history of the relevant commodity price, there are limits on how much its price is likely to change from one month to the next. Technically, the degree to which prices can change between periods is known as their 'volatility'. As we move from one month to the next we have to add together the volatilities relevant to deliveries in the current month that arise in each of the preceding months. This means that the “width” (technically, standard deviation) of each month's distribution increases.
88. Moreover, the random choice for one month affects the range of choices for the next month. That is, the random choice of price for the previous month⁷⁶ reduces the available choices for the next month - the range of prices for the next period is not 0% to 100% of the cumulative price distribution. The range is primarily determined by our historical analysis of the volatility in month-ahead prices. Accordingly, we constrain price changes between periods so that they are consistent with the month-ahead volatility levels for the commodity that would have been expected as of the Valuation Date. If a commodity has had relatively stable prices over time, the extent to which its price is likely to change from one month to the next is quite limited. If its expected volatility is higher, then a much wider range of prices are possible for the next month. For example, suppose that we arrived at a price of 20 €/unit for one month and the month-ahead volatility is 15%,⁷⁷ then, based on the characteristics of
76 In this context, by "previous” we simply mean the month immediately preceding the one being considered. Note that, broadly speaking, the very first month of the commodity price path will not have a price distribution, its price will equal the prevailing spot price. We discuss the methodology in greater detail in Appendix B.2. ↩
77 This is broadly consistent with the expected monthly volatility for gas and coal as of the valuation date. See Appendix B.2.ii. ↩
[Page 28]
a log-normal distribution, we would know that there is a 95% probability that the price for the next period would be between 14.90 €/unit and 26.80 €/unit.⁷⁸
89. We create each price path in exactly the same way, starting from an initial price which is either fixed (the day-ahead price for gas prices) or only has a very narrow distribution (due to the volatility in month-ahead prices for coal prices) and then randomly choose prices, within the constrained range, for each subsequent month. Our final step for gas prices is to use historical data on the volatility of day-ahead prices to create daily prices from the monthly price paths that we have created.
90. The following sub-sections explain how we created the price distributions for coal, gas and CO₂ prices. In Section III.E above, we explain that to model electricity prices, we require forecasts of both electricity demand and the plants that will be available to generate electricity. We could also have treated these inputs stochastically, just as we do commodity prices. However, we concluded that it was not necessary to do so, except with respect to variations in the balance between renewable and fossil-fired generation. The relative prices of gas, coal and CO₂ are the main determinants of the electricity generation that Eemshaven could produce and the free cash flows that the generation would create. Variations in the demand and the fossil-fuelled plant mix will have a much smaller effect on the profitability of Eemshaven and these variations are, in any event, much less volatile than commodity prices. Accordingly, stochastically modelling the capacity of each plant type and demand would have significantly complicated the calculations, without delivering a material increase in the accuracy of the results.
91. We derive our coal and gas price paths from the following data:
78 This confidence interval follows from the model's assumption that prices follow a log-normal distribution, under the simplifying assumption that there is no change in the mean (expected) price. Note that simply adjusting the price up and down by the volatility factor (3 €/unit = 20 €/unit x 15%) does not yield a 95% confidence interval. Although the volatility indicates limits on typical changes in prices, such changes can significantly exceed this level. It is necessary to rely on the statistical properties of log-normal distributions to arrive at the confidence interval. ↩
79 A forward price is simply the price for which gas or coal for delivery during a future period can be purchased on a given day. ↩
[Page 29]
92. For short- to medium-term coal and gas prices, we have relied on forward curves.⁸⁰For long-term coal and gas prices, we rely on IEA 2016 World Energy Outlook, which was published in November 2016, since it is the last long-term commodity price forecast produced by an independent, widely respected, international institution before the valuation date.⁸¹ From the 2016 World Energy Outlook, we have selected the New Policies scenario which forms the IEA's central case. The projections are only provided for spot years – in this case 2020, 2030 and 2040. For the years between 2020 and 2030 and again between 2030 and 2040, we have simply assumed a linear progression from one data point to the next (“linear interpolation") to derive annual prices. After 2040, we have projected annual prices starting from the value of prices in 2040 and updating for inflation.⁸²
93. We note that the IEA scenarios were developed after the Paris Agreement on climate change had been reached, stating that "[t]he goals set out in Paris, and the measures that governments have announced to achieve them, significantly influence the projections in this year's WEO”⁸³ and “the underlying assumptions have been reviewed carefully to reflect the post-Paris expectations for international co-operation on climate change”.⁸⁴ The IEA also says that the New Policies scenario “incorporates existing energy policies as well as an assessment of the results likely to stem from the implementation of announced intentions, notably those in the climate pledges submitted for KOP21”.⁸⁵
94. The volatility of coal and gas prices is a key driver of the range of prices that it is reasonable to consider for the future. In line with standard practice, we assume that their volatility, as of the valuation date, is a reasonable predictor of their future volatility and therefore we
80 Specifically, we rely on forward curves from July 2017. Anyone carrying out a Fair Market Value assessment as of 9 October 2017 would have had to begin their modelling several months earlier and it is for this reason that we rely on forward prices from July 2017 rather than October 2017. In any event, the difference between the July and October forward prices for the period beyond to 2020, which is the first year that we model, is minimal. ↩
81 None of the institutions whose forecasts we would consider using, such as the EC or the European Network of Transmission System Operators - Electricity, published scenarios in 2017. ↩
82 The IEA forecasts are of spot prices, so prices for immediate delivery, rather than forward prices. Forward prices and spot prices converge as the time to delivery for the forward product shortens but they are generally not identical. The theory underlying the stochastic model that we use to generate the price paths requires the forecast to be of forward prices, which is then converted into different possible spot price paths. Accordingly, we converted the IEA spot prices into an equivalent set of forward prices using standard techniques to make this conversion, see Appendix B.2.i for details. ↩
83 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 32. ↩
84 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p.33. ↩
85 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 31. ↩
[Page 30]
have based our volatility analysis on data from 2013 onwards.⁸⁶ We need information on the volatility of prices in both the short-term (a few months from any given starting point) and the longer term (up to several years into the future) – this is known as a “term-structure”. Prices tend to be more volatile in the short-term than they are in the long-term, because the market participants generally consider that over the longer term there will be time for the market to recover from the effects of a short-term shock. Incorporating a term structure for volatility enables us to capture this effect.
95. Gas and coal prices do not move entirely independently of each other. This is hardly surprising since the two fuels are often substitutes for one another: if gas prices increase, making the use of gas less economic, then coal prices may also rise as coal is used instead of gas. However, the correlation is not perfect for a number of reasons, such as:
96. As with the volatility of each commodity price, and again in line with standard practice, we rely on the historical information on the short and longer term correlations between coal and gas prices as a reasonable prediction for their future correlation.
97. Values for the forward and forecast prices for coal and gas, the volatility term structure of coal and gas prices and the correlation term structure between gas and coal prices are the only parameters we need to derive a set of 100 appropriately correlated spot price paths for these commodities. The precise method that we use is described in Appendix B.2 but the outcome of the process is shown in Figure 5 and Figure 6 below. The solid dark blue line in these figures represents the mean or average of the price paths on each day, whilst the light blue line represents the median – on any day, 50% of the price paths will have a price higher than the median and 50% will have a lower price. The top end of the dark grey band shows the 26th highest daily price and the bottom end of the dark grey band shows the 75th highest daily price. Similarly, the top end of the light grey band shows the 6th highest daily
86 2013 was the start of the third phase of the EU Emissions Trading Scheme. Since this phase had significantly different implications for power plants than the first two phases, we considered that the relationship between coal and gas prices might have changed at this point and, hence, that it would not be reasonable to extend our analysis further back in time. ↩
[Page 31]
price and the bottom end of the light grey band shows the 95th highest daily price. Both figures indicate that the bulk of the price paths lie within a reasonably narrow range for most of the period⁸⁷ but that there are some more extreme paths, particularly on the high price side.
87 For example, for gas prices, the annual average differences between the 75th percentile price and the 26th percentile price are [Redacted] €/MWh in 2025, [Redacted] €/MWh in 2030, [Redacted] €/MWh in 2040 and [Redacted] €/MWh in 2050. See Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_charting'. ↩
[Page 32]
FIGURE 5: GAS PRICE PATH DISTRIBUTIONS⁸⁸
[Chart Redacted]
Y-Axis: Gas price distribution (€/MWh)
X-Axis: 2017 2020 2023 2026 2029 2032 2035 2038 2041 2044 2047 2050 2053
Legend: 6th to 95th percentile, 26th to 75th percentile, Mean, --- Median
FIGURE 6: COAL PRICE PATH DISTRIBUTION⁸⁹
[Chart Redacted]
Y-Axis: Coal price distribution (€/tonne)
X-Axis: 2017 2020 2023 2026 2029 2032 2035 2038 2041 2044 2047 2050 2053
Legend: 6th to 95th percentile, 26th to 75th percentile, Mean, --- Median
[Page 33]
98. The gas and coal prices shown in Figure 5 and Figure 6 are for the Dutch market. However, we also need coal and gas prices for other European markets because these are included in the electricity market model we use to project Dutch electricity prices. We assume that gas and coal prices for other markets can be derived from the Dutch gas and coal prices by adding on reasonable estimates of the costs of transporting the fuels from the Netherlands to the relevant market.
99. Our approach to creating CO₂ price paths, is different to the approach we have used for gas and coal price paths. This is because CO₂ prices are driven more by policy decisions than by market forces. Specifically, the CO₂ price changes according to the number of CO₂ permits that are available each year. Whilst the general direction of the EU's climate change policy is known - the number of permits will be decreased over time – the precise trajectory that will be implemented is not yet fixed until 2054. There remains the possibility that additional measures will be introduced if the level of CO₂ emissions is not considered to be falling fast enough. For this reason, we have not included any correlations between CO₂ prices and coal/gas prices. In addition, as discussed above, coal prices tend to be global prices and so will not be affected to any significant degree by what happens to CO₂ prices in Europe since the European coal market is relatively small in global terms.⁹⁰
100. We start from the forecasts contained in the same IEA report on which we rely for coal and gas prices.⁹¹ In this case we rely on two of the scenarios contained in the report (the “450” and New Policies scenarios),⁹² instead of only one (New Policies) as in the case of the coal and gas price paths. This is because the IEA CO₂ price scenarios reflect different policy developments that were considered possible at the valuation date and so we use them to
88 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_chart'. Note that 'Commodity' in Table D.2.1 needs to be set to 'Gas' and VBA macro needs to be re-run. ↩
89 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_chart'. Note that 'Commodity' in Table D.2.1 needs to be set to 'Coal' and VBA macro needs to be re-run. ↩
90 According to the BP Statistical Review of World Energy 2020, in 2017 Europe accounted for only 8.5% of global coal consumption, and by 2019 its share had fallen to 7.2%. Exhibit BR-33, BP, Statistical Review of World Energy, 2020, p. 47. ↩
91 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 45, which was published in November 2016 and so was the latest IEA forecast available. ↩
92 There is a third scenario, Current Policies, but the CO₂ prices under this scenario are very close to those under the New Policies scenario. Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 39. ↩
EXPERT REPORT: DAMAGE CAUSED TO EEMSHAVEN BY THE COAL BAN
RWE AG and RWE Eemshaven Holding II BV vs.
Kingdom of the Netherlands
ICSID Case No. ARB/21/4
|
PREPARED BY Dan Harris |
PREPARED FOR RWE AG and RWE Eemshaven |
18 DECEMBER 2021
Brattle
[Page i]
This report was prepared for RWE AG and RWE Eemshaven Holding II B.V., in accordance with The Brattle Group's engagement terms with RWE Generation Holding B.V., and is intended to be read and used as a whole and not in parts.
The report reflects the analyses and opinions of the authors and does not necessarily reflect those of The Brattle Group's clients or other consultants.
There are no third party beneficiaries with respect to this report, and The Brattle Group does not accept any liability to any third party in respect of the contents of this report or any actions taken or decisions made as a consequence of the information set forth herein.
[Page ii]
TABLE OF CONTENTS
[Page iii]
Appendix F : Adjustments to Eemshaven’s data for tax reporting ............................... 170
[Page iv]
TABLE OF TABLES
Table 12: Average efficiency by plant type in 2020 for the netherlands and Germany ......... 144
[Page v]
TABLE OF FIGURES
Figure 15: Sorted distribution of the loss in value of Eemshaven due to the Coal Ban ............ 77
[Page vi]
Figure 46: Depreciation and impairment assuming full operations 2010-2054...................... 174
Figure 48: Depreciation and impairment assuming full operations 2010-2029 ...................... 175
[Page 1]
1. On 10 December 2019, the Dutch government approved a law to prohibit the use of coal for generating electricity by 2030 at the latest (the “Coal Ban”).¹ The law affects RWE AG and RWE Eemshaven Holding II B.V. (“RWE Eemshaven”, collectively “Claimant") because Claimant owns a Dutch coal-fired plant, Eemshaven, which will have to close at the end of 2029 as a result of the Coal Ban. RWE Eemshaven is a subsidiary and group company of RWE AG (when referring to the RWE group of companies, “RWE”). Without the Coal Ban, Eemshaven could technically continue operating until the end of 2054. Counsel for the Claimant, Luther Rechtsanwaltsgesellschaft mbH, has asked Brattle to estimate the damages the Claimant has suffered due to the change in the value of the Eemshaven plant as a result of its enforced early closure. Accordingly, Eemshaven is the object of our valuation.
2. In making our damage calculations, Counsel for Claimant have provided us with the following instructions:
1 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
2 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017. ↩
[Page 2]
3. Our names are Dan Harris and Serena Hesmondhalgh. Mr Harris has been a consultant focused on the energy sector for twenty years and Dr Hesmondhalgh for over thirty years. We are both experts in the economic and financial analysis of the energy sector, particularly in the analysis of large capital investments such as natural gas pipelines, power stations, electricity transmission lines, distribution networks, and refineries. We have both provided expert witness testimony on damages in many arbitrations and court cases concerning such energy sector investments. Between us, we have provided expert testimony in ECT, ICC, LCC, SCC, and UNCITRAL arbitrations. Appendix A contains our CVs.
4. We understand that our duty in this case is to inform the Court of our independent professional opinions, based on our experience and understanding of the facts in this case. We do not offer any opinion on the legal merits of the claims. We are committed to expressing our full opinions, even those aspects that might not favour the commercial interests of the Claimant. The Brattle Group has worked for subsidiaries of the RWE group, but not the Claimant specifically, on three occasions in the last ten years, but has no ongoing relationship with RWE, its subsidiaries, or its legal advisors other than the work we are doing for RWE in relation to the Coal Ban. RWE Generation Holding B.V. is compensating The Brattle Group for our analysis and for the work of our supporting team of economists. The compensation is based on The Brattle Group's standard hourly rates applied to the time dedicated to the analysis, and does not depend in any manner on the outcome of the dispute.
5. Section I.D summarises our findings and conclusions. The relevant factual background to the case is provided in Section II, whilst we provide an overview of our framework for estimating damages in Section III. The remaining sections, Sections IV to VII, go through each of the
[Page 3]
steps of our damages framework, and present damages calculations inclusive of interest. Finally, in section VIII, we comment briefly on the possibility of Eemshaven's remaining open after 2030 by converting to natural gas or 100% biomass.
6. Dr Hesmondhalgh has been primarily responsible for Sections IV and V and Mr Harris for Sections III.A to III.D, VI and VII. They are jointly responsible for the remaining sections.
7. To measure Eemshaven's loss in value as a result of the Coal Ban, we calculate the difference between the Fair Market Value of the plant “but-for” the Coal Ban, and the Fair Market Value with the Coal Ban in place, its “actual" value.
8. With the Coal Ban, Eemshaven can no longer burn coal from 1 January 2030.⁴ Hence, the plant will have to close by the end of 2029, since NERA finds that it would not be viable to continue operating using only unsubsidised biomass. Consequently, almost all the loss in value from the Coal Ban results from the Claimant's inability to operate Eemshaven beyond 2030.⁵
9. For both the actual and but-for cases, we determine the Fair Market Value of Eemshaven using the standard discounted cash flow (“DCF”) methodology. First, for each relevant year, we calculate free cash flows to the plant by subtracting fixed and variable operating costs, tax and capital expenditures from the plant's revenues.⁶ Second, we discount the free cash flows back to the valuation date, October 2017, using a discount rate that reflects the risk of the cash flows. Discounting reflects the fact that a euro today is worth more than a euro that is only available at some future date.⁷ The sum of the discounted free cash flows represents the Fair Market Value of the plant: what a willing and informed buyer would have been prepared to pay for Eemshaven as of the valuation date.
10. Eemshaven's free cash flows are, in essence, the difference between its revenues and its costs. In turn, Eemshaven's revenues depend on the level of electricity prices, which are
4 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
5 There are also some earlier cash flow effects, starting in 2020, which we take into account. These reflect different decisions regarding investments and tax payments between our but-for and actual cases. See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
6 Note that under our DCF approach, the cost of building Eemshaven is not relevant, since RWE has already incurred these costs i.e. they are "sunk". The capital costs therefore play no role in deciding whether to generate electricity on a given day or whether to continue operating the plant. ↩
7 For a more detailed explanation of discounting, see Section VI.C. ↩
[Page 4]
largely driven by the price of coal, gas and CO₂ (collectively “commodity prices”).⁸ The prices of coal and CO₂ are also the most significant drivers of Eemshaven's electricity production costs. Hence, with regard to both revenues and costs, commodity prices are the most important determinant of Eemshaven's free cash flows and value. Commodity prices fluctuate from day to day and, given the long time frame over which we have to forecast the free cash flows, we adopt a methodology which captures a full range of possible outcomes for commodity prices for that period so as to arrive at a robust damages estimate.
11. In more detail, we have carried out a probabilistic analysis of the likely development of commodity prices that is based on (a) our best estimate of future developments, (b) the volatility of each commodity price and (c) the historic correlation between movements in prices for the various commodities. Using this framework, we have created 100 different commodity price paths. This kind of exercise, also referred to as a Monte Carlo simulation, is a common way to capture a wide range of possible future outcomes.⁹
12. We have used these 100 commodity price paths to construct 100 'pairs' of free cash flow paths - each 'pair' consisting of one set of cash flows for the actual case (with the Coal Ban) and one for the but-for case (without the Coal Ban), both based on the same commodity price path. We then use a discount rate to calculate the present value of each pair of free cash flows, as of the valuation date. This results in 100 ‘pairs' of actual and but-for Fair Market Values, one ‘pair' for each commodity price path.
13. For each of the 100 commodity price paths, the loss in value of Eemshaven resulting from the Coal Ban is simply the difference between the Fair Market Value in the actual case, and the Fair Market Value of the but-for case. Hence, we calculate 100 estimates of loss in value that Eemshaven has suffered due to the Coal Ban. Note that, in the but-for case, if a commodity price path is unfavourable, it seems reasonable to suppose that the Claimant would curtail its losses by closing the plant. As a result, none of our estimates of the loss in value of Eemshaven is strongly negative.¹⁰ Hence, the value of the plant is not simply the average of a number of positive and negative cases, because the Claimant can largely eliminate negative outcomes by closing the plant. This ability to largely eliminate losses in cases with unfavourable commodity prices means that the loss in value for any commodity price path cannot be strongly negative and is generally either zero or positive.
8 See Sections IV.B and IV.C. ↩
9 See for example Exhibit BR-3, Levy, G., Computational Finance Using C and C#, Quantitative Finance Series, 2008, p. 37. Exhibit BR-4, Berk, J.B., DeMarzo, P.M., Corporate Finance, Third Edition, p. 1057. ↩
10 The loss in value can be negative because we assume that a decision to close the plant would only be made after two years of losses. ↩
[Page 5]
14. By construction, each of the 100 price paths is equally likely to occur. Hence, we could arrive at a final damages figure by simply taking the average of the plant's loss in value for each of the 100 price paths. However, a few of the price paths lead to a particularly high loss in value (damages). To ensure that the estimate of the loss in value is robust, we prefer to avoid a situation where a few cases have a very large effect on the damages claimed. Conservatively, we exclude from the average the price paths corresponding to the top and bottom 5% of the 100 damages outcomes. After removing these ‘outliers', then, we find that:
15. From an economic perspective, the Claimant's damages claim represents a reasonable cost for reducing carbon emissions. We calculate that, on average, closing Eemshaven at the end of 2029 will result in 210 million tons of avoided carbon emissions. ¹¹ Accordingly, the claim is equivalent to the Netherlands paying around €16 for each tonne of avoided carbon. ¹² This price is lower than the CO₂ price has been since mid-2018.¹³
11 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
12 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
[Page 6]
16. Eemshaven is the largest coal-fired plant in the Netherlands,¹⁴ with a nameplate net capacity of 1,560 MW, split between two identical 780 MW units (see Figure 1). The plant has an effective net capacity that varies by month [Redacted] depending on the external temperature.¹⁵ In normal operation, the Eemshaven plant requires around [Redacted] full-time equivalent staff.¹⁶
FIGURE 1: EEMSHAVEN POWER PLANT¹⁷
[Image of Eemshaven Power Plant]
14 Exhibit BR-5, Report of the Ministry of Economic Affairs, 2016. ↩
15 Harris-Hesmondhalgh Workpapers, Tables E.1 and E.2 – Dispatch Model, Tables E.1.2 and E.2.2. Note data in Workpapers represents one unit. ↩
16 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H29. ↩
17 Exhibit BR-6, Velatia Networks, Safe and Reliable, Goodbye to the Coal Power Plants in the Netherlands by 2030, dated 21 January 2019. ↩
[Page 7]
17. The maximum annual output of the plant is approximately [Redacted],¹⁸ enough to provide the electricity for around [Redacted] Dutch households,¹⁹ or roughly [Redacted] of the current Dutch population.
18. The plant opened in 2015 after [Redacted] years of construction works²⁰ and, in line with general industry expectations,²¹ it was expected that technically it could operate for 40 years – so until 2054. At present, Eemshaven operates using a mixture of hard coal and biomass.²² However, the plant's use of biomass is constrained by environmental permits which only allow Eemshaven to burn 800,000 tonnes of biomass per year.²³ The plant will only burn biomass when it expects it to be economically viable to do so. This is currently the case primarily because Eemshaven receives subsidies for any electricity it generates using biomass up to a limit of 1,788,889 MWh per year,²⁴ but these subsidies will cease after 2027.²⁵
19. In 2017, the total installed capacity of generating plants in the Netherlands was approximately 31.7 GW.²⁶ As shown in Figure 2, the majority of the plants (61%) were gas-fired, with coal-fired plants accounting for only 14.5% or 4.6 GW. Aside from one relatively small nuclear plant, the remaining plants produced electricity from renewable sources of various types.
18 This is based on average effective net capacity, [Redacted] days of maintenance per year and a forced outage rate of [Redacted]. See Harris-Hesmondhalgh Workpapers, Tables E.1 and E.2, Tables E.1.2 and E.2.2. ↩
19 According to Exhibit BR-7, CBS, Trends in the Netherlands 2018, Economy, the average consumption of electricity in Dutch households is over 2,900 kWh. ↩
20 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab 'Blad 1'. ↩
21 See, for example, Exhibit BR-8, International Energy Agency and Nuclear Energy Agency, Projected Costs of Generating Electricity, 2015 Edition, dated 30 September 2015, p.30. ↩
22 Exhibit BR-9, RWE, Eemshaven Power Plant ↩
23 Exhibit BR-10, RWE, Environmental Permit Eemshaven, dated 11 December 2007, pp. 90-92 for the granted request and Exhibit BR-11, KEMA Consulting, Application for Incorporation Permit, dated 20 December 2006, pp. 48-49 for the request details, see Table 3.1.2. ↩
25 Exhibit BR-12, National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy, dated 30 November 2016. We understand that, as of the valuation date, RWE expected that the subsidies would not start before May 2019 and that is what we have modelled. ↩
26 Harris-Hesmondhalgh Workpapers, Tables I - Other Supporting Analysis, Tab 'Breakdown of the Dutch Generation Capacity'. For more information visit: https://transparency.entsoe.eu. ↩
[Page 8]
FIGURE 2: BREAKDOWN OF DUTCH GENERATING CAPACITY IN 2017²⁷
[Pie Chart]
20. There were five operational coal-fired plants in the Netherlands in October 2017.²⁸ In addition to Eemshaven, RWE owned another coal plant, Amer-9. At that time, the other coal plants belonged to Uniper, Vattenfall, and ENGIE:
27 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. For more information visit: https://transparency.entsoe.eu, last accessed on 8 January 2021. ↩
28 Exhibit BR-13, Government of The Netherlands, The Future of Fossil Fuels. Prior to October 2017, additional coal-fired energy units operated in in the Netherlands. However, between 2016 and 2017, five units closed as a result of the Dutch Energy Agreement (Energieakkoord, 2013): Amer 8, Gelderland, Borssele, and Maasvlakte unit 1 and 2. See Exhibit BR-14, Final Report 2014-2019, Dutch Coal Covenant, pp. 10-13. ↩
29 Exhibit BR-15, Our power plants in the Netherlands - Uniper, last accessed on the 23 December 2020. ↩
30 Exhibit BR-16, Vattenfall, Vattenfall's Last Coal Power Plant in The Netherlands is Closing, dated 20 December 2019. ↩
[Page 9]
21. The possibility of a phase out of coal-fired plants was first raised in November 2015, when the Dutch parliament adopted a resolution calling on the cabinet to investigate such a phase out taking into consideration all the relevant advantages and disadvantages.³² However, the coal plant closure was opposed by the Dutch prime minister, who considered that it would result in electricity imports from brown coal plants, which would be more environmentally harmful than generating electricity from the modern Dutch hard coal plants, including Eemshaven.³³ As a follow up to the 2015 resolution, the Rutte II cabinet conducted an inquiry into the future of the Dutch coal plants, which considered several different possibilities. In January 2017, the cabinet concluded that closing the coal plants had many disadvantages and was not required to meet the CO₂-reduction aims set for 2020. It was only after the 2017 election and the formation of the Rutte III cabinet in October 2017 that a Coal Ban became sufficiently defined and probable that it would have affected the value of coal-fired plants in the Netherlands.³⁴
22. The political parties in the coalition released the Coalition Agreement on 10 October 2017, a document that reflects their policy priorities for the period 2017-2021. The Coalition Agreement includes a dedicated chapter on climate and energy that includes a commitment to close coal-fired power plants “by the end of 2030 at the latest".³⁵
23. On 20 December 2019, the prohibition on the use of coal for electricity generation came into force.³⁶ The law granted transitional periods for coal-fired plants during which they could continue to operate, with different transitional periods being specified according to the efficiency of the plant. For plants with an electrical efficiency above 44% - Eemshaven and
31 Exhibit BR-17, de Volkskrant, One of The Last Four Coal-Fired Power Stations in The Netherlands Wants to Close, dated 21 October 2020. ↩
32 Exhibit BR-18, Phys.Org, Dutch Lawmakers Approve Plan to Close Coal Power Plants, dated 26 November 2015. ↩
33 Exhibit BR-18, Phys.Org, Dutch Lawmakers Approve Plan to Close Coal Power Plants, dated 26 November 2015. ↩
34 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017pp. 42-43. ↩
35 Exhibit BR-2, 2017-2021 Coalition Agreement, Confidence in the Future, dated 10 October 2017pp. 42-43. ↩
36 Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
[Page 10]
the two Maasvlakte plants – the transitional period extends until 31 December 2029.³⁷ For less efficient plants, such as Amer 9, the transitional period ends on 31 December 2024. Hemweg 8 closed on 1 January 2020 because, unlike Amer 9, it does not burn biomass and so does not produce renewable heat or electricity. In return for this early closure, Hemweg 8 received compensation of €52.5 million.³⁸
24. We understand that the Dutch State has not provided Claimant with any financial compensation for the loss in Eemshaven's value resulting from the Coal Ban.
37 Article 3 of the Coal Ban Law, Exhibit BR-1, Minister of Economic Affairs and Climate, Electricity Production Prohibition Act, dated 20 December 2019. ↩
38 Based on its efficiency, the date by which Hemweg 8 could have originally expected to stop burning coal would have been the same as that for Amer-9, the end of 2024. However, the government brought forward its closure to 1 January 2020 and provided compensation to its owner, Vattenfall. Exhibit BR-19, European Commission Press Release, State Aid: Commission Approves Compensation for Early Closure of Coal Fired Power Plant in the Netherlands, Brussels, dated 12 May 2020. ↩
[Page 11]
25. As outlined above, we have been instructed to measure the change in the Fair Market Value of Eemshaven as a result of the Coal Ban. In this section, we:
26. We also outline the specific approach that we have taken to determining the cash flows used in the DCF model, including how we have accounted for risks and alternative future commodity price developments.
27. According to the International Valuation Standards, the Organisation for Economic Co-operation and Development (“OECD”) defines the “Fair Market Value” of an asset as “the price a willing buyer would pay a willing seller in a transaction on the open market.”³⁹ The International Valuation Standards also quote the definition of the United States Internal Revenue Service, which defines “Fair Market Value" as:
“the price at which the property would change hands between a willing buyer and a willing seller, neither being under any compulsion to buy or to sell and both having reasonable knowledge of relevant facts.”⁴⁰
28. Both definitions are substantively the same, and we adopt them in this report.
29. Alternatives to the FMV perspective include:⁴¹
39 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 23. ↩
40 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 23. ↩
41 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 21-22. ↩
[Page 12]
30. Hence, the relevant feature of adopting a FMV approach in this case is that we do not take into account any value associated with Eemshaven that is specific to it being owned by RWE, and would not accrue to a third-party buyer. Since operating a large coal-fired power plant like Eemshaven is a complex undertaking, we assume that a “willing buyer” in the case of Eemshaven would be a large sophisticated corporation, which also operates a number of other power plants. In our view, this is the most likely buyer profile. It would be very unlikely for a company that owns no other power plants to bid successfully for Eemshaven. We highlight where this criterion becomes relevant throughout the report.
31. As noted above, Counsel for Claimant have asked us to calculate the loss in value of Eemshaven resulting from the Coal Ban, on a FMV basis. We make this assessment using 9 October 2017 as the Valuation Date and adopting the following standard approach:
32. The most recent edition of the Global Arbitration Review Guide to Damages in International Arbitration (the “GAR Guide”), discusses this approach, noting that:
[Page 13]
“[t]he but-for premise considers the questions of what would have happened in the absence of the breach. To find an answer, the but-for premise compares the hypothetical situation without the breach and the actual situation with the breach".⁴²
33. There are three main methods for determining a FMV:⁴³
34. However, in our experience, the standard way of determining the FMV for a power plant is by applying a DCF model. When assisting with mergers and acquisitions and also when assessing damages in arbitrations, we have routinely applied DCF models to value power plants and similar assets for many years. It is also the approach that we see clients in the industry apply in their internal valuation exercises, and when considering asset acquisitions or divestments.
42 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 114. ↩
43 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, p. 29. ↩
44 "The most common form of the income approach is to focus on cash (rather than an accounting measure like income) and use a discounted cash flow (DCF) method." Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 196. ↩
45 A multiples approach is where an analyst values a business based on a multiple or ratio such as profit to value. For example, suppose an analyst knows the profit to value ratio of business 'A' is 10, and also knows the profit of the business being valued (business 'B') is 2. If the ratio of profit to value is the same for both business A and B, the analyst can calculate the value of business B as 10 x 2 = 20. ↩
[Page 14]
35. Third-party presentations and academic articles mirror our experience.⁴⁶ Other authoritative sources also endorse the use of a DCF model to establish an asset's FMV.⁴⁷ The DCF method is also commonly used by financial analysts preparing reports for investors, and financial managers seem to prefer the DCF method over any other.⁴⁸ Hence, any prospective buyer of Eemshaven would include a DCF calculation when establishing the FMV of Eemshaven. Moreover, the DCF is based on fundamental and accepted principles of financial economics.⁴⁹
36. In the GAR Guide to Damages, the authors note that “[t]he income approach [implemented through a DCF valuation] is the usual starting point for the valuation”.⁵⁰ The authors point out that the income method, as implemented through a DCF model, allows the valuer to take into account the specific characteristics of the asset.
37. In another chapter of the GAR Guide, the author notes that:
46 For example, in a presentation on power plant economics, Alstom - a maker of equipment for the electricity sector – discussed alternative methods of evaluating power plant economics, and concluded that the DCF "method is preferred by economists and [power plant] developers". Exhibit BR-22, Alstom, Power Plant Economics, 2006, pp. 8-9. ↩
47 For example the chapter on 'Expropriation and unilateral alterations or termination of contracts' in the World Bank's 'Guidelines on the Treatment of Foreign Direct Investment note that "such determination [of FMV] will be deemed reasonable if conducted as follows: (a) for a going concern with a proven record of profitability, on the basis of the discounted cash flow value". See Exhibit BR-23, World Bank, "Guidelines on the Treatment of Foreign Direct Investment," Foreign Investment Law Journal, Chapter IV Expropriation and unilateral alterations or termination of contracts, 1992, p.304. ↩
48 Graham and Harvey (1999), for example, surveyed 392 Chief Financial Officers on the practices used to evaluate real asset investments and found that the two most popular techniques were the DCF and the Internal Rate of Return approaches. See Exhibit BR-24, Graham, J.R. and Campbell R.H., "The Theory and Practice of Corporate Finance: Evidence from the Field", Journal of Financial Economics, dated 10 December 1999, pp. 197-201. ↩
49 Leading corporate finance specialists support the DCF as the preferred valuation methodology for income-earning assets. For instance, Reilly and Brown (2004) recommend this valuation methodology stating: "These discounted cash flow valuation techniques are obvious choices for valuation because they are the epitome of how we describe value: that is, the present value of expected cash flows." See Exhibit BR-25, Reilly, F., Brown, K.C., Investment Analysis & Portfolio Management, Chapter 11: An Introduction to Security Valuation, Seventh Edition, Thomson Southwestern, 2003, p. 378 Similarly, Copeland, Koller and Murrin (1994), in their leading textbook on valuation, state that: "The DCF approach captures all the elements that affect the value of the company in a comprehensive yet straightforward manner. Furthermore, the DCF approach is strongly supported by research into how the stock markets actually value companies." See Exhibit BR-26, Copeland, T., Koller, T., Murrin, J., Valuation Measuring and Managing the Value of Companies, Second Edition, John Wiley & Sons, Inc., 1994, p. 70. ↩
50 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, p. 198. ↩
[Page 15]
“In fact, the DCF method is the most common methodology used in valuation analyses involving assets in the energy and natural resources industries (as well as most other industries). First, it is widely supported by professional literature, and its workings are well understood. Indeed, most investors rely on a DCF analysis to determine whether or not to undertake a particular project. Second, the DCF approach is a widely accepted method to estimate damages and fair market valuations in international disputes; in many energy and mining cases panels have adopted the DCF method without hesitation.”⁵¹
38. With regard to the acceptance of DCF models by Tribunals and Courts, a 2015 ICSID award noted that "[T]he DCF method is widely accepted as the appropriate method to assess the [fair market value] of going concerns.”⁵²
39. A DCF method is particularly appropriate to establish the FMV of Eemshaven, because Eemshaven was, at the valuation date, an operating asset. Its technical characteristics, for example how costs vary with the level of electricity production – were well understood, as were its main revenue drivers. In particular, as we explain in more detail in Sections IV to VI below, the data needed to project its revenues and costs were readily available. In particular, to determine the plant's key revenues and costs, the forward prices and forecast prices of the relevant commodities were available, as was data on the volatility of prices of these commodities.
40. Given that, by construction, DCF models can integrate a wide array of assumptions, interactions, and probabilities, the DCF method permits us to account for all relevant value drivers in an objective and transparent manner, including the effect of different possibilities about the future development of commodity prices.
41. In this section, we explain the alternative methods for valuing Claimant's losses that we considered, but ultimately rejected.⁵³
51 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December 2018, pp. 358-359, emphasis added. The GAR Guide also notes that "[a]s has been discussed in other chapters of this book, the discounted cash flow (DCF) model has become an established tool in calculating damages claims in international arbitrations." (p.232). ↩
52 Exhibit BR-27, Quiborax S.A. v. Plurinational State of Bolivia, ICSID Case No. ARB/06/2, Award, dated 16 September 2015, ¶ 344. ↩
53 For a discussion of alternative valuation methods, see Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 29-49. ↩
[Page 16]
42. One sub-category of the “market” approach to valuation is to look at share price movements. RWE AG, the ultimate parent of RWE Eemshaven, has shares that are publicly traded, and the prices of which are readily available. Hence, looking at changes in the RWE AG share price around October 2017 could have been one way to measure the loss in value resulting from the Coal Ban. However, in the present case an analysis of RWE AG's share price will not yield a reliable estimate of loss for several reasons.
43. First, our instruction was to take a Valuation Date immediately before the Coal Ban had any effect on the value of Eemshaven and also to consider the full effect of the Coal Ban. In practice, the probability that the Coal Ban would become law, and, particularly, that there would be only very limited compensation for the early closure of Eemshaven, increased between October 2017 and the end of 2019. Hence, the effect of the Coal Ban on RWE's share price increased gradually over the period between October 2017 and the end of 2019, when the Coal Ban entered into law. During the period between October 2017 and January 2020 there were many other events that caused RWE's share price to change. These events mean that it is not possible to discern the effect of the Coal Ban on the share price over such an extended period.
44. Moreover, RWE AG is active in a wide range of geographic and product markets, and its share price represents the sum of the value of all of these diverse activities. Hence, untangling the various influences on RWE AG's share price over time would inevitably result in precisely the kind of DCF valuation exercise that we have undertaken.
45. Second, even if RWE AG's share price was only influenced by developments in the Dutch electricity market, its movements would have reflected not only the losses resulting from the Coal Ban, but also investors' expectations that the Dutch government might compensate the Claimant for its losses. If the market expected Eemshaven would receive some compensation, then any change in the share price would underestimate the losses resulting from the Coal Ban. For example, while RWE's 2017 financial accounts mentioned the Coal Ban for the first time, as of that date RWE could not be certain what, if any, compensation it would receive.⁵⁴ Accordingly, we conclude that an examination of changes in RWE AG’s share price is not informative for an evaluation of the Claimant's loss.
54 "In mid-October 2017, the new Dutch government concluded its coalition agreement. [...] One objective is for the country to stop generating electricity from coal completely by 2030. [...] At present, it is impossible to predict the ramifications of the coalition agreement for the energy sector, as a lot depends on the details of the climate protection package." See Exhibit BR-28, RWE, Annual Report 2017, p. 36. ↩
[Page 17]
46. Another sub-category of the “market” approach to valuation is to look at comparable transactions. A comparable transactions approach is only possible if assets similar to the asset being valued were sold around the valuation date.
47. In the current case, a comparable coal-fired plant would need to have been sold around October 2017. The ‘comparable' plant would need to have been recently completed, because otherwise it would be less efficient and have a shorter life than Eemshaven, leading to an underestimate of the loss in value. It would also need to have been located in the Netherlands or a market in which electricity prices were very similar to the Netherlands, as otherwise its future revenues, and therefore value, might differ significantly from those for Eemshaven. Similarly, a sale before or after the valuation date could mean that the value of the 'comparable' plant did not correspond to the value of Eemshaven as of the valuation date.
48. No sales of Dutch coal plants took place in the autumn of 2017. ENGIE sold its coal plants in the Netherlands and Germany in April 2019.⁵⁵ However, that sale took place eighteen months after the Coal Ban had been announced. Hence, the transaction price for the ENGIE plants will reflect the expected value of the plants with the Coal Ban in place as of April 2019 and may take into account some expectation of compensation. Accordingly, this transaction will not provide an accurate estimate of the loss in value for Eemshaven resulting from the Coal Ban.
49. We understand that in early December 2020, RWE AG accepted compensation from the German government for the expected early closure of the Westfalen and Ibbenbüren power plants in Germany. The Westfalen plant has a similar design and was completed at around the same time as Eemshaven. However, Ibbenbüren is significantly older than either Eemshaven or Westfalen, and so is not comparable to either.
50. This point aside, there are a number of reasons why it is not possible to estimate the Claimant's losses from the early closure of Eemshaven from the compensation it received for Westfalen/Ibbenbüren. We discuss three such reasons below.
51. First, Eemshaven operates in a different market than the Westfalen/Ibbenbüren plants, and Dutch wholesale prices have consistently differed from those in Germany.
52. Second, the years of lost production for Eemshaven and the German plants differ, and so are not comparable. Specifically, the compensation for lost electricity production in Germany
55 Exhibit BR-29, S&P Global Platts, Engie sells 2.3 GW German, Dutch Coal Plants to Riverstone Holdings, dated 26 April 2019. ↩
[Page 18]
was for the [Redacted]-year period [Redacted]. It is not meaningful to compare lost profits in this period to lost production for the 25-year period 2030 to 2054. It is clear from our modeling that prices develop very differently [Redacted]. The longer time horizon in our valuation creates the possibility for a wider range of outcomes, including higher value cases that are less likely to occur in the period [Redacted].
53. Third, due to differences between the valuation dates for Eemshaven (October 2017) and for Westfalen and Ibbenbüren ([Redacted]), values are also expected to be different due to a variety of factors, including developments in commodity prices.
54. These three examples illustrate why the compensation that RWE received for the closure of its German plants is not a good guide to the loss of value for Eemshaven as a result of the Coal Ban.
55. A third valuation approach would be to value Eemshaven based on its historical earnings – so in other words, to assume that past earnings are representative of future earnings.
56. Looking at historical profitability can be a useful guide to future profitability for a process with stable input and output prices. However, it makes little sense for a coal-fired power plant, where the prices of both inputs and outputs can vary very significantly, even over short periods. Hence, for coal-fired plants, past profits or losses provide only a limited guide to expected future profits or losses. Valuing Eemshaven based on past profits would be equivalent to assuming that future commodity and electricity prices will be the same as the average commodity prices over the last few years. There is no reason to think that this will be the case. A rational buyer would value a coal-fired power plant considering its future cash flows, not its historical profits.
57. We also note that, as of the October 2017 Valuation Date, Eemshaven had only been in operation for one complete year, calendar year 2016. It would be unreasonable to use data from a single year to benchmark projected operations for the following 37 years. Moreover, we understand that the typical teething issues associated with a new plant affected may have affected 2016 operations.⁵⁶ Specifically, as we explained in section VI.A.5, Eemshaven's total operating costs were higher in 2016 and 2017 than they were forecast to be in subsequent years.
56 We rely on historical information from 2016 and 2017 to allocate RWE's costs across subcategories, such as maintenance and staff. We expect the cost allocation to remain relatively similar over time. ↩
[Page 19]
58. A fourth valuation approach, the cost approach, would involve looking at the replacement cost of Eemshaven, or some other measure of cost such as its net book value (NBV).⁵⁷
59. The cost of replacing Eemshaven could provide a ceiling for damages.⁵⁸ However, in this case it will not provide an accurate measure of the loss in value. RWE spent around €3.2 billion in constructing Eemshaven.⁵⁹ Yet, RWE has recognised that the actual value of the plant – even absent the Coal Ban – was lower than its construction cost. Accordingly, to reflect this, RWE booked a tax-deductible impairment of [Redacted] in [Redacted].⁶⁰ In other words, even before the Coal Ban, the Eemshaven plant was worth significantly less than its replacement cost. Moreover, replacement value is more often used where there is a claim of direct expropriation. We understand that this is not the Claimant's claim.
60. RWE reached a bilateral agreement (“VSO” or “Vaststellingsovereenkomst”) with the Dutch Tax Authorities that the tax book value of Eemshaven was of [Redacted].⁶¹ This value would represent a more accurate estimate of the plant's value than the replacement cost.⁶² This is because the tax book value reflects the impairment discussed above. However a DCF model will result in a more accurate estimate of the loss in value than relying on book values. This is because, as outlined above, the DCF can account for the specific losses Claimant experienced as a result of the Coal Ban.
61. We also note that RWE recorded impairments for Eemshaven in [Redacted]. However, these impairments are not relevant to an assessment of Eemshaven's FMV in October 2017. An impairment is a one-off change in a plant's lifetime value. For example, some of the impairments that RWE recorded related to [Redacted].
57 Net book value refers to the value of a an asset recorded in the accounts, such as a plant or a building, after taking into account the building's loss of value due to economic obsolescence and technical depreciation. ↩
58 Analysts refer to this as the Depreciated Replacement Cost of DRC. The reference to depreciation means that the replacement asset should be in the same state or age as the original asset. So in the case of Eemshaven, as of October 2017 the plant would be about two years old. Hence, the DRC would be slightly lower than the New Replacement Value. Exhibit BR-30, Royal Institute of Chartered Surveyors (RICS). Depreciated Replacement Cost Method of Valuation for Financial Reporting, London: 1st Edition, November 2018, p. 4. ↩
59 Harris-Hesmondhalgh Workpapers, Tables G - Investments Model, Table G6. ↩
60 Harris-Hesmondhalgh Workpapers, Tables G - Investments Model, Tab 'Blad 1', Tax View Section. ↩
62 Eemshaven's book value was [Redacted] at the end of [Redacted]. See Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab 'Blad1'. Hence, the book value would be slightly higher as of the valuation date, as less deprecation would have occurred. ↩
[Page 20]
[Redacted]. Accordingly, impairments in [Redacted] do not imply that the value of Eemshaven will continue to decrease, or that future impairments will be needed. In our forecasts, we have already accounted for the circumstances as of October 2017 – [Redacted] – that were partially responsible for the impairments.
62. The International Valuation Standards set out the five key steps for a DCF model as follows:⁶³
63 Exhibit BR-20, International Valuation Standard Council, International Valuation Standards, dated 31 January 2020, pp. 37-38. ↩
64 Companies pay taxes based on current year, nominal cash flows. Moreover, depreciation, which is also calculated based on nominal investment values, impacts the taxable base of a company. ↩
65 'Explicit period' refers to the period over which cash flows are modelled explicitly – so there is a value calculated for each year - rather than being included in a terminal value calculation. ↩
66 Eemshaven would close by the end of 2054. However, we extend the analysis to consider 2055, because there are some expenses that a power plants needs to incur after ceasing operations. We discuss these expenses in more detail in Section VI.B below. In terms of modelling, we focus on the period from 2020 to 2055 since it is the period most relevant for the Claimant's damages. ↩
[Page 21]
63. Finally, all the discounted cash flows from all future years must be added together to determine their overall 'present value' and hence a value for Eemshaven on which informed and willing buyers and sellers could agree, namely the FMV.
64. To forecast cash flows as of October 2017, we start by forecasting so-called 'commodity margins' for each year. The commodity margin is the difference between the revenues the plant is expected to earn from generating and selling electricity, and the variable costs associated with generating that electricity.⁶⁸ The latter mainly consists of commodity costs, namely costs for coal, CO₂, and biomass. These commodity costs (plus those for gas) are also key factors influencing electricity prices, since they determine the costs of producing electricity for all the other fossil-fuel powered plants operating in the market.
65. The commodity margin of a plant in any given period typically determine when it will operate since, all other things being equal, it only makes sense to operate when the commodity margin is positive. We therefore use our forecasts of commodity margins to forecast how Eemshaven would operate i.e. at what times and what output levels it would be likely to be dispatched in each year. In this way, we determine the revenues and variable costs of the plant that are used in the financial model to determine the plant's FMV.
66. More specifically, as shown in Figure 3, to forecast Eemshaven's future cash flows as of October 2017 we adopt a three step process that we explain in more detail below.
67 See Section VI.C below. See also Harris-Hesmondhalgh Workpapers, Tables F - Cost of Capital. ↩
68 A variable cost is a cost that varies directly with output. For example, coal is a variable cost for Eemshaven, as every MWh of output requires a specific amount of coal to generate. ↩
[Page 22]
FIGURE 3: OUR THREE-STEP CALCULATION OF FREE CASH FLOWS
[Diagram showing a three-step process]
100 price paths for coal, gas and CO₂.
Step 1: Commodity price models (Price path simulation)
Step 2: European electricity market modelling, Plant Dispatch optimisation
Step 3: Financial modelling (Discounted free cash flows)
Commodity margin paths (100 in But-For and 100 in Actual)
67. First we forecast commodity prices, and specifically prices for gas, coal and CO₂ permits. We use market-based forward curves and third party price forecasts to derive future commodity prices. Section IV of our report describes this process.
68. We recognise that there is not only one plausible path describing the future development of commodity prices out to 2054. We also recognise that there are some plausible commodity price paths under which Eemshaven's costs would have been expected to be too high for it to operate profitably. Under these price paths, Eemshaven might close before 2054 even absent the Coal Ban. However, there are also many other plausible commodity price paths under which Eemshaven would generate significant profits but-for the Coal Ban. To quantify and bound this range of outcomes, we have modelled 100 alternative price paths for each commodity.
69. The generation of multiple commodity price paths is an example of a 'Monte Carlo' simulation. A Monte Carlo simulation is a mathematical technique that generates random variables for modelling risk or uncertainty of a given system – in this case future commodity prices in the Netherlands. We describe this method in further detail in Section V.
70. Monte Carlo simulations are a widely accepted way of simulating variables for which a range of plausible values exist. For example, in May 2020 the European Commission (EC) approved the compensation the Dutch government offered to Vattenfall for the early closure of the
[Page 23]
Hemweg plant.⁶⁹ The EC noted that “[t]he compensation amount has been calculated as the present value of the net expected annual cash flows”⁷⁰ and that:
“Expected gross margins have been estimated by multiplying the expected production volumes –based on past unplanned unavailability rate - with expected hourly power prices coming from Vattenfall internal Monte Carlo "BOFIT" model."⁷¹
71. The EC's decision underlines both that other large operators such as Vattenfall apply Monte Carlo simulations in their plant valuations, and that the EC, as well as the Dutch State, accepted this valuation methodology. Major corporate finance textbooks also confirm Monte Carlo simulation as a way to model a range of outcomes. For example, in a book on the computational aspects of financing, Prof. Levy notes that:
“Monte Carlo simulation and random number generation are techniques that are widely used in financial engineering as a means of assessing the level of exposure to risk. Typical applications include the pricing of financial derivatives and scenario generation in portfolio management.”⁷²
72. Second, we have to estimate what electricity prices result from those commodity prices, taking into account how the mix of power plants in the Dutch system will likely change over time and what the demand for electricity is likely to be. To do this, we use a computer model of the entire European electricity market, to predict the electricity prices that would result from the forecast commodity prices (see Section V). In essence, as explained above, the price of electricity at any moment depends in large part on the generating plant available, the demand for electricity, and the cost of the commodity inputs needed to generate the electricity. The model combines these factors to determine electricity prices over the relevant period. Given the electricity and commodity prices, we then model the revenues that Eemshaven would have earned, and the variable costs it would have incurred from generating electricity.
73. Third, we need to calculate Eemshaven's cash flows from our estimates of its future revenues – based on electricity prices and plant output – and operating and capital costs.
69 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020. ↩
70 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020, p. 3. ↩
71 Exhibit BR-31, European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands, dated 12 May 2020, p. 4 emphasis added. ↩
72 Exhibit BR-3, Levy, G., Computational Finance Using C and C#, Quantitative Finance Series, 2008, p. 50. ↩
[Page 24]
We deduct fixed operating costs from the commodity margins, as well as investments and taxes, to arrive at cash flows. In this way, we create 100 cash flow paths and, hence, 100 simulations of the future profitability of Eemshaven.
74. Above, we noted that some commodity price paths might, at some point, result in potential losses for Eemshaven. However, it is important to recognise that Eemshaven can limit the effect of any negative commodity price paths by ceasing operations. It is reasonable to expect that RWE would do so in a scenario in which Eemshaven's operation is expected to result in continuing losses – although importantly, by closing the plant RWE would also terminate the option to enjoy positive profits at some future date, should commodity prices move in a favourable direction. Hence, the value of the plant is not simply the average of a number of positive and negative price paths, because we can largely eliminate negative outcomes by closing the plant.
75. For example, suppose that in 60% of simulations Eemshaven made a profit of 20 (arbitrary units), and in 40% of simulations the plant would, if it continued to operate until 2054, make a loss of 30. Without the option to close, the expected profit would be 40% x -30 + 60% x 20 = 0.
76. However, the losses in the unfavourable cash flow paths can largely be eliminated by closing Eemshaven before 2054.⁷³ Accordingly, the expected profit would actually be 40% x 0 + 60% x 20 = 12. The ability to largely eliminate losses in simulations with unfavourable cash flow paths means that Eemshaven suffers a loss in value as a result of the Coal Ban, even if the plant would make losses if it continued operating to 2054 in some of the simulations.
77. We discount the free cash flows to October 2017, to calculate their present value as of that date and, hence, the FMV of the plant. We calculate the cash flows and FMVs under the actual and but-for cases for each of the 100 commodity price paths. Section VI explains this process in more detail.
78. Finally, to calculate the loss of Fair Market Value, we compare the 100 pairs of FMVs for the actual and but-for cases and so determine 100 estimates of the loss in FMV as a result of the Coal Ban. We combine these 100 results into a single figure in a statistically robust manner (see Section VII).
73 We say 'largely eliminate', because as we discuss in section VI.B, the plant may tolerate losses for some years to preserve the option to produce electricity and make profits if commodity prices develop favourably in the future. ↩
[Page 25]
79. To measure the Fair Market Value of Eemshaven, we must forecast the relevant commodity and electricity prices up to and including 2054. As we explain in the rest of this section, we have generated 100 different price paths for coal, gas and CO₂ prices. We use these commodity price paths to create 100 paths for electricity prices and we use the combination of the commodity and electricity price paths to determine Eemshaven's revenues and costs and, hence, its cash flows. We provide a detailed description of our methodology in Appendix B.
80. A wide range of commodity price developments is possible in the period up to 2054, particularly given the inherent volatility of commodity prices. Accordingly, simply considering one "central" commodity price scenario would not, in our view, provide a reliable estimate of the FMV of Eemshaven. Instead, we take into account the full range of possible commodity price paths.
81. One possible way to deal with the range of future commodity prices is to employ scenarios. For example, it is common to see demand or prices forecasts that feature ‘high', 'base' and 'low' scenarios. In more detail, scenario analysis consists of creating a series of alternative, internally coherent sets of assumptions – scenarios – and then assigning a probability to each scenario to arrive at a final damages estimate. Such an approach is commonly used when assessing the benefits of a particular course of action – for example, the purchase of a power plant - where it is important to understand what might happen in a worst case, what a very good outcome would look like, and what it is most reasonable to expect would happen.
82. When it comes to assessing damages, however, there are two main drawbacks to using scenario analysis. First, it is only feasible to construct a relatively small number of scenarios and these may be very different from each other so that under one scenario there may be no damages and under another there may be high damages. Consequently, simply averaging the results from the scenarios may produce misleading results particularly as a large number of alternative, equally plausible sets of assumptions are ignored. Perhaps more importantly, any attempt to overcome this problem by calculating a probability-weighted average is problematic because there is inevitably a high degree of subjectivity in assigning probabilities to each scenario.
[Page 26]
83. Due to these drawbacks, we prefer to generate alternative commodity prices paths using a probabilistic or “stochastic” approach, known in the field as a “Monte Carlo” analysis.⁷⁴ A stochastic approach focuses on a smaller number of key drivers and considers these in much greater detail, taking into account the volatility in their values based on data available as of the valuation date.
84. We illustrate what we mean by a stochastic analysis by explaining in general terms how we create price paths for a single generic commodity, as shown in Figure 4. We first need to create a distribution of all the possible prices that the commodity could have at a given time period - these are the vertical lines shown in red in the figure, which represent the distribution of prices from highest to lowest.⁷⁵ We then pick a random price from the distribution of all possible prices, using a random number generator.
FIGURE 4: CREATING STOCHASTIC PRICE PATHS
[Chart showing price paths over time]
Y-Axis: Commodity price (€/unit)
X-Axis: Valuation date, month₁, month₂, month₃, month₄, month₅, month₆, month₇, month₈
Legend: Mean, Sample price draw
85. To facilitate the selection of a random price, rather than calculate the probability associated with each monthly price shown schematically in Figure 4, we express the probabilities of individual prices occurring as a cumulative price distribution. In a cumulative price distribution, there is a zero percent chance of the commodity price being lower than the lowest price and a 100% chance that it will be lower than the highest price. In between these
74 See Appendix B for details. ↩
75 The shading underneath each line is simply intended to highlight the region of the distribution where it is most probable that a price will lie. ↩
[Page 27]
extremes, each possible price level will be associated with a particular probability that prices will be no higher than that level. For example, there might be a 10% chance that the commodity price will be lower than 5 €/unit, a 50% chance that it will be lower than 15 €/unit and a 90% chance that it will be lower than 35 €/unit. We then pick a value between 0% and 100% at random. The randomly chosen figure determines what price we assume for that time period and price path. For example, if our random choice was 50%, then we would assume a price of 15 €/unit and so on.
86. We repeat this procedure for each month and, in this way, build up a 'path' of prices over time. In terms of Figure 4, we start from a price as of the Valuation Date. We then pick a price at random from the cumulative distribution of prices derived from the price distribution shown for Month 1. We then pick a price for Month 2, randomly choosing a price from the cumulative distribution of prices derived from the price distribution for Month 2, and so on.
87. Based on the history of the relevant commodity price, there are limits on how much its price is likely to change from one month to the next. Technically, the degree to which prices can change between periods is known as their 'volatility'. As we move from one month to the next we have to add together the volatilities relevant to deliveries in the current month that arise in each of the preceding months. This means that the “width” (technically, standard deviation) of each month's distribution increases.
88. Moreover, the random choice for one month affects the range of choices for the next month. That is, the random choice of price for the previous month⁷⁶ reduces the available choices for the next month - the range of prices for the next period is not 0% to 100% of the cumulative price distribution. The range is primarily determined by our historical analysis of the volatility in month-ahead prices. Accordingly, we constrain price changes between periods so that they are consistent with the month-ahead volatility levels for the commodity that would have been expected as of the Valuation Date. If a commodity has had relatively stable prices over time, the extent to which its price is likely to change from one month to the next is quite limited. If its expected volatility is higher, then a much wider range of prices are possible for the next month. For example, suppose that we arrived at a price of 20 €/unit for one month and the month-ahead volatility is 15%,⁷⁷ then, based on the characteristics of
76 In this context, by "previous” we simply mean the month immediately preceding the one being considered. Note that, broadly speaking, the very first month of the commodity price path will not have a price distribution, its price will equal the prevailing spot price. We discuss the methodology in greater detail in Appendix B.2. ↩
77 This is broadly consistent with the expected monthly volatility for gas and coal as of the valuation date. See Appendix B.2.ii. ↩
[Page 28]
a log-normal distribution, we would know that there is a 95% probability that the price for the next period would be between 14.90 €/unit and 26.80 €/unit.⁷⁸
89. We create each price path in exactly the same way, starting from an initial price which is either fixed (the day-ahead price for gas prices) or only has a very narrow distribution (due to the volatility in month-ahead prices for coal prices) and then randomly choose prices, within the constrained range, for each subsequent month. Our final step for gas prices is to use historical data on the volatility of day-ahead prices to create daily prices from the monthly price paths that we have created.
90. The following sub-sections explain how we created the price distributions for coal, gas and CO₂ prices. In Section III.E above, we explain that to model electricity prices, we require forecasts of both electricity demand and the plants that will be available to generate electricity. We could also have treated these inputs stochastically, just as we do commodity prices. However, we concluded that it was not necessary to do so, except with respect to variations in the balance between renewable and fossil-fired generation. The relative prices of gas, coal and CO₂ are the main determinants of the electricity generation that Eemshaven could produce and the free cash flows that the generation would create. Variations in the demand and the fossil-fuelled plant mix will have a much smaller effect on the profitability of Eemshaven and these variations are, in any event, much less volatile than commodity prices. Accordingly, stochastically modelling the capacity of each plant type and demand would have significantly complicated the calculations, without delivering a material increase in the accuracy of the results.
91. We derive our coal and gas price paths from the following data:
78 This confidence interval follows from the model's assumption that prices follow a log-normal distribution, under the simplifying assumption that there is no change in the mean (expected) price. Note that simply adjusting the price up and down by the volatility factor (3 €/unit = 20 €/unit x 15%) does not yield a 95% confidence interval. Although the volatility indicates limits on typical changes in prices, such changes can significantly exceed this level. It is necessary to rely on the statistical properties of log-normal distributions to arrive at the confidence interval. ↩
79 A forward price is simply the price for which gas or coal for delivery during a future period can be purchased on a given day. ↩
[Page 29]
92. For short- to medium-term coal and gas prices, we have relied on forward curves.⁸⁰For long-term coal and gas prices, we rely on IEA 2016 World Energy Outlook, which was published in November 2016, since it is the last long-term commodity price forecast produced by an independent, widely respected, international institution before the valuation date.⁸¹ From the 2016 World Energy Outlook, we have selected the New Policies scenario which forms the IEA's central case. The projections are only provided for spot years – in this case 2020, 2030 and 2040. For the years between 2020 and 2030 and again between 2030 and 2040, we have simply assumed a linear progression from one data point to the next (“linear interpolation") to derive annual prices. After 2040, we have projected annual prices starting from the value of prices in 2040 and updating for inflation.⁸²
93. We note that the IEA scenarios were developed after the Paris Agreement on climate change had been reached, stating that "[t]he goals set out in Paris, and the measures that governments have announced to achieve them, significantly influence the projections in this year's WEO”⁸³ and “the underlying assumptions have been reviewed carefully to reflect the post-Paris expectations for international co-operation on climate change”.⁸⁴ The IEA also says that the New Policies scenario “incorporates existing energy policies as well as an assessment of the results likely to stem from the implementation of announced intentions, notably those in the climate pledges submitted for KOP21”.⁸⁵
94. The volatility of coal and gas prices is a key driver of the range of prices that it is reasonable to consider for the future. In line with standard practice, we assume that their volatility, as of the valuation date, is a reasonable predictor of their future volatility and therefore we
80 Specifically, we rely on forward curves from July 2017. Anyone carrying out a Fair Market Value assessment as of 9 October 2017 would have had to begin their modelling several months earlier and it is for this reason that we rely on forward prices from July 2017 rather than October 2017. In any event, the difference between the July and October forward prices for the period beyond to 2020, which is the first year that we model, is minimal. ↩
81 None of the institutions whose forecasts we would consider using, such as the EC or the European Network of Transmission System Operators - Electricity, published scenarios in 2017. ↩
82 The IEA forecasts are of spot prices, so prices for immediate delivery, rather than forward prices. Forward prices and spot prices converge as the time to delivery for the forward product shortens but they are generally not identical. The theory underlying the stochastic model that we use to generate the price paths requires the forecast to be of forward prices, which is then converted into different possible spot price paths. Accordingly, we converted the IEA spot prices into an equivalent set of forward prices using standard techniques to make this conversion, see Appendix B.2.i for details. ↩
83 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 32. ↩
84 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p.33. ↩
85 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 31. ↩
[Page 30]
have based our volatility analysis on data from 2013 onwards.⁸⁶ We need information on the volatility of prices in both the short-term (a few months from any given starting point) and the longer term (up to several years into the future) – this is known as a “term-structure”. Prices tend to be more volatile in the short-term than they are in the long-term, because the market participants generally consider that over the longer term there will be time for the market to recover from the effects of a short-term shock. Incorporating a term structure for volatility enables us to capture this effect.
95. Gas and coal prices do not move entirely independently of each other. This is hardly surprising since the two fuels are often substitutes for one another: if gas prices increase, making the use of gas less economic, then coal prices may also rise as coal is used instead of gas. However, the correlation is not perfect for a number of reasons, such as:
96. As with the volatility of each commodity price, and again in line with standard practice, we rely on the historical information on the short and longer term correlations between coal and gas prices as a reasonable prediction for their future correlation.
97. Values for the forward and forecast prices for coal and gas, the volatility term structure of coal and gas prices and the correlation term structure between gas and coal prices are the only parameters we need to derive a set of 100 appropriately correlated spot price paths for these commodities. The precise method that we use is described in Appendix B.2 but the outcome of the process is shown in Figure 5 and Figure 6 below. The solid dark blue line in these figures represents the mean or average of the price paths on each day, whilst the light blue line represents the median – on any day, 50% of the price paths will have a price higher than the median and 50% will have a lower price. The top end of the dark grey band shows the 26th highest daily price and the bottom end of the dark grey band shows the 75th highest daily price. Similarly, the top end of the light grey band shows the 6th highest daily
86 2013 was the start of the third phase of the EU Emissions Trading Scheme. Since this phase had significantly different implications for power plants than the first two phases, we considered that the relationship between coal and gas prices might have changed at this point and, hence, that it would not be reasonable to extend our analysis further back in time. ↩
[Page 31]
price and the bottom end of the light grey band shows the 95th highest daily price. Both figures indicate that the bulk of the price paths lie within a reasonably narrow range for most of the period⁸⁷ but that there are some more extreme paths, particularly on the high price side.
87 For example, for gas prices, the annual average differences between the 75th percentile price and the 26th percentile price are [Redacted] €/MWh in 2025, [Redacted] €/MWh in 2030, [Redacted] €/MWh in 2040 and [Redacted] €/MWh in 2050. See Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_charting'. ↩
[Page 32]
FIGURE 5: GAS PRICE PATH DISTRIBUTIONS⁸⁸
[Chart Redacted]
Y-Axis: Gas price distribution (€/MWh)
X-Axis: 2017 2020 2023 2026 2029 2032 2035 2038 2041 2044 2047 2050 2053
Legend: 6th to 95th percentile, 26th to 75th percentile, Mean, --- Median
FIGURE 6: COAL PRICE PATH DISTRIBUTION⁸⁹
[Chart Redacted]
Y-Axis: Coal price distribution (€/tonne)
X-Axis: 2017 2020 2023 2026 2029 2032 2035 2038 2041 2044 2047 2050 2053
Legend: 6th to 95th percentile, 26th to 75th percentile, Mean, --- Median
[Page 33]
98. The gas and coal prices shown in Figure 5 and Figure 6 are for the Dutch market. However, we also need coal and gas prices for other European markets because these are included in the electricity market model we use to project Dutch electricity prices. We assume that gas and coal prices for other markets can be derived from the Dutch gas and coal prices by adding on reasonable estimates of the costs of transporting the fuels from the Netherlands to the relevant market.
99. Our approach to creating CO₂ price paths, is different to the approach we have used for gas and coal price paths. This is because CO₂ prices are driven more by policy decisions than by market forces. Specifically, the CO₂ price changes according to the number of CO₂ permits that are available each year. Whilst the general direction of the EU's climate change policy is known - the number of permits will be decreased over time – the precise trajectory that will be implemented is not yet fixed until 2054. There remains the possibility that additional measures will be introduced if the level of CO₂ emissions is not considered to be falling fast enough. For this reason, we have not included any correlations between CO₂ prices and coal/gas prices. In addition, as discussed above, coal prices tend to be global prices and so will not be affected to any significant degree by what happens to CO₂ prices in Europe since the European coal market is relatively small in global terms.⁹⁰
100. We start from the forecasts contained in the same IEA report on which we rely for coal and gas prices.⁹¹ In this case we rely on two of the scenarios contained in the report (the “450” and New Policies scenarios),⁹² instead of only one (New Policies) as in the case of the coal and gas price paths. This is because the IEA CO₂ price scenarios reflect different policy developments that were considered possible at the valuation date and so we use them to
88 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_chart'. Note that 'Commodity' in Table D.2.1 needs to be set to 'Gas' and VBA macro needs to be re-run. ↩
89 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'M_chart'. Note that 'Commodity' in Table D.2.1 needs to be set to 'Coal' and VBA macro needs to be re-run. ↩
90 According to the BP Statistical Review of World Energy 2020, in 2017 Europe accounted for only 8.5% of global coal consumption, and by 2019 its share had fallen to 7.2%. Exhibit BR-33, BP, Statistical Review of World Energy, 2020, p. 47. ↩
91 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 45, which was published in November 2016 and so was the latest IEA forecast available. ↩
92 There is a third scenario, Current Policies, but the CO₂ prices under this scenario are very close to those under the New Policies scenario. Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, p. 39. ↩
[Page 34]
determine the range of possible CO2 price outcomes.93 We use these two scenarios to create a distribution of possible CO2 prices for each of the three years for which the IEA provides CO2 prices (2020, 2030, and 2040). The 450 scenario incorporates the IEA's view of a high CO2 price scenario and so we use it to set the upper limit94 of the range of possible CO2 prices, while the New Policies scenario represents the mean value.95 These are the only two parameters that we need to be able to define our distribution of CO2 prices. 96 We use the scenarios to create a distribution of possible CO2 prices for each of the three years for which the IEA provides CO2 prices.
101. We have also included a “policy ratchet” which means that CO2 prices can only increase over time.97 The rationale for imposing this ratchet is that it seems likely that if a price path sets off with a particular level of CO2 prices, this reflects a world in which climate policy is focused on a particular pace of decarbonisation. Declining CO2 prices would be inconsistent with such a policy. Since higher CO2 prices tend to reduce the value of Eemshaven, imposing the policy ratchet is conservative because it may lead to an underestimate of the plant's actual loss in value.
102. All the IEA scenarios have the same CO2 price for 2020. Hence, we do not have to pick from a distribution of prices for that year. For 2030, 2040 and 2050 we follow the procedure for creating a price path described in Section IV.A above to create 100 prices. We then rank the picked prices in each year from the one with the highest price to the one with the lowest price. So, in 2030, the price path with the highest price has rank 1, the path with the second highest price has rank 2 and so on. We repeat the exercise for the prices in 2040 and 2050.
93 The third scenario (Current Policies) has CO2 prices ([Redacted] $/tonne in 2015 prices for 2020/2030/2040) which are sufficiently close to the New Policies prices ([Redacted] $/tonne) to make it impossible to fit a standard distribution through these prices and those of the other two scenarios. This also means that the third scenario prices fall within the distribution of prices that we consider but that our approach enables us to consider higher CO2 price possibilities than would be the case if we attempted to include the Current Policies prices. See Ibid. ↩
94 More accurately, we assume that the 450 scenario prices are equal to the 97.5th percentile prices since there will always be the possibility of some outliers that are not captured by a scenario. This assumption defines the width of the distribution in terms of a 95% confidence interval, which is standard practice. ↩
95 We do not adopt this approach for coal and gas prices because we rely on volatility levels derived from data available as of the valuation date to determine the width of the distributions. However, with a policy-driven price, such as CO2 prices, historical volatility levels are unlikely to be a good predictor of the range of possible future CO2 prices. ↩
96 Following standard practice, we assume that they follow a "log normal" distribution, see Exhibit BR-34, Hull J.C., Options, Futures and Other Derivatives, 9th edition, pp. 322-323. Such distributions can be fully specified from only two parameters, the width of the distribution and its mean value. ↩
97 Without the policy ratchet, a single CO2 price path could incorporate rising prices for a time followed by falling prices. ↩
[Page 35]
The ratchet mechanism means that if, for example, a price path has rank 10 in 2030,98 it cannot have a price in 2040 that has a lower rank than 10.99 The ratchet also means that the price in 2040 must be equal to or higher than the price that the path had in 2030. Suppose that a price path has a price of 25 €/t in 2030 and is ranked 10th. If the price that we initially picked for that path in 2040 is 30€/t and it has rank 8, then we keep the price we initially picked. If, however, the price we initially picked for 2040 was only 22 €/t then we would replace our initial pick with the higher of 25 €/t (the 10th ranked price in 2030) and the price with rank 10 in 2040.
103. Once we have determined the prices for 2020, 2030 and 2040, we use linear interpolation to set the prices for the intervening years. Beyond 2040, we assume that the mean price will simply increase from its 2040 level in line with inflation and assume that the width of the distribution remains the same and apply the ratchet mechanism in 2050. We derive daily prices from the annual prices using the historical volatility of CO2 prices.
98 We also rank the price picks in 2020 even though they all have the same value so that the ranking is random. However, we need to rank the 2020 prices in order to be able to apply the ratchet mechanism in 2030. ↩
99 The rankings can be thought of as reflecting possible policy paths. The fundamental assumption is that policies will never ease off i.e. drop to a higher rank or price, but can be tightened i.e. move to a lower rank. ↩
[Page 36]
FIGURE 7: CO2 PRICE PATH DISTRIBUTION100
[Redacted]
€/tonne
2017 2022 2027 2032 2037 2042 2047 2052
[Redacted] 6th-95th percentile [Redacted] 26th-75th percentile —Mean —Median
104. When modelling biomass, we use a 2018 biomass price of [Redacted] from RWE's “Eemshaven Cofiring Business Case”.101 We then increase this price with inflation.
105. Note that, unlike carbon, coal and gas prices, we do not perform any stochastic modelling of biomass prices, for two reasons. First, the historical price data we would need to be able to estimate correlations between biomass and other commodity prices is not available. Second, biomass prices do not affect damages. This is because Eemshaven stops burning biomass in 2027, before the Coal Ban takes effect.
100 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
101 Exhibit BR-36, RWE, Eemshaven Cofiring Business Case. ↩
[Page 37]
106. The revenues that Eemshaven could have been expected to earn over its remaining technical life are one of the key inputs in determining the loss in value it has suffered as a result of the Coal Ban. The plant earns revenues from selling its output into the Dutch electricity market. Accordingly, to estimate Eemshaven's future revenues it is necessary to:
107. We have carried out the overall market modelling in conjunction with Baringa Partners ("Baringa"), a consultancy firm that specialises in electricity market modelling. We provided Baringa with the assumptions on commodity prices, plant capacities and demand that we wanted to be included in the market model. Baringa used this information to provide detailed electricity price projections,102 for the actual and but-for cases. Baringa used PLEXOS® to perform its electricity market modelling. PLEXOS® is a commercially available third-party software widely used by electricity market participants including, for example, RWE and many transmission system operators.
108. We have taken the electricity prices produced by Baringa and used these to determine in detail how Eemshaven would have operated, taking into account its technical characteristics, and hence what revenues it would have earned and what operating costs it would have incurred.
109. As discussed in Section III.E above, our estimate of the damages suffered by Eemshaven is based on data that would have been available in October 2017. We have, therefore, chosen to base our generating capacity and demand forecasts on the EU Reference Scenario 2016 ("EU Reference Scenario”) published by the European Commission in August 2016.103 The EU Reference Scenario was the scenario containing long-term, detailed, country-by country projections of generating capacity and demand produced by a reputable, independent
102 A price for every four hour period of time from January 2020 until December 2054. ↩
103 Exhibit BR-37, European Commission, EU Reference Scenario, dated 15 July 2016. For more information visit: https://ec.europa.eu/energy/data-analysis/energy-modelling/eu-reference-scenario-2016_en. ↩
[Page 38]
institution that was published closest to the valuation date.104 No such scenarios were published in 2017 by the EU or other respected international institutions.105
110. We chose to focus on the EU Reference Scenario because it is an independent, publicly available, view of the likely development of the European electricity market and so consistent with a Fair Market Value. For example, the EU scenarios are used to inform European energy policy decisions. The EU Reference Scenario is based on the assumption that the legally binding greenhouse gas and renewable energy targets for 2020 will be achieved and that the longer term policies agreed at EU and Member State level until December 2014 will be implemented.
111. The EU Reference Scenario provides assumptions for electricity demand and plant capacities by fuel type for every fifth year starting from 2015 and ending in 2050. For the intervening years, we have relied on linear interpolation. However, the EU Reference Scenario does not detail installed capacity and demand for all of the countries that are included in the market model used by Baringa. For installed capacity and demand projections of countries that are not included in the EU Reference Scenario or that are very distant from the Netherlands,106 we relied on Baringa's proprietary Reference Case, which reflect Baringa's central or “best estimate" view of the evolution of European markets. Whilst it would have been preferable to use the same data source for all the countries modelled, the inclusion of data from Baringa Reference Case will not have any material impact on our analysis since the data are only used for markets that are remote from the Netherlands.
112. We deliberately rely mainly on a single capacity scenario for all the price paths, although we allow some variations in renewable capacity in response to CO2 prices, as explained in the next sub-section. Adjusting capacities to reflect price movements can often lead to circularities - for example, if more renewable plants are assumed to be built in response to, say, high CO2 prices then the likely outcome is that CO2 prices will fall with the result that the decision to invest may no longer be justified. The alternative approach would have been to treat capacity additions as another stochastic variable. In order to include another stochastic variable, we would have had to increase the number of paths that we considered very considerably in order to ensure that we had a representative set of results. This would have added complexity to the calculations without materially increasing the accuracy of the results.
104 For example, the IEA World Energy Outlook scenario on which we rely for commodity prices does not contain such data. ↩
105 The next EU Reference Scenario was only published in 2020 and the next Ten Year Network Development Plan produced by the European Network of Transmission System Operators – Electricity was only published in 2018. ↩
106 Baringa models the whole of Europe but markets in countries such as Greece and Italy have essentially no impact on the Dutch market. ↩
[Page 39]
113. The level of commodity prices has an impact on the economic attractiveness of renewable energy plants, such as wind and solar plants: the higher the marginal cost of fossil-fired generation rises, the more the economics of renewable plants improve because they generally have very low or zero marginal costs. However, while the level of commodity prices is a driver of changes in renewable capacity in the medium term, in the long term it is the decarbonisation agenda and the targets for renewable capacity that drive the level of renewable capacity. Accordingly, while we take a single view on the capacity of renewables in 2050, in the years prior to that we adjust the share of renewable capacity away from that predicted in the Reference Scenario as commodity prices vary between price paths. We adopt this approach not just for the Netherlands but also for all the immediately surrounding markets.
114. If commodity prices in a particular price path are above the mean level of commodity prices, we increase the level of renewable capacity that is constructed (and then remains operating). Similarly, as annual commodity prices move below the expected mean level of commodity prices, we decrease the level of renewable capacity. To maintain the original capacity margin and ensure there are sufficient flexible plants available to deal with fluctuations in renewable output, we also adjust the capacity of fossil-fired plants and demand-side options. Further details of this methodology are described in Appendix C.2.i.b.
115. In almost all respects, the electricity market assumptions for the but-for and actual cases are identical. However, there is, of course, a difference in the plant mix in the Netherlands in the two cases. In the but-for case, Amer remains available until the end of 2032 and Eemshaven and the two coal plants in Maasvlakte 107 remain available until 2054, whereas there are no Dutch coal plants after 2030 in the actual case. We assume that the coal capacity that is closed in the actual case is replaced by new gas-fired plants with the same capacity.
116. Most electricity markets, including that in the Netherlands, have a day-ahead market in which generating plants bid to be dispatched and are selected in order of increasing bid prices until demand for each hour is met. The most expensive plant whose bid is accepted sets the price for that period: this is known as marginal pricing.
107 Uniper's MPP3 and Riverstone's (formerly ENGIE's) Maasvlakte power plant. See Section II.B above. ↩
[Page 40]
117. Baringa uses PLEXOS® to simulate this process by dispatching plants in order of their "marginal generation costs”, starting from the cheapest and working up through increasingly expensive plants until demand is met (the “merit order”). By marginal generation costs we mean the costs that a generator incurs per unit of output produced, namely: fuel costs (including any relevant transportation costs), CO2 costs, and any other costs that vary with output.108
118. Due to the long period and the number of price paths for which we require electricity prices (out to then end of 2054),109 Baringa has not modelled prices for every hour since this would be unfeasibly time consuming. Instead, Baringa has divided each year into four-hourly periods, with 2,190 periods for each year. It has then calculated the average demand for each period and determined the price for that period.
119. To project yearly electricity prices for the Netherlands, Baringa modelled the development of the entire European electricity market out to 2054. It is important to model a wider region than just the Netherlands because the Dutch electricity market is directly connected to the markets in Belgium (two connections), Germany (four connections), Denmark (one connection), Norway (one connection) and Great Britain (one connection) and connected to France through Belgium and Germany.
120. Baringa has produced two sets of 100 electricity price paths. One set of price paths for the but-for case (excluding the Coal Ban), see Figure 8, and one set of price paths for the actual case out to 2030 (including the Coal Ban). Figure 9 demonstrates that the differences between the electricity prices in the but-for and actual electricity prices are very small throughout the 2020's and, indeed, are [Redacted] until [Redacted]. [Redacted]
108 For example, for coal plants, other costs varying with output include the costs of running the milling machines to prepare the coal for use and the costs of the chemicals needed to operate the "scrubbers" that remove sulphur dioxide from the exhaust gases. ↩
109 We do not model the market for the period 2017 to 2020 because the actual and but-for cases would be the same and Eemshaven could have hedged its output and commodity costs for this period using contemporaneous forward curves, which show a positive clean dark spread for a plant with Eemshaven's efficiency. ↩
[Page 41]
FIGURE 8: BUT-FOR ELECTRICITY PRICE PATHS110
[Redacted]
Baseload electricity price (€/MWh)
2020 2021 2022 2023 [Redacted] 2025 2026 2027 2028 [Redacted] 2030 2031 2032 2033 [Redacted] 2035 2036 2037 2038 [Redacted] 2040 2041 2042 2043 [Redacted] 2045 2046 2047 2048 [Redacted] 2050 2051 2052 2053
[Redacted] 6th-95th percentile [Redacted] 26th-75th percentile —Mean --- Median
FIGURE 9: DIFFERENCES BETWEEN BUT-FOR AND ACTUAL ELECTRICITY PRICES111
[Redacted]
Distribution of difference between Actual and But-for baseload electricity prices (€/MWh)
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
[Redacted] 6th-95th percentile [Redacted] 26th-75th percentile —Mean --- Median
[Page 42]
121. To calculate the loss in value of Eemshaven that Claimant has suffered as a result of the Coal Ban, it is important to take into account the specific characteristics and costs of Eemshaven. However, the electricity market modelling carried out by Baringa uses generic assumptions for coal plants that vary by their age and size. This is entirely appropriate to avoid distorting the outcomes (electricity prices) by including specific assumptions only for Eemshaven but it means that it would not be reasonable to use the coal plant output data from the Baringa runs directly in our financial model.
122. Instead, we assume that the expected operation of Eemshaven can be determined simply on the basis of the projected electricity prices and its specific operating costs. This is a standard assumption when stochastically modelling power plants because it significantly simplifies the calculations without materially affecting the outcome. The reason that there is little or no impact is because on those occasions when Eemshaven is the marginal plant it will not make any contribution to its commodity margin. Hence, whether it operates or not has essentially no impact on the level of free cash flows it produces.
123. We have built a model that determines the output pattern of Eemshaven that maximises its commodity margins, given Baringa's forecast electricity prices, as well as coal and CO2 prices and other operating constraints. In Section V.C.1, we explain how this model works and the results that it produces. Note that the assumptions in the model on how Eemshaven would operate vary depending on whether Eemshaven is burning only coal (after 2027) or a mixture of subsidised biomass and coal (from 2020 to 2027). We explain the differences in Section V.C.2.
124. We use our plant dispatch model to calculate the annual commodity margins made by Eemshaven for each price path under the actual and but-for cases. To do this, we first calculate the marginal generation costs for each 4-hour price period based on:
110 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
111 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 43]
125. The difference between the electricity price for a period and the marginal generation costs of a plant is known as the “clean dark spread” or “CDS”.113 At its simplest, a plant will generally want to operate and produce electricity whenever the CDS is positive and shutdown whenever it is negative. However, it is also necessary to take into account a number of technical constraints to determine, in practical terms, how a plant would actually want to run.
126. Since each period represents four hours, the decisions on when to operate a plant114 and when to shut it down are relatively straight-forward because the minimum run time for Eemshaven is [Redacted] and the minimum down time is [Redacted].115 However, every time a plant starts up, it incurs additional costs: it has to burn fuel just to get the turbines spinning before any useful electricity is produced and also has to use oil to start the combustion process. In addition, the rate at which a plant can increase its output is limited – this restriction is known as a “ramping constraint". The start-up costs and ramping constraint have to be taken into account in assessing whether it is profitable for the plant to generate or not. The more consecutive periods there are with positive CDSs, the more likely it is that the commodity margins from these periods will outweigh the start-up cost. In practice, this means that there are no occasions when the plant would want to run for only [Redacted] and, hence, the minimum run time constraint has no impact on the results.
127. It can sometimes be cheaper to run the plant through a four hour period that has a slightly negative CDS because the losses involved are less than the start-up cost that would otherwise be incurred. In such a situation, it is generally cheaper to reduce the output of the plant to its minimum stable operating level, even though the efficiency at which the plant produces electricity will be lower than if it was producing its full output.
128. In addition, the coal and biomass that are burnt by Eemshaven are delivered to the plant by ship and RWE Eemshaven has a contract with the adjacent harbour to secure berths for these ships. [Redacted]
112 We consider fuel transportation and handling costs as well as other variable costs such as cooling water. ↩
113 "Clean" because it takes into account the emissions costs associated with generating, “dark” because it relates to a "coal plant" and "spread" because it measures a difference between two quantities, the electricity price and the plant's costs. ↩
114 Eemshaven consists of two identical units. We model the operation of a single unit and assume that the other unit would operate in an identical fashion. ↩
115 We do not explicitly impose a minimum runtime of [Redacted] as it is only in the rarest occasions that the plant would optimally want to run shorter than [Redacted]. It only happens 32 times across all 100 simulations, at most in 6 out of 76,704 four hourly periods between 2020 and 2054 in a given simulation. ↩
[Page 44]
[Redacted].116 We incorporate both facets of the harbour contract into the dispatch model.117
129. We use a standard mathematical technique, called mixed integer programming, to take all these constraints into account in determining in which periods Eemshaven will run and in which periods it will be shut down.118 We assume that there will be a [Redacted] day maintenance period each [Redacted].119 In addition, to account for unplanned outages, i.e. breakdowns, we apply a [Redacted]% reduction to the results for each block based on RWE's expectations in 2017.
130. As an example of the output of the dispatch model, Figure 10 plots the CDS in the first 3 months of 2030 for one price path (dark blue line, right axis) against the optimal running pattern generated by our dispatch model (light blue columns, left axis).
116 Exhibit BR-38.D, RWE, Land Lease Akte II, dated 11 March 2009, article 22.8 and Exhibit BR-38.A, RWE, Schedule 22, dated 17 February 2009 ↩
117 See Appendix D.3 for details. ↩
118 We explain the model in detail in Appendix D. [Redacted] days represents an average of a long overhaul every [Redacted] years and shorter outage periods in the intervening years. ↩
119 Exhibit BR-39, RWE, Cluster Eemshaven, MTP 2017 (2018-2022), dated 8 September 2017. ↩
[Page 45]
FIGURE 10: EXAMPLE GENERATION PATTERN120
[Image of a line and bar chart showing Generation (MW) and Clean Dark Spread (€/MWh) from Jan/30 to Mar/30]
3,500 150
3,000 100
2,500 50
2,000 0
1,500 -50
1,000 -100
500 -150
0 -200 Jan/30 Jan/30 Feb/30 Feb/30 Mar/30 Mar/30
Generation (MW) Clean Dark Spread (€/MWh)
Notes: 4 hourly periods (01/01/2030 - 31/03/2030).
131. Under the Stimulering Duurzame Energieproductie+ (SDE+) scheme, Eemshaven currently receives subsidies when it burns biomass instead of coal.121 The SDE+ provides plants burning biomass with a “top-up" to electricity market prices for a pre-determined volume of electricity produced from renewable sources based on a 'strike price' that is designed to reflect the additional costs a plant incurs when burning biomass. The strike price and the maximum electricity volume that will be supported are specifically stipulated in each subsidy package awarded. As shown on the left-hand side of Figure 11, the top-up amount paid for a given year is normally equal to the difference between the strike price and the annual average electricity price for the Dutch market. However, if the average annual electricity
120 Harris-Hesmondhalgh Workpapers, Tables E.3 –Dispatch Model inputs. ↩
121 Exhibit BR-12, National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy, dated 30 November 2016. ↩
[Page 46]
price falls below a floor price, as shown on the right-hand side of Figure 11, the top-up is limited to the difference between strike price and the floor price.122
FIGURE 11: OPERATION OF THE SDE+ SCHEME
[Image of a diagram illustrating the SDE+ scheme with strike price, floor price, and SDE+ top-up]
Strike price
SDE+ top- up
SDE+ top- up
Floor price
Annual electricity price
Annual electricity price
132. Eemshaven has a single SDE+ scheme that will run until 2027. The details of the scheme, which were agreed before October 2017, are shown in Table 1. Even though the Coal Ban does not take effect until after Eemshaven's biomass subsidy has ended, it is a relevant consideration in calculating Eemshaven's loss in value because:
133. For both these reasons, it is important that we estimate the cash flows under the actual and but-for cases accurately during the period 2020-2030. For the period prior to 2020, Eemshaven would have been able to hedge its position based on the contemporaneous forward curves. Since the forward curves indicate that it would have been profitable for the plant to operate i.e. the clean dark spreads are positive, it follows that the cash flows in the actual and but-for cases would be identical and hence can be ignored when determining the loss in Eemshaven's fair market value as a result of the Coal Ban.
122 Suppose the strike price is [Redacted] €/MWh and the floor price is [Redacted] €/MWh, If the average annual electricity price is equal to [Redacted] €/MWh, the "top-up" is equal to [Redacted] €/MWh. However if the average annual electricity price falls below the floor price to, say, [Redacted] €/MWh, the "top-up" is only equal to the difference between the strike price and the floor price [Redacted] €/MWh. ↩
[Page 47]
TABLE 1: EEMSHAVEN SDE + SUBSIDY123
| Subsidy number | [1] See note | SDE1693517 |
| Original start date | [2] See note | [Redacted] |
| Expected start in Oct 2017 | [3] See note | [Redacted] |
| Duration years | [4] See note | 8 |
| End date | [5] [3]+[4] | 30-Apr-2027 |
| Annual generation limit MWh | [6] See note | 1,788,889 |
| Biomass capacity MW | [7] See note | 256 |
| Strike price, nominal €/MWh | [8] See note | [Redacted] |
| Floor price, nominal €/MWh | [9] See note | [Redacted] |
| Maximum total subsidy € mln | [10] See note | [Redacted] |
Notes and sources: [1], [4], [6], [7], [10]: Exhibit BR-73, National Enterprise Agency of The Netherlands, SDE Projects Available in Autumn 2016. [2], [8], [9]: Exhibit BR-12, National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy. [3]: Inputs from RWE.
134. For the period between 2020 and 2027, the plant dispatch model described in the preceding sub-section takes into account the impact of these biomass subsidies by assuming that Eemshaven will factor the subsidy that it received in the previous year into the biomass spread that it considers when deciding whether or not to burn biomass in a particular period.
135. Eemshaven has an environmental permit,124 which only allows it to burn 800,000 tonnes of biomass every year. This prevents it from reaching its full subsidy level of 1.789 TWh, although it comes very close to this level.125 Consequently, the dispatch model seeks to optimise when to burn biomass and when to burn coal subject to this limit. We discuss the optimisation models for the biomass subsidy period in greater detail in Appendix D.
136. [Redacted] We agree that this is a reasonable assumption.
123 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
124 Exhibit BR-10, RWE, Environmental Permit Eemshaven, dated 11 December 2007, pp. 90-92 for the granted request and Exhibit BR-11, KEMA Consulting, Application for Incorporation Permit, dated 20 December 2006, pp. 48-49 for the request details, see Table 3.1.2. ↩
125 Burning 800,000 t of biomass with an energy content of [Redacted] and a maximum efficiency of [Redacted] results in 800,000 t × [Redacted] generated electricity from renewable energy sources. ↩
[Page 48]
137. The following information from the plant dispatch model for each year, and for the 100 price paths, for both the but-for and actual cases is included in the financial model:
126 See also ¶128 above for a more detailed explanation of the harbour contract. ↩
[Page 49]
138. In this section, we describe the steps we take to derive Eemshaven's cash flows from the commodity margins produced in the previous step. We also discuss how we derive and apply a discount rate, which we apply to the cash flows to arrive at the FMV.
139. To calculate cash flows, we first add trading revenues to the commodity margins. We then deduct:
140. To arrive at the “free” cash flows, economists consider all cash inflows and outgoings to the project, including those coming from operating activities – included in sub-bullets a) and b) above - and those from investment activities, included in sub-bullet c).
141. RWE Generation SE – which is the generation division of RWE AG – produces forecasts of the likely revenues and costs associated with operations for over 70 individual plants, including Eemshaven, in the course of its normal business. RWE Generation SE refers to these forecasts as Station Contribution Outlook or ‘SCOut' reports.127 [Redacted] [Redacted].128 Each SCOut report forecasts revenues, investment needs and operating costs for the next [Redacted] years.
142. It seems reasonable to assume that any prospective buyer would have access to the most recent SCOut report as part of a ‘due diligence' process, and in particular would base its valuation on the data in the October 2017 SCOut report. Accordingly, this report is one of the key data sources on which we rely to forecast cash flows.129
127 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017. ↩
128 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017. ↩
129 SCOut was published on 10 October 2017, one day after the valuation date of 9 October 2017. The information on which SCOut relies was available some time in advance. For example, SCOut performs its analysis based on market pricing data as of [Redacted]. We would expect a third party buyer to have ↩
[Page 50]
143. In addition to selling electricity, RWE generates revenues from trading the coal, CO2, gas and electricity that are needed for, or generated by, RWE's plants. This is a common practice in the energy industry, often referred to as ‘Asset Backed Trading'. 130 RWE refers to this as Commercial Asset Optimisation or “CAO”.131 The reference to “Asset” in the names is because the trading that is carried out is associated with physical assets – in this case power plants.
144. As noted in Section I.A, we have been instructed to value losses based on a FMV perspective. FMVs look at the price that a buyer would be willing to pay for an asset. Hence, the question arises whether a buyer would consider CAO revenues when valuing Eemshaven. Potential purchasers who do not own any other plants, and have no other trading operations, would likely assume significantly lower CAO revenues than those that RWE could achieve. However, potential purchasers with a portfolio of plants would likely value CAO revenues at similar levels to RWE. This means that Eemshaven would be worth more to a larger, more sophisticated buyer and, hence, that the successful bidder would be such a buyer. 132 We conclude, therefore, that the calculation of the FMV should include the CAO revenues.133
145. CAO revenues arise as Eemshaven operations allow RWE to exploit price differentials, or arbitrage, to increase its profits.134 We give a more detailed example in Appendix E, in which asset-backed trading involves ‘time arbitrage'. Other forms of asset-backed trading include geographic arbitrage, where traders exploit price differences in a commodity at different locations, technical arbitrage, where a trader can take advantage of price differentials for different qualities of a commodity, and production arbitrage, where firms can vary physical production to exploit price differences in the underlying commodities.135
access to the same information as of 9 October 2017. See Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, pp. 47-48.
130 Exhibit BR-41, Basteviken, M., Pearson-Woodd, N., Asset-Backed Trading in the Energy and Resources Sector, International Tax Review, dated 5 March 2019. ↩
131 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, pp. 127-131, 135. ↩
132 Not least, precisely because it would factor profits from trading into the value it placed on Eemshaven whereas a company with no other assets would not do so. The higher value would make it more likely that RWE would accept the sophisticated company's bid. ↩
133 Our analysis takes into account CAO revenues net of costs associated with trading. See Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, p. 127. ↩
134 Exhibit BR-42, Corporate Finance Institute, Arbitrage. ↩
135 For a full description of Asset Backed Trading, see Exhibit BR-41, Basteviken, M., Pearson-Woodd, N., Asset- Backed Trading in the Energy and Resources Sector, International Tax Review, dated 5 March 2019. [Redacted] ↩
[Page 51]
146. In practice companies such as RWE, which own several power plants, carry out this kind of trading optimisation across all their plants, rather than on a plant-by-plant basis. They will also typically carry out more complex trades, involving multiple commodities and geographies. Trading activities are an important part of the revenues of a sophisticated power generator, such as we assume would be the most likely willing buyer of Eemshaven.
147. We model commodity prices and commodity margins from 2020 onwards. Hence, for each of the 100 commodity price paths, we need to forecast CAO revenues from 2020 onwards. Moreover, the forecast CAO revenues need to be consistent with the commodity margins we forecast.
148. The October 2017 SCOut report includes estimates of the CAO revenues to be allocated to Eemshaven for the period [Redacted].136 These forecasts may not be consistent with the commodity price paths that we model. However, the October 2017 SCOut forecasts still provide a useful basis for establishing the relationship between CAO revenues and commodity margins. For the period [Redacted] the ratio between CAO revenues and commodity margins [Redacted].137 Hence, it seems reasonable to suppose that this relationship would endure, and that future CAO revenues [Redacted] and the plant revenues, [Redacted]. Accordingly, we forecast CAO revenues for the period 2020-2054 based on the [Redacted]. Naturally, CAO revenues cease after the plant ends operations.
149. Eemshaven, like other coal-fired plants, has two types of operating costs: variable costs, which vary with the amount of electricity produced; and fixed costs, which are largely independent of the plant's output. The commodity margins, which are the starting point for our financial model, already deduct the variable costs. These are mainly the cost of coal and
137 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H18. We find that CAO revenues account for approximately [Redacted] of EEM commodity margins. ↩
[Page 52]
CO2 permits.138 Accordingly, in the financial model, we need only to deduct fixed costs.139 Fixed operating cost items include grid fees, environmental fees, the cost of the land lease, property taxes, salaries, and maintenance costs.
150. We base our operating cost forecasts on the October 2017 SCOut report.140 [Redacted] There are a number of reasons why we need forecasts of some of the individual operating costs in our model.
151. [Redacted] the land lease and property taxes, [Redacted]. We discuss these items in more detail below.
152. Second, not all the notionally 'fixed costs' are fully independent of plant output. That is, some costs are only “semi-fixed". Some of the operating costs can vary depending on whether the plant is running for a relatively high or low number of hours in a year. For example, if the plant is consistently running for a lower number of hours, it will incur lower maintenance costs because maintenance is normally only required after a plant has operated for a fixed number of hours since its last overhaul. As Table 2 illustrates, RWE has provided us with data on the percentage of savings that is possible, based on the number of running hours a year, for specific types of cost. In particular, Eemshaven:
138 Harris-Hesmondhalgh Workpapers, Tables E.1 – Dispatch model, Table E.1.3. ↩
139 The October 2017 SCOut report refers to fixed operating costs as "Total Controllable Costs" or "TCC". The October 2017 SCOut report refers also to "Internal Service Charges" or "ISC". We understand that these charges correspond to a cost category that is applicable to German plants but not to Dutch plants. ↩
140 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017 pp. 45, 47 and 48, "Total Controllable Costs/ ISC". ↩
[Page 53]
153. [Redacted].141 We have reviewed these numbers, and find the savings as a function of operating hours to be reasonable.142
TABLE 2: VARIATION OF 'FIXED' COSTS WITH RUNNING HOURS143
| Running hours as share of yearly hours | ||
|---|---|---|
| Cost savings | [Redacted] | [Redacted] |
| [Redacted] | [Redacted] | |
| [Redacted] | [Redacted] | |
| [Redacted] | [Redacted] | |
154. We forecast specific categories of costs based on the totals in the SCOut report, assuming that the share of individual costs will be the same as for the years 2016 and 2017, for which we have a breakdown of operating costs.144 First, we remove the costs of property taxes and the land lease, which we model separately.145 Then we apply the average 2016/2017 share of each cost to the remaining operating costs from the SCOut report, to obtain forecasts of individual operating cost categories. For example, staff costs averaged [Redacted]% of total operating costs in 2016/2017. We assume that staff costs continue to represent [Redacted]% of total operating costs from 2018 onwards. Table 3 below illustrates the percentage of each type of operating cost that we apply.
142 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H24. ↩
143 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
144 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H26. ↩
145 The exact amount of property taxes to deduct depends on the property taxes that RWE expected to pay when preparing SCOut. We infer the expected payments as the values recorded for the but-for case in our model for the period 2020-2022. See Harris-Hesmondhalgh Tables H – Financial Model, Table H26, Table H27, and Table H28. ↩
[Page 54]
TABLE 3: SHARE OF OPERATING COSTS146
| Annual Costs, € mln | Share of costs, % | |||||
|---|---|---|---|---|---|---|
| 2016 [A] | 2017 [B] | 2016 [C] | 2017 [D] | Average 2016-2017 [E] | ||
| Average ([C],[D]) | ||||||
| [A]/[9][A] [B]/[9][B] | ||||||
| Grid fees | [1] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Operations costs | [2] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Nature measures | [3] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Staff | [4] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Maintenance costs | [5] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Facility related costs | [6] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Several other smaller costs | [7] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Depreciation of stored goods | [8] Table H26 | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
| Total operating costs net of land lease costs and property taxes | [9] Sum ([1]-[8]) | [Redacted] | [Redacted] | [Redacted] | [Redacted] | [Redacted] |
155. Having 'disaggregated' the SCOut operating cost forecasts into individual cost elements, we remove the non-cash item that accounts for the depreciation of unused stored goods.147 We then forecast all the other costs assuming that they increase with our forecast of inflation. Finally, for each commodity price path and year, we adjust each semi-fixed operating cost based on the number of hours the plant runs.
156. Until 2029, operating costs are very similar in the actual and but-for cases. The small differences relate to the lower property tax payments.148
157. RWE has signed a [Redacted]-year lease [Redacted].149 We forecast the annual land lease costs based on
146 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
147 The accounts and the SCOut report refer to these costs as "Afa Gangigkeiten". See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, and Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017. ↩
148 Property taxes are based on the book value of the assets. Since we apply accelerated depreciation in the actual case relative to the but-for case, book values and hence property taxes are lower in the actual case than in the but-for case. See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H22 and Table H23. ↩
149 See Exhibit BR-38.C, RWE, Land Lease Akte I, dated 16 March 2009, art 1.2. ↩
[Page 55]
the cost per square meter set out in the contract.150 We apply a corresponding yearly price increase factor of [Redacted]%.
158. In cases where Eemshaven closes, RWE would logically consider terminating the land lease, so as to avoid the associated costs. However, the decision to terminate the land lease involves three main factors:
159. Hence, in each year, Eemshaven would logically compare the cost of the termination fee and the cost of buying the land to the value of the land acquired and the avoided future costs.154
160. We find that the optimal time for Eemshaven to terminate the land lease and buy the land is [Redacted].155 If Eemshaven terminated the lease after this date, then the increase in the price of buying the land is larger than the reduction in the avoided lease payments. It would not be optimal for Eemshaven to terminate before [Redacted], because waiting another year reduces the termination fee by more than the avoided lease payments.156
150 Exhibit BR-38.C, RWE, Land Lease Akte I, dated 16 March 2009, art. 9.1. The first land lease payment as of 2020 is [Redacted]. See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H27. ↩
151 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H27. ↩
152 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H27. ↩
153 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H28. ↩
154 In other words, Eemshaven has two options every period: an early termination and payment of a fee or continuing with the lease. By paying the fee, Eemshaven then has the option, but not the obligation, to purchase the land. [Redacted] [Redacted] See Harris-Hesmondhalgh Tables H – Financial Model, Table H27. ↩
155 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H27. ↩
156 [Redacted] Tables H – Financial Model, Table H27. ↩
[Page 56]
161. Note that the optimal year in which to buy the land is independent of the actual plant closure date, and so is the same in the actual and but-for cases. Hence, the choice has no effect on damages.
162. Additionally Eemshaven incurs costs in using the harbour to unload coal for use in the plant. The fee consists of a payment per ship, and so is broadly a variable cost. [Redacted] [Redacted] [Redacted] [Redacted]
163. Eemshaven pays property taxes and various other taxes. Property tax payments are calculated with reference to the value of the land and buildings multiplying by the property tax rate of 0.75%.160 We estimate the value of the land by reference to Eemshaven's lease, by assuming that the site's owner receives lease payments in perpetuity, and then computing the present value of the lease payments, using a discount rate appropriate to Eemshaven.161 In addition, we also include the value of other land reported in the accounts.162
164. We use the value of the buildings from Eemshaven's accounts. We assume that the buildings are unique to the operations of the power plant, and hence fully depreciate them by the
157 Exhibit BR-38.D, RWE, Land Lease Akte II, dated 11 March 2009, art. 22.8. ↩
158 Exhibit BR-38.D, RWE, Land Lease Akte II, dated 11 March 2009, art. 22.8 and Exhibit BR-38.B, RWE, Schedule 23, dated 17 February 2009 ↩
159 Harris-Hesmondhalgh, Tables H – Financial Model, Table H9 and Table H27. ↩
160 Exhibit BR-43, Municipality of Eemsmond, Real Estate Tax. [Redacted] However, we expect that in the event of particularly high or particularly low commodity prices and, respectively, low/high plant values, the plant owner and the municipality would renegotiate the property tax basis so that the tax payments better reflect the value of land and buildings. Hence, we calculate property tax payments by reference to the value of land and buildings payments over time, which remain stable across price paths. ↩
161 Financial theory indicates that the value of an asset is the value of the cash flows it can generate over time, after adjusting these cash flows for their risk and uncertainty. We assume the land's owner can receive payments equivalent to Eemshaven's payments over time. ↩
162 Harris-Hesmondhalgh Workpapers, Tables H - Financial Model, Table H28. The land lease includes an annual inflation factor of [Redacted]%. See Harris-Hesmondhalgh Workpapers, Tables H - Financial Model, Table H27 and Table H28. ↩
[Page 57]
time the plant closes.163 This assumption will tend to underestimate damages, relative to an assumption that the buildings depreciate independently of the operation of the power plant. This is because linking depreciation to the operation of the power plant means that in the actual case the buildings become obsolete earlier than in the but-for case. Hence every year the building-related portion of the tax payments are lower in the actual case than the but-for case, reducing damages.
165. Eemshaven's accounting data combines property taxes and other taxes in a single category. Based on the analysis of property taxes above, we back out the portion of the overall tax amount that relates to other taxes. We understand that other taxes include taxes on energy used for own buildings, and water charges. As explained in the preceding sub-section, we assume that, regardless of the year in which it closes, Eemshaven will retain the site. Based on discussions with RWE, we understand that retaining the site will result in Eemshaven incurring [Redacted]% of its other tax payments after closure.164
166. A potential buyer of Eemshaven would consider the effect of the acquisition on its corporate overhead costs. Overhead costs are expenses incurred to support the business that are not directly related to a specific product or service – in this case generating electricity from coal. The costs of the CEO and the board, legal and human resources, office rent and insurance are all typical examples of overhead costs.
167. Clearly, acquiring a plant such as Eemshaven would only affect some types of overhead costs. For a large buyer, it seems unlikely that the costs of the CEO or the costs of office rental would increase as a result of the acquisition of Eemshaven. To estimate the increase in a potential acquirer's overhead costs as a result of purchasing Eemshaven, we consider how RWE treats overhead costs.
168. RWE divides its overhead costs into central business unit (BU) costs.165 RWE estimates that, on closing Eemshaven, around [Redacted]% of the overheads allocated to Eemshaven would be eliminated.166 This implies that, upon acquiring Eemshaven, a buyer's overhead would
163 Under some commodity price paths, Eemshaven shuts down early in the actual and/or the but-for case. In these instances, we assume Eemshaven fully depreciates the remaining book value of the buildings in its last year of operation, which means that Eemshaven does not incur taxes on the buildings after its closure. ↩
164 Harris-Hesmondhalgh Workpapers, Tables H - Financial Model, Table H28. ↩
166 Exhibit BR-44, RWE, Consideration of Overhead Costs When Evaluating Assets and Contracts, dated 30 September 2015. ↩
[Page 58]
increase by the same amount. For example, suppose a BU had overhead of 100, and allocated 30 of the overhead to Eemshaven. Upon closure of Eemshaven, the overhead would fall by [Redacted]. Hence, a buyer of Eemshaven would experience an increase in overhead of [Redacted].
169. We consider that RWE's overhead costs provide a reasonable estimate of the overhead costs of any potential buyer. If the buyer of the asset did not have any corporate functions – for example, because the plant was the buyer's only asset – it would need to recreate the corporate overhead services. The cost of the services would likely be greater than RWE's allocated overhead, because the services would not be shared among several assets.
170. If the buyer was a firm like RWE Generation SE, then the corporate overhead costs should be similar to RWE's current corporate overhead. The projected overhead costs in the October 2017 SCOut report were subject to a review by the Board of RWE Generation SE. Historical overheads have been subject to external accounting audits, and contribute to RWE's declared profits and hence taxes. [Redacted] [Redacted].167 This kind of overhead allocation method is standard and consistent with other overhead allocation practices that we have seen.
171. Accordingly we estimate the increase in a potential buyer's overhead costs, resulting from the acquisition of Eemshaven, as [Redacted]% of the overhead RWE allocates to Eemshaven. Specifically, we use the SCOut overhead cost forecast for years [Redacted] inclusive. After [Redacted], we increase the [Redacted] forecast cost with inflation.
172. Upon plant closure, the overhead costs associated with the Eemshaven plant fall to zero. This is logical, since the overhead costs associated with Eemshaven were zero for the third party before it acquired Eemshaven, and so they would return to zero after its closure.
173. We check the forecast operating costs, including direct overheads, in the SCOut report in two ways. First, we check that the total forecast costs correspond to the historical operating costs for 2016 and 2017. The SCOut report contains annual operating costs of [Redacted] in the period 2020-2022. The accounts report total operating costs of [Redacted] and [Redacted].168 Hence, SCOut forecasts slightly lower operating costs than the plant experienced in 2016 and 2017. This makes sense given that we would expect the plant to
167 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017 pp. 132 and 135. ↩
168 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H26. ↩
[Page 59]
'learn by doing' and realise some operating cost savings after the first few years of operation.
174. Second, we benchmark the costs against fixed cost estimates for coal plants published by Forbes - Energy Innovation,169 the Energy Information Administration (“EIA”)170 and the National Renewable Energy Laboratory (“NREL”).171 These publications all present fixed costs in US Dollars for different years. We have converted the costs to Euros using two different approaches. First, we relied upon the contemporaneous market exchange rate. Second, we used a purchasing power parity (PPP) exchange rate.172 This is a theoretical exchange rate that allows you to buy the same product or service in different countries.173 We apply a PPP exchange rate to account for the possibility that the dollar may have been unusually strong against other currencies during the relevant period, which would lead to an overestimate of fixed operating costs in Euros.
175. After converting the operating costs to Euros per MW, we apply Eurozone inflation to bring the fixed costs to 2020 prices. Finally, we apply Eemshaven's capacity to yield costs in Euros. We compare the benchmark costs against our October 2017 forecast of Eemshaven's fixed operating costs for 2020. As discussed above, our forecast is based on the SCOut forecast plus direct overhead costs, which yields a 2020 cost of [Redacted] [Redacted]
169 Exhibit BR-45, Forbes - Energy Innovation: Policy and Technology, Carbon Capture And Storage: An Expensive Option For Reducing U.S. CO2 Emissions, dated 3 May 2017. ↩
170 The EIA collects, analyses and disseminates energy related information as part of the U.S. Department of Energy. Exhibit BR-46, EIA, Assumptions to The Annual Energy Outlook: Cost and Performance Characteristics of New Central Station Electricity Generation Technology, 2015. ↩
171 NREL is a government-owned contractor-operator facility. That has more than 40 years of experience in renewable energy and energy efficiency research. Exhibit BR-47, NREL, Annual Technology Baseline 2017 ↩
172 OECD 2020, PPPs and exchange rates, available at http://stats.oecd.org/. See Exhibit BR-48, OECD, Purchasing Power Parities (PPP) 2008-2019. ↩
173 For example, if a hamburger costs $5 in the US but an identical hamburger costs €4, then the PPP exchange rate is 5/4 = 1.25 US Dollars per Euro. The market exchange rate may be different. ↩
[Page 60]
TABLE 4: FIXED COST BENCHMARKING174
| 2020 € mln [A] | 2020 PPP € mln [B] | ||
|---|---|---|---|
| Forbes | [1] | [Redacted] | [Redacted] |
| EIA | [2] Table H34 | [Redacted] | [Redacted] |
| NREL | [3] Table H34 | [Redacted] | [Redacted] |
| Average | [4] Average([1] to [3]) | [Redacted] | [Redacted] |
| Forecast Brattle | [5] Table H34 | [Redacted] | [Redacted] |
176. RWE Eemshaven is not claiming for the roughly €3 billion of capital investment that it has made in the Eemshaven plant. This capital expenditure is a sunk cost,175 and so irrelevant to a calculation of Eemshaven's FMV as of October 2017. However, capital expenditures remain relevant to the Claimant's damages for two reasons. First, past capital expenditures give rise to a depreciation expense, which the plant owner can use to reduce taxes, which we discuss in the next section. Second, future capital expenditures use up cash, and so reduce free cash flows.
177. We understand that RWE expects capital expenditures for Eemshaven to follow a cyclical pattern, which reflects smaller ongoing capital expenditures for [Redacted] years coupled with larger investments every [Redacted] year. In our experience, this kind of ‘cycle' of major overhauls and investments for coal-fired plants, and the level of capital expenditure, is typical in the power sector. The 2017 SCOut report forecasts the smaller capital expenditures for the period [Redacted]. We forecast the smaller capital expenditures beyond [Redacted] by applying inflation to the forecast [Redacted] small expenditures. As of [Redacted] the smaller expenditures are about [Redacted] per year.176
178. The large investments every [Redacted] years involve periodic overhauls.177 Overhauls refer to maintenance activities that, due to their relatively high costs and scope, would not be
174 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
175 In this context, a sunk cost refers to costs that have already been incurred and can no longer be recovered. ↩
176 Harris-Hesmondhalgh Workpapers Tables G – Investments Model, Table G4. ↩
177 In particular, Eemshaven has two units: Eemshaven A and Eemshaven B, both of identical size. SCOut 2017 foresees that investments in each unit will take place in [Redacted]. See Harris-Hesmondhalgh Workpapers, ↩
[Page 61]
appropriate to include as normal operating expenses but instead are capitalised. We project the cost of the periodic overhauls based on the SCOut report, applying inflation after [Redacted]. As of [Redacted] the cost of an overhaul amounts to approximately [Redacted].178
179. [Redacted] Carrying out a major overhaul just before closing the plant would be like paying for a car to be serviced just before taking it to the scrapyard. In particular, in the actual case where the plant closes at the end of 2029, we assume RWE would avoid [Redacted]% of the planned overhaul costs in 2029.179
180. Similarly, in the but-for case we apply a reduction of [Redacted]% of the overhaul cost when overhauls take place in the last operating year. We assume no savings in overhauls taking place one year before closure, on the basis that there may not be sufficient notice of closure to realise overhaul cost savings. In the but-for case, when Eemshaven closes in 2054, we assume that the plant can save [Redacted]% of the 2053 overhaul costs, since the owner would know that closure will occur in 2054.
181. Typically, there will be a delay between when a company records revenue in its accounts, and when the company is actually paid. Similarly, there is usually a difference between when a company incurs a cost, and when it actually pays for the goods or services. Businesses need so-called 'working capital' to account for these timing differences. Technically, working capital is usually defined as receivables, amounts that the company is owed, less trade payables, amounts that the company owes its suppliers, plus inventory, stocks of goods, and other short term assets, like cash.
182. [Redacted] [Redacted] However, we understand from RWE that the working capital required for Eemshaven is [Redacted]
Tables G – Investment and Depreciation Model, Table G4. The dispatch model equally assumes outages corresponding to overhauls every [Redacted] years, but-for simplification assumes the corresponding annual equivalent every year.
178 The investment covers only one of Eemshaven blocks. See footnote 177. ↩
[Page 62]
[Redacted] This also means that working capital [Redacted]
183. [Redacted] we take the working capital for 2017 for Eemshaven, and inflate this value over time.180
184. In the sub-sections above, we have described how we estimate all the operating costs that we deduct from Eemshaven's revenues. However, to calculate Eemshaven's taxable income, we must also deduct depreciation.
185. Depreciation and capital expenses can be thought of as two sides of the same coin. Capital expenditures are not included in the profit and loss statements that companies prepare to compute their taxable income. Instead, when a firm undertakes a capital expenditure, the expense is recorded as a depreciable asset.181 The depreciable asset is expensed over time in the firm's income statement. The capital expenditure reflects the actual cash outlay, but depreciation is the accounting construction used to spread the cost of the capital expenditure over time. Hence, depreciation expenses are what economists call a 'non-cash expense'. Ultimately, total depreciation expenses over the life of an asset match the total original capital expenditure.
186. Our financial model forecasts depreciation by modelling past and expected capital expenditures by type of expense.182 The period over which a company may depreciate a specific type of asset (its “tenor”) is typically set out in the relevant tax legislation. For example, RWE depreciates the capital expenditure it incurs in constructing power plants over roughly [Redacted] years.183 This makes sense, because plants are long-lived assets. RWE depreciates other capital expenses, such as software and other IT-related investments, over only [Redacted] years. The shorter period reflects that these investments become technologically obsolete after a relatively short time. Based on information from RWE, we apply the depreciation tenor specific to each type of capital expense. We then sum up the depreciation expense for each type of capital expenditure by year, to obtain the total yearly depreciation expense.
180 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H10. ↩
181 There are exceptions, the most notable being land purchases, which are a capital expense but not typically depreciated. ↩
182 RWE provided us with detailed depreciation reports under IFRS accounting rules, which differ from those presented to tax authorities. In Appendix F, we explain the steps to approximate depreciation for tax purposes from the detailed IFRS accounts. ↩
183 Harris-Hesmondhalgh Workpapers, Tables G – Investment and Depreciation Model. ↩
[Page 63]
187. Depreciation increases the accounting expenses of Eemshaven, allowing it to record lower taxable profits [Redacted] [Redacted] [Redacted] [Redacted] [Redacted]
188. [Redacted] [Redacted]
189. [Redacted] Specifically, as of 2017, Dutch tax legislation allowed for a tax carry forward of nine years.185 If after nine years losses from a given year have not been used to offset profits, the tax carry forward is lost. Accordingly, we allow Eemshaven up to nine years to consume the depreciation related losses.
190. Most of Eemshaven investments are long-lived, and would normally be expected to have an accounting value even after 2030. However, the Coal Ban leads to a reduction in the useful life of most of these assets – they need to be fully depreciated by the end of 2029. Shortening the depreciation tenors increases the annual depreciation expenses in the actual case. Therefore, depreciation expenses are higher in the actual case than in the but-for case during the 2020's. [Redacted] [Redacted]186
191. In the but-for case, Eemshaven may also wish to shut down before 2054 under some price paths. Such closures would not be planned in the same way as the Coal Ban closure, and so would leave some depreciation allowances unused at the time of closure.
184 In accounting terms, the losses create a tax asset. ↩
185 Exhibit BR-49, Deloitte, Netherlands Alert, New Policy Goals Include Corporate Income Tax Rate Reduction, Abolition of Dividend WHT, dated 13 October 2017. For example, suppose a total initial unused loss of 120, and profits of 40 per year. Each year, the company could consume 40 units of the loss. After three years, the group would consume, 120 units, the entire loss, and avoid paying any taxes. ↩
186 Apart from transferring losses over time, a third party buyer could also transfer yearly losses across subsidiaries. We understand that Dutch legislation allows subsidiaries of the same parent company to consume the losses of other subsidiaries to reduce their tax payments, a practice more commonly known as group relief. Suppose that Company A owns two subsidiaries: Company B, which recorded losses of €50, and Company C, which recorded profits of €50. Because group relief allows for losses to be transferred across subsidiaries, Company C can offset its €50 profit with Company's B €50 losses, and pay no taxes. See Exhibit BR-50, PWC, Corporate - Group Taxation, Netherlands, dated 6 September 2020. However, to the extent of our knowledge, there is no energy company with a large and profitable enough portfolio in the Netherlands to use the additional large depreciation losses that Eemshaven generates in the actual case compared to the but-for case. ↩
[Page 64]
192. Profitable operations of Eemshaven after 2030 will result in taxable profits – so positive net income - when Eemshaven has exhausted its tax credits. Where there are taxable profits, we calculate Eemshaven's taxes by applying the prevailing corporate tax rate in the Netherlands as of October 2017, 25%,187 to Eemshaven's taxable income.
193. To conclude, the Brattle financial model computes free cash flows by taking into account all cash outgoings, including ongoing operating expenses, capital expenses, and tax payments to calculate after-tax cash flows in each year. At the same time, it adds back depreciation, which does not reflect any cash outlay.
194. As we explain above, we generate 100 price paths for gas, coal, and CO2 prices. Hence, we generate 100 'pairs' of free cash flow paths for both the actual and but-for cases. Some of the combinations of commodity prices result in cash losses188 for Eemshaven in some years, in the sense that the plant is unable to cover its fixed and variable costs, excluding depreciation.
195. However, Eemshaven has the option to shut down, if it finds itself making cash losses, and it expects the losses to continue. Economists refer to this kind of option as a 'real option'.189 Eemshaven's ability to close limits losses in simulations with unfavourable commodity price paths. That is, we can, in effect, reduce the impact of loss-making commodity price paths by closing the plant.
187 Exhibit BR-49, Deloitte, Netherlands Alert, New Policy Goals Include Corporate Income Tax Rate Reduction, Abolition of Dividend WHT, dated 13 October 2017, Exhibit BR-51, PWC, Netherlands Corporate Taxes on Corporate Income, dated 6 July 2020. The corporate tax rate in place and expected as of October 2017 was 25%. Later plans announced the intention to reduce the corporate income tax rate to 21.7%, but this was not known at the time of the valuation. The 21.7% rate has not been implemented. ↩
188 We distinguish between cash losses, whereby the plant does not cover its operating costs, and accounting losses, whereby the plant does not cover operating costs plus depreciation. A year in which the plant makes an accounting loss may well have positive cash flows. Hence, shut down decisions would be based on cash losses, not accounting losses. Note that we do not include investments when calculating cash losses, since a one-off investment could give a misleading impression of cash losses that would not in fact continue in the future. ↩
189 The term real option reflects that managers of physical assets, such as plants, have the flexibility to decide when and how much to operate. Economists use the term real to distinguish it from financial options, a related but separate field in economics. Real options is a mainstream approach to valuation in academic circles. Professor Stewart Myers of the MIT Sloan School of Management first coined the term 'real options' in 1973. Exhibit BR-52, Myers, S.C., Determinants of Corporate Borrowing, Sloan School of Management, MIT, September 1976. Real options has evolved to become a standard valuation method. It is discussed in hundreds of dedicated research articles, chapters in general corporate finance textbooks, MBA programs, and even entire textbooks. See for example Exhibit BR-4, Berk, J.B., DeMarzo, P.M., Corporate Finance, Third Edition, Chapter 22: Real Options and Exhibit BR-53, Guthrie, G., Real Options in Theory and Practice, Oxford University Press, 2009. ↩
[Page 65]
196. The decision as to whether to close the plant at a given date is complex. A rational plant owner would need to consider:
197. For example, logically Eemshaven would not close after one year of losses, if it expected to make profits for the remainder of its useful life. However, it would not be realistic to assume that Eemshaven has perfect foresight, and can perfectly predict the future paths of commodity prices from any given date. Accordingly, we implement a simplified 'shut down rule', whereby Eemshaven will close after two years of cash losses in the but-for case if it expects that it will also make losses in the next year. In effect, we assume that Eemshaven management can reasonably distinguish between temporary negative events and longer term trends.
198. In the actual, we shorten the shut-down rule by one year. That is, if Eemshaven makes losses in one year and expects to make losses in the next year, it closes. We adopt a shorter shut down rule in the actual case because the remaining life of the plant is so much shorter than its potential life in the but-for case. It makes sense for the plant to be less willing to accept an additional year of losses in the actual case, because the prospect of future profits offsetting the losses is lower when the plant must close at the end of 2029, relatively to a situation where the plant could run until 2054.
199. For example, suppose that for a given commodity price path, Eemshaven had a negative cash flow of €10 million in 2039, €10 million in 2040 and that the given commodity price path would result in a loss of €5 million in 2041. We would assume that Eemshaven closes at the end of 2040, and generates no positive cash flows from 2040 onwards. Hence for this commodity price path, from 2040 onwards there will be no further loss in Eemshaven's fair market value, since there are no differences in the cash flows under either the but-for and actual cases.
200. Figure 12 illustrates the effect of this shut-down rule for Eemshaven. The figure shows the number of years across all the price paths with positive cash flows in dark blue, and the
[Page 66]
number of years with negative cash flows in light blue.190 In the but-for case, the total number of modelled years in which Eemshaven runs and generates positive cash flows is substantially higher than in the actual case. There are some years with negative cash flows, but these are offset by a higher share of profitable years for the price paths where Eemshaven continues operations. In the actual case, operations are limited to 2029, and so the number of years in which Eemshaven can make profits is reduced. As a result, the share of years with negative cash flows is increased.
FIGURE 12: DISTRIBUTION OF CASH FLOWS WITH A SHUTDOWN RULE191
[Image of a stacked bar chart showing the number of year-price paths for "But For" and "Actual" cases, split into "Positive" and "Negative" cash flows.]
1,800
1,600
1,400
1,200
1,000
800
600
400
200
0 But For Actual
Positive Negative
201. Our shut down rule likely underestimates the FMV in the but-for cases for two reasons. First, our analysis does not consider the possibility of ‘mothballing' the plant. Mothballing refers to a temporary closure of the plant. Mothballing incurs costs to partially decommission the plant, costs to maintain the plant while it is in a mothballed state, and costs to recommission the plant and bring it back into operation. However, mothballing preserves the option to
190 Suppose there were only two price paths. Under one price path, the plant closes after 10 years and under the other it closes after 15 years even though its technical life was 20 years. The total number of year price- paths would be 25 (10 +15). If we further assume that the plant only makes losses in the two years before it closes, there would be 8 positive years for the first path and 13 for the second path, so there would in total be 21 positive year-price paths and 4 negative year-price paths. ↩
191 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
[Page 67]
restart the plant, which can be very valuable. We find that there are price paths where negative cash flows for a number of years are then succeeded by positive cash flows. Mothballing, rather than closing, the plant would enable Eemshaven to take advantage of the later more profitable years.
202. However, we do not currently have data on the costs of mothballing the Eemshaven plant, [Redacted]. To calculate mothballing costs, we would need to make assumptions about what work would be done to place the plant in a 'mothballed state', how many staff would be retained while the plant was in mothballs, the kind of maintenance regime that RWE would apply and so on. To calculate these numbers would be a complex undertaking.
203. Second, while the downside in negative cash flow years is limited to Eemshaven's avoidable fixed costs, the upside of positive cash flow years can be substantial. We note that remaining open would, for most simulations, result in a higher value than closing based on our shut- down rule. This is because a series of negative years are sometimes followed by a series of very profitable years. Indeed, if we did not apply any shut down rule and simply assumed the plant would remain open until the end of 2054 in the but-for case, then the average FMV of the but-for case increases to [Redacted] from [Redacted]. On the other hand, if we assumed that the plant always remains open until the end of 2029 in the actual case, the FMV of the actual case falls to [Redacted] from [Redacted].192 Hence, the lost FMV, and so damages, would be higher if we did not apply our shut down rule.193
204. If Eemshaven shuts down before 2054, the most significant impact is, of course, the plant's inability to realise any further operating revenues or incur operating costs. However, the plant's closure will trigger several additional costs and savings. Our analysis identifies six impacts on the FMV that result from a closure decision.
205. We have discussed two of the savings from closure in the preceding sub-sections. First, as explained in Section VI.A.4 above, the closure of the plant would eliminate its related corporate overhead costs. Second, as we explain in Section VI.A.6, the plant can avoid costly overhaul capital investments in the run up to closure. This creates a cost saving, which increases the FMV of the plant compared to a calculation in which this effect is not taken into account.
192 Harris Hesmondhalgh Workpapers, Tables H – Financial Model, Table H2. ↩
193 As we explain in Section VII below, we remove certain outlier outcomes to arrive to loss in FMV. After removing outliers, the but-for scenario would increase from [Redacted] to [Redacted] if we did not apply a shut down rule, and the actual scenario would decrease from [Redacted] and [Redacted]. See Harris Hesmondhalgh Workpapers, Tables H - Financial Model, Table H2. ↩
[Page 68]
206. [Redacted] [Redacted]
207. While the first three issues result in cost savings, which increase the FMV in the actual case, the fourth issue -decommissioning costs – reduces the FMV in the actual case. As explained above, Eemshaven has the option to buy the land on which the plant sits. Hence, even if the plant closes before 2054, the owner can keep the plant in place and postpone the dismantling costs until at least 2054.194 However, we understand that there is a requirement that parts of the plant that have mild radioactive contamination resulting from coal ash – specifically the boiler – must be dismantled and removed within two years of the plant closure.195 We assume that the costs of disposing of the contaminated boiler are equal to [Redacted]% of the costs of dismantling the entire plant.196 Incurring costs closer to the valuation date increases their present value, relative to a scenario where a plant operator is able to defer decommissioning costs to a later date. Hence, with respect to decommissioning costs earlier closure reduces the FMV, relative to a price path under which Eemshaven closes in 2054.
208. Fifth, closing the plant leads to redundancy payments for plant staff and related corporate personnel.197 A third party buyer would face similar obligations to RWE, which are largely determined by sectorial and national labour laws, and plant requirements, such as the number of staff needed to operate Eemshaven. [Redacted] [Redacted]
209. [Redacted] For example, for an 'orderly' closure – so a closure that RWE could anticipate 5-6 years ahead – RWE can reduce redundancy costs by replacing staff that retire in the run up to closure with external contractors. [Redacted] An external contractor's compensation exceeds that of a full time employee salary, but the former does not attract any redundancy
194 See ¶158.b above and Harris Hesmondhalgh Workpapers, Tables H – Financial Model, Table H27, Exhibit BR-38.C, RWE, Land Lease Akte I, dated 16 March 2009. ↩
195 Exhibit BR-54, Overheid.nl, Decree on Basic Safety Standards for Radiation Protection, dated 23 October 2017. ↩
196 Harris Hesmondhalgh Workpapers, Tables H – Financial Model, Table H30. We expense the disposing of the contaminated boiler in the first year of closure. ↩
197 We assume an equal distribution of redundancy expenses in the two years covering the last operating year and the year after operations cease. ↩
[Page 69]
costs when the plant shuts down. Ultimately, the savings from avoided redundancy costs exceed the additional compensation costs for external hires, making this strategy beneficial.
210. On the other hand, as outlined above, there are price paths under which Eemshaven closes unexpectedly early under the but-for cases. These outcomes result in higher redundancy costs. The lack of closure notice means that RWE would replace retiring employees with new employees, even in the run-up to an unanticipated closure. Once closure takes place, Eemshaven would face redundancy costs for the new employees. Hence, an unexpected closure increases redundancy costs relative to an orderly closure, and so reduces Eemshaven's value in the but-for case.
211. As we noted above, closure will also reduce some corporate overhead costs, including staff costs. Hence, some corporate employees will also become redundant following Eemshaven's closure. RWE considers that redundancy costs of corporate staff are equivalent to [Redacted] [Redacted]198
212. Sixth, we release working capital, in the form of cash and inventory, following the plant's closure, which results in a positive cash flow. Since working capital is released earlier in the actual case, this tends to increase the value of the actual case and reduce damages, relative to a case where there was no release of working capital.
213. The 100 commodity and electricity price paths lead to 100 different free cash flow projections from 2020 onwards for the actual and but-for cases. The cash flows are in nominal terms, or 'money of the day'. To calculate what these cash flows imply for the FMV of Eemshaven, we need to discount each year's free cash flows back to the valuation date, October 2017. This procedure is known as calculating the “net present value" of the free cash flows and the FMV is simply equal to the net present value of the free cash flows.
214. Discounting reflects the fact that a euro today is worth more than a euro tomorrow, and that future projected cash flows are often subject to risk. Financial analysts discount future cash flows to reflect the time value of money and risk, thereby making the cash flows comparable
198 This assumption is likely conservative for damages. [Redacted] [Redacted] we estimate relatively lower redundancy costs in both the actual and but-for cases. Because the redundancies are incurred earlier in the actual case, assuming lower redundancy costs increases the value of the actual case. [Redacted] [Redacted] ↩
[Page 70]
with a certain, or guaranteed, cash flow today. For example, suppose that a project is forecast to generate €10 in one year's time. An analyst might assess the various risks, and conclude that the promise of €10 in one year's time from the project is worth the same as €8 for certain today. A reasonable investor would be indifferent between the two possibilities. In this example, the discount is €2 (being €10-€8) or 20% (€2/€10).
215. Financial theory tells us that future cash flows should be discounted at the project's opportunity cost of capital,199 which is the return that an investor would expect to earn from another project with the same risk. Investors wish to ensure that they are being appropriately rewarded for the risks they are taking. Hence, they would discount the future cash flows at the opportunity cost of capital, and check that the sum of the discounted cash flows is positive. If it is not, the investors are better off investing in another project, since they can get a better return for the same risk.
216. Investors need to be compensated for the risks they assume. In practise, investors are able to eliminate much of the risk of an investment by 'diversification' – that is, holding a wide portfolio of investments. In a portfolio of investments, some investments may be successful while others are not. Hence some of the risk of good and bad outcomes cancel one another out. Economists call this 'diversifiable risk'. It is the risk that an investor can eliminate by holding a portfolio of investments. It is considered that “a risk that can be diversified away when held along with other investments in a portfolio is, in a very real way, not a risk at all”.200 The remaining risk is the called ‘systematic risk' because it is the risk that applies to the entire portfolio. For example, the risk of an economic depression will negatively affect the value of most of the investments in a portfolio, to one extent or another. Hence an investor cannot eliminate this risk by diversification. Accordingly, investors only need to be compensated for the risks that they actually bear, which are the systematic risks. Hence, the opportunity cost of capital of an investor – in other words the discount rate – only reflects systematic risk.
217. A prospective buyer is likely to finance the purchase of Eemshaven with a mixture of equity and debt. Accordingly, standard practice is to calculate the opportunity cost of capital by combining the cost of equity and the cost of debt taking into account the share of debt and equity used to finance the project, and so determine the Weighted-Average Cost of Capital (“WACC”).201 We note that there is no debt specifically associated with Eemshaven.
199 See, Exhibit BR-55, Brealey, Myers, and Allen, Principles of Corporate Finance, 10th edition, (The McGraw- Hill Companies, 2011) Chap. 9. ↩
200 Exhibit BR-56, Perold A.F., The Capital Asset Pricing Model, Journal of Economic Perspectives - Volume 18, Number 3, Summer 2004, p. 3. ↩
201 We provide more details in Appendix G. ↩
[Page 71]
Accordingly, we determine the proportion of debt and equity for Eemshaven based on the average debt ratio of companies in the business of coal-fired generation and trading.202
218. A standard way to measure the equity cost of capital for a project is to use the Capital Asset Pricing Model (“CAPM”).203 We have applied the CAPM to measure the cost of equity in other projects, and in particular for energy and telecoms regulators who use the cost of equity as an input to set tariffs for firms that have market power. We calculate the cost of equity for an operating coal-fired plant, based on the historical stock price performance of companies which earn a significant percentage of their revenues from coal-fired generation and trading activities. We explain the details of the CAPM, and the cost of capital calculation, in Appendix G.
219. The cost of debt reflects the interest associated with loans to an operating coal-fired plant. Specialised financial institutions such as Standard and Poor's routinely grade companies' debt, which provides a benchmark to determine a company's creditworthiness. We find that a Standard and Poor's debt credit rating of BBB was typical for Western European companies operating in the power sector in October 2017.204 We compute the cost of debt based on a set of Western European companies with BBB or equivalent credit ratings.
220. Based on the above considerations, we calculate an after-tax WACC of 3.85%. Table 5 summarises the elements of the WACC calculation. Appendix G gives details of the calculations.
202 See Appendix G.3. for details of the comparable companies. RWE's debt to equity ratio is very similar to the average of comparator firms. See Harris-Hesmondhalgh Workpapers, Tables F - Cost of Capital, Table F3. When valuing a firm, debt is relevant for two reasons. First, debt is relevant to compute interest payments, which are tax deductible. By assuming an integrated buyer with a firm-wide debt target, our methodology allocates more interest-related tax savings to Eemshaven when it performs well, and less interest-related tax savings when it performs worse. Second, debt is also relevant to assess whether a firm can enter into bankruptcy. There is no realistic prospect that the Eemshaven entity would declare bankruptcy, and indeed it is not directly responsible for any debt. So the only risk is that the integrated buyer company goes bankrupt because of Eemshaven's closure, and this risk is the same in the actual and but-for cases. We would expect this risk to be small for an integrated buyer. For example, the creditworthiness of RWE AG, as measured by credit rating agencies, has remained stable since early 2016 despite the announced closures of coal plants in the Netherlands and Germany. See Harris-Hesmondhalgh, Tables F – Cost of Capital. See also Exhibit BR-57, RWE, RWE Bonds and Credit Ratings, dated 30 November 2020. ↩
203 See, e.g., Exhibit BR-55, Brealey, Myers, and Allen, Principles of Corporate Finance, 10th edition, (The McGraw-Hill Companies, 2011) Chapter 8, page. 192. ↩
204 As of October 2017, RWE AG had a Moody's credit rating of Baa3, equivalent to a BBB- rating from Standard & Poors. Harris-Hesmondhalgh Workpapers, Tables F. ↩
[Page 72]
TABLE 5: COST OF CAPITAL205
| Date | [1] | See note | 09/10/2017 |
| Risk-free rate | [2] | See note | [Redacted] |
| Beta (unlevered) | [3] | Table F3 | 0.47 |
| MRP over long-term bonds | [4] | Assumed | 5.50% |
| Beta (levered) | [5] | See note | 0.70 |
| Cost of levered equity | [6] | [2]+[5]x[4] | [Redacted] |
| Cost of debt | [7] | See note | [Redacted] |
| Tax rate | [8] | See note | 25.0% |
| Target debt ratio | [9] | Table F3 | 39% |
| WACC | [10] | See note | 3.85% |
Notes and sources: [1]: Valuation date. [2]: EuroSwap (20 years). [5]=[3]*(1+(1-[8]))*[9]/(1-[9]) [7]: BVAL composite index, BBB rating 20Y maturity as of 9/10/2017. [8]: Exhibit BR-81, KPMG, Corporate Tax Rates. [10]: [6]x(1-[9])+[7]x[9]x(1-[8]).
205 Harris-Hesmondhalgh Workpaper, Tables F - Cost of Capital, Table F1. ↩
[Page 73]
221. In the previous sections, we describe how we generate 100 'pairs' of free cash flow paths for both the actual and but-for cases. We then use a discount rate to calculate the present value of each set of cash flows, as of the valuation date. Hence, from the previous steps, we have 100 'pairs' of present values, where each present value represents the FMV of Eemshaven for a given set of circumstances. Specifically, each pair consists of a present value, or FMV, in the actual case (where the Coal Ban is in place), and a present value, or FMV, for the but-for case (without the Coal Ban), for a given commodity price path.
222. In this section, we calculate the loss in value of Eemshaven resulting from the Coal Ban as the difference between the FMV in the but-for case and the FMV in the actual case for each commodity price path. Figure 13 illustrates the 100 pairs of but-for and actual FMVs.
[Page 74]
[Chart content is blacked out]
1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96
Price Paths
[Chart content is blacked out]
1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96
Price Paths
223. Based on these pairs, we calculate 100 estimates of loss in value of Eemshaven, corresponding to the 100 commodity price paths. Figure 15 below illustrates the sorted
206 Price paths are ordered in ascending order of FMV. ↩
207 Price paths are ordered based on the corresponding FMV in the But-For scenario. ↩
[Page 75]
distribution of the 100 estimates of loss in value of the plant, with the lowest loss in value on the left hand side of the figure and the highest loss in value on the right hand side of the figure.
224. We note that any DCF valuation must account for the fact that many different cash flows are possible for a project. For example, costs could be higher than expected, or revenues could be lower. A DCF valuation should be based on the average or expected cash flows. The use of expected cash flows in a discounted cash flow model is standard practice for any valuation. For example, the seminal corporate finance text book by Brealey & Myers notes that:
“When you are working with cash-flow forecasts, bear in mind the distinction between the expected value and the most likely (or modal) value. Present values are based on expected cash flows—that is, the probability-weighted average of the possible future cash flows. If the distribution of possible outcomes is skewed (...), the expected cash flow will be greater than the most likely cash flow.”208
225. There are several ways to arrive at expected cash flow. One could try and develop a “central” cash flow forecast, which is somewhere in the middle between higher and low cases. A reliable central cash flow forecast would generally have a 50% chance of being above the actual cash flows and a 50% chance of being below the actual cash flows. Accordingly, if an investor buys an asset based on a central cash flow projection, it would have a 50% risk of having paid too much, with the benefit of hindsight. Of course, the investor also has a 50% chance of paying less for the asset than it turns out to be worth.
226. One could also apply a ‘scenario' based approach, generating for example high, medium, and low cash flow forecasts. However, as we discussed in section IV.A above, the disadvantage of a scenario based approach is that it involves subjective judgements about the probability of each scenario occurring. Similarly, creating a central cash flow scenario involves subjective judgements about the probability of different outcomes.
227. In contrast, the Monte Carlo simulation we use to generate the 100 outcomes is simply an advanced technique to estimate the expected cash flows. It is more precise than simply looking at the most likely outcome, or making subjective judgements regarding 'high' and 'low' scenarios. The simulations examine a wider range of potential outcomes with a probability for each one that derives from standard statistical techniques. The technique
208 Exhibit BR-55, Brealey, Myers, and Allen, Principles of Corporate Finance, 10th edition, (The McGraw-Hill Companies, 2011), p. 252 ↩
[Page 76]
makes the calculation of the average outcome more reliable than other methods. But in concept it is the same principle seen in any valuation. Our Monte Carlo method simply makes explicit – in the form of multiple alternative price paths – what is hidden and implicit in an alternative approach such as a central price path analysis.
228. Having generated 100 outcomes, as in any DCF analysis we need to combine them into a single expected cash flow forecast. By construction, each of the 100 outcomes is equally likely.209 Hence we estimate the expected cash flows by taking the average of the 100 outcomes. As the quote above highlight, to use anything other than mean or average cash flows would be incorrect.
229. Taking the average of the loss in value across all the price paths results in a damage amount of [Redacted].210 In other words, a rational potential buyer would pay [Redacted] less for the Eemshaven plant with the Coal Ban than without the Coal Ban.
230. However, Figure 15 below shows that a few of the price paths lead to particularly high damages. The highest damages case exceeding [Redacted]. There is nothing inherently surprising about this result. Given 100 outcomes, there are bound to be some that are extremely favourable to Eemshaven. There are also commodity price paths that are unfavourable to Eemshaven. However, the unfavourable outcomes result in the closure of the Eemshaven plant, rather than commensurately large losses. Hence, the ‘skew' of the distribution of the losses towards high positive values reflects the fact that Eemshaven represents a real option. That is, the plant has the option to stay open when commodity prices are favourable, and close when they are not.
231. However, to avoid a situation where a few price paths have a very large effect on the damages, we remove the highest and lowest 5% of values. Figure 15 shows these ‘outlier' simulations in black. Adopting this approach reduces our damages estimate, as of 9 October 2017, from [Redacted] to [Redacted].211
209 We note that even though the 100 price paths we draw have equal weight, the underlying statistical
distribution from which we draw the price paths is such that there will be more draws of price paths closer
to the mean of the distribution than those further away from the mean. ↩
210 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H2. ↩
211 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H2. ↩
[Page 77]
[Chart content is blacked out]
1 6 11 16 21 26 31 36 41 46 51 56 61 66 71 76 81 86 91 96
Sorted price paths by Lost FMV
232. Our analysis shows that, in the 'but for' scenario, in some cases the buyer of Eemshaven could end up with an asset worth considerably more than [Redacted], while in other cases the value of Eemshaven would be close to zero. Our calculated FMVs for the 'but for' scenario reflect these possibilities.
233. However, such risks are typical with many investments. As we explained above, an investor could eliminate the risk through diversification. In this way, a negative outcome for Eemshaven would be offset by a positive outcome for another investment. Similarly, losses in other investments in the portfolio would, on average, offset a highly positive outcome for Eemshaven. This is why a diversified investor would be prepared to pay the average of the 100 outcomes.
234. Our finding – that Eemshaven has significant value under many commodity price paths – is consistent with analysis published around the valuation date. For example, a report by Carbon Tracker (“CT”), published in December 2017 after the Valuation Date,213 found that the most efficient coal-fired power plants, such as Eemshaven, would still be profitable in 2030. This study considers a single set of commodity prices, so it does not take into account
212 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
213 Exhibit CLEX-03. ↩
[Page 78]
the additional value associated with the optionality associated with coal-fired plants. Our range of possible price paths gives rise to some paths where coal-fired plant could be profitable as well as some where they are unlikely to be profitable over the longer term. Indeed, the need for the Coal Ban law can itself be viewed as indicating that at least some coal-fired plants, such as Eemshaven, will be profitable even by 2030.
235. We calculate the financial damages to Eemshaven as of 9 October 2017. However, RWE will only receive compensation after an award is rendered, which could be five or more years after this Valuation Date.214 To illustrate the impact that interest will have on the overall payments to be made, we have calculated the interest that will accrue between the Valuation Date and 18 December 2021, the date of submission of this report.
236. Counsel for RWE has instructed us that the ECT calls for the application of pre-award interest using a commercial rate established on a market basis. A commercial interest rate is conceptually similar to the concept of a fair market value, except that it applies to the interest rate that a willing borrower and a willing lender would agree to.
237. LIBOR (the London inter-bank overnight borrowing rate) and its European equivalent, EURIBOR, are two of the most commonly quoted commercial interest rate benchmarks. LIBOR is established on the basis of commercial, market-based agreements between large banks,215 as is EURIBOR. Other tribunals in Investor-State arbitrations have confirmed this. For example, one tribunal noted that the EURIBOR rate “represents an objective, market- oriented rate".216 Hence, LIBOR/EURIBOR is consistent with the concept of a “commercial rate established on a market basis".
238. However, most companies cannot borrow at the LIBOR/EURIBOR rate. Rather, they borrow at the LIBOR/EUIBOR rate plus a premium. Hence, LIBOR/EURIBOR plus two percentage
214 Following the discussion on the time value of money above, the delay in compensation has a cost. For
example, if a claimant was owed $10 five years ago, it would not be sufficient to simply give the claimant
$10 today. Because of inflation the purchasing power of $10 reduces over time. To provide adequate
compensation, the claimant should receive an additional amount, rather than the $10 that was owed five
years ago. ↩
215 Specifically, LIBOR is the borrowing rate between banks in London, and EURIBOR is the lending rate for
banks in the European Union. ↩
216 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition,
dated 1 December 2018, p. 311 quoting the award in ARB/05/24. ↩
[Page 79]
points represents a typical commercial rate of interest. This is reflected in a recent ICSID award, where the respondent proposed a pre-award interest rate of LIBOR plus two percentage points, and the claimant proposed a higher rate based on its own borrowing costs. The Tribunal found that LIBOR plus two percentage points “is a commercially reasonable rate”.217 Recent research reveals that LIBOR plus a 2% premium is emerging as a standard for pre-award interest in Investor-State awards.218
239. A typical long-term commercial loan would apply compound interest – which is to say that interest accrues on interest owed. From an economic perspective, applying compound interest is the only way to compensate a claimant fully. This is because the claimant has not only lost the interest on the amounts owed, but has also lost any interest that could accrue on the interest. Hence, applying simple interest would not provide full compensation. As the GAR Guide to damages explains:
“in most situations economists favour compound interest for pre-award interest. The reason is that yields (which are based on compounding) are the economic benchmark of market interest rates. While financial contracts with simple interest do exist and are straightforward to value, the market values of such contracts are ‘reverse – engineered' to make sure that they trade at market yields. Applying a market yield without compounding would not make the claimant whole."219
240. The frequency with which interest is compounded must be consistent with the interest rate applied. For example, EURIBOR rates are available for loan periods of one week, one month, three months, six months, and 12 months.220 If we applied a one month EURIBOR rate, we would need to calculate interest for each month, update the interest rate, and then apply the new rate to the principal owed and the calculated interest for the previous month.
217 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition,
dated 1 December 2018, p. 311 quoting the award in ARB/07/23. ↩
218 The GAR Guide to Damages includes a chapter on pre-award interest, which provides a comprehensive list
of investor state cases published on the ICSID website. The review concludes a majority of awards add
interest based on a base rate (such as BRIBOR, EURIBOR, LIBOR and ROBOR, in 46 of 60 cases). The review
also shows that the most commonly used base rate is LIBOR (in 21 of the 60 cases) and that the most
commonly used spread was 2% (in 14 of the 21 cases applying a spread). See Exhibit BR-21, Global
Arbitration Review, The Guide to Damages in International Arbitration, Third Edition, dated 1 December
2018, Section 22. ↩
219 Exhibit BR-21, Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition,
dated 1 December 2018, p. 306, emphasis added. ↩
220 Exhibit BR-58, EMMI, Euribor Rates. ↩
[Page 80]
241. In our view, applying a 12 month EURIBOR rate and compounding annually is reasonable. Using more frequent compounding intervals, combined with consistent interest rates, could also be reasonable, but would make little difference to the overall amount of interest owed, while adding to the complexity of the interest calculations.
242. Table 6 shows that, based on damages of [Redacted] interest of [Redacted] will have accrued by 18 December 2021. Accordingly, including pre-award interest, damages amount to [Redacted].
TABLE 6: DAMAGES INCLUDING INTEREST
| Damages € mln | [1] | See note | [Redacted] |
| Interest adjustment factor | [2] | See note | 1.07 |
| Damages including Interest as at 18 December 2021 € mln |
[3] | [1]x[2] | [Redacted] |
Notes and Sources:
[1]-[2]: Harris-Hesmondhalgh Workpapers - Tables H.
243. We calculate that, on average, closing Eemshaven in 2030 will result in nearly 210 million tons of avoided CO2 emissions.221 This is the average reduction based on the 90% of fair market value simulations that remain after removing outliers.
244. To put the claim for loss in value into context, we can recalculate the compensation claimed in terms of the price that the Netherlands would be paying for each ton of avoided CO2 emissions. This is analogous to the logic of the Kyoto Protocol's Joint Implementation (JI) mechanism, whereby companies could invest in a project that will reduce greenhouse gas emissions, and use the reduction in emissions to offset their own carbon emissions.222 Between 2007 and 2012, the Netherlands approved over 200 such projects.223
221 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
222 More specifically, the sponsoring company would be granted emission reduction units (ERUs) which it can
use towards fulfilling part of their obligations under the EU ETS until 2020. Exhibit BR-59, United Nations
Climate Change, Joint Implementation. For more information about the Kyoto Protocol, visit:
https://unfccc.int/kyoto_protocol. ↩
223 The Netherlands did not approve JI projects after 2012 due to limits in the use of the credits generated for
the ETRS mechanisms, see Exhibit BR-60, Overview of NL Issued Letters of Approval for Participation in a JI
Project Activity, Last Update Nov. 2013. ↩
[Page 81]
245. For each of the 90 simulations that determine our final damages, we calculate the after-tax loss in value for each operational year – which is the basis for the claim – and divide this by the CO2 emissions that Eemshaven emits in the but-for case, and that would be avoided in the actual case. For each case, this results in a price reduction, expressed in €/ton of CO2 - for each year between 2030 and 2054. We then discount the reduction price at the WACC back to October 2017. Discounting reflects that earlier reductions in emissions are more valuable than later emissions reductions. After discounting, we calculate the average discounted reduction price for each of the 90 simulations. Finally, we take the average of the average yearly reduction price for the 90 simulations.
246. We calculate that on average, the claim is equivalent to the Netherlands paying around €16 for each ton of avoided CO2 emissions.224 This price is significantly lower than the average carbon price of 37 €/t of CO2 that we apply in our model or the actual market price of CO2 since 2018.225
247. Finally, we comment briefly on the feasibility of Eemshaven mitigating damages from the Coal Ban by converting to burn only biomass.
248. Clearly, Eemshaven cannot continue to burn a mixture of 15% biomass and 85% coal after 2029, since this would violate the Coal Ban. Possible alternatives would be to convert the Eemshaven plant to burn 100% biomass.
249. Claimant has retained another expert firm, NERA, to investigate the feasibility of these conversions providing mitigation.226 NERA finds that it would not be feasible to convert Eemshaven to 100% biomass, absent subsidies. This means that, according to NERA, mitigation of damages by conversion to biomass is not possible, since all biomass subsidies are expected to end in 2027.
250. We have reviewed the NERA report and consider that NERA's conclusions are reasonable. We also note that while some coal-fired plants have been converted to natural gas in the United States, this was only economic because US gas prices are relatively low, due to an excess of gas that US producers now export in the form of LNG. In contrast, the Netherlands
224 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7. ↩
225 See Harris-Hesmondhalgh Workpapers, Tables H – Financial Model, Table H7 and Appendix H. ↩
226 Nera Report. ↩
[Page 82]
and the EU more generally is a net gas importer, with relatively high gas prices. Similarly, we are unaware of any coal plants that have been converted to 100% biomass without subsidies.
251. We confirm that insofar as the facts stated within this report are within our own knowledge, we believe them to be true and that the opinions expressed represent our true and complete professional opinion.
Signature |
Signature |
Serena Hesmondhalgh |
Dan Harris |
18 December 2021 |
18 December 2021 |
London, UK |
Rome, Italy |
[Page 83]
Dr. Serena Hesmondhalgh has worked as a consultant in the energy sector for more than twenty-five years, predominantly in the electricity and gas sectors. She has provided advice on a wide range of topics: litigation and arbitration, commercial damages, competition cases, asset valuation, the design of trading arrangements and price controls.
In recent years she has provided expert testimony for around fifteen gas contract arbitrations, mostly focused on north-west Europe, as well as arbitrations on issues including billing system problems, electricity contracting restrictions, market manipulation, failure to respect regulatory guarantees and due process in relation to electricity and gas networks, expropriation of district heating assets, warranty violations and insurance claims for power stations.
Dr. Hesmondhalgh has also worked extensively with EU energy regulators, particularly in Great Britain, on competition and regulation issues. On behalf of Naftogaz of Ukraine, Dr. Hesmondhalgh analyzed the potential anti-competitive effects of the Nord Stream 2 pipeline unless various commitments regarding its use and pricing were to be imposed – the analysis was submitted to the European Commission. She has also conducted investigations into potential electricity market abuse undertaken by the GB regulator, as well as providing advice on the redesign of trading arrangements (GB, the Netherlands, Belgium), transmission network access (EU, GB, Greece), transportation tariffs (GB, Ukraine) market monitoring, quality of supply obligations (GB, Germany, Australia) and price controls and incentives (GB, Germany, Australia).
Dr. Hesmondhalgh's modelling skills have been used to develop a range of tools for asset valuation including electricity dispatch modelling, power plant asset valuation, price control revenue assessments, interconnector trading arrangement impacts and pan-European gas flows.
1981-1985
University of Oxford
Oxford, United Kingdom
D.Phil. in Experimental Nuclear Structure Physics
1977-1981
Sussex University
Brighton, United Kingdom
B.Sc. Physics with Mathematics (First Class Honours)
[Page 84]
[Page 85]
[Page 86]
[Page 87]
[Page 88]
[Page 89]
[Page 90]
[Page 91]
[Page 92]
[Page 93]
[Page 94]
[Page 95]
[Page 96]
[Page 97]
[Page 98]
Dr. Hesmondhalgh has developed a number of models to simulate the operation of competitive electricity markets. These have been extensively used to value over 40 power plant projects across Europe and beyond. One of her models, the Brattle Annual Model, enables prices across Europe to be estimated by representing the region as individual electricity markets interconnected by transmission lines. Whilst primarily a cost-based model, it has been designed to facilitate including shaped price add-ons to match historic price shapes and forward curve data.
She has also developed a number of bespoke models to value long term contracts in electricity and gas markets and a model of the European gas network, designed to assess flows between markets and prices in those markets on the basis of existing and proposed supply sources, storage costs and price-sensitive demand. Dr. Hesmondhalgh has also directed a number of other projects which required an in-depth understanding of modelling issues. These include:
[Page 99]
"GB Electricity Demand – 2012 and 2025. Impacts of demand reduction and demand shifting on wholesale prices and carbon emissions. Results of modelling", for the Sustainability First Smart Demand Forum, Serena Hesmondhalgh, Gill Owen, Maria Pooley and Judith Ward, December 2013.
"A Trip to RIIO in Your Future?”, Peter Fox-Penner, Dan Harris and Serena Hesmondhalgh, Public Utilities Fortnightly, October 2013.
"GB Electricity Demand – 2012 and 2025. Initial Brattle Demand-Side Model – Scope for Demand Reduction and Flexible Response”, for the Sustainability First Smart Demand Forum, Serena Hesmondhalgh and Sustainability First, December 2012.
"Easing the Transition from Oil-Indexation", Serena Hesmondhalgh and Dan Harris, Petroleum Economist, August 3, 2011.
"BSC Modification 229: Potential interactions with options for changes to transmission charging", Serena Hesmondhalgh and Dan Harris, The Brattle Group, Ltd., May 23, 2011.
“A Review of LE/Ventyx's Cost-Benefit Analysis of Modification, P229, Lot 3 Additional Analysis", Serena Hesmondhalgh and Dan Harris, The Brattle Group, Ltd., September 2, 2010.
“A Review of LE/Ventyx's Cost-Benefit Analysis of Modification, P229, Lot 1 Report”, Serena Hesmondhalgh and Dan Harris, The Brattle Group, Ltd., September 2010.
“Alternative Trading Arrangements for Intermittent Renewable Power: A Centralised Renewables Market and Other Concepts", Serena Hesmondhalgh, Dan Harris and Penelope Wilson, The Brattle Group, Ltd., April 2010. Published by Ofgem at (www.ofgem.gov.uk).
"EU Climate and Energy Policy to 2030 and the Implications for Carbon Capture and Storage: A Report for ALSTOM Power Systems", Serena Hesmondhalgh, Toby Brown and David Robinson, The Brattle Group, Inc., March 2009.
"Is fuel diversity the answer to security of supply?", Serena Hesmondhalgh and Dan Harris for the 9th IAEE European Energy Conference “Energy Markets and Sustainability in a Larger Europe," Florence, Italy, June 2007.
“Critique of the Industry Codes Governance Arrangements”, Serena Hesmondhalgh, Boaz Moselle and Toby Brown, The Brattle Group, Inc., June 2008.
[Page 100]
“A Review of TenneT's Connections Policy”, Serena Hesmondhalgh, Carlos Lapuerta and Dan Harris, The Brattle Group Ltd., July 2007.
"Can Wind Work In An LMP Market?”, Serena Hesmondhalgh, Philip Q Hanser and Dan Harris, Natural Gas & Electricity, November 2005.
"Long-Term Reserve Contracts in the Netherlands”, Serena Hesmondhalgh, Carlos Lapuerta and Dan Harris, The Brattle Group Ltd., June 2004.
“A Study on Renewable Energy in the New Irish Electricity Market”, Serena Hesmondhalgh and Dan Harris, The Brattle Group Ltd., June 2004.
"Global Gas Supply & Demand – Impact on Hub Prices Query” presented at C5 Conference in Frankfurt, Germany, December 2011.
"An Economic Analysis of the Remit Proposals”, presented at the 16th European Gas Conference in Oslo, Norway, June 2011.
"Resource Adequacy and Renewable Energy in Competitive Wholesale Electricity Markets", Serena Hesmondhalgh, Johannes P. Pfeifenberger and David Robinson, The Brattle Group, Inc., presented at the 8th Annual British Institute of Economics Academic Conference, September 23, 2010.
"Oil Indexation & Gas Prices: Is Current Pricing for Gas Sustainable?", presented at the Flame 2010 Conference, Amsterdam, The Netherlands, March 2010.
"How Do You Value Storage in Emerging Gas Markets?", presented at the Sparks and Flames Conference, Rotterdam, The Netherlands, December 2009.
"Liquidity in wholesale electricity markets", presented at an Ofgem Seminar, London, United Kingdom, August 2009.
"How Open are Europe's Energy Markets?”, presented at 13. IIR-Jahrestkongress fur die Energiewirtschaft, Austria, April 2008.
[Page 101]
Mr. Dan Harris has more than fifteen years of experience as an expert in valuation and quantification of damages. He has been retained by major law firms and their clients to testify on damages and quantum in international arbitration proceedings in a variety of forums including the International Centre for Settlement of Investment Disputes, the International Chamber of Commerce and the Permanent Court of Arbitration. He has acted as an expert witness for Nigeria in an ICSID dispute in the oil sector, and is currently acting as an expert witness in a commercial arbitration for a private client in Nigeria. Mr. Harris is listed as one of the world's leading arbitration experts in Who's Who Legal: Arbitration.
Mr. Harris is a regular speaker at gas and electricity conferences, and lectures at the Florence School of Regulation. Prior to joining The Brattle Group in 2002, Mr. Harris worked for Shell's upstream oil and gas business in the Netherlands for five years in a variety of roles, including the development of economic models for new oil and gas field developments.
2001-02
London School of Economics London, United Kingdom- MSc. Economics (Merit)
1991-95
Imperial College London, United Kingdom - M. Eng. Chemical Engineering (First Class Honours)
International Arbitration
Commodities
Natural Gas
Electric Power
[Page 102]
[Page 103]
[Page 104]
"The potential for price disputes in hub-indexed gas contracts”, Chapter in ‘Gas and LNG Price Arbitrations: A Practical Handbook' Second Edition, March 2020, published by Globe Law and Business, ISBN: 1787421929 with Valentina Bonetti and Carlos Lapuerta.
"Risk and Return for Regulated Industries", published by Elsevier, with Bente Villadsen, Mike Vilbert and Larry Kolbe, 1st May 2017, ISBN: 9780128125878.
Review of Approaches to Estimate a Reasonable Rate of Return for Investments in Telecoms Networks in Regulatory Proceedings and Options for EU Harmonization, with Richard Caldwell, Francesco Lo Passo, and Lucia Bazzucchi, July 18, 2016, Prepared for the European Commission's Directorate-General for Communications Networks, Content and Technology (DG Connect).
"A Subject of Interest: Pre-award Interest Rates in International Arbitration” Dan Harris, Richard Caldwell, and M. Alexis Maniatis Published by The Brattle Group, Inc. June 1, 2015.
"A Tale of Two Crises: The Betas of EU Networks”, August 2013 Dan Harris and Francesco Lo Passo Published by The Brattle Group, Inc.
"International Experience in Pipeline Capacity Trading", Dan Harris, Toby Brown, Alessandro Massolo, 5 August 2013, prepared for AEMO.
"The Difference Between Winning & Losing: Engaging the Vital Role of Expert Witnesses in Arbitration" Presented at ‘Successfully Negotiating & Renegotiating Long Term Gas Supply Contracts,' July 2013 Berlin, Germany.
[Page 105]
'The WACC for the Dutch TSOs, DSOs, water companies and the Dutch Pilotage Organisation', Dan Harris, Bente Villadsen, Jack Stirzaker, 4 March 2013, prepared for NMa.
'Calculating the Equity Risk Premium and the Risk-free Rate' Dan Harris, Bente Villadsen, Francesco Lo Passo, 26 November 2012, prepared for the NMa and OPTA.
'Impact Assessment for the Framework Guidelines on Harmonised transmission tariff structures', Dan Harris, Penelope Wilson, 6 August 2012, prepared for ACER.
'Shift From Conventional To Unconventional Resources – What Does This Mean For Downstream Gas Players?' 27th – 28th March 2012: Unconventional Gas &Oil Global Summit, Warsaw, Poland.
'A Comparison of Anti-Manipulation Rules In US and EU Electricity And Natural Gas Markets: A Proposal For A Common Standard', with Shaun Ledgerwood, Energy Law Journal, Volume 33, No. 1 2012.
"REMIT: Issues For LNG trading", Presented to the LNG Global Conference September 27 2011
"Easing the Transition from Oil-Indexation,” by Serena Hesmondhalgh and Dan Harris, Petroleum Economist, August 3, 2011.
"Research Into Gas Flexibility Services: Method Decision Flexibility Services," by Dan Harris, José Antonio Garcia, and Ilinca Popescu, The Brattle Group Ltd, prepared for the NMa Energiekamer (NMa), August 2, 2011.
"What Can Be Done at a Commercial Level to Resolve Contractual Disputes?" Presented at 'Commercial and Legal Strategies for Managing Risk in Long Term Gas Supply Contracts,' taking place July 11-12 2011 Berlin, Germany.
"Defining Market Manipulation in a Post-REMIT World," by Shaun D. Ledgerwood, Dan Harris, Bin Zhou, and Pinar Bagci, The Brattle Group, Inc., June 2011, available at www.brattle.com.
"Are your tariffs compliant with the 3rd Gas Directive?" Presented at the 4th Annual European UGS and Infrastructure Forum Berlin, 5th April 2011.
"Economic Impact of the Dutch gas Hub Strategy on the Netherlands", December 2010 with Coleman Bazelon and Penny Dickson. Available at www.brattle.com.
[Page 106]
“A Review of the OXERA Report: ‘Quantifying Antitrust Damages: Towards non-binding guidance for courts',” with Richard Caldwell and Carlos Lapuerta, Journal of European Competition Law and Practice (September 2010).
"La stima dei Danni nel dritto della concorrenza”, with Richard Caldwell and Carlos Lapuerta, Dritto e Practica della Società, (June 2010), 35-44.
“Alternative Trading Arrangements for Intermittent Renewable Power: A Centralised Renewables market and Other Concepts”, April 2010, with Serena Hesmondhalgh and Penny Dickson. Published by Ofgem at (www.ofgem.gov.uk).
“Assessment of the method to determine the value of the regulatory asset base (gas connections) managed by Dutch gas distribution network operators” May 2010, Dan Harris, Carlos Lapuerta. Published by the Energiekamer.
Faruqui, Ahmad, Dan Harris, and Ryan Hledik. “Unlocking the €53 Billion Savings from Smart Meters in the EU: how increasing the adoption of dynamic tariffs could make or break the EU's smart grid investment.” Energy Policy, October 2010.
“Alternative Trading Arrangements For Intermittent Renewable Power: A Centralised Renewables Market and Other Concepts” April 2010, with Serena Hesmondhalgh and Penny Dickson, available at www.ofgem.gov.uk.
Faruqui, Ahmad, and Dan Harris. “On Demand." Utility Week 12 Mar. 2010: 24.
"Oil Indexation & Gas Prices: Is Current Pricing for Gas Sustainable?" presented at the Flame 2010 Conference, Amsterdam, the Netherlands, March 2010.
"How Do You Value Storage In Emerging Gas Markets?" presented at the Sparks and Flames Conference, Rotterdam, the Netherlands, December 2009.
"Unlocking the €53 Billion Savings from Smart Meters in the EU,” by Ahmad Faruqui, Dan Harris, and Ryan Hledik, October 2009, Brattle discussion paper (available at www.brattle.com)
"Valuing gas storage without reliable prices”, Flame gas conference, Amsterdam, the Netherlands, March 2009.
"Beating the Queue - Connection Policies for a Liberalised Market,” presented at PowerGrid Europe, by Dan Harris, The Brattle Group, June 2008.
“A Review of TenneT's Connections Policy," by Carlos Lapuerta, Serena Hesmondhalgh, and Dan Harris, The Brattle Group Ltd., July 2007.
[Page 107]
"Assessing Pipe-to-Pipe Competition: Theoretical Framework and Application to GTS,” by Boaz Moselle and Dan Harris, The Brattle Group, December 2007.
"Is fuel diversity the answer to security of supply?" Prepared with Serena Hesmondhalgh for the 9th IAEE European Energy Conference “Energy Markets and Sustainability in a Larger Europe", June 2007.
"Independent System Operators for EU Energy Markets” February 2007, with Boaz Moselle, published as a Brattle Energy newsletter Issue 01 2007.
"Factors affecting geographic market definition and merger control for the Dutch electricity sector" June 2006, with Boaz Moselle and Prof. David Newbery. Published by NMa/DTe.
"Can Wind Work In An LMP Market?” November 2005, with Serena Hesmondhalgh and Philip Q Hanser, Published in Natural Gas & Electricity.
"Study on Renewable Energy in the new Irish Electricity Market” June 2004 prepared for Sustainable Energy Ireland with Serena Hesmondhalgh.
"Long Term Reserve Contracts in the Netherlands", June 2004, prepared for the Dutch Ministry of Economic Affairs.
"A Study on Locational Signals in Europe" September 2004 prepared for ETSO with Carlos Lapuerta.
"Wholesale Gas Competition in the Netherlands and Implications for Phase III Customers", June 2003, with Carlos Lapuerta. Published by NMa/DTe.
“Incentive Regulation” presented at the EMART Energy conference in Paris, October 2002.
"The Development of a spot market exchange infrastructure for Belgium”, (February 2003) with Carlos Lapuerta and Boaz Moselle, prepared on behalf of the APX and Elia.
[Page 108]
252. In this appendix, we set out in more detail how we determined the commodity prices we used in our analysis. As discussed above,227 commodity prices (coal, gas, and CO2) are relevant both because they are a driver of electricity prices and because they are costs RWE incurs when operating Eemshaven. Over the period to 2054, these commodity prices could develop in different ways. Therefore, we assess 100 plausible price paths for these commodities, taking into account the extent to which movements in the different commodities are correlated. As we explain further, in Appendix C.2.i.b below, we also use these commodity price paths to vary our assumptions on the level of renewable capacity in the key European electricity markets that we model.
253. As explained further in this appendix, we have created the price paths using the probabilistic Monte Carlo method. We first explain how we identified the relevant variables to treat probabilistically (“stochastically") in Appendix B.1 and then describe in more detail the models we developed for creating the different price paths. For coal and gas, as discussed in Appendix B.2, we rely on a “two factor” model, which enables both long and short term effects to be captured and is frequently used in commodity trading or risk management. This approach is not suitable for modelling CO2 prices primarily because CO2 prices are highly policy dependent but also because the ETS system currently allows participants to submit their purchased permits at any point in the future so CO2 prices cannot be associated with a particular delivery period, unlike coal and gas prices. We therefore adopt a different model, which is described in Appendix B.3.
254. To create our 100 commodity price paths, we need first to identify a starting set of data for prices into the future from which we can use as the basis of our probabilistic analysis. Market prices (forward curves) for commodities are only available for at most a few years into the future. Consequently, we also rely on published forecasts by the International Energy Agency (“IEA”). These extend further into the future (to around 2050) but show a broad range of possible outcomes. It is this range of possible outcomes that we incorporate into our probabilistic approach.
255. Renewable generation capacity is also an important consideration since many types of renewable generation have essentially zero marginal generation costs and so will always run when they are able to do so. Hence, a high level of renewable generation capacity may limit
[Page 109]
the ability of Eemshaven to generate electricity and will reduce electricity prices, to Eemshaven's detriment.
256. To determine the price paths for coal and gas, we combine forward prices and price projections available on the valuation date with information on the volatility of coal and gas prices and their correlation available at the valuation date.
257. Effectively, we start with forward prices available on the valuation date for deliveries in a future period, and trace how the price might change in reaction to new information or events as time evolves. These changes in prices have to reflect our best estimate of the magnitude of the impact that new information will have in a structured and coherent way. We achieve this by adopting a specific model for the behaviour of coal and gas prices, which is routinely used by traders. It is known as a “two factor” model because it distinguishes between two types of information, short-term and long-term information. Commodity forward contracts with a long time until delivery only react to long-term information, whereas contracts where deliveries will start soon also react to short-term events, such as temporary imbalances in supply and demand.
258. The theory underpinning the two factor model is that coal and gas prices will vary from their forward curve levels in response to new information or events following what is known as a "random walk". A random walk implies that, for example, the coal price will change from one month to the next in an uncertain fashion that does not depend on how the coal price has changed up until that point.228 This uncertain, “random”, change is best assessed by probabilistic analysis. The extent to which the coal prices are likely to vary from one month to the next depends on their volatility – if the volatility of coal prices is high, then it is possible that prices could change very significantly from one month to the next whereas if their volatility is low this is much less likely.
259. The assumption that coal and gas prices follow a random walk over time, allows us to use the historical volatility and correlation in their historical forward prices to determine the
228 Although, of course, the coal price at the start of the month does depend on the changes that have occurred in previous months. In other words, if the coal price increased from, say 50 €/t to 52 €/t between months A and B, the 2 €/t increase has no influence on whether the coal price goes up or down from month B to month C, although it does determine the price to which the next change is applied (52 €/t). Moreover, the likelihood of any given change depends on the volatility of coal prices so very large changes are less likely than smaller changes. ↩
[Page 110]
distribution of credible outcomes for any forward contract.229 In line with standard practice, we draw from these distributions multiple times – in this case, 100 times, to build up 100 price paths for each commodity. The process is known formally as Monte Carlo analysis, and was developed by prominent mathematicians in the 1940s who worked on the Manhattan Project. Monte Carlo analysis use a sequence of random numbers to pick values from a pre- determined probability distribution of different outcomes derived from an analysis of volatility data.
260. To illustrate the ideas underlying our approach, Figure 16 shows an illustrative example of possible price changes in TTF gas prices over 38 months. Given that forward contracts with a short time to delivery react to both short-term and long-term information, we expect them to exhibit a higher volatility than contracts with a longer time to delivery. This makes sense, as short-dated forward prices are extremely sensitive to recent information and events. The prices in long-dated contracts tend to be more stable, as at any given point in time traders reason that the market will have time to restore equilibrium in response to short-term supply and demand imbalances. Thus, in any month, the market price of a contract for deliveries twelve months ahead will tend to change by a lower percentage than the price of a contract for deliveries one month ahead.
261. However, because this “instantaneous volatility” accumulates over time, the longer the time to delivery of a forward contract, the larger its cumulative volatility. These features of commodity prices are commonly referred to as the “volatility term structure”.
229 Focusing on forwards is standard practice, in part because it simplifies the mathematics necessary to construct a random walk, and in part because, the price of a commodity forward at maturity will converge with the spot price. The overall price outcome for any commodity forward contract between now and maturity will naturally reflect the combination of the potential period-to-period price changes during the interim. We build a forward curve model as described in Exhibit BR-61, Clewlow L., and Strickland C., Energy Derivatives: Pricing and Risks Management, Lacima Publications, 2000 "Forward Curve Models", Chapter 8. ↩
[Page 111]
Chart Description: A combination bar and line chart showing volatility over time.
Chart Legend:
Y-Axis (Left): Cumulative monthly volatility (%) - Scale from 0% to 35% in increments of 5%.
Y-Axis (Right): Instantaneous monthly volatility (%) - Scale from 0% to 8% in increments of 1%.
X-Axis (Months): Nov-17, Jan-18, Mar-18, May-18, Jul-18, Sep-18, Nov-18, Jan-19, Mar-19, May-19, Jul-19, Sep-19, Nov-19, Jan-20, Mar-20, May-20, Jul-20, Sep-20, Nov-20.
262. Knowing a forward contract's time to delivery and its corresponding volatility allows us to determine how the price of the contract will react to new information at the valuation date. Figure 17 illustrates how we use the volatility term structure to simulate (spot) prices. In this hypothetical example, we assume that the instantaneous volatility in the forward price decreases by 5 percentage points with every month. The rows represent forward contracts with different maturities (delivery periods) and the columns show different months. Each cell of the matrix represents the volatility of a forward contract (defined by the row) at a given time to delivery (defined by the column). In each month all forward contracts are exposed to the same information (short-term and long-term). It is only due to their different times to delivery that they react differently to it. We trace the reactions of a given forward contract over time by summing all its reactions to news across the columns in Figure 17. So, for example, a contract with a delivery date in May will have a volatility of 15% when it is traded in February and of 20% if traded in March. As a forward contract reaches delivery, by definition, it must converge to the spot price.
230 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 112]
| Expected Monthly Volatility | |||||
|---|---|---|---|---|---|
| Feb | Mar | Apr | May | Jun | |
| Forward contract with Mar delivery |
25% | 30% | Mature | Mature | Mature |
| Forward contract with Apr delivery |
20% | 25% | 30% | Mature | Mature |
| Forward contract with May delivery |
15% | 20% | 25% | 30% | Mature |
| Forward contract with Jun delivery |
10% | 15% | 20% | 25% | 30% |
Annotations to Figure 17:
263. As discussed above, we assume that commodity prices follow a random walk. This implies that the natural logarithms of the prices are normally distributed,231 or, equivalently, that prices follow a “log-normal" distribution. Figure 18 illustrates the distribution of future log prices in our model. It demonstrates that, in line with the preceding discussion on cumulative volatility, the width of the distribution of potential prices increases as the period between the valuation date and the delivery date increases.
231 A normal distribution is a probability distribution often referred to as a bell curve for its resemblance to a bell. The mean is the expected value with the highest probability. Deviation from the mean is symmetric, which means that a deviation from the mean of +2%, for example, has the same probability to occur of a deviation of -2%. The standard deviation of the distribution determines how likely a given deviation from the mean is. A random walk assumes that returns are normally distributed. ↩
[Page 113]
Chart Description: A line chart showing distributions of future prices over time.
Y-Axis: Log prices (€/unit)
X-Axis: t0, t1, t2, t3, t4, t5, t6, t7, t8
Annotations on chart:
Valuation date (at t0)
Note: *In an additional step, we turn these risk-neutral prices into actual prices.
264. A corollary of the assumption that the logarithms of commodity prices are normally distributed is that actual simulated prices follow a log-normal distribution. Figure 19 shows the values of a log-normal distribution that correspond to a standard normal distribution of its log values. The log-normal distribution has several advantageous features for the simulation of prices, including that all prices drawn from this distribution are positive.232
232 While some commodity markets have seen negative price episodes in recent years, including electricity and oil markets, it is rather uncommon or even unheard of in the European gas market and global coal markets. Hence, restricting the possible price outcomes to the positive number space by design is helpful. ↩
[Page 114]
[Chart showing two overlapping distribution curves] |
|
X-Axis Labels: -5, 0, 5, 10, 15 Legend: lognormal, normal |
265. The methodology we have described determines how forward prices react to new information. We trace the changes of the price of a forward contract until it matures, i.e. deliveries start under the contract, to obtain a simulated spot price. Combining all the spot prices for all the contract maturities gives us a price path for a given commodity.233 We have repeated the process 100 times and we obtained the price paths shown in Figure 20 for gas traded at TTF and in Figure 21 for coal delivered in the Amsterdam-Rotterdam-Antwerp (“ARA”) region in the Netherlands.
233 The described methodology produces risk-neutral spot prices, where the mean of the spot price distribution in a given period T is equal to the forward price F(t0, T), where t0 is the Valuation Date. As discussed below, expected spot prices are generally more risky than forward prices and we make an adjustment to account for this risk. A discussion of risk-neutral discounting can be found in: Exhibit BR-34, Hull J.C., Options, Futures and Other Derivatives, 9th edition, Chapter 15. ↩
[Page 115]
FIGURE 21: 100 PRICE PATHS OF ARA COAL PRICES BETWEEN 2017 AND 2054235Y-Axis Title: Coal price paths (€/tonne) Y-Axis Labels: 2017, 2018, 2019, 2021, 2022, 2023, 2024, 2025, 2026, 2028, 2029, 2030, 2031, 2032, 2033, 2035, 2036, 2037, 2038, 2039, 2040, 2042, 2043, 2044, 2045, 2046, 2047, 2049, 2050, 2051, 2052, 2053, 2054 [Redacted] |
FIGURE 20: 100 PRICE PATHS OF TTF GAS PRICES BETWEEN 2017 AND 2054 234Y-Axis Title: Gas price paths (€/MWh) Y-Axis Labels: 2017, 2018, 2019, 2021, 2022, 2023, 2024, 2025, 2026, 2028, 2029, 2030, 2031, 2032, 2033, 2035, 2036, 2037, 2038, 2039, 2040, 2042, 2043, 2044, 2045, 2046, 2047, 2049, 2050, 2051, 2052, 2053, 2054 [Redacted] |
[Page 116]
266. In summary, to implement our stochastic approach we have had to:
267. The following sub-appendices explain in more detail how we have carried out each of these tasks.
268. We start by creating a forward price curve from data available as at the valuation date that covers the entire period in which we are interested i.e. 2017 to 2054. A forward curve is simply the set of forward prices for different maturities (delivery periods) available on a given trading day.
269. Ideally, we would rely entirely on forward price data to create our price paths. However, this is not possible because the forward curves for coal and gas prices goes from around the valuation date extended at most 5 years into the future. Consequently, we also rely on the New Policies price forecasts contained in the IEA’s 2016 World Energy Outlook,236 the latest long-term forecast produced by a reputable international body that would have been available at the valuation date.
270. In order to combine the forward curve data with the IEA projection into a single coherent dataset, we (i) convert all prices into nominal (money of the day) Euro terms, (ii) estimate the forward prices consistent with the IEA spot price projection, and (iii) use interpolation to provide data for years for which no data are available.
271. While our forward prices are already expressed in terms of nominal Euros, the spot prices in the IEA scenario are provided in 2015 US Dollars as shown in the top half of Table 7. We convert the IEA prices to Euros using the average 2015 US$/€ exchange rate, and inflate them using a contemporaneous International Monetary Fund inflation forecast.237 In this
234 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'Path_chart'. ↩
235 Harris-Hesmondhalgh Workpapers, Tables D.2 – Coal and Gas Price Simulation, Tab 'Path_chart'. Please note that you need to use the switch in the Workpaper D.2 to get the chart for gas and coal respectively. ↩
236 We explain why we have chosen this scenario in Section IV.B above. ↩
237 Exhibit BR-62, International Monetary Fund, World Economic Outlook Database, October 2017. ↩
[Page 117]
way, we obtain nominal spot price forecasts in €/tonne for coal and €/MWh for gas shown in the bottom half of Table 7.
TABLE 7: IEA - WORLD ECONOMIC OUTLOOK 2016 – СОMMODITY PRICE FORECASTS 238
[Redacted]
Notes and sources:
[1]-[5]: See Harris-Hesmondhalgh Workpapers, Tables B -
Commodity Betas, Table B13.
[6]: [3]x[5]/([1]x[2]).
[7]: [4]x[5]/[2].
272. As noted above, the IEA projection is of spot prices but the theory underlying our stochastic model requires that the price inputs to the model are forward prices. Accordingly, we have to convert the IEA spot prices into equivalent forward prices.
273. Expected spot prices are generally not equal to forward prices due to market sentiment and conditions changing over time. As a results, a price agreed on, say, 21 October 2020 for delivery over January 2021 is unlikely to equal the average of the spot (day-ahead) prices during January 2021. Buying a forward contract fixes the price and so removes risk associated with only discovering what the price will be the day-before delivery. This means that, compared to forward prices, spot prices contain a risk premium.
274. To estimate this embedded risk premium in spot prices, we apply a method that is a widely used in corporate finance, the Capital Asset Pricing Model, or CAPM.239 The CAPM predicts that the risk premium of an asset is equal to the risk premium for the entire market, the market risk, multiplied by a factor that measures the degree to which the asset's price
238 Harris-Hesmondhalgh Workpapers, Tables B – Commodity Forward Curves and Commodity Betas. ↩
239 For a derivation of the relationship between expected spot prices and forward prices see Exhibit BR-63, Pindyck, R.S., The Dynamics of Commodity Spot and Futures Markets: A Primer, The Energy Journal, 2001, Vol. 22, No. 3, p. 16. ↩
[Page 118]
moves in line with the market, i.e. its market exposure or beta.240 We explain the CAPM model in greater detail in Appendix G, in the context of determining the appropriate discount rate to use in calculating a fair market value.
275. To apply the CAPM and estimate the betas for gas prices, we consider the hypothetical value of a company that sells gas for delivery at different times in the future. We assume that the company sells gas for delivery during every month of the forward curve, starting with the next month and ending with the latest possible delivery month for which one can buy a forward contract. We discount the value of these sales at the risk-free rate241 to compute a net present value of these companies.242 We repeat this process for every trading day from 2013 to 2017 allowing us to record changes in the net present values (returns) of the companies.
276. We compute the beta by comparing the change in the net present values of the company to the change in the reference market, for which we have chosen the FTSE World Index.243 For example, if, on average, the net present value (the price) of the company changes by 0.5% in response to a 1% change in the market, then it has a beta of 0.5. We compute weekly returns for the FTSE World Index to avoid any temporary illiquidity issues that might arise if we used daily data.244
277. We carry out exactly the same procedure to determine the beta of coal prices. We find that the beta of gas is 0.23 and that for coal is 0.45 (see Table 8).
278. The other component of the CAPM model, the market risk, is determined by multiplying a risk-free rate by an appropriate market risk premium. In line with standard practice, we use a EURIBOR rate as a proxy for the risk-free rate and apply a standard market risk-premium of 5.5%.245
240 A beta is the covariance of company returns and market returns scaled by the market variance. ↩
241 We rely on the risk free rate because, as just described, forward prices are fixed and so riskless. ↩
242 We rely here on one of the fundamental theories in corporate finance: We implicitly, assume here that the companies sell gas or coal by locking in the forward rate. Hence by the time of the company valuation, all future prices are known. However, we would arrive at the same value if we assumed that the company sold the gas or coal at the spot rate, as long as we applied an appropriate discount rate, reflecting the risk associated with the cash flows. ↩
243 A beta is a number that measures the relationship between the movements in the returns of an asset (in this case a commodity) and the returns of the overall market. We select FTSE All World as the reference market because it reflects a liquid set of globally traded companies, diversified across sectors, to reflect a wide class of returns. Exhibit BR-64, FTSE Russell, FTSE All-World Index, dated 29 January 2021. ↩
244 This problem was first discussed by Dimson (1979), Exhibit BR-65, Dimson, Risk Measurement When Shares are Subject to Infrequent Trading, Vol. 7, No. 2, dated 1 May 1979. ↩
[Page 119]
TABLE 8: COMMODITY CAPM PARAMETERS 246
| Coal [A] |
Gas [B] |
|
|---|---|---|
| Risk-free rate [1] | 1.52% | 1.52% |
| Commodity beta [2] | 0.45 | 0.23 |
| Market risk premium [3] | 5.50% | 5.50% |
| Commodity discount rate [4] | 3.99% | 2.80% |
Notes and sources:
See See Harris-Hesmondhalgh Workpapers, Tables B -
Commodity Betas.
[1]: 20-Year EURIBOR rate.
[3]: See Exhibit BR-64, Damodaran, A., Equity Risk
Premium (ERP): Determinant, Estimation and
Implications - A post Crisis Update, Stern School of
Business, p. 67.
[4]: [1]+[2]x[3].
279. To deduct the risk premium from the spot prices we have derived from the IEA forecasts, we discount each forecast price back to the valuation data at the CAPM rate (row [4] of Table 8), and then “roll it forward” again at the risk-free rate to obtain a forward price for 2020, 2030 and 2040, the years for which the IEA provides a price forecast. This process is illustrated with a hypothetical example for 2030 in Figure 22. We also apply this methodology to obtain a price forecast for 2054 by assuming that the forecast prices between 2040 and 2054 remain constant in real terms.247
246 Harris-Hesmondhalgh Workpapers, Tables B – Commodity Forward Curves and Commodity Betas. ↩
247 Harris-Hesmondhalgh Workpapers, Tables B – Commodity Forward Curves and Commodity Betas. ↩
[Page 120]
[A diagram showing a process flow from left to right. On the left is a blue box labeled "Present value". An arrow points from this box to a pink box labeled "Estimated forward price". Above this arrow is the text "Roll forward at risk free rate". A third, larger blue box on the right is labeled "Projected spot price". An arrow points from the "Projected spot price" box to the "Estimated forward price" box. Above this arrow is the text "Discount at rate including market risk". Below the diagram, "2017" is under the "Present value" box and "2030" is under the "Projected spot price" box.]
280. The IEA forecast only specifies prices for 2020, 2030 and 2040. Since we also need prices for the intervening years, we derive these values by using linear interpolation, i.e. assuming that the change in prices from, say, 2020 to 2030 is the same for each year, in other words, follows a straight line. In this way, we obtain annual forward prices from 2030 to 2054.
281. However, for the period prior to 2030, we rely on actual forward market data, where available, and only interpolate from the end of the forward curve to our 2030 forward price estimates. Figure 23 and Figure 24 present the resulting extended forward curves for deliveries of coal and gas respectively. The solid line shows the actual forward prices from around the valuation date whilst the dashed line represents the forward prices derived from the IEA forecast prices.
[Page 121]
[Redacted]
| X-Axis Labels: 2017, 2020, 2022, 2024, 2027, 2029, 2032, 2034, 2036, 2039, 2041, 2044, 2046, 2049, 2051, 2053 |
| Legend: Market forward price, -Forward curve extrapolation |
248 Harris-Hesmondhalgh Workpapers, Tables B – Commodity Forward Curves and Commodity Betas. ↩
[Page 122]
[Redacted]
| X-Axis Labels: 2017, 2019, 2021, 2023, 2025, 2027, 2029, 2031, 2033, 2035, 2037, 2039, 2041, 2043, 2045, 2047, 2049, 2051, 2053 |
| Legend: Market forward price, Forward curve extrapolation |
282. Volatility is a measure of how much prices react to new information. If the volatility of a commodity price is high, the chance of a large price change from one period to the next is high. Conversely, if the commodity's volatility is low, large price changes between periods are unlikely. Accordingly, in order to create the distributions for coal and gas prices from which we derive our commodity price paths, we need to estimate the volatility of coal and gas prices as their volatility will determine the width of the distributions.
283. There are two common approaches to estimating volatility:
249 Harris-Hesmondhalgh Workpapers, Tables B – Commodity Forward Curves and Commodity Betas. ↩
[Page 123]
commodity (put option) at an agreed price at a given date.250 This approach assumes that the prices of put and call options depend on the expected volatility of future prices. We can, therefore, infer the level of expected volatility by studying the volatility that is reflected in option prices (“implied volatility”).
284. Both approaches have advantages and disadvantages. An abundance of objective data offers a key advantage to studying historical volatility of forward contracts. A disadvantage is that the volatility of prices may change over time, so the past might not be representative of the future. In contrast, the market prices of options contracts traded in 2017 will reflect most directly the market's contemporaneous expectations of future price volatility.251 We consider that it is more consistent with our general approach to focus on expected price volatility and hence to rely on the option approach as far as possible. However, there are no relevant options for gas prices and so we rely on an analysis of the historical volatility of forward gas prices to determine their volatility term structure.
285. We estimate the future volatility term structure of coal and gas prices using a two-factor model,252 which, as outlined above, calculates the volatility of the price of a contract with a given time before expiration (“time to maturity") on the basis of a combination of the short term volatility of the price, which reflects how price react to transitory information, its long-term volatility, which reflects how the price of the contract reacts to permanent (long-term) information, and a parameter that reflects how quickly the influence of the short-term volatility dies away as the time to maturity increases (“decay rate").
286. We estimated the implied volatility of coal prices from prices of European options on ARA coal forward contracts with different maturities using the so called "Black model”. The model is named after Fisher Black, who proposed it in 1976 as a pricing model for European options on futures.253 Since then, the Black model has been routinely used to price options on forward and future contracts.254
287. The Black model expresses the price of a European option as a function of: the time to maturity, the exercise price of the option and the expected volatility of the underlying
250 Options can be exercised either at maturity (European options) or at any time up to maturity (American options). ↩
251 Of course, in a sense, the options approach is also historical in that it reflects expectations as of the valuation date and not now. ↩
252 By "two factor" we simply mean a model that consists of both a short-term volatility term and a long-term volatility term, see discussion beginning at ¶258 above. ↩
253 Exhibit BR-34, Hull J.C., Options, Futures and Other Derivatives, 9th edition, pp. 392-393. ↩
254 Exhibit BR-34, Hull J.C., Options, Futures and Other Derivatives, 9th edition, pp. 392-394. ↩
[Page 124]
futures contract. Knowing the final result of the model (the price of the option) and all the inputs except for the implied volatility, we calculate the implied volatility by “inverting” the calculation formula.
288. To safeguard against outliers, we calculate average implied volatilities for different maturities across 30 trading days. We then construct a term structure of implied volatilities based on how the average implied volatility varies with time to maturity.
289. As is evident from Figure 25, the volatility of coal prices does not significantly decline with time to maturity. Accordingly, we assessed how a one-factor model, which is a model where volatility is constant across all maturities, compares to the two-factor model. We found that a one-factor model (the dotted line in Figure 25) provides only a marginally worse fit than a two-factor model and so, to reduce the computational burden, we have adopted a one-factor model.
[Page 125]
[Line chart showing volatility over time] |
|
Y-Axis Title: Annualised volatility (%) Y-Axis Labels: 0%, 2.0%, 4.0%, 6.0%, 8.0%, 10.0%, 12.0%, 14.0%, 16.0%, 18.0%, 20.0% X-Axis Labels: M+2, M+4, M+6, M+8, M+10, M+12, M+14, M+16, M+18, M+20, M+22, M+24, M+26, M+28, M+30, M+32, M+34, M+36, M+38, M+40, M+42, M+44, M+46 Legend: Option-implied volatility, One Factor Model |
290. We estimate volatility of gas prices from data on forward contracts published by ICIS Heren for gas traded at the Dutch Title Transfer Facility (“TTF”). Gas prices generally show seasonal variations reflecting the significantly higher demand for gas for heating during the winter months. To account for the seasonality in prices we estimate two separate two-factor models, one for winter and one for summer.
291. To compute the historical volatility of gas prices, we first construct a “relative term structure" of monthly delivery periods from standard forward contracts traded at the TTF. Products are traded with reference to a specific delivery period, for example September 2017 in case of monthly contracts or Q3 2018 in case of quarterly contracts.256 To obtain a relative term structure, we measure the time difference between the assessment date (trading date) and the delivery period in order to trace prices across the term structure over
255 Harris-Hesmondhalgh Workpapers, Tables C.2.2 – Black Model, Tab 'Vol term structure'. ↩
256 For a given delivery month, we take the most granular product available as at the assessment date, meaning that if we have monthly, quarterly and yearly contracts we consider the monthly contract. Purchases of standard gas forward contracts entitle to flat hourly deliveries over a pre-defined delivery period. ↩
[Page 126]
time. For example, on a trading date in July 2017, the September 2017 product would be the two months-ahead (“M+2”) product. Similarly for quarterly contracts, on a trading date in January 2018, the Q3 2018 product would be a Q+2 product.
292. To determine the historical volatility of gas prices, we calculate the daily “returns" for each (relative) contract; a daily return is the change in price from one day to the next and determine the natural logarithm of these returns (daily log returns).257 Standard theory states that the standard deviation of daily log returns for a product measures its volatility.258 Finally, we determine what parameters for each two factor model best replicate the historical volatility term structure that we have found. Figure 26: plots the modelled TTF volatility term structures against the historically observed one.
257 Following standard practice in finance, the Clewlow and Strickland (2000) model we impose for coal and gas prices assumes that forward prices are log-normally distributed. This implies that log returns are normally distributed which has several desirable properties. ↩
258 Calculation of standard deviation is based on a sample of trading days between 2013 and 2017. ↩
[Page 127]
[Line chart showing volatility in summer] |
|
Y-Axis Title: Annualised volatility in summer (%) Y-Axis Labels: 0%, 5%, 10%, 15%, 20%, 25%, 30% |
[Line chart showing volatility in winter] |
|
Y-Axis Title: Annualised volatility in winter (%) Y-Axis Labels: 0%, 5%, 10%, 15%, 20%, 25%, 30% X-Axis Labels (for both charts): M+1, M+4, M+7, M+10, M+13, M+16, M+19, M+22, M+25, M+28, M+31, M+34, M+37, M+40, M+43, M+46, M+49, M+52, M+55, M+58 Legend (for both charts): Historical volatility, Two-factor model |
293. The final issue that we need to take into account when creating our price paths is how coal and gas prices relate to each other i.e. what correlation there is between the movements of coal and gas prices. We need, therefore, to estimate their correlation based on data that would have been available as of the valuation date.
294. Intuitively we would expect coal prices to increase when gas prices increase because to some extent they are “competing fuels", meaning that there are uses the main one being electricity generation – where gas-fired power plants can be used as a substitute for coal-fired power plants and vice versa. For example, whenever the price of coal is such that the use of coal becomes less competitive than the use of gas, gas will replace coal, gas demand will increase and gas prices can be expected to increase. A change in the price of coal, therefore, leads to a change in the price of gas. In other words, coal and gas prices are "correlated".
259 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 128]
295. As the coal and gas prices do not move entirely independently of each other, we need to account for their correlation when simulating spot prices. To obtain correlated spot prices, we build a term structure of correlation using the same methodology we used to build the volatility term structure of gas prices. We build daily log returns for coal and gas forward products of different maturities over the period 2013-2017 and then compute the correlation of the returns.260 The bars in Figure 27 represent the historical correlation term structure. As with the volatility term structures that we calculate for gas, we create separate correlation term structures for winter and summer to reflect the seasonality in gas prices.
[Bar chart showing correlation over time] |
|
Y-Axis Title: Correlation between ARA coal and TTF gas (rho (T-t)) Y-Axis Labels: 0.00, 0.10, 0.20, 0.30, 0.40, 0.50, 0.60, 0.70, 0.80, 0.90, 1.00 X-Axis Title: Time to delivery (months) X-Axis Labels: 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47 49 51 53 55 57 59 Legend: Summer historical, Winter historical, Summer fit, Winter Fit |
296. After calculating the historical correlation term structure, we fit a two-factor model to the two historical term structures. The dashed lines in Figure 27 represent the modelled correlation term structures and Table 9 shows the resulting correlation factors on which we rely.
260 Correlation is a statistical measure of the relationship of two random variables. A high positive correlation (with values close to 1) implies that the two variables move almost identically, i.e. if the price for coal goes up by 5% from one period to the next, the price for gas will also go up by roughly 5%. Conversely, a high negative correlation (close to -1) implies that if the price of coal goes up by 5%, the price for gas will go down by roughly 5%. If the correlation is zero, the price series move independently of each other. ↩
261 Harris-Hesmondhalgh Workpapers, Tables C.3, Commodity Correlation, Tab 'Coal_Gas_chart'. ↩
[Page 129]
TABLE 9: CORRELATION FACTORS 262
| Short-term correlation | Long-term correlation | |||||
|---|---|---|---|---|---|---|
| Coal [A] Table C.3.2 |
Gas-Winter [B] Table C.3.2 |
Gas-Summer [C] Table C.3.2 |
Coal [D] Table C.3.2 |
Gas-Winter [E] Table C.3.2 |
Gas-Summer [F] Table C.3.2 |
|
| Coal | 1 | 0.22 | 0.12 | 1 | 0.43 | 0.52 |
| Gas-Winter | 0.22 | 1 | 0 | 0.43 | 1 | 0 |
| Gas-Summer | 0.12 | 0 | 1 | 0.52 | 0 | 1 |
297. Each time we build a coal price path, we build a gas price path that reflects the correlation between coal and gas prices that we have estimated. To do this, we use the standard technique of “Cholesky decomposition” to derive a set of coefficients that transform uncorrelated draws into correlated draws with pre-specified correlation coefficients. This technique turns the correlation matrix in Table 9 into factors with which we then multiply our price draw for a coal price to derive a consistent gas price. The distribution of the adjusted price draws will then exhibit the correlations we calculated.
298. The model just described generates monthly prices for ARA coal and TTF gas. While coal is mostly traded in monthly contracts and so the monthly coal price is the spot coal price, gas is frequently traded for shorter periods and, in particular, for delivery on the next day, so-called day-ahead products. It is the day-ahead price that corresponds to the spot price for gas.263 Hence, we need to turn our monthly gas price paths into daily gas price paths but do not need to do this for coal prices.
299. In order create daily gas price paths, we first make an adjustment to reflect the average historical deviation of day-ahead prices from month-ahead prices. In a second step, we include day-to-day variations in prices based on the historical volatility of day-ahead prices. We estimate both parameters from historical return data in our 2013-2017 sample of gas prices.264
262 Harris-Hesmondhalgh Workpapers, Tables C.3, Commodity Correlation, Table C.3.1 ↩
263 There is an increasing amount of intra-day trading in many European markets. Nonetheless, day-ahead prices are generally considered to be spot. ↩
264 Harris-Hesmondhalgh Workpapers, Tables C.1. ↩
[Page 130]
300. Just as we need a model of coal and gas prices so we need one for CO2 prices. However, it would not be appropriate to adopt the same model for CO2 prices that we use for coal and gas prices for the reasons we explain below.
301. CO2 prices are formed within the EU Emissions Trading System (ETS) established in 2005. Over 11,000 installations including power plants and industrial plants have to submit sufficient permits (each permit covers the emission of one tonne of CO2) to cover their emissions. The ETS regulates the total number of permits that are available and allows participants to trade these permits with each other, which establishes a market price for CO2 permits.265 Unused permits remain valid for future years.266
302. The market price heavily depends on the number of permits that the ETS allocates to participants every year,267 and the number of permits is governed by policy decisions, unlike other commodities whose supply is driven by economic factors.
303. These features of the ETS mean that the stochastic model described in Appendix B.2 is not appropriate for CO2 prices for two reasons:
265 Exhibit BR-66, European Commission, EU Emissions Trading System (EU ETS), dated 23 November 2016. ↩
266 Exhibit BR-66, European Commission, EU Emissions Trading System (EU ETS), dated 23 November 2016. ↩
267 Permits are allocated through auctions and free allocations, with auctions being the default mechanism since the start of Phase 3 of the ETS in 2013. ↩
[Page 131]
304. Instead, we choose a different approach to creating 100 possible CO2 price paths, which allows for different policy paths. We start from the three IEA forecasts of European CO2 prices included in the World Economic Outlook in 2016: the Current Policies scenario, the New Policies scenario and the 450 scenario.268
305. Table 10 shows the forecast prices for each scenario in 2020, 2030 and 2040. We use the New Policies scenario and the 450 scenario to determine an appropriate range of possible prices in each of these years assuming that the initial distribution of CO2 prices, like the prices for coal and gas, follows a log-normal distribution.269 We therefore construct a log-normal distribution such that 97.5% of all draws from this distribution lie below the 450 scenario value and the mean of the distribution is equal to New Policies scenario value. We do not explicitly rely on the Current Policies scenario but its prices fall within the distribution that we create and it is not possible to create a log-normal distribution that results in only 2.5% of all the draws lying below the New Policies values.
TABLE 10: IEA CO₂ PRICE FORECASTS 270
| 2015 $/€ exchange rate | [1] | 1.11 | ||
| Scenario | 2020 [A] |
2030 [B] |
2040 [C] |
|
| Current Policies 2015$/t | [2] | [Redacted] | [Redacted] | [Redacted] |
| New Policies 2015$/t | [3] | [Redacted] | [Redacted] | [Redacted] |
| 450 Scenario 2015$/t | [4] | [Redacted] | [Redacted] | [Redacted] |
| Inflation | [5] | [Redacted] | [Redacted] | [Redacted] |
| Current Policies €/tonne | [6] | [Redacted] | [Redacted] | [Redacted] |
| New Policies €/tonne | [7] | [Redacted] | [Redacted] | [Redacted] |
| 450 Scenario €/tonne | [8] | [Redacted] | [Redacted] | [Redacted] |
Notes and sources:
[1]-[5] See Harris-Hesmondhalgh Workpapers, Tables D.3 - CO2 Price Ratchet,
Table D.3.10.
[6]=[2]*[5]/[1]
[7]=[3]*[5]/[1]
[8]=[4]*[5]/[1]
306. Figure 28: shows the resulting distributions of prices in 2030, 2040 and 2050. For 2050 we have assumed that the New Policies scenario prices would increase by inflation and that the width remains the same as for 2040, which implicitly means we assume the 450 scenario
268 Exhibit BR-32, International Energy Agency, World Energy Outlook, 2016, Table 1.1, p. 39. ↩
269 The standard assumption is that commodity prices follow a log-normal distribution. ↩
270 Harris-Hesmondhalgh Workpapers, Tables D.3 - CO2 Price Ratchet. ↩
[Page 132]
prices also increase by inflation. Note that for 2020, the IEA does not forecast different prices in the New Policies and 450 scenarios. Hence, we simply use the price of [Redacted] €/MWh shown in lines [7] and [8] of Table 10 above, and do not impose a distribution. On the horizontal axis we plot prices and on the vertical axis the frequency with which a given price level occurs - its probability of occurring. The price that we assume will occur most frequently is the New Policies scenario price. The frequency with which prices below this level occur drops sharply but there is a more gradual reduction in the frequency with which prices higher than the New Policies price are assumed to occur. By construction, 97.5% of prices remaining below the 450 scenario level. We let the computer draw 100 different prices from each distribution. These are the basis for our price paths.
[Three distribution curve charts for 2030, 2040, and 2050] |
|
Y-Axis Title: Frequency X-Axis Title: CO2 Price (€/tonne) X-Axis Labels: 0, 100, 200, 300 (for each chart) |
307. We assume that each of the 100 draws represents one simulation of CO2 prices in June 2030, June 2040 and June 2050. In order to determine how each price path develops from one simulation to the next, we apply a mechanism that we call the policy ratchet. It involves the following steps:
271 Harris-Hesmondhalgh Workpapers, Tables I - Other Supporting Analysis. ↩
272 The 2020 price for all the IEA 2016 World Energy Outlook scenarios. ↩
[Page 133]
308. We repeat this sequence of steps 100 times to create 100 price paths.
309. By way of example, assume that we pick the rank 48 in 2020. As in all price paths, this means the price is [Redacted] €/tonne. We then draw a random number to determine the rank for this price path in 2030 and pick 65. The price draw with rank 65 in 2030 is 34.33 €/tonne. In contrast the price draw 48 in 2030 is 45.22 €/tonne. Hence, we adopt rank 48 to determine the 2030 price for this path and linearly interpolate between [Redacted] €/tonne in June 2020 and 45.22 €/tonne in 2030.
310. In an alternative example, assume we are at rank 91 in 2020 and our 2030 draw is rank 24. The price draw with rank 24 in 2030 is 62.35 €/tonne. We linearly interpolate between [Redacted] and 62.35 €/tonne to obtain the CO2 price path between June 2020 and June 2030.
311. This mechanism thus allows for rapid increases in CO2 prices within a decade reflecting the uncertainty around what EU climate policy will look like over the forecast period. It also allows for slower price increases, but, like any ratchet, we assume that CO2 prices cannot decrease over time, as we deem it reasonable to assume that EU policymakers would take measures to prevent a price slump by shortening supply of permits in an effort to meet climate targets.
273 This last contingency is only relevant for very few extreme price paths in which the same rank ten years later actually results in a lower nominal price. ↩
[Page 134]
312. We extend the price series to include the time from the Valuation Date to June 2020 and from June 2050 to December 2054. For the earlier period, we linearly interpolate between spot prices as of the Valuation Date and the price of [Redacted] €/tonne in June 2020. For the latter period, we assume prices increase by long-term inflation.
313. Finally, we add day-to-day variations using the methodology described in Appendix B.2.iv for gas prices.274 Figure 29 shows the resulting prices paths from 2017 to 2054.275
[Redacted]
| Y-Axis Title: Carbon price paths (€/tonne) |
| X-Axis Labels: 2017, 2019, 2021, 2023, 2025, 2027, 2029, 2031, 2033, 2035, 2037, 2039, 2041, 2043, 2045, 2047, 2049, 2051, 2053 |
274 Note that we only need to implement the second step described in Section B.2.iv, as we do not start from month-ahead prices but rather average daily prices. ↩
275 Note that we linearly interpolate between spot prices in 2017 and our modelled price from 2020 to create monthly prices and then take account of intra-month volatility to create daily prices. ↩
276 Harris-Hesmondhalgh Workpapers - Tables I - Other Supporting Analysis. ↩
[Page 135]
314. In this Appendix we summarise the electricity market modelling that Baringa carried out, based on the input assumptions on which we asked it to rely. Appendix C.1 sets out our approach to modelling the electricity market whilst the key assumptions that are used in the modelling are described in Appendix C.2. We set out the main results of the modelling in Appendix C.3.
315. To calculate the electricity prices that are consistent with our commodity price paths, we have made use of a computer model of the entire European electricity market and used this to estimate electricity prices for each of the 100 commodity price paths from 2020 to 2054 under the but-for case and from 2020-2030 under the actual case. In addition to commodity prices, such a model also needs assumptions on:
316. The next sub-appendix explains the sources that we have used for these assumptions.
317. We engaged Baringa to provide the electricity price projections using a well-known and well-developed power market model, PLEXOS®. PLEXOS® uses least-cost optimisation to dispatch plants to meet demand for the minimum cost, and provides projections of power prices, generation volumes, operating margins and emissions. Baringa regularly uses PLEXOS® to provide pan-European forecasts and PLEXOS® is also used by many transmission system operators.
318. Typically, Baringa runs PLEXOS® using hourly demand data. However, in this case, it has relied on 4 hourly demand periods, with demand averaged over 4 hour steps and supply dispatched in 4 hour periods to meet it. This is a pragmatic step to reduce to reasonable levels the running time required to complete 100 price paths for 34 years. For the purposes of assessing the fair market value of coal-fired power plant, we consider that the 4-hourly granularity is sufficient to reflect appropriately dispatch behaviour given that the ramping rate and start-up costs for such plants generally make it very inefficient and physically challenging to operate in shorter cycles than four hours.
[Page 136]
319. As outlined in Section V above, in addition to our commodity price paths, the key sources used in building the stochastic electricity price paths were:
320. It is easier for Baringa to model the whole European market than to model just the countries that are likely to have an effect on the Dutch electricity market. However, the development of these distant markets, such as Greece and Romania, has essentially no impact on the Dutch market. Baringa and we took the pragmatic view that relying on the Q2 2019 Baringa Reference Case for such countries, which was already loaded into PLEXOS®, would not affect the resulting Dutch electricity prices and would significantly speed up the time required to complete the electricity modelling analysis. Table 11 summarises the sources that Baringa relied upon for all the key assumptions.
277 Exhibit BR-37, European Commission, EU Reference Scenario, dated 15 July 2016. ↩
278 Baringa Reference Cases are the central in-house view of Baringa on how the European power market will evolve. ↩
[Page 137]
TABLE 11: SOURCES OF KEY ASSUMPTIONS 279
| Parameter | Markets | Source | Impact on NL prices |
|---|---|---|---|
| Capacity and annual demand | NL, BE, DE, ES, FI, FR, GB, IT, PL | IEA EU Reference Scenario 2016 | High |
| DKW, NO, SE | Baringa Reference Q2 2017 scenario | High | |
| All other European markets | Baringa Reference Q4 2019 scenario | Low | |
| Hourly demand profile | All | Baringa Reference Q2 2017 scenario | High |
| Plant characteristics | All | Baringa Reference Q2 2017/Q4 2019 scenarios (the two sets of characteristics are essentially identical) | High |
| Heat pump & EV demand | NL, BE, DE, DKW, ES, FI, FR, GB, IT, NO, PL, SE | Baringa Reference Q2 2017 scenario | High |
| All other European markets | Baringa Reference Q4 2019 scenario | Low | |
| Interconnector capacities | To/from NL | Baringa Reference Q2 2017 scenario | High |
| To/from BE, DE, DKW, FR, GB, IT | Baringa Reference Q2 2017 scenario | High | |
| All other European markets | Baringa Reference Q4 2019 scenario | Low |
321. The EU Reference Scenario only provides generation capacity assumptions in 5 year steps so Baringa has linearly interpolated between each of the 5 year steps to obtain yearly capacity data. After 2045, Baringa kept the assumptions on capacity (and demand) constant. The resulting initial capacity mix in the Netherlands for the but-for case is shown in Figure 30. Note that demand side response or “DSR” corresponds to electricity consumers who are able to adjust their consumption in response to market signals. The capacity mixes in 2020 and 2050 for the countries neighbouring the Netherlands are shown in Figure 31. Baringa made adjustments to these assumptions to “flex” the renewable capacity assumptions in line with changing commodity price assumptions, as discussed further below, see Appendix C.2.i.b.
279 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 138]
[Redacted]
| Y-Axis Title: Installed Capacity (GW) |
| X-Axis Labels: 2020, 2022, 2024, 2026, 2028, 2030, 2032, 2034, 2036, 2038, 2040, 2042, 2044, 2046, 2048, 2050, 2052, 2054 |
|
Legend:
|
280 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 139]
[Redacted]
| Y-Axis Title: Installed Capacity (GW) |
| X-Axis Labels: 2020, 2050 (for BE, DE, DKW, FR, GB) |
|
Legend:
|
322. The range of commodity prices included in the electricity modelling is wide, see Figure 5, Figure 6 and Figure 7 above. As we briefly discussed in Section IV.C, this price variation can be expected to drive variations in the economic competitiveness of renewable capacity compared to thermal capacity, and hence variations in the investment in renewable capacity.
323. To account for this, we “flex” the share of renewable capacity from the EU Reference Scenario capacity mix for each commodity price path. For each path, the share of renewable capacity in 2018 and from 2050 onwards is assumed to be equal to the share in the EU Reference Scenario capacity mix for those years but is allowed to diverge from that capacity mix in the intervening years with the maximum divergence occurring in the middle of the modelling horizon, i.e. in 2034. The general idea is illustrated in Figure 32. The rationale behind this approach is that in the near term there is lower uncertainty around commodity prices and the profitability of renewable capacity and the generation mix remains close to its current state, but uncertainty in commodity prices increases in the medium term and so the
281 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 140]
outlook for renewables becomes more uncertain. In the long term, the capacity mix will mainly be driven by the decarbonisation agenda rather than by commodity prices.282 Therefore, although the uncertainty in CO2 prices increases, uncertainty around the level of renewable generation reduces. To reflect this idea, over the medium term the share of renewable capacity is increased for high commodity price paths whereas it is decreased in low commodity price paths.
324. Figure 30 and Figure 31 above show that a large share of the renewable capacity is provided by solar and wind plants. Such plants have “intermittent output", meaning that they can only generate when sun and wind are available. To balance supply and demand when faced with plants with intermittent output, network operators have to provide flexibility through resources such as batteries, which store excess electricity, or DSR, which leads to lower demand. Accordingly, Baringa has assumed that battery storage capacity and DSR will increase/decrease at the same rate as renewable capacity. In order to ensure that the capacity margin – the margin between installed capacity adjusted for availability (“de-rated") and peak demand – remains consistent with the assumptions in the EU Reference Scenario, Baringa also flexes the capacity of fossil-fired plants in the opposite direction to renewable capacity - so it reduces fossil-fired capacity in high commodity price paths that have increased renewable capacity and increases it in low commodity price paths that have reduced renewable capacity.283 This ensures that overall capacity margins remain comparable across the different price paths, so that capacity margin fluctuations do not drive differences in prices from the different commodity price paths.
325. We flex the share of renewable output by a maximum of approximately 5 percentage points relative to the EU Reference Scenario level. To increase the share of renewable capacity in the overall capacity mix by 5 percentage points, the change in total renewable capacity may have to be much higher.284
282 Whilst it is obvious that governments' are likely to intervene if insufficient renewable capacity is built, the same is likely to be true if too much renewable capacity is built because of the adverse effect this can have on security of electricity supplies. ↩
283 The capacity margin is the margin of available capacity over demand, generally calculated as (CAP-D/D) where D is expected peak demand and CAP is expected available generation capacity at peak, adjusted for expected outages and variation in generation from intermittent power producers. ↩
284 For example, suppose a market has an installed capacity of 100 GW of which 20 GW or 20% is renewable capacity. To increase the share of renewable capacity by 5 percentage points to 25%, an extra 5 GW of renewable capacity have to be added, which corresponds to a 25% increase in renewable capacity. ↩
[Page 141]
[Line chart showing capacity adjustment over time] |
|
Y-Axis Title: Renewable Capacity Scalar (%) Y-Axis Labels: 0%, 20%, 40%, 60%, 80%, 100%, 120%, 140% X-Axis Labels: 2018, 2020, 2022, 2024, 2026, 2028, 2030, 2032, 2034, 2036, 2038, 2040, 2042, 2044, 2046, 2048, 2050, 2052, 2054 Legend: Minimum renewable capacity, EU Reference Scenario, Maximum renewable capacity |
326. To differentiate the capacity mix between the commodity price paths we calculate the extent to which commodity prices from a particular price path vary from those in the median price path. In more detail, for every price path and every year between 2020 and 2054, we first calculate the log of the annual average price of every commodity,286 P(t, c, n) and the median of those logs, P(t, c), where t denotes the year, c denotes the commodity and n denotes the price path. Next, we calculate the deviation from the median as:
∆P(t,c,n) = P(t,c,n) – P(t, c)
327. For each price path we then measure by how much each of the three commodity prices deviate from their respective median price on average across all the years we analyse. We then average the individual commodity price deviations together to create a single “aggregate deviation”, ∆P(n) - Formally, this is the average price deviation from the median across all modelled years (T) and all commodities (C):
285 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
286 We look at logarithm values because of our assumption that commodity prices follow a log normal distribution, as discussed above. ↩
[Page 142]
T C
ΔΡ(n) = (Σ Σ ∆Ρ(t,c,n))/(T × C)
t=1 c=1
328. We rank these aggregate deviations from highest to lowest value. We assume that the price path with the median (50th highest) aggregate deviation corresponds to the case where the renewable capacity exactly matches the EU Reference Scenario values. We apply the maximum upward adjustment to renewable capacity share to the price paths with the 10 highest aggregate deviations and the maximum downward adjustment to the price paths with the 10 lowest aggregate deviations. The extreme outcomes from this process are shown in Figure 33 below.
[Stacked bar chart showing capacity assumptions] |
|
Y-Axis Title: Installed Capacity (GW) Y-Axis Labels: 0, 5, 10, 15, 20, 25, 30, 35, 40, 45 X-Axis Labels: Min, Max (for 2020, 2025, 2030, 2035, 2040, 2045, 2050) Legend:
|
329. For the other price paths, the upward/downward adjustment is determined pro-rata from the average of the renewable capacity in the median aggregate deviation price path i.e. the EU Reference Scenario values, and the capacity in the price paths that have the greatest upward/downward deviation in renewable capacity, depending on how far away the aggregate deviation for a price path lies from the median towards the upper or lower
287 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 143]
aggregate deviation boundary. If, for example, the aggregate deviation lies two thirds of the way from the median to the upper bound aggregate deviation value, then its renewable capacity will be set equal to the EU Reference Scenario value plus two thirds of the additional capacity included in the maximum renewable capacity case.
330. This process is applied not only in the Netherlands, but also in all the key markets that interconnect with the Netherlands (Belgium, Denmark West, France, Germany, Great Britain).
331. The efficiencies that Baringa assigns to individual plants are based on Baringa's best estimates of reasonable values both at minimum stable load (the lowest sustainable output) and full output. For some power plants, Baringa uses specific technical data but for the majority of plants, it uses generic assumptions based of the type of the plant and its age.
332. Table 12 shows Baringa's assumptions on the average full output efficiency of plants in the Netherlands and Germany in 2020, on a capacity weighted basis.288
288 By "capacity-weighted", we mean that we multiply the efficiency for a particular plant by its capacity and then sum up all these values and divide them by the total capacity. In this way, the average efficiency figures that we present are influenced more by the efficiency of larger plants than smaller plants. ↩
[Page 144]
TABLE 12: AVERAGE EFFICIENCY BY PLANT TYPE IN 2020 FOR THE NETHERLANDS AND GERMANY 289
| Full load efficiency (capacity weighted, LHV) |
|
|---|---|
| Plant Type | |
| CHP Coal | [Redacted] |
| CHP Gas | [Redacted] |
| CHP Lignite | [Redacted] |
| Coal | [Redacted] |
| Gas OCGT | [Redacted] |
| Gas CCGT | [Redacted] |
| Lignite | [Redacted] |
Source: Baringa Partners.
333. We keep the assumptions on demand (peak and annual volumes) constant across the commodity price paths, thus implicitly assuming that long-term electricity demand is inelastic to price. We start from EU Reference Scenario assumptions on annual demand levels (except for Denmark-West, Norway and Finland which come from the Baringa Reference case Q2 2017), and then linearly interpolate between the 5 year steps to create yearly assumptions.
334. Baringa has used its Reference Case Q2 2017, which incorporates peak demand assumptions as well as annual demand figures, to determine peak demand levels consistent with the annual demand assumptions, by applying the ratio between peak and annual demand incorporated in its Reference Case.
335. As we do not make any capacity adjustments after 2050, we assume that demand remains flat from 2050 onwards. Based on these assumption, Figure 34 shows the assumed development of demand in the Netherlands.
289 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 145]
[Redacted]
| X-Axis Labels: 2020, 2022, 2024, 2026, 2028, 2030, 2032, 2034, 2036, 2038, 2040, 2042, 2044, 2046, 2048, 2050, 2052, 2054 |
| Legend: Annual energy, Peak Demand |
336. Figure 35 shows the output by plant type in the Netherlands under the but-for case that results from Baringa's power market modelling for selected price paths and years. We show the results for the price paths with the highest, lowest and central aggregate deviations in renewable capacity, at the start (2020) and middle (2035) of the modelled horizon.
337. In 2020 there are only small differences in the capacity mix between different price paths. Differences in generation are primarily the result of commodity price differences in this year, and in particular due to gas to coal competition. In the price path with the highest aggregate deviation, and so the highest commodity prices and renewable capacity, gas-fired generation is particularly competitive; and so has high gas fired generation and lower coal-fired generation, both in the Netherlands and the markets that are directly connected to it.
290 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 146]
338. By 2035 the different price paths also involve significantly different capacity mixes. For example, the generation from wind, solar and biomass varies from 34 TWh to 45 TWh. Thermal generation decreases as renewable generation increases across the price paths. There are also variations in the total Dutch generation across the price paths, driven largely by the relative competitiveness of NL thermal plants versus those in interconnected markets.
[Stacked bar chart showing generation] |
|
Y-Axis Title: Generation (TWh) Y-Axis Labels: 0, 20, 40, 60, 80, 100, 120, 140 X-Axis Labels: Minimum aggregate deviation, Median aggregate deviation, Maximum aggregate deviation (for 2020 and 2035 - ButFor) Legend:
|
339. The key output from the dispatch model is the wholesale market electricity price for the Netherlands for each year and price path. These results can be collated to provide a distribution of average electricity prices292 for each month, as shown in Figure 36, which is the same as Figure 8.
291 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
292 What are known in the industry as "baseload prices” because the average is across all the hours in a month and hence represents the price that a plant that ran continuously throughout the month would receive. Plants that run continuously are referred to as running at baseload. ↩
[Page 147]
[Redacted]
| X-Axis Labels: 2020, 2021, 2022, 2023, 2025, 2026, 2027, 2028, 2030, 2031, 2032, 2033, 2035, 2036, 2037, 2038, 2040, 2041, 2042, 2043, 2045, 2046, 2047, 2048, 2050, 2051, 2052, 2053 |
| Legend: 6th-95th percentile, 26th-75th percentile, Mean, --- Median |
340. As the figure shows, the range of electricity prices across different commodity price paths is large, driven primarily by the wide range of commodity prices considered particularly in the later years. The range of electricity prices would be even wider but for the fact that the impact of high commodity prices, which increase electricity prices, are to some extent offset by the higher levels of renewable capacity in these price paths for the period before 2050. Increasing the volume of low marginal cost renewable means that there are more periods when these plants are on the margin and so create very low (or negative) electricity prices and so this reduces the impact of the high electricity prices in other period.
341. There is very little difference between the monthly baseload electricity prices in the actual and but-for cases (as can be seen from Figure 37 which is the same as Figure 9 above) and essentially [Redacted] before [Redacted]. This is to be expected given the relatively modest change in the overall capacity mix in the Netherlands between these cases, and the fact that the capacity mix in all the other modelled countries does not vary between the cases.
293 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 148]
[Redacted]
| X-Axis Labels: 2020, 2021, 2022, 2023, 2024, 2025, 2026, 2027, 2028, 2029 |
| Legend: 6th-95th percentile, 26th-75th percentile, Mean, --- Median |
342. Figure 38, Figure 39 and Figure 40 show the electricity prices for a year sorted from highest to lowest, for the but-for case for 2020, 2035, and 2054 respectively. Such figures are known as “price duration curves” because they depict the percentage of the year for which prices exceed any given value. Each figure contains the price duration curves for the price paths with the 6th highest annual average price, the median annual average price and the 96th highest average annual price across all price paths. If a price duration curve drops sharply towards or below zero (at the right hand side of the price duration curve), it indicates that renewable capacity is setting prices.
343. In 2020, there is little difference across the selected price duration curves as commodity price and renewable variation is limited, see Figure 38.
344. In 2035 there is a significant difference in renewable energy capacity between the commodity price paths whose electricity prices are shown. This mitigates the variation related to commodity prices, and brings down prices towards the right hand end of the price duration curve, see Figure 39.
294 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 149]
345. In 2054, there is significant variation in electricity prices between the paths shown, which is driven largely by differences in commodity prices because there is very little difference in the capacity mix across the price paths. Accordingly, the point at which prices drop sharply downwards towards or below zero is the same for all three price paths, see Figure 40.
[Page 150]
[Line chart showing price duration] |
|
Y-Axis Title: €/MWh Y-Axis Labels: -20, 80, 180, 280, 380, 480 X-Axis Title: Percentage of year X-Axis Labels: 0%, 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, 100% Legend: 6th highest average price, Median average price, 96th highest average price |
[Line chart showing price duration] |
|
Y-Axis Title: €/MWh Y-Axis Labels: -20, 80, 180, 280, 380, 480 X-Axis Title: Percentage of year X-Axis Labels: 0%, 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, 100% Legend: 6th highest average price, Median average price, 96th highest average price |
[Page 151]
[Line chart showing price duration] |
|
Y-Axis Title: €/MWh Y-Axis Labels: -20, 30, 80, 130, 180, 230, 280, 330, 380, 430, 480 X-Axis Title: Percentage of the year X-Axis Labels: 0%, 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, 100% Legend: 6th highest average price, Median average price, 96th highest average price |
295 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
296 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
297 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 152]
346. In this appendix, we describe the technical implementation of the dispatch model we referred to in Section V.C. We rely on two separate mixed integer programs,298 a simpler one for the period from 2030 to 2054 when Eemshaven runs exclusively on coal and a more complex model for the period 2020-2029 when Eemshaven can burn a mixture of coal and biomass.
347. While we could have used the more complex model for the entire modelling period, the simpler model reduces the computational time and produces the same results as the more complex model because the plant is assumed only to burn coal.
348. Eemshaven consists of two identical units and so we focus on optimising the dispatch of just one of the units and assume that the other unit would be dispatched in an identical manner. This is also the approach that RWE takes in its long-term modelling.
349. Table 13 lists all variables that we use in the models.
TABLE 13: DISPATCH MODEL NOMENCLATURE
| Variable | Description |
|---|---|
| Globals and market inputs | |
| s ∈ {1, ..., 100} | Simulation index |
| t | A four-hourly period between 2020 and 2054 |
| T | Final period |
| Ny | Number of periods in year y |
| y(t) | Discrete function mapping four-hourly period to years between 2020 and 2054 |
| CElect | Electricity price from Electricity market model in period t in €/MWhel299 |
298 A mixed integer program is one that combines linear equations, such as “a=b+c”, with requirements that a variable can for example only take the value zero or one i.e. an integer, in this case even binary, value. ↩
299 We refer to two different energy units, megawatt hours thermal and megawatt hours electric. A thermal power plant converts thermal energy into electric energy. However, with an efficiency below 100%, it ↩
[Page 153]
| CVart | Plant-specific variable costs not directly related to fuel, e.g. limestone and ammonia water in period t in €/MWhel |
| CCoalt | Coal price including transport, stocking and local handling costs in period t in €/MWhth300 |
| CCO2t | Emission allowance price per ton of CO2. |
| CGasoilt | Low-sulphur gas oil price in €/MWhth |
| ECoal | Carbon content factor of coal in t CO2/MWhth |
| EGasoil | Carbon content factor of low-sulpure gasoil in t CO2/MWhth |
| Plant specific inputs | |
| Ht(Pt) | Plant efficiency in period t at generation level Pt |
| Pt | Full output capacity in period t in MWhel |
| Pt | Minimum output capacity in period t in MWhel |
| SUCt(CSUC,casht, CCoalt, CCO2t, CGasoilt) | Start-up costs in period t depending on coal, carbon and gasoil prices |
| CSUC,casht | Cash component of start-up costs |
| RFOt | Margin loss due to ramping between P and P |
| RLt | Margin loss due to ramping upon start-up |
| At | Binary indicator taking the value of 1 if plant is available in period t and 0 else. |
| FO | Forced outage rate (%) |
| HCA | Fuel input curve intercept |
| HCB | Fuel input curve slope |
| y'(t) | Discrete function mapping four-hourly period to subsidy periods between [Redacted] and April 2027301 |
cannot convert every MWh of thermal energy into electric energy but some of it becomes "waste" heat. This necessitates the distinction between the two types of energy.
300 Coal prices are usually quoted in €/ton. The standard benchmark price applicable to the Netherlands is ARA (Amsterdam-Rotterdam-Antwerp), which is standardised at an energy content of 6,000 kilocalories per ton. This allows us to convert prices in €/ton to prices in €/MWhth. See Harris-Hesmondhalgh Workpapers, Tables E.1 and E.2 – Dispatch Model, Tab 'Constants and Inputs'. ↩
301 This reformulation is necessary as subsidy periods and calendar years are not always congruent. The last subsidy period spans only January and February 2027. The corresponding set of periods for a given subsidy period is given by y' = {t ∈ N|y'(t) = y'}. ↩
[Page 154]
| Ny' | Number of periods in subsidy period y' |
| ToPy' | Maximum biomass input in a given subsidy period y' in MWhth |
| CoFi | Maximum biomass co-firing level in a given period t |
| SL | Station load in % of net output |
| CStrikey' | Strike price in subsidy period y' |
| CFloor | Floor price for subsidy |
| Cbiomasst | Biomass price including transport, stocking and local handling costs in period t in €/MWhth |
| Decision variables | |
| ut ∈ {0, 1} | Binary unit commitment variable indicating whether the plant is running or not in period t |
| vt ∈ {0, 1} | Binary variable indicating a start-up in period t |
| wt ∈ {0, 1} | Binary variable indicating a shut-down in period t |
| pt ∈ [0, (Pt − Pt)] | Generation above Pt |
| fcoalt | Coal input in period t in MWhth |
| fbiomasst | Biomass input in period t in MWhth |
350. As explained in Section V.C, we optimise the unit's dispatch against the clean dark spread, or CDS. If the CDS is positive, it is optimal for the unit to run and earn profits. If the CDS is negative, it will be optimal in many instances to shut the unit down and wait for the next positive CDS period. We calculate the CDS in period t (CDSt) according to the following expression:
CDSt = (Celect − Cvart) − (Ccoalt + CCO2t × Ecoal)/Ht(Pt) (I)
351. Ideally, the unit would run in all periods t when CDSt > 0 and would be shut down whenever CDSt ≤ 0. However, the unit faces a number of physical and technical
[Page 155]
constraints.302 Starting up is costly and it takes a while for the unit to reach its full output level.
352. Due to these technical constraints, it may sometimes be favourable to keep the unit running even when CDSt < 0 as it would be more costly to start-up again later. While it is optimal to run at the unit's maximum capacity, P, when CDSt > 0, the unit's losses from operating when CDSt < 0 can be minimised by reducing its output to the minimum stable generation level, P. The maximum generation capacity varies slightly with the average temperature in a given month, as shown in Figure 41, but the minimum stable generation level is constant.
FIGURE 41: MAXIMUM AND MINIMUM CAPACITY303
[Redacted]
| Capacity in MW | |||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
302 As described above, Eemshaven consists of two units EEM A and EEM B. As these units are technically identical, we model them identically and therefore use the terms unit and plant interchangeably. ↩
303 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 156]
353. The unit is less efficient (Ht is higher) if it runs on minimum generation output P and thus the clean dark spread is lower than it would be if the plant ran on full output.304
CDSt(Pt) < CDSt(Pt) (II)
354. In any given period, t, we can therefore determine whether it is better to run at full output or minimum output. The optimal generation level, provided the unit is running, is given by:
Pt|ut=1 = max (Pt × CDSt(Pt), Pt × CDSt(Pt)), Pt ∈ {Pt, Pt} (III)
355. Where ut ∈ {0,1} is a binary variable that is equal to 1 when the unit is running in period t and 0 if it is not. The corresponding optimal margin when the unit is running is given by:305
M*t|ut=1 = CDSt(P*t|ut=1) × P*t|ut=1 (IV)
356. Therefore the optimal production level is independent of the choice of whether to run at all and the optimisation problem reduces to a unit commitment problem that optimises when to set ut equal to one and when to set it to zero, subject to the technical constraints mentioned above and described in greater detail below.
357. Given that starting up a unit incurs additional costs, we have to be able to take these into account in deciding when the unit should run and to do so, we need to be able to identify periods in which the unit starts up or shuts down.
358. We define two more binary variables: vt ∈ {0,1} that indicates a start-up in period t and wt ∈ {0,1} which signals a shut-down in period t. Given the choice of ut, the values of vt and wt follow directly from the relationship:
ut − ut−1 = vt − wt ∀t (V)
359. ∀t indicates that this relationship holds for all periods, in case of the 2030-2054 dispatch model that corresponds to the period from the first four hours of 2030 (1 January 2030 00:00 – 03:59 = period 0) until the last four hours of 2054 (31 December 2054 20:00-23:59 = period T). The relationship in (V) implicitly gives the values for vt and wt depending on the choice of ut and ut−1. This allows us to formulate a simple objective function as shown below in (VI).
J = ∑Tt=0 (M*t − RFOt) × At × ut − (SUCt + RLt)× vt (VI)
304 The efficiency of a coal-fired power plant determines how much coal is necessary to produce 1 MWh of electricity. Assuming the efficiency at full output is at [Redacted]% it takes ca. [Redacted] MWh of coal (which corresponds to roughly [Redacted] tons). ↩
305 Note that, for notational simplicity we proceed to denote M*t|ut=1 by M*t. ↩
[Page 157]
360. SUCt indicates the start-up cost the unit would incur if it starts up in period t (i.e. vt = 1). To start up a unit must burn [Redacted] MWhth of coal and [Redacted] MWhth of gasoil. Additionally, there is a fixed cost, CSUC,cash, of € [Redacted]/start (as of 2020).306 Hence, the total start-up costs are given by:
SUCt
= CSUC,cash + [Redacted] MWhth × (CCoalt + ECoal × CCO2t) + [Redacted] MWhth (VII)
× (CGasoilt + EGasoil × CCO2t)
361. A unit is unable instantaneously to go from zero output to full output but takes some time to do so. This limit on the rate at which the output of the plant can increases is known as a “ramping constraint” and we need to include it in our model because, as explained above, the commodity margin that the unit can earn depends on the output level at which it is operating.
362. We use two variables: RFOt, “ramp to full output” from minimum stable generation, and RLt, “ramp to lowest” i.e. minimum stable generation, to account for the lost margins associated with ramping up the output of a plant. RWE’s dispatch model,307 which underpins the results shown in the SCOut reports308, assumes that upon start-up, a unit would need to run at its minimum stable generation capacity for one hour and that it would take two hours to get from minimum stable generation to full output.309 The orange area in Figure 42 represents the lost generation that RWE models. The financial ramping loss is defined by the difference between M*t|vt=1 and the actual margin achieved when the ramping constraints are respected.
306 Information received from RWE. ↩
307 Information received from RWE. ↩
308 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, pp. 47-48. ↩
309 Information received from RWE. ↩
[Page 158]
FIGURE 42: RAMPING LOSS IN GENERATION UPON START-UP310
[Redacted]
363. Likewise, the orange area in Figure 43 shows the loss in generation that occurs if the unit goes from its minimum stable generation to full output. The margin loss with this ramping constraint is defined as shown in (VIII), where Mt (Pt) gives the margin at generation level Pt.
RFOt
= { 0.5/4 × (Mt(Pt) − Mt(Pt)) if M*t = Mt(Pt) AND M*t−1 = Mt−1(Pt−1) (VIII)
0 else } ∀t
310 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 159]
FIGURE 43: RAMPING LOSS FROM P TO P311
[Redacted]
364. The loss shown in Figure 42 is 3 times as large as the loss shown in Figure 43. If (i) the optimal margin, would be M*t−1 = Mt−1(Pt−1) if the unit was running in t − 1, and (ii) the optimal generation level in the start-up period t is Pt, then (VII) defines the conditions under which RFOt > 0. Consistent with this formulation, we set RLt = 2 × RFOt. While this definition of RLt works in almost all cases, there can be situations (when the CDS is close to zero) when M*t−1 = Mt−1(Pt−1) but u*t−1 = 0.312 In those cases, RFOt = 0 and, as shown in (IX), it is necessary for RLt = 1.5/4 × (Mt(Pt) − Mt(Pt)).
311 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
312 It tends to be optimal to run at minimum output Pt when CDSt(Pt) < 0 ∀Pt ∈ {Pt, Pt}. However, if limε→0 CDSt + ε = 0 where CDSt ≤ 0 for ε ≥ 0, the relatively higher efficiency Ht(Pt) (vs Ht(Pt)) can lead to situations in which full output is better than minimum output despite both resulting margins being less than zero. As an example, assume that Celect − Cvart = [Redacted] €/MWhel and (Ccoalt + CCO2t × Ecoal) = [Redacted] €/MWhth. Further assume that the efficiency of full output of [Redacted] is equal to [Redacted] and the output at minimum generation of [Redacted] is [Redacted]%. The resulting margins are given by Mt(Pt) = [Redacted]/MWhel − [Redacted] MWhth / [Redacted] × Pt = [Redacted] and correspondinglyMt(Pt) = [Redacted]. ↩
[Page 160]
RLt = { 2/4/4 × RFOt iff M*t = Mt(Pt) AND M*t−1 = Mt−1(Pt−1)
1.5/4 × (Mt(Pt) − Mt(Pt)) iff M*t = Mt(Pt) AND M*t−1 = Mt−1(Pt−1)
0 else } ∀t (IX)
365. Finally, we impose binary constraints on the decision variables in expression (X).
ut, vt, wt ∈ {0,1} (X)
366. We compute M*t, SUCt, RFOt and RLt and pass these exogenous values on to a commercial solver313 to solve the mixed-integer program in (XI).314
max{ut}Tt=0 J subject to (V), (X) (XI)
367. The commercial solver returns a vector {u*t}Tt=0 that maximises J. This vector implicitly also contains the optimal values {v*t}Tt=0 (and {w*t}Tt=0). We determine the optimised output in period t according to:
g*t := u*t × (P*t|ut=1 − ramplosst) (XII)
368. Note that, to avoid unnecessary definitions, we do not include the equations defining ramplosst, the lost generation, because it should be clear from Figure 42 and Figure 43 what is involved in defining them.
369. One of the key results from the dispatch model is the commodity margin that each unit earns i.e. its revenues minus the costs directly associated with operating the unit. The commodity margin in period t is determined by:
m*t := (M*t − RFOt) × u*t − (SUCt + RLt) × v*t (XIII)
370. We compute the annual commodity margin, the annual total generation and the total running hours for a unit according to:315
cm*y := (1 − FO) × ∑t∈y m*t ∀y ∈ {2030, ...,2054}
gen*y := (1 − FO) × ∑t∈y g*t ∀y ∈ {2030, ...,2054} (XIV)
314 See Harris-Hesmondhalgh Workpapers - Tables E.2 for details. ↩
315 Where y = {t ∈ N|y(t) = y}. ↩
[Page 161]
run*y := (1 − FO) × ∑t∈y u*t ∀y ∈ {2030, ...,2054}
371. The forced outage rate (FO) adjusts the commodity margin and generation for unexpected outages when the plant trips. As opposed to scheduled outages, which are reflected in At, the forced outage rate represents probability of an outage occurring at any point throughout a year, and we therefore apply it to the aggregate margins and generation figures.
372. To simplify the explanations, we have omitted the subscript indicating that the equations apply to a particular simulation, s. But we repeat the optimization described in equations (I) to (XIV) for all simulations s ∈ {1, ...,100} and pass on the year-simulation combinations of cmys and runys to the financial model.
373. The dispatch model described above for 2030-2054 condenses to the optimisation problem shown in (XI) because (1) there is only one choice to be made: how much to generate in each period, and (2) we are able to specify this choice in binary terms as a decision in each period of whether not to generate electricity (unit commitment problem).
374. However, as described in Section V.C.2, RWE will receive subsidies for burning biomass under the SDE+ scheme until April 2027. In principle, from January 2020 to April 2027 the optimal dispatch decision should not only take into account when, and how much, to generate but also how much and when to generate sustainably (i.e. by burning biomass). Ideally, the dispatch decision would compare the subsidised biomass margin with the clean coal margin in period t and pick whichever option is cheaper. However, such a simple formulation of the optimisation problem is not feasible for several reasons:
316 This corresponds to roughly [Redacted]% of the total generation assuming that the plant runs [Redacted] hours at maximum output in a given year. ↩
317 Exhibit BR-11, KEMA Consulting, Application for Incorporation Permit, dated 20 December 2006, pp. 48-49. ↩
[Page 162]
[Redacted]
375. These features impose additional constraints that have to be taken into account.
376. As we cannot internalise the trade-off between the subsidised biomass margin and the coal margin, because the former is unknown at the time of the decision, we formulate the optimisation to burn as much biomass as possible subject to constraints on co-firing described above.
377. As the unit margin changes with the chosen fuel mix, we cannot determine it exogenously (as a fixed input to the optimisation) as we did in the longer term optimisation problem. Instead, we have to define an additional variable for inclusion in the optimisation:
mt := (Celect − Cvart) × (ut × Pt + pt − (vt + 1/2rfot)/4 × [Pt − Pt]) (XV)
−vt × SUCt − (Ccoalt + CCO2t × Ecoal) × fcoalt − Cbiomasst × fbiomasst ∀t
378. The term on the first line represents the unit’s revenues (adjusted for Cvart) in period t depending on the choice of ut, pt and rf ot.319 The second line represents the plant’s costs in period t depending on the choice of fuel inputs fCoalt and fbiomasst.
379. Again, we formulate the objective function, for which we find the maximum value, as the sum of all margins between t = 0 (1 January 2020 0:00-3:59) and t = T (31 December 2029 20:00-23:59). Sbiomasst is last year’s biomass subsidy amount, which we assume to be the best estimate of the current year’s biomass subsidy. The objective function J in (XVI) ensures that the optimisation decision considers the impact of the subsidy by adjusting the effective costs of biomass by the subsidy estimate.
J = ∑Tt=0 mt + Sbiomasst × fbiomasst (XVI)
318 This reflects RWE’s technical expectation around the time of the valuation date. ↩
319 vt is implicitly given by the relationship in (V) which also holds for this version of the model. ↩
[Page 163]
380. As discussed above, we need to account for losses that arise due to the plant’s ramping constraints. However, in this optimisation it is not possible endogenously to determine the optimal generation level if the unit is running because of the biomass mixing constraints. Therefore, as we describe, we need additional equations to adjust the generation directly as it feeds into the margin calculation in (XV). Just as before, we define two ramping components, a ramping loss upon start-up (reflecting the need to run an hour at the minimum stable generation level, Pt) and a ramping loss going from minimum stable generation to full output.
381. The ramping loss upon start-up is once again governed by vt. The ramp loss resulting from a switch in generation level requires the introduction of an additional binary variable rfot ∈ {0,1}. From (XV) follows that the ramp loss applies when rfot = 1. (Note RFOt in the 2030-2054 optimisation is not a decision variable but an exogenous parameter.) The first two constraints in (XVII) determine the value of rfot in period t. (XVII. 1) states that rfot must to be equal to 1 if pt > pt−1, i.e. the generation in t exceeds the generation in t − 1.320(XVII. 2) ensures that the ramping loss only applies when pt = [Pt − Pt].
382. In principle, the unit can start-up and remain at Pt. In that case, there would be no ramping loss. (XVII. 3) covers this eventuality by specifying that the ramp loss must be less than or equal to pt. If the optimal choice, in the absence of ramping, for a given period implied vt = 1 and pt = 0, (XVII. 3) sets pt = 1/4 vt × [Pt − Pt], such that ut × Pt + pt − (vt + 1/2rfot)/4 × [Pt − Pt] = ut × Pt.
rfot × [Pt − Pt] ≥ pt − pt−1 ∀t (XVII. 1)
rfot × [Pt − Pt] ≤ pt ∀t (XVII. 2)
1/4 vt × [Pt − Pt] ≤ pt ∀t (XVII. 3)
383. Following a similar logic, (XVIII) requires that pt = 0 if ut and that it takes a maximum value of [Pt − Pt].
pt ≤ ut × [Pt − Pt] ∀t (XVIII)
320 Note that, while the model would allow values for pt between 0 and (Pt – Pt), its linear structure leads to the choice of pt ∈ {0, (Pt – Pt)}. ↩
[Page 164]
384. The burning of biomass is subject to two restrictions: (i) how much biomass can be burnt in any period, and (2) an annual limit on how much biomass can be burnt. We also have to ensure that the assumed output of the plant is consistent with the amount of biomass and coal that is being burnt. Below we describe the constraints that we use to implement these restrictions.
385. (XIX) ensures that the fuel input (fcoalt, fbiomasst) in the second line of (XV) suffices to generate ut × Pt + pt − (vt + 1/2rfot)/4 × [Pt − Pt]. We compute the required fuel input by means of a linearised fuel input curve, shown as the dark blue line in Figure 44. The fuel input curve determines how much fuel the plant needs to generate at a given output level from which we can calculate the efficiency of the unit, generation level divided by fuel input, as shown by the light blue line.
FIGURE 44: FUEL INPUT CURVE AND EFFICIENCY321
[Redacted]
321 Harris-Hesmondhalgh Workpapers, Tables I – Other Supporting Analysis. ↩
[Page 165]
4 × HCA × ut + HCB × (ut × Pt + pt − (vt + 1/2rfot)/4 × [Pt − Pt]) (XIX)
− fCoalt − fbiomasst = 0 ∀t
386. (XIX) ensures that the sum fcoalt + fbiomasst equals the required fuel input for the chosen generation level in period t.
387. (XX) imposes a constraint on the maximum use of biomass in a given subsidy period y' in line with the plant’s environmental permit.322
∑t∈y' fbiomasst − ToPy' ≤ 0 ∀y' (XX)
388. (XXI) ensures that we maintain a technically possible fuel mix by limiting the maximum use of biomass to [Redacted]
fbiomasst ≤ CoFi ∀t (XXI)
389. The formulations above require that some of the variables are restricted to taking values of either 0 or 1. We impose this restriction in (XXII).
ut, vt, wt, rfot ∈ {0,1} ∀t (XXII)
390. Lastly, we make sure that the plant observes scheduled outages by imposing:
ut ≤ At ∀t (XXIII)
391. Once again, we resort to the commercial solver to find the optimal values of {u*t, p*t, rfo*t, v*t, w*t, (fcoalt)*, (fbiomasst)*}Tt=0 to the problem:
max J subject to (V), (XVII), (XVIII), (XIX), (XX), (XXI), (XXII), (XXIII) (XXIV)
392. We define the optimal generation in period t by:
g*t := u*t × Pt + p*t − v*t + 1/2rfo*t/4 × [Pt − Pt] ∀t (XXV)
393. And the optimal margin in period t corresponds to:
m*t := (Celect − Cvart) × g*t
−v*t × SUCt − (Ccoalt + CCO2t × Ecoal) × (fcoalt)* − Cbiomasst × (fbiomasst)*∀t (XXVI)
394. As for the 2030-2054 optimisation, we compute annual figures according to (XIV).
322 Note that ToPy' = 0 for periods after the subsidy end in April 2027. ↩
[Page 166]
395. Once we know the amount of biomass that the plant has burnt in a year, we can compute the subsidies the plant will earn.
396. The SDE+ scheme awards subsidies to the gross sustainable generation.323 We compute the share of biomass fuel input to obtain the share of sustainable generation in each subsidy period y'. The sustainable generation is given by:
sgeny' := ∑t∈y' fbiomasst/∑t∈y' fbiomasst + ∑t∈y' fcoalt ×(1 + SL) × (1 − FO) × ∑t∈y'g*t (XXVII)
397. The subsidy margin then amounts to:
smy' := min(CStrikey' − 1/Ny' ∑t∈y' CElect, CStrikey' − CFloory') × sgeny' (XXVIII)
398. Where y is the year for which holds y' ⊆ y.
399. Eemshaven’s lease contract includes a harbour fee.324 The contract specifies that Eemshaven has to pay a fee for each ship arriving at its dock. [Redacted].325 The last annual fee is payable in [Redacted]. Based on this information, we compute a variable harbour fee per tonne of coal/biomass used, CHFt.326
400. We impose the Harbour Fee Floor in two steps. First, we run the models described in the preceding sections with adjusted variable costs according to:327
Cvar't = Cvart − CHFt (XXIX)
401. [Redacted]
323 Exhibit BR-12, National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy, dated 30 November 2016. ↩
325 Exhibit BR-38.A, RWE, Schedule 22, dated 17 February 2009. ↩
326 The variable fee is equal to the [Redacted]. ↩
327 RWE have provided us with variable costs that include the harbour fee. ↩
[Page 167]
402. [Redacted]
[Page 168]
403. CAO revenues are the income RWE generates by trading electricity, coal, gas, and CO2 emission rights. CAO revenues are generation by typical trading activities which try to make use of arbitrage benefits, in particular ‘time arbitrage’.
404. In a ‘time arbitrage’, the trader exploits the differences between the current spot price of a commodity and its future price. Where the spot price of a commodity is lower than its future price, it can buy a commodity now and enter into a forward agreement to sell the commodity in the future for a higher price.
405. For example, suppose on a particular day the clean dark spread328 for power to be delivered in three months’ time is positive. That is, the electricity price RWE could obtain under a forward agreement would be higher than the forward prices for commodities needed to produce this electricity. RWE could enter into a forward agreement, committing itself to deliver a certain amount of electricity in exchange for a fixed price in three months’ time. At the same time, RWE could enter into other forward agreements where it purchases the coal and CO2 permits that Eemshaven will need to generate that power in three months’ time, thereby locking in its costs. By locking in the price of electricity and the relevant input costs in three months’ time (together, the “three months’ forward CDS”), RWE can thereby lock in a margin.
406. When the time to deliver the power arrives, RWE has two options: (i) It can produce the electricity and use it to fulfil the forward contract, or (ii) it can buy electricity at the spot CDS to fulfil its forward agreement and sell the commodities bought forward to produce this electricity. Irrespective of what the spot CDS is, RWE will be able to at least realise the fixed margin under the CDS. Whenever the spot CDS at the time of delivery is positive, RWE can produce the electricity and deliver it for the agreed margin. It can also sell the production at the spot CDS and buy the required electricity to fulfil the forward contract at the spot CDS. The choice will not have any impact on RWE’s margins. However, if the spot CDS at the delivery date is negative, RWE can even make an additional profit by using option (ii) above, i.e. by “unwinding” the hedge.
407. We illustrate these trading operations in Table 4 below, which assumes a forward CDS for Eemshaven of 3 €/MWh (see line [1]). First, we will consider different possibilities for RWE if the spot CDS is positive:
328 As explained in ¶ 125, the clean dark spread is the difference between the electricity price for a period and the marginal generation costs of the plant. ↩
[Page 169]
408. Despite the existence of different strategies to exploit price differences for a profit, they all lead to the same margin of €3/MWh, a trait that economists call a “no arbitrage opportunity”.
409. However, an arbitrage opportunity arises when the Spot CDS is negative (see fourth column). In this case, RWE would not produce. RWE can make €1/MWh by selling the commodities secured under the forward agreements and, instead, buy the energy required to fulfil the forward contract at the spot CDS. For this delivery, it will get €3/MWh, i.e. the net result is a profit of €4/MWh.
[Page 170]
TABLE 14: ILLUSTRATION OF ASSET BACKED TRADING329
| Spot CDS > 0 | Spot CDS < 0 | |||||||
|---|---|---|---|---|---|---|---|---|
| Spot CDS > Forward CDS | Spot CDS = Forward CDS | Spot CDS < Forward CDS | Spot CDS < Forward CDS | |||||
| [A] | [B] | [C] | [D] | |||||
| Forward CDS | €/MWh | [1] | Assumed | 3 | 3 | 3 | 3 | |
| Spot CDS | €/MWh | [2] | Assumed | 5 | 3 | 1 | -1 | |
| Decision to produce | [3] | Yes | Yes | Yes | No | |||
| Option 1: Fulfill forward agreement by “unwinding hedge” | ||||||||
| Produce at spot CDS terms | €/MWh | [4] | [2] when [3] = Yes | 5 | 3 | 1 | n.a. | |
| Trading spot and forward CDS terms | € / MWh | [5] | [1]-[2] | -2 | 0 | 2 | 4 | |
| Net result | €/MWh | [6] | [4]+[5] | 3 | 3 | 3 | 4 | |
| Option 2: Fulfill forward agreement with own production | ||||||||
| Produce at forward CDS terms | €/MWh | [7] | =[1] | 3 | 3 | 3 | 3 | |
| Choice | [8] | [6] or [7] | Indifferent | Indifferent | Indifferent | Unwind hedge | ||
410. Other forms of asset-backed trading include geographic arbitrage, where traders exploit price differences in a commodity at different locations, technical arbitrage, where a trader can take advantage of price differentials for different qualities of a commodity and production arbitrage, where firms can vary physical production to exploit price differences in the underlying commodities. These forms of arbitrage are relevant to the commodities used to produce electricity from the Eemshaven plant.
411. As explained in the main body of the report, we model capital expenses, depreciation, and property taxes based on Eemshaven accounting data330 and SCOut forecasts.331
412. For the purposes of modelling taxes, we are interested in the capital expenses and the depreciation expenses that are reported to Dutch tax authorities. These may differ from the accounting figures since country-specific legislation allows companies to make adjustments on financial reporting for tax purposes. We discuss the adjustments we make to the financial statements to model financial reporting for tax purposes below.
329 Harris-Hesmondhalgh Workpapers, Tables H – Financial Model. ↩
330 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tabs ‘Blad 1’ and ‘173 10 to 17’. ↩
331 Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, pp. 47-48. RWE provided detailed datasets of Eemshaven’s capital expenses and depreciation. The datasets include information by type of investment, investment value, year, and depreciation tenors. The detailed datasets are consistent with the values reported in Eemshaven’s financial statements. ↩
[Page 171]
413. We make four adjustments to the financial statements to model financial reporting for tax purposes.
414. The first difference relates to the timing of RWE Eemshaven’s impairments. Accountants record impairments when current market conditions indicate that the value of an asset has fallen below its book value. When an impairment takes place, accountants reduce the book value of the asset, which reduces the stream of future depreciation.
415. RWE recorded an impairment of [Redacted] for tax purposes in [Redacted].332 We include this impairment when modelling depreciation.333
416. Second, RWE provided us with a document demonstrating that adjustments to the total capital expenses and depreciation in the financial statements match the filings RWE made to the Dutch Tax authority. The document reallocates certain operating expenses under the financial statements as capital expenses for tax purposes. Up until [Redacted] the reallocated amounts total [Redacted].334 We take into account the reallocated capital expenses, and depreciate them over five years.335
417. The third difference relates to the likely dismantling costs that Eemshaven will need to incur after ending operations. Dismantling expenses relate to the costs that the plant operator need to incur to return the site to its initial conditions after the plant’s closure. Under standard accounting rules, companies are allowed to record large foreseeable future expenses in their accounts, and depreciate them over time.336 However, prior to dismantling, these expenses do not represent a cash outlay. They are simply a way for the business to offset the dismantling costs against taxes while the business is still operating. [Redacted]
332 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab ‘Blad 1’, TAX VIEW section. ↩
333 We model depreciation and impairments jointly. To model the [Redacted] impairment, we model two scenarios. First, we model the likely depreciation expense of [Redacted] in the absence of the impairment. Then, we model the depreciation profile in [Redacted] after taking into account the [Redacted] impairment. The [Redacted] impairment that Eemshaven reported to Dutch tax authorities totals [Redacted]. We then back-out the percentage reduction in the value of the assets in place in 2016 consistent with a total impairment of [Redacted] impairment. ↩
334 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab ‘Blad 1’. ↩
335 We assume 5 years to reflect the likely short-lived nature of these expenses. ↩
336 For more information see Exhibit BR-67, IAS Plus, IAS 16 Property Plant and Equipment. ↩
[Page 172]
Our analysis removes the dismantling provisions from the CAPEX and depreciation analysis, which account for roughly [Redacted].337
418. Finally, RWE has made other minor adjustments to the CAPEX that total [Redacted] between 2010 and 2017.338 We take into account these differences in our tax calculations.
419. To assess the accuracy of our depreciation forecast from 2017 onwards, in Table 15 we compare the depreciation based on RWE’s tax returns and our financial model, for the period 2010 to 2017. Our financial model reports total depreciation in the period 2010-2017 of [Redacted]. Eemshaven tax returns indicate a reported depreciation of [Redacted], a difference of only [Redacted]. Hence, we conclude that our depreciation modelling is accurate. After taking into account the four adjustments mentioned above, we project depreciation for tax purposes over time.
TABLE 15: TAX RETURNS COMPARISON339
| 2010 [A] | 2011 [B] | 2012 [C] | 2013 [D] | 2014 [E] | 2015 [F] | 2016 [G] | 2017 [H] | Total [I] | |
|---|---|---|---|---|---|---|---|---|---|
| Tax depreciation € mln [1] See note | [Redacted] | ||||||||
| Impairment € mln [2] See note | [Redacted] | ||||||||
| Sum of depreciation and impairment € mln [3] [1]+[2] | [Redacted] | ||||||||
| Modelled depreciation € mln [4] Table G7 | [Redacted] | ||||||||
| Difference € mln [5] See note | [Redacted] | ||||||||
| Difference over modelled depreciation % [6] [5]/[4] | [Redacted] | ||||||||
Notes and sources:
[1], [2]: Inputs from RWE, tab ‘Blad1’
[5]= [3][I]-[4][I]
420. For the post-2017 forecast period, we rely on data from the October 2017 SCOut report. SCOut provides detailed investment projections over the [Redacted] year period [Redacted] inclusive. We record those expenses in our model.
421. We project Eemshaven’s CAPEX after [Redacted] based on SCOut, after removing one-off investments in the forecasted period340 and distinguishing between cyclical major
337 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Tab ‘Blad1’. ↩
338 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Table G8. ↩
339 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model, Table G13. ↩
340 SCOut describes the main drivers of CAPEX for every year. To project expenses over time, we exclude from the analysis the years 2018 and 2019, [Redacted]. See Exhibit BR-40, RWE, SCOut Q3 2017, Station Contribution Outlook, dated 10 October 2017, pp. 47-48 ↩
[Page 173]
overhauls341 and ongoing CAPEX342. We project ongoing CAPEX and overhaul years over time with inflation. The resulting investment profile follows a cyclical shape, combining years with smaller ongoing CAPEX and years that additionally carry out overhauls.
422. Our model also takes into account that Eemshaven is unlikely to incur planned investment in years close to the plant’s closure, as we explain in Section VI.A.6 above. Figure 45 below illustrates the CAPEX over the entire period of operations through 2054.
FIGURE 45: EEMSHAVEN CAPEX 2010-2054343
[Redacted]
423. We assume that all the investments the SCOut report forecasts for [Redacted] depreciate over a [Redacted] year period.344 Figure 46 below shows the resulting depreciation profile. The original plant investments, which took place largely between 2010 and 2015, are fully
341 We understand that RWE carries out scheduled overhauls for Eemshaven every [Redacted] years. [Redacted]. We infer the cost of these overhauls from the large CAPEX recorded in SCOut [Redacted]. ↩
342 We calculate yearly smaller ongoing capital expenses by excluding one-off investments and scheduled overhauls. ↩
343 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model. ↩
344 We assume [Redacted] years to overhauls and other small ongoing investments. ↩
[Page 174]
depreciated by [Redacted]. Hence, the only deprecation after [Redacted] relates to relatively minor depreciation of maintenance-related capital expenditures.
FIGURE 46: DEPRECIATION AND IMPAIRMENT ASSUMING FULL OPERATIONS 2010-2054345
[Redacted]
424. Our analysis also takes into account differences between the actual case and the but-for case. In the actual case, where Eemshaven is set to stop operations at the end of 2029, the plant would be allowed to apply ‘accelerated’ deprecation and fully depreciate its assets by the end of 2029. After closure, the plant makes no additional investments. Figure 47 and Figure 48 below illustrate the CAPEX and depreciation profiles under an assumed closure date of 2029.
345 Harris-Hesmondhalgh Workpapers, Tables G - Investment and Depreciation Model. ↩
[Page 175]
FIGURE 47: CAPEX ASSUMING FULL OPERATIONS 2010-2029346
[Redacted]
FIGURE 48: DEPRECIATION AND IMPAIRMENT ASSUMING FULL OPERATIONS 2010-2029347
[Redacted]
[Page 176]
425. We apply the weighted average cost of capital, or WACC, as the discount rate. The WACC reflects that energy companies routinely use a combination of debt and equity to finance a project. The WACC recognises that debt and equity are subject to different risks and costs, and discounts the cash flows of the project by taking into account the proportion of debt and equity used to finance a project. Simply put, the WACC is the average rate a project pays to finance its assets.
426. The following figure illustrates the WACC formula:
FIGURE 49: WEIGHTED AVERAGE COST OF CAPITAL348
[Redacted]
427. Mathematically, the WACC formula is expressed as:
Cost of capital = (rf + (rm − rf) × β ) x (1 − d) + rdx (1 – tc) x d
where:
(rf + (rm − rf) × β ): is the cost of equity, and specifically
rf is the expected returns of risk-free assets (Risk Free Rate);
(rm − rf) is the expected market excess returns over risk-free assets, which is also called MRP (“Market Risk Premium”), or ERP (“Equity Risk Premium”);
β is the equity beta, and is a measure of the market, also called systematic, risk of the investment.
rd is the cost of debt.
tc is the corporate tax rate.
d is the share of debt of a project and, conversely, (1 – d) the share of equity.
348 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital. ↩
[Page 177]
428. The Capital Asset Pricing Model (“CAPM”) is a widely applied model to measure the cost of shareholder equity. We have applied the CAPM to estimate the cost of equity and the cost of debt both in the context of business valuation and in the context of regulatory proceedings, where cost of capital is used as a determinant of access prices to regulated infrastructure such as gas pipelines or electricity networks.
429. In essence, the logic underlying CAPM is that, to hold equities which are not risk free, investors will require a return over and above the return that they could earn on a risk-free asset. This additional return is the MRP or ERP.
430. The contribution of the specific project or firm to the investor’s systematic risk is measured by the parameter “beta”. Beta reflects the risk that is correlated with the market, and that investors cannot eliminate by holding a diverse portfolio of assets. We refer to this as ‘systematic risk’. A portfolio with a systematic risk equivalent to the market risk would have a beta of 1. An asset with a higher systematic risk than the market would have a beta above 1. Conversely, an asset with a systematic risk below that of the market would have a beta below 1. Thus, a beta of 0.5 means that if the market declines by 1%, we would expect the value of the investment to decline by 0.5%, so in this example it is less risky than the market. A beta of 1.5 means that if the market declines by 1%, we would expect the value of the investment to decline by 1.5%, so it is more risky than the market. By definition, the market portfolio has a beta of 1.0.
431. The capital asset pricing model states that the cost of capital for Eemshaven depends on its asset beta. This beta cannot be calculated directly. RWE AG, the parent company of Eemshaven, is publicly traded in the market, but the stock movements reflect developments in its various business areas, so we cannot infer the market movements associated to its coal generation businesses. This is a common problem in practice because investment projects are seldom organised as independent public companies. The solution to this problem is to estimate betas for a sample of companies that face the same (macro) risks as Eemshaven.
432. To calculate the asset beta one must calculate the returns for shareholders of the comparable firms, for example at weekly intervals, and calculate the correlation between these returns and the returns on the market index over the same period.349
433. The criteria for identifying good risk comparables are that they should:
349 Returns include share price increases, dividend distributions, and buybacks. ↩
[Page 178]
434. Listed companies generating electricity from coal sources are the obvious place to start a search for suitable comparables. However, note that listed companies active in the coal-fired power generation business tend to be integrated companies, combining activities of electricity generation and distribution.
435. The market movements of integrated companies will hence reflect movements of their various businesses and power plant portfolio. To address this, we have searched for publicly listed companies for which a majority of their revenues come from energy generation and trading activities, and for which coal-fired generation is the most important contributor to its production activities. These companies will be predominantly impacted by relevant developments in the coal-generation business, such as changes in market-wide electricity prices and coal prices.
436. Table 16 summarises the results of these companies. Our sample includes six companies as of October 2017. Five of them operate in Poland, while the sixth one operates in Canada. Revenues from energy generation and trading make up between 67% and 99% of total revenues. Conversely, coal and lignite generation make up at least 68% of the plant’s own energy generation. We proxy coal revenues by assuming that these are proportional to the shares of coal and lignite production shares. For example, 91% of Tauron’s energy production comes from coal and lignite, and hence we assume that 91% of its energy and trading revenues come from coal. We estimate a firm’s share of revenues from coal-fired power generation business as the product of its share of revenues coming from generation and the share of energy and trading revenues coming from coal, as shown in row [3] below. We hence estimate that between 41% and 95% of these firms’ revenues depend on coal-fired generation, with a median value of 74%.
[Page 179]
TABLE 16: REVENUE TESTS FOR SELECTED COMPANIES350
| Zespol Elektrowni Patnow Adamow Konin SA [A] | Tauron Polska Energia SA [B] | PGE Polska Grupa Energetycz na SA [C] | Enea SA [D] | Energa SA [E] | TransAlta Corp [F] | Median [G] | ||
|---|---|---|---|---|---|---|---|---|
| Share of revenues from generation and trading | [1] Table F6 | 95% | 80% | 88% | 67% | 61% | 99% | 84% |
| Share of production from coal Generation | [2] Table F6 | 100% | 91% | 87% | 93% | 68% | 76% | 89% |
| Share of revenues from coal-fired power generation | [3] [1]*[2] | 95% | 73% | 76% | 63% | 41% | 75% | 74% |
Notes and sources:
[3]: Revenues proxy from the generation share
437. We calculate the betas only on a sample of companies between the end of September 2012 and the end of September 2017 with share prices continually available from the moment they were listed.351 We also verified that the shares were sufficiently “liquid”, or traded with sufficient frequency. Stocks that are not traded frequently, or “illiquid” stocks, will in fact tend to underestimate beta. We rely on two liquidity tests that Mr. Harris has applied in other work with energy regulators. First, we check that the shares of these companies were traded every week from the moment they were listed within our sample period. All of the firms meet this criteria. Second, we look at the bid-ask spread of the traded shares. The bid ask spread is the difference between what sellers wants to sell the stock for (or ask) and what buyers are willing to pay for it (or bid) at a given point in time. Illiquid stocks reflect relatively large spreads between both figures. In other work, energy regulators have applied a maximum bid-ask spread of 1% for a stock to be included in a beta estimate. Table 17 illustrates that all of the firms meet this standard.
350 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital, Table F4. ↩
351 In the case of Zespol Elektrowni Patnow Adamow Konin SA and Energa SA, trading data start slightly later, in late October 2012 and early December 2013 respectively. ↩
[Page 180]
TABLE 17: LIQUIDITY TESTS FOR SELECTED COMPANIES352
| Zespol Elektrowni Patnow Adamow [A] | Tauron Polska Energia SA [B] | PGE Polska Grupa Energetycz na SA [C] | Enea SA [D] | Energa SA [E] | TransAlta Corp [F] | |
|---|---|---|---|---|---|---|
| Bid-ask spread [1] Table F10 | 0.8% | 0.5% | 0.3% | 0.6% | 0.2% | 0.4% |
| Share of weeks with trading activity [2] Table F7 | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% | 100.0% |
Notes and sources:
Information collected between September 2012 - September 2017
[A]: Traded since October 2012
[E]: Traded since December 2013
438. For the companies selected, I obtained estimates of the firms’ betas from Bloomberg, a financial data provider. We use a beta calculated using a weekly return over a five-year period against a world index of share prices.353
439. Market data on Bloomberg shows betas on a ‘levered’ basis, meaning that the individual betas computed for the companies reflect each firm’s combination of equity and debt. These betas are not comparable, because the debt of a firm impacts the market risk of equity holders. We therefore proceeded to ‘unlever’ the beta of each company to calculate the asset betas, by taking into account its share of debt and the applicable tax rate.354 A standard mathematical formula estimates how debt affects the equity beta. The standard formula permits the conversion of ‘levered’ betas to the “unlevered” betas that would apply if the companies had 100% equity financing.355 We estimate asset betas within a range of 0.32 and 0.73, as shown in row [3] of Table 18 below. We took the median of these values, at 0.47 as the asset Beta applicable to Eemshaven.
352 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital, Table F5. ↩
354 We use net debt and explain the choice in Appendix G.3 below. In addition, tax rates are relevant in the CAPM model because debt is tax deductible. Financing a project through debt, as opposed to equity, has the advantage of reducing a project’s tax payments. The unlevering formula recognises the impact of the corporate income tax rate on the beta. ↩
355 Exhibit BR-68, Corporate Finance Institute, Hamada’s Equation. The standard formula is given by: ↩
Unlevered Beta = Unlevered beta x (1 + (1 – tax) x leverage ratio)
Where,
- Tax is the applicable corporate tax rate,
- And leverage ratio reflects D/E, the ratio of net debt to equity.
[Page 181]
TABLE 18: BETA ESTIMATES FOR COAL INTENSIVE POWER GENERATION FIRMS356
| Company | Zespol Elektrowni Patnow Adamow | Tauron Polska Energia SA | PGE Polska Grupa Energetycz na SA | Enea SA | Energa SA | TransAlta Corp | Median |
|---|---|---|---|---|---|---|---|
| Country | POLAND | POLAND | POLAND | POLAND | POLAND | CANADA | |
| Raw Beta [1] | 0.50 | 0.78 | 0.53 | 0.86 | 0.60 | 1.15 | |
| Net debt to EV [2] | 42.7% | 54.7% | 3.9% | 18.1% | 35.3% | 48.7% | 39% |
| Corporate tax rate [3] | 19.0% | 19.0% | 19.0% | 19.0% | 19.0% | 26.5% | |
| Asset beta [4] | 0.32 | 0.43 | 0.52 | 0.73 | 0.41 | 0.56 | 0.47 |
440. The firms from which we derive the betas do not obtain their revenues exclusively from coal-fired electricity generation. For RWE Eemshaven coal-fired electricity generation is the only source of revenue. Hence, we have also investigated the relationship between a firm’s assets beta and the proportion of its revenues from coal-fired electricity generation, to see if asset beta for a firm that derives all of its revenue from coal-fired electricity generation – like RWE Eemshaven – could have a beta that differs from the median beta we estimate above.
441. To do this, we calculated the statistical relationship between each company’s asset beta and its underlying coal and lignite portfolio. We proxy the size of the coal portfolio by taking into account the share of energy produced with coal or lignite, and in turn the share of energy generation and trading activities of the total firm revenues. We find that, on average, a greater share of revenues coming from coal fired power is associated with a lower beta. In the case of a company operating at 100% in the sector of coal fired power, the statistical relationship implies that a coal fired power plant attracts a beta of 0.43, lower than, but consistent with, the median value derived above. This implies that using an asset beta of 0.47 is likely to overestimate the asset beta of RWE Eemshaven, and hence overestimate its actual cost of capital.
356 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital, Table F2. ↩
[Page 182]
FIGURE 50: RELATIONSHIP BETWEEN ASSET BETA AND SHARE OF COAL OPERATIONS357
[Redacted]
442. The CAPM calls for investors’ forecast of the market risk premium (MRP). The MRP is the difference between the return obtained from investing in the average market portfolio and the return offered by risk-free investments. This MRP is the additional return which investors need or expect over and above a risk-free asset, to compensate for the risk of holding the market portfolio of investments. There is no consensus MRP, but analysts usually start with long-term historical averages. Good statistical estimates of average historical MRPs require very long periods of time. The most commonly cited averages run from 1900 to date.
443. In other work, we have based our estimates of the MRP on long-run historical averages. In a recent report for the European Commission on the cost of capital in the EU telecoms sector we stated that an MRP of 5-5.5% over bonds would be reasonable.358 Applying the upper
357 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital. ↩
358 Exhibit BR-69, European Commission, Review of Approaches to Estimate a Reasonable Rate of Return For Investments in Telecoms Networks in Regulatory Proceedings and Options for EU Harmonization, 2016, pp. 9-10.Exhibit BR-70, Damodaran, A., Equity Risk Premium (ERP): Determinant, Estimation and Implications - A post Crisis Update, Stern School of Business, dated 1 October 2009 ↩
[Page 183]
end of the range will attribute less value to future cash flows relative to using the lower number, and hence reduce the present value of the cash flows.
444. The analysis involves estimating cash flows denominated in euros out to 2054. Market risk premiums are derived as an excess return from a long-term risk-free rate. Accordingly, we use the average yield on 20-year Euribor swaps as the risk-free rate as of October 2017.359 We use a 20-year maturity because this is consistent with the historical MRP data available. The estimated risk-free rate is [Redacted] %.
445. The cost of debt is the cost at which a company could obtain debt financing. These costs depend on the creditworthiness of the company. We therefore determine the creditworthiness of comparable companies, which we consider to be European utilities.360 For these, a typical Debt imposes a cost to a project. Table 19 shows the credit ratings of a wide range of European utilities. We find that a Standard and Poor’s debt credit rating of BBB was typical for Western European companies in October 2017. Our sample includes the top-four energy utilities by market capitalisation as reported by Bloomberg, as well as all companies within the top 20 of energy firms for which the majority of revenues comes from power generation activities. The total sample is comprised of nine firms, including: Iberdrola, Engie, Endesa, Verbund, Fortum, EnBW, Uniper, Enel, and EDF.
359 Euribor is the lending rate between banks in the European Union and is calculated on loans with very short maturity (between one week and one year). It is risk free because it widely used by major financial institutions to settle very short term obligations. A 20 year Euribor swaps reflect the market expectations of Euribor rates in 20 years, consistent with the 20-year maturity of the MRP. ↩
360 We look at European utility companies because they would likely be potential third party buyers. ↩
[Page 184]
TABLE 19: STANDARD AND POOR'S CREDIT RATINGS OF WESTERN EUROPEAN UTILITIES
| Company | IBERDROLA SA | ENGIE | ENDESA SA | VERBUND AG | FORTUM OYJ | ENBW ENERGIE | UNIPER SE | ENEL SPA | EDF |
|---|---|---|---|---|---|---|---|---|---|
| Ticker | IBE SM | ENGI FP | ELE SM | VER AV | FORTUM FH | EBK GR | UN01 GR | ENEL IM | EDF FP |
| Country | SPAIN | FRANCE | SPAIN | GERMANY | FINLAND | GERMANY | GERMANY | ITALY | FRANCE |
| LT Foreign Issuer Credit | [Redacted] | ||||||||
Notes and Sources:
Selected comparables are the largest companies in terms of market capitalisation operating in western Europe. Their primary industry is power generation but for Enel SPA.
Credit ratings as of valuation date.
446. Hence, the cost of debt we apply is the 20 years yield361 of the EUR Composite Index from Bloomberg, which is a market indicator for the cost of debt issued by a set of companies with BBB rating. As of 9 October 2017, the yield associated to these firms equalled [Redacted] %.
447. The WACC combines the cost of equity and the cost of debt in proportion to the amount of debt and equity used to finance an asset like Eemshaven. The best guide as to the proportion of debt and equity a buyer would apply to Eemshaven is the proportion of debt and equity that firms engaged in power generation apply to their other assets. Accordingly, we derive the share of debt and equity by looking at the share of debt and equity financing from the same firms that we used to estimate beta.
448. We compute net debt, which is the outstanding debt level after excluding a company’s cash holdings. The key idea is that cash can offset the outstanding debt of a firm, and so net debt better reflects the outstanding debt obligations of a firm.362 The use of net debt derives from the idea that the value of a firm has essentially two components. On the one hand, the value of its productive assets, and on the other hand, the value of its cash holdings, which are subject to a different class of risk than the rest of the business. Because the value of any firm is claimed by either its debt holders or its equity holders, removing cash entails also adjusting the relative shares of the financing sources of a firm. Figure 51 below illustrates this point, where the exclusion of cash leads to a commensurate reduction in the level of debt.
361 20-years is a typical maturity for a corporate bond. ↩
362 Exhibit BR-4, Berk, J.B., DeMarzo, P.M., Corporate Finance, Third Edition, p. 417. ↩
[Page 185]
FIGURE 51: FIRM VALUE AND FINANCING SOURCES, WITH AND WITHOUT CASH363
[Redacted]
449. The exclusion of cash is fundamental to appropriately measure business risk. Cash is exposed to little market risks, since the value of cash is largely independent on the variations in market-wide returns. Regardless of the direction on which the market moves, €100 in cash are worth essentially the same over time, so the beta of cash tends to be close to 0. The exclusion of cash tends to a) decrease the equity beta of a project, and b) reduce the weight of debt in the cost of capital calculation.
450. We compute the share of net debt from the set of comparable companies over the entire analysis period between September 2012 and September 2017. Our analysis indicates that the median net debt ratio of these companies stands at 39%, which we apply as the target debt level a third-party investor would apply to a coal-fired power plant. The horizontal blue line in Figure 52 below illustrates the median net debt ratio.
363 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital. ↩
[Page 186]
FIGURE 52: NET DEBT RATIO AND MEDIAN364
[Redacted]
451. In Table 14, we combine the cost of equity and the cost of debt in the Weighted-Average Cost of Capital (“WACC”). In a first step, our analysis calculated the unlevered beta from a sample of comparable companies in Bloomberg. The unlevered beta needs to be transferred again into a levered beta that reflects the debt and equity combination of a potential buyer. Moreover, we combine the elements above to derive a cost of capital that reflects the equity and debt combination for a third-party buyer of Eemshaven as of the valuation date of October 2017. We obtain a discount rate of 3.85% as of October 2017.
364 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital. ↩
[Page 187]
TABLE 20: COST OF CAPITAL AS OF OCTOBER 2017365
| Date | [1] | See note | 09/10/2017 |
| Risk-free rate | [2] | See note | [Redacted] |
| Beta (unlevered) | [3] | Table F3 | 0.47 |
| MRP over long-term bonds | [4] | Assumed | 5.50% |
| Beta (levered) | [5] | See note | 0.70 |
| Cost of levered equity | [6] | [2]+[5]x[4] | [Redacted] |
| Cost of debt | [7] | See note | [Redacted] |
| Tax rate | [8] | See note | 25.0% |
| Target debt ratio | [9] | Table F3 | 39% |
| WACC | [10] | See note | 3.85% |
Notes and sources:
[1]: Valuation date.
[2]: EuroSwap (20 years).
[5]=[3]*(1+(1-[8]))*[9]/(1-[9])
[7]: BVAL composite index, BBB rating 20Y maturity as of 9/10/2017.
[8]: Exhibit BR-81, KPMG, Corporate Tax Rates.
[10]: [6]x(1-[9])+[7]x[9]x(1-[8]).
365 Harris-Hesmondhalgh Workpapers, Tables F – Cost of Capital, Table F1. ↩
[Page 188]
FIGURE 53: CO2 PRICES366
[Redacted]
This section lists the supporting Brattle workpapers below:
366 Harris-Hesmondhalgh Workpapers, Tables D.3 – CO2 Price ratchet. ↩
[Page 189]
| Exhibit No. | Description | Date |
|---|---|---|
| Exhibit BR-1 | Minister of Economic Affairs and Climate, Electricity Production Prohibition Act | 20 December 2019 |
| Exhibit BR-2 | 2017-2021 Coalition Agreement, Confidence in the Future | 10 October 2017 |
| Exhibit BR-3 | Levy, G., Computational Finance Using C and C#, Quantitative Finance Series, 2008 | |
| Exhibit BR-4 | Berk, J.B., DeMarzo, P.M., Corporate Finance, Third Edition | |
| Exhibit BR-5 | Report of the Ministry of Economic Affairs, 2016 | |
| Exhibit BR-6 | Velatia Networks, Safe and Reliable, Goodbye to the Coal Power Plants in the Netherlands by 2030 | 21 January 2019 |
| Exhibit BR-7 | CBS, Trends in the Netherlands 2018, Economy | |
| Exhibit BR-8 | International Energy Agency and Nuclear Energy Agency, Projected Costs of Generating Electricity, 2015 Edition | 30 September 2015 |
| Exhibit BR-9 | RWE, Eemshaven Power Plant | |
| Exhibit BR-10 | RWE, Environmental Permit Eemshaven | 11 December 2007 |
| Exhibit BR-11 | KEMA Consulting, Application for Incorporation Permit | 20 December 2006 |
[Page 190]
| Exhibit BR-12 | National Enterprise Agency of The Netherlands, Eemshaven: Decision to Grant a Subsidy | 30 November 2016 |
| Exhibit BR-13 | Government of The Netherlands, The Future of Fossil Fuels | |
| Exhibit BR-14 | Final Report 2014-2019, Dutch Coal Covenant | |
| Exhibit BR-15 | Our power plants in the Netherlands - Uniper, last accessed on the 23 December 2020 | |
| Exhibit BR-16 | Vattenfall, Vattenfall’s Last Coal Power Plant in The Netherlands is Closing | 20 December 2019 |
| Exhibit BR-17 | de Volkskrant, One of The Last Four Coal-Fired Power Stations in The Netherlands Wants to Close | 21 October 2020 |
| Exhibit BR-18 | Phys.Org, Dutch Lawmakers Approve Plan to Close Coal Power Plants | 26 November 2015 |
| Exhibit BR-19 | European Commission Press Release, State Aid: Commission Approves Compensation for Early Closure of Coal Fired Power Plant in the Netherlands, Brussels | 12 May 2020 |
| Exhibit BR-20 | International Valuation Standard Council, International Valuation Standards | 31 January 2020 |
| Exhibit BR-21 | Global Arbitration Review, The Guide to Damages in International Arbitration, Third Edition | 1 December 2018 |
| Exhibit BR-22 | Alstom, Power Plant Economics, 2006 | |
| Exhibit BR-23 | World Bank, “Guidelines on the Treatment of Foreign Direct Investment,” Foreign Investment Law Journal, Chapter IV Expropriation and unilateral alterations or termination of contracts, 1992 | |
| Exhibit BR-24 | Graham, J.R. and Campbell R.H., “The Theory and Practice of Corporate Finance: Evidence from the Field”, Journal of Financial Economics | 10 December 1999 |
| Exhibit BR-25 | Reilly, F., Brown, K.C., Investment Analysis & Portfolio Management, Chapter 11: An Introduction to Security Valuation, Seventh Edition, Thomson Southwestern, 2003 | |
| Exhibit BR-26 | Copeland, T., Koller, T., Murrin, J., Valuation Measuring and Managing the Value of Companies, Second Edition, John Wiley & Sons, Inc., 1994 | |
| Exhibit BR-27 | Quiborax S.A. v. Plurinational State of Bolivia, ICSID Case No. ARB/06/2, Award | 16 September 2015 |
| Exhibit BR-28 | RWE, Annual Report 2017 |
[Page 191]
| Exhibit BR-29 | S&P Global Platts, Engie sells 2.3 GW German, Dutch Coal Plants to Riverstone Holdings | 26 April 2019 |
| Exhibit BR-30 | Royal Institute of Chartered Surveyors (RICS). Depreciated Replacement Cost Method of Valuation for Financial Reporting, London: 1st Edition, November 2018 | |
| Exhibit BR-31 | European Commission, State Aid SA.54537 (2020/NN) - Netherlands Prohibition of Coal for the Production of Electricity in the Netherlands | 12 May 2020 |
| Exhibit BR-32 | International Energy Agency, World Energy Outlook, 2016 | |
| Exhibit BR-33 | BP, Statistical Review of World Energy, 2020 | |
| Exhibit BR-34 | Hull J.C., Options, Futures and Other Derivatives, 9th edition | |
| Exhibit BR-35 | Argus, UK Carbon Price Floor to Remain in Place Until 2021 | 26 November 2016 |
| Exhibit BR-36 | RWE, Eemshaven Cofiring Business Case | |
| Exhibit BR-37 | European Commission, EU Reference Scenario | 15 July 2016 |
| Exhibit BR-38.A | RWE, Schedule 22 | 17 February 2009 |
| Exhibit BR-38.B | RWE, Schedule 23 | 17 February 2009 |
| Exhibit BR-38.C | RWE, Land Lease Akte I | 16 March 2009 |
| Exhibit BR-38.D | RWE, Land Lease Akte II | 11 March 2009 |
| Exhibit BR-39 | RWE, Cluster Eemshaven, MTP 2017 (2018-2022) | 8 September 2017 |
| Exhibit BR-40 | RWE, SCOut Q3 2017, Station Contribution Outlook | 10 October 2017 |
| Exhibit BR-41 | Basteviken, M., Pearson-Woodd, N., Asset-Backed Trading in the Energy and Resources Sector, International Tax Review | 5 March 2019 |
| Exhibit BR-42 | Corporate Finance Institute, Arbitrage | |
| Exhibit BR-43 | Municipality of Eemsmond, Real Estate Tax | |
| Exhibit BR-44 | RWE, Consideration of Overhead Costs When Evaluating Assets and Contracts | 30 September 2015 |
| Exhibit BR-45 | Forbes - Energy Innovation: Policy and Technology, Carbon Capture And Storage: An Expensive Option For Reducing U.S. CO2 Emissions | 3 May 2017 |
| Exhibit BR-46 | EIA, Assumptions to The Annual Energy Outlook: Cost and Performance Characteristics of New Central Station Electricity Generation Technology, 2015 | |
| Exhibit BR-47 | NREL, Annual Technology Baseline 2017 | |
| Exhibit BR-48 | OECD, Purchasing Power Parities (PPP) 2008-2019 |
[Page 192]
| Exhibit BR-49 | Deloitte, Netherlands Alert, New Policy Goals Include Corporate Income Tax Rate Reduction, Abolition of Dividend WHT | 13 October 2017 |
| Exhibit BR-50 | PWC, Corporate - Group Taxation, Netherlands | 6 September 2020 |
| Exhibit BR-51 | PWC, Netherlands Corporate Taxes on Corporate Income | 6 July 2020 |
| Exhibit BR-52 | Myers, S.C., Determinants of Corporate Borrowing, Sloan School of Management, MIT, September 1976 | |
| Exhibit BR-53 | Guthrie, G., Real Options in Theory and Practice, Oxford University Press, 2009 | |
| Exhibit BR-54 | Overheid.nl, Decree on Basic Safety Standards for Radiation Protection | 23 October 2017 |
| Exhibit BR-55 | Brealey, Myers, and Allen, Principles of Corporate Finance, 10th edition, (The McGraw-Hill Companies, 2011) | |
| Exhibit BR-56 | Perold A.F., The Capital Asset Pricing Model, Journal of Economic Perspectives - Volume 18, Number 3, Summer 2004 | |
| Exhibit BR-57 | RWE, RWE Bonds and Credit Ratings | 30 November 2020 |
| Exhibit BR-58 | EMMI, Euribor Rates | |
| Exhibit BR-59 | United Nations Climate Change, Joint Implementation | |
| Exhibit BR-60 | Overview of NL Issued Letters of Approval for Participation in a JI Project Activity, Last Update Nov. 2013 | |
| Exhibit BR-61 | Clewlow L., and Strickland C., Energy Derivatives: Pricing and Risks Management, Lacima Publications, 2000 | |
| Exhibit BR-62 | International Monetary Fund, World Economic Outlook Database, October 2017 | |
| Exhibit BR-63 | Pindyck, R.S., The Dynamics of Commodity Spot and Futures Markets: A Primer, The Energy Journal, 2001, Vol. 22, No. 3 | |
| Exhibit BR-64 | FTSE Russell, FTSE All-World Index | 29 January 2021 |
| Exhibit BR-65 | Dimson, Risk Measurement When Shares are Subject to Infrequent Trading, Vol. 7, No. 2 | 1 May 1979 |
| Exhibit BR-66 | European Commission, EU Emissions Trading System (EU ETS) | 23 November 2016 |
| Exhibit BR-67 | IAS Plus, IAS 16 Property Plant and Equipment | |
| Exhibit BR-68 | Corporate Finance Institute, Hamada’s Equation |
[Page 193]
| Exhibit BR-69 | European Commission, Review of Approaches to Estimate a Reasonable Rate of Return For Investments in Telecoms Networks in Regulatory Proceedings and Options for EU Harmonization, 2016 | |
| Exhibit BR-70 | Damodaran, A., Equity Risk Premium (ERP): Determinant, Estimation and Implications - A post Crisis Update, Stern School of Business | 1 October 2009 |
| Exhibit BR-71 | KPMG, Corporate Tax Rates | |
| Exhibit BR-72 | Bloomberg Dataset, WACC Calculation | |
| Exhibit BR-73 | European Central Bank (ECB), Long Term Inflation Forecast, 2017 Q3 | |
| Exhibit BR-74 | Bloomberg Dataset, Commodity Betas, Workpaper B | |
| Exhibit BR-75 | European Central Bank (ECB), Statistical Data Warehouse, Exchange Rate US Dollar/Euro | |
| Exhibit BR-76.A | RWE, Eemshaven Annual Report, 2010 | |
| Exhibit BR-76.B | RWE, Eemshaven Annual Report, 2011 | |
| Exhibit BR-76.C | RWE, Eemshaven Annual Report, 2012 | |
| Exhibit BR-76.D | RWE, Eemshaven Annual Report, 2013 | |
| Exhibit BR-76.E | RWE, Eemshaven Annual Report, 2014 | |
| Exhibit BR-76.F | RWE, Eemshaven Annual Report, 2015 | |
| Exhibit BR-76.G | RWE, Eemshaven I Annual Report, 2016 | |
| Exhibit BR-76.H | RWE, Eemshaven II Annual Report, 2016 | |
| Exhibit BR-76.I | RWE, Eemshaven I Annual Report, 2017 | |
| Exhibit BR-76.J | RWE, Eemshaven II Annual Report, 2017 | |
| Exhibit BR-77 | RWE, Book Value and Depreciation of Eemshaven, 2010-2017 | |
| Exhibit BR-78 | RWE, Eemshaven Working Capital Overview | |
| Exhibit BR-79 | RoyalHaskoning DHV Study on Decommissioning Cost | |
| Exhibit BR-80 | National Enterprise Agency of The Netherlands, SDE Projects Available in Autumn 2016 | 18 January 2017 |
| Exhibit BR-81 | International Energy Agency, Energy Statistics Manual, 2004 | |
| Exhibit BR-82 | ICE Futures Europe, API2 Rotterdam Coal Option (Future Style Margin) | 8 January 2021 |
| Exhibit BR-83 | BP, Approximate Conversion Factors, Statistical Review of World Energy, 2019 | |
| Exhibit BR-84 | IEA, Unit Converter and Glossary For Common Energy Units | 31 December 2016 |
[Page 194]
CONFIDENTIAL
| Exhibit BR-85 | Bloomberg, API21MON OECM Index Description, accessed on 15 December 2020 |
|
| Exhibit BR-86 | ICIS, European Daily Electricity Markets Methodology | 24 May 2017 |
| Exhibit BR-87 | IGU Natural Gas Conversion Pocketbook, 2012 | |
| Exhibit BR-88 | Energy yield calculation - Cofiring at Eemshaven |