INTERNATIONAL CENTRE FOR SETTLEMENT OF INVESTMENT DISPUTES

In the arbitration proceeding between

NEXTERA ENERGY GLOBAL HOLDINGS B.V. AND
NEXTERA ENERGY SPAIN HOLDINGS B.V.

Claimants

and

KINGDOM OF SPAIN

Respondent

ICSID Case No. ARB/14/11


DECISION ON JURISDICTION, LIABILITY AND
QUANTUM PRINCIPLES


Members of the Tribunal
Professor Donald M. McRae, C.C., President of the Tribunal
The Honourable L. Yves Fortier, P.C., C.C., O.Q., Q.C., Arbitrator
Professor Laurence Boisson de Chazournes, Arbitrator

Secretary of the Tribunal
Ms. Luisa Fernanda Torres

Date of dispatch to the Parties: 12 March 2019

[Page i]

REPRESENTATION OF THE PARTIES

Representing Claimants:

Ms. Karyl Nairn QC
Mr. George Zimmerman
Mr. David Herlihy
Ms. Teresa Queirós
Ms. Sara Nadeau-Séguin
Mr. Jacob Lefkowitz
Ms. Carla Alves
Skadden, Arps, Slate, Meagher & Flom (UK) LLP
40 Bank Street
London E14 5DS
United Kingdom

and

Mr. Alberto Fortún
Mr. Luis Pérez de Ayala
Cuatrecasas, Gonçalves Pereira
Calle de Almagro 9
28010, Madrid
Spain

Representing Respondent:

Mr. José Manuel Gutiérrez Delgado
Mr. Javier Castro López
Mr. Pablo Elena Abad
Mr. Antolín Fernández Antuña
Mr. Roberto Fernández Castilla
Ms. Patricia Fröhlingsdorf Nicolás
Ms. Mónica Moraleda Saceda
Ms. Elena Oñoro Sainz
Ms. Almudena Pérez-Zurita Gutiérrez
Ms. Amaia Rivas Kortazar
Ms. María José Ruíz Sánchez
Mr. Diego Santacruz Descartín
Mr. José María Alonso

Abogacía General del Estado
Ministry of Justice of the Government of
Spain
Calle Ayala 5
28001, Madrid
Spain

[Page ii]

[Page vii]

TABLE OF SELECTED ABBREVIATIONS

Arbitration Rules ICSID Rules of Procedure for Arbitration
Proceedings 2006
C-[#] Claimants' Exhibit
CL-[#] Claimants' Legal Authority
Cl. Bif. Claimants' Observations on the Request for
Bifurcation dated 2 October 2015
Cl. C-Mem. Jur. Claimants' Counter-Memorial on Preliminary
Objections dated 8 August 2016
Cl. Mem. Merits Claimants' Memorial on the Merits dated 22
May 2015
Cl. Rej. Jur. Claimants' Rejoinder on Preliminary
Objections dated 14 November 2016
Cl. Reply Merits Claimants' Reply on the Merits dated 10
August 2016
Cl. Skeleton Claimants' Skeleton Argument dated 9
December 2016
Cl. PH Mem. Claimants' Response to Tribunal's Post-
Hearing Question dated 27 February 2017
Cl. PH Reply Claimants' Reply to Spain's Submission of 27
February 2017, dated 7 March 2017
Cl. Obs. Eiser Claimants' Observations on the Eiser Award
dated 22 June 2017
Cl. Reply Eiser Claimants' Reply Observations on the Eiser
Award dated 18 July 2017
Cl. Obs. EC Decision Claimants' Observations on the EC Decision
of 10 November 2017 in Case SA.40348
(20155/NN) dated 8 January 2018
Cl. Obs. Achmea Claimants' Observations on the Achmea
Judgment, the Novenergía II Award, and the
Blusum Award dated 9 April 2018

[Page viii]

CER- Claimants' Expert Report
CER-Compass Lexecon First First Expert Report of Professor Pablo T.
Spiller and Dr. Manuel A. Abdala of Compass
Lexecon dated 4 March 2015
CER-Compass Lexecon Second Second Expert Report of Professor Pablo T.
Spiller and Dr. Manuel A. Abdala of Compass
Lexecon dated 9 August 2016
CER-Compass Lexecon Third Addendum to Second Expert Report of
Professor Pablo T. Spiller and Dr. Manuel A.
Abdala of Compass Lexecon dated 19 August
2016
CER-Price Expert Report of Mr. Henry Price dated 9
August 2016
CWS- Claimants' Witness Statement
CWS-Arechabala First First Witness Statement of Mr. Miguel Ignacio
Arechabala dated 19 May 2015
CWS-Arechabala Second Second Witness Statement of Mr. Miguel
Ignacio Arechabala dated 8 August 2016
CWS-Arechabala Third Third Witness Statement of Mr. Miguel
Ignacio Arechabala dated 21 November 2016
CWS-Davidson First First Witness Statement of Mr. F. Mitchell
Davidson dated 21 May 2015
CWS-Davidson Second Second Witness Statement of Mr. F. Mitchell
Davidson dated 2 August 2016
CWS- Kujawa First First Witness Statement of Ms. Rebecca
Kujawa dated 19 May 2015
CWS- Kujawa Second Second Witness Statement of Ms. Rebecca
Kujawa dated 10 August 2016
CWS- Nicolaï First First Witness Statement of Mr. George Nicolaï
dated 8 August 2016
CWS- Nicolaï Second Second Witness Statement of Mr. George
Nicolaï dated 14 November 2016
CWS-Sorensen Witness Statement of Mr. Mark Sorensen

[Page ix]

dated 10 November 2016
ECT Energy Charter Treaty
EC First Application European Commission's Application for Leave
to Intervene as a Non-Disputing Party dated 12
November 2014
EC Written Submission European Commission's Written Submission
dated 5 September 2016
Hearing Hearing on Jurisdiction and Merits held 12-19
December 2016
ICSID Convention Convention on the Settlement of Investment
Disputes Between States and Nationals of
Other States dated 18 March 1965
ICSID or the Centre International Centre for Settlement of
Investment Disputes
R-[#] Respondent's Exhibit
RL-[#] Respondent's Legal Authority
Resp. C-Mem. Merits Respondent's Counter-Memorial on the Merits
dated 4 March 2016
Resp. Mem. Jur. Respondent's Memorial on Preliminary
Objections and Request for Bifurcation dated 9
September 2015
Resp. Rej. Merits Respondent's Rejoinder on the Merits dated 20
October 2016
Resp. Reply Jur. Respondent's Reply on Preliminary Objections
dated 14 October 2016
Resp. Skeleton Respondent's Skeleton Argument dated 9
December 2016
Resp. PH Mem. Respondent's Response to Tribunal's Post-
Hearing Question dated 27 February 2017
Resp. PH Reply Respondent's Reply to Claimants' Submission
of 27 February 2017 dated 7 March 2017
Resp. Obs. Eiser Respondent's Observations on the Eiser Award

[Page x]

dated 11 July 2017
Resp. Reply Eiser Respondent's Reply Observations on the Eiser
Award dated 25 July 2017
Resp. Obs. EC Decision Respondent's Observations on the EC
Decision of 10 November 2017 in Case
SA.40348 (20155/NN) dated 8 January 2018
Resp. Obs. Achmea Respondent's Observations on the Achmea
Judgment, the Novenergía II Award, and the
Blusum Award dated 9 April 2018
RER- Respondent's Expert Report
RER-Accuracy First Economic First Expert “Economic Report on the
Plaintiffs and their Claim
” of Mr. Eduard
Saura, Mr. Christophe Schmit and Mr.
Stéphane Perrotto of Accuracy dated 2 March
2016
RER-Accuracy Second Economic Second Expert “Report on Claims of the
Claimants
" of Mr. Eduard Saura, Mr.
Christophe Schmit and Mr. Stéphane Perrotto
of Accuracy dated 20 October 2016
RER-Accuracy on Lack of Activity Expert “Economic Report on the Lack of
Economic Activity of the Plaintiffs in the
Netherlands
" of Mr. Eduard Saura and Mr.
Christophe Schmit dated 14 October 2016
RER-Casanova Expert Report of Mr. Jesús Casanova dated 19
October 2016
RER-Servert First First Expert Report of Mr. Jorge Servert dated
14 October 2016
RER-Servert Second Supplementary Expert Report of Mr. Jorge
Servert submitted 13 December 2016
RWS- Respondent's Witness Statement
RWS-Montoya First First Witness Statement of Mr. Carlos
Montoya dated 3 March 2016
RWS-Montoya Second Second Witness Statement of Mr. Carlos
Montoya dated 19 October 2016

[Page xi]

Request for Arbitration Request for Arbitration dated 12 May 2014
Tr. Day [#] [Speaker(s)] [page:line] Transcript of the Hearing (English) (as revised
by the Parties in February 2017)
Tribunal Arbitral Tribunal constituted on 23 January
2015

[Page 1]

I. INTRODUCTION AND PARTIES

1. This case concerns a dispute submitted to the International Centre for Settlement of Investment Disputes (“ICSID” or the “Centre"), on the basis of the Energy Charter Treaty, which entered into force on 16 April 1998 for the Netherlands and the Kingdom of Spain (the "ECT"), and the Convention on the Settlement of Investment Disputes between States and Nationals of Other States, which entered into force on 14 October 1966 (the "ICSID Convention").

2. The Claimants are NextEra Energy Global Holdings B.V (“NextEra Global"), and NextEra Energy Spain Holdings B.V. ("NextEra Spain"), both limited liability companies incorporated under the laws of the Netherlands (besloten vennootschap met beperkte aansprakelijkheid), (together, “Claimants”).

3. The Respondent is the Kingdom of Spain (“Spain” or “Respondent").

4. Claimants and Respondent are collectively referred to as the “Parties.” The Parties' representatives and their addresses are listed above on page (i).

5. This dispute relates to measures implemented by Respondent modifying the regulatory and economic regime of renewable energy projects.

II. PROCEDURAL HISTORY

A. REGISTRATION AND CONSTITUTION OF THE TRIBUNAL

6. On 15 May 2014, ICSID received a Request for Arbitration dated 12 May 2014, accompanied by exhibits C-001 to C-012, from Claimants against Spain (the "Request for Arbitration”). On 21 May 2014, the Centre formulated a question to Claimants regarding the Request for Arbitration, and Claimants submitted a response on 22 May 2014.

7. On 23 May 2014, in accordance with Article 36(3) of the ICSID Convention, the Secretary-General of ICSID registered the Request for Arbitration, as supplemented by

[Page 2]

letter of 22 May 2014, and notified the Parties of the registration. In the Notice of Registration, the Secretary-General invited the Parties to proceed to constitute an arbitral tribunal as soon as possible in accordance with Rule 7(d) of ICSID's Rules of Procedure for the Institution of Conciliation and Arbitration Proceedings (the “Institution Rules").

8. In accordance with Article 37(2)(a) of the ICSID Convention, the Parties agreed to constitute the Tribunal as follows: three arbitrators, one to be appointed by each Party, and the third, presiding arbitrator to be appointed by agreement of the Parties. Pursuant to the Parties' agreed method of constitution, failing an agreement of the Parties on the presiding arbitrator, s/he would be appointed by the Chairman of the ICSID Administrative Council without limitation to the ICSID Panel of Arbitrators.

9. The Tribunal is composed of Professor Donald M. McRae, a national of Canada and New Zealand, President, appointed by agreement of the Parties; Mr. L. Yves Fortier, a national of Canada, appointed by Claimants; and Professor Laurence Boisson de Chazournes, a national of France and Switzerland, appointed by Respondent.

10. On 23 January 2015, in accordance with Rule 6(1) of the ICSID Rules of Procedure for Arbitration Proceedings (the “ICSID Arbitration Rules"), the Secretary-General of ICSID notified the Parties that all three arbitrators had accepted their appointments and that the Tribunal was therefore deemed to have been constituted on that date. Ms. Luisa Fernanda Torres, ICSID Legal Counsel, was designated to serve as the Secretary of the Tribunal.

B. THE FIRST SESSION

11. On 15 May 2015, a date agreed by the Parties, in accordance with ICSID Arbitration Rule 13(1) the Tribunal held a first session with the Parties in-person in Washington, DC.

12. On 21 May 2015, following the First Session, the Tribunal issued Procedural Order No. 1, supplemented on 3 June 2015 with its Annex A (Procedural Calendar). Procedural Order No. 1 embodied the Parties' agreements on procedural matters and the Tribunal's decisions on the disputed issues. It established, inter alia, that the applicable Arbitration Rules would be those in effect from 10 April 2006, that the procedural languages would

[Page 3]

be English and Spanish, that the place of proceeding would be Washington, DC, and it also set out the Procedural Calendar for this arbitration.

C. THE PARTIES' WRITTEN SUBMISSIONS AND PROCEDURAL APPLICATIONS

13. On 22 May 2015, Claimants filed their Memorial on the Merits (“Memorial on the Merits"), accompanied by exhibits C-001 to C-124; legal authorities CL-001 to CL-064; three (3) witness statements by: Mr. F. Mitchell Davidson, Mr. Miguel Ignacio Arechabala and Ms. Rebecca Kujuwa, respectively; and one (1) expert report by Dr. Manuel Abdala and Prof. Pablo Spiller of Compass Lexecon, with exhibits CLEX-001 to CLEX-106.1

14. On 23 June 2015, pursuant to the Procedural Calendar, Respondent provided a notice of its intent to submit Objections to Jurisdiction and a Request for Bifurcation.

15. On 9 September 2015, Respondent filed a Memorial on Preliminary Objections with Request for Bifurcation (“Memorial on Jurisdiction and Request for Bifurcation"); accompanied by exhibits R-001 to R-028; and legal authorities RL-001 to RL-019.

16. On 18 September 2015, following a joint request by the Parties, the Tribunal amended the Procedural Calendar (“Procedural Calendar – Amendment No. 1").

17. On 28 September 2015, Claimants filed an application asking the Tribunal to order Respondent to produce a legal authority to the Tribunal to assess its relevance, and then to Claimants if the Tribunal found the authority relevant, namely, The PV Investors v. Kingdom of Spain, PCA Case No. 2012-14, Preliminary Award on Jurisdiction (13 October 2014) (“PV Investors Award on Jurisdiction"). On 5 October 2015, Respondent filed observations on this application, together with exhibit R-029.


1 Exhibits C-001 to C-012 had been previously submitted with the Request for Arbitration. See supra, ¶ 6. ↩

[Page 4]

18. On 2 October 2015, Claimants filed their Observations on Respondent's Request for Bifurcation (“Response on Bifurcation”); accompanied by legal authorities CL-086 to CL-133.2

19. On 28 October 2015, the Tribunal issued Procedural Order No. 2, dismissing Respondent's Request for Bifurcation.

20. On 6 January 2016, the Tribunal decided not to issue the order requested in Claimants' application of 28 September 2015, but encouraged Respondent to make its best efforts to make the PV Investors Award on Jurisdiction available to the Tribunal. On 18 February 2016, Respondent submitted the PV Investors Award on Jurisdiction to the record (without a designated legal authority number), together with evidence of consent of the claimants in the PV Investors proceeding.3

21. On 4 March 2016, Respondent filed its Counter-Memorial on the Merits (“Counter-Memorial on the Merits"), accompanied by exhibits R-030 to R-231; legal authorities RL-020 to RL-098; one (1) witness statement by Mr. Carlos Montoya; and one (1) expert report by Mr. Eduard Saura, Mr. Christophe Schmit and Mr. Stéphane Perrotto of Accuracy, with exhibits ACQ-001 to ACQ-039.

22. On 22 March 2016, Claimants informed the Centre and the Tribunal that the Spanish law firm Cuatrecasas Gonçalves Pereira had been retained as co-counsel in this matter, and on 20 May 2016 provided the corresponding power of attorney.

23. On 13 May 2016, following exchanges between the Parties, the Parties submitted for decision by the Tribunal their respective Redfern Schedules including their Requests, Objections and Replies on Document Production.

24. On 3 June 2016, the Tribunal issued Procedural Order No. 4 on Document Production.


2 The legal authorities were submitted electronically on 5 October 2015. ↩
3 On 8 August 2016, Claimants resubmitted a copy of this Award with their Counter-Memorial on Jurisdiction, as CL-134. ↩

[Page 5]

25. On 8 August 2016, Claimants filed their Counter-Memorial on Preliminary Objections (“Counter-Memorial on Jurisdiction”) accompanied by exhibits C-126 to C-167; legal authorities CL-134 to CL-144; and one (1) witness statement, by Mr. George Nicolaï.4

26. On 8 and 9 August 2016, the Parties informed the Tribunal of an agreed extension of the deadline for the Claimants' Reply on the Merits until 10 August 2016, Respondent's agreement being conditioned upon Claimants' submission of certain evidence of the circumstances causing the delay together with the Reply on the Merits.

27. On 11 August 2016, Claimants filed their Reply on the Merits (“Reply on the Merits") accompanied by exhibits C-168 to C-271; legal authorities CL-145 to CL-175; three (3) witness statements by: Mr. F. Mitchell Davidson, Mr. Miguel Ignacio Arechabala, and Ms. Rebecca Kujawa, respectively; two (2) expert reports: one by Dr. Manuel Abdala and Prof. Pablo Spiller of Compass Lexecon, with exhibits CLEX-107 to CLEX-282, an another by Mr. Henry Price, with exhibits SD-001 to SD-024.

28. On 11 August 2016, Claimants also filed a communication explaining the circumstances underlying the extension for the submission of the Reply on the Merits, and announcing that "[u]nless the Tribunal otherwise direct[ed], Dr Abdala and Professor Spiller w[ould] supplement their evidence with a brief further report" to take account of those circumstances, approximately within two weeks. In addition, alleging delays in Respondent's document production, Claimants requested a further opportunity to analyze the materials received during document production and to introduce them into the record at a later time, by consent or with leave from the Tribunal. On 11 August 2016, Respondent filed a response objecting to the delay in the filing of the Reply on the Merits and opposing to Claimants' requests of 11 August 2016. On 12 August 2016, Claimants submitted reply observations.

29. On 17 August 2016, the Tribunal (i) informed the Parties that the consequences of the delay in the filing of the Reply on the Merits could be considered in the determination of costs but did not affect the admissibility of the submission, and it invited Respondent to


4 The exhibits and legal authorities were submitted electronically on 9 August 2016. ↩

[Page 6]

provide comments concerning the subsequent Procedural Calendar; and (ii) indicated that it would rule on the issue of admissibility of any further reports or documents if and when an application for leave to file them was made. On 18 August 2016, Respondent filed observations on the subsequent Procedural Calendar, and Claimants filed a reply on the same day.

30. On 19 August 2016, Claimants submitted an Addendum to the Second Expert Report of Dr. Abdala and Prof. Spiller, with exhibits CLEX-283 to CLEX-286. On 22 August 2016, the Tribunal invited Respondent to make observations on the admissibility of this report, and it informed the Parties that the report would not be transmitted to the Tribunal Members until a ruling on its admissibility had been made. On 29 August 2016, Respondent filed a response, opposing the admissibility the report, and requesting an extension for the filing of its Rejoinder on the Merits. On 30 August 2016, Claimants submitted observations on the requested extension.

31. On 15 September 2016, the Tribunal (i) admitted into the record the Addendum to the Second Expert Report of Dr. Abdala and Prof. Spiller dated 19 August 2016; and (ii) granted Respondent an extension for the filing of the Rejoinder on the Merits (“Procedural Calendar – Amendment No. 2”).

32. On 14 October 2016, Respondent filed its Reply on Preliminary Objections (“Reply on Jurisdiction"), accompanied by exhibits R-232 to R-276; legal authorities RL-099 to RL-110; and one (1) expert report by Mr. Eduard Saura and Mr. Christophe Schmit of Accuracy, with exhibits ACQ-040 to ACQ-042.

33. On 20 October 2016, Respondent filed its Rejoinder on the Merits (“Rejoinder on the Merits"), accompanied by exhibits R-277 to R-424; legal authorities RL-111 to RL-120; one (1) witness statement by Mr. Carlos Montoya, with exhibits R-225_CMR to R-266_CMR; three (3) expert reports by: Mr. Eduard Saura, Mr. Christophe Schmit and Mr. Stéphane Perrotto of Accuracy with exhibits ACQ-043 to ACQ-090, Mr. Jesús Casanova

[Page 7]

with five unnumbered exhibits, and Prof. Jorge Servert with exhibits JSR-001 to JSR-010 and JSRC-001 to JSRC-041, respectively.5

34. On 27 October 2016, Respondent filed an application requesting authorization from the Tribunal to submit an additional exhibit (R-424) and certain corrected exhibits (JSR-05 and JSR-10). On the same day, Claimants consented to the request. On 28 October 2016, the Tribunal granted Respondent's application, and on 3 November 2016 the documents were submitted by Respondent.

35. On 8 November 2016, the Tribunal held a pre-hearing organizational conference with the Parties by telephone.

36. On 11 November 2016, the Tribunal issued Procedural Order No. 5 embodying the Parties' agreements on procedural matters pertaining to the organization of the Hearing and the Tribunal's decisions on the disputed issues.

37. On 7 November 2016, Claimants filed an application asking the Tribunal (i) to order Respondent to produce certain documents not produced and to provide a complete copy of an exhibit already on record (R-078); and (ii) to grant Claimants leave to introduce the materials into the record if they elected to do so upon review. On 8 November 2016, Respondent (i) filed observations on Claimants' application of 7 November 2016; (ii) filed its own application asking the Tribunal to order Claimants to produce a number of documents not produced; and (iii) communicated to the Tribunal its willingness to introduce into the record a new legal authority, namely Isolux Infrastructure Netherlands BV v. Kingdom of Spain, SCC Case V2013/153, Award (12 July 2016) (“Isolux Award") subject to a guarantee of confidentiality by the present Tribunal. On 15 November 2016, Claimants provided observations on Respondent's application of 8 November 2016.6


5 Exhibits R-424, JSR-005 and JSR-010 were submitted electronically on 3 November 2016. See infra, ¶ 34. ↩
6 On 21 and 22 November 2016, the Parties filed further communications relating to one of the matters at issue in Respondent's application (Respondent's Request for Document Production No. 52), further discussed infra, ¶ 42. In addition, in the communication of 22 November 2016, Respondent reiterated its request to the Tribunal to order the confidentiality of the Isolux Award, and asked for the same order with respect to another legal authority filed by Claimants, namely CSP Equity Investment S.à.r.l v. Kingdom of Spain, SCC Case 2013/094, Award on Jurisdiction (13 May 2016) (CL-176). ↩

[Page 8]

38. On 14 November 2016, Claimants filed their Rejoinder on Preliminary Objections ("Rejoinder on Jurisdiction”), accompanied by exhibits C-272 to C-282; legal authorities CL-176 to CL-192; and two (2) witness statements by: Mr. George Nicolaï, and Mr. Mark Sorensen, respectively.7

39. On 16 November 2016, Respondent filed a request for clarification of Procedural Order No. 5. The Tribunal responded on the same day.

40. On 18 November 2016, the Parties notified the witnesses and experts called for examination at the Hearing.

41. On 23 November 2016, the Tribunal issued Procedural Order No. 6 concerning the Parties' applications of 7 and 8 November 2016 (supra, ¶ 37). The Tribunal (i) ruled on the Parties' respective requests for document production, ordering production of some documents and dismissing some requests; (ii) deferred the decision relating to one of the matters at issue (Respondent's Request for Document Production No. 52); (iii) invited the Parties to liaise directly concerning another of the matters at issue (Respondent's Request for Document Production No. 55); (iv) authorized the introduction of the Isolux Award into the record granting confidentiality with respect to that award, and to “any other award provided to the Tribunal where confidentiality is required.” On 25 November 2016, following the Tribunal's authorization, Respondent submitted the Isolux Award to the record (RL-121) in Spanish.

42. From 21 November 2016 to 30 November 2016, the Parties filed a number of additional procedural applications and communications in response to them, as follows:


7 One of the exhibits (C-282) was submitted electronically on 15 November 2016. ↩
8 These documents were provisionally identified as R-425 to R-442, RL-122 to RL-123. See Respondent's communication of 25 November 2016. ↩
9 These documents were provisionally identified as C-283 to C-293. ↩

[Page 9]

43. On 1 December 2016, the Tribunal issued Procedural Order No. 7, concerning the above referenced applications (supra ¶ 42) (i) authorizing the Parties to introduce into the record the documents referred to in their respective applications of 21 November 2016; (ii) authorizing the filing of the new witness statement from Mr. Arechabala and affording Respondent additional time at the Hearing (over its already allotted time) to


10 The legal authorities referred to were CLEX-006, CLEX-052, CLEX-117, CLEX-174, CL-005, RL-115. ↩
11 These documents were provisionally identified as R-443 to R-446. ↩

[Page 10]

address this witness statement through direct examination of Prof. Servert and Mr. Montoya; (iii) inviting Claimants to use their best efforts to produce more responsive data with regard to Respondent's Request for Document Production No. 55; (iv) ruling on the Parties' disagreements concerning the Hearing Agenda; (v) asking Respondent to provide a translation of the Isolux Award; and (vi) instructing the Parties to file Skeleton Arguments by 9 December 2016.

44. On 2 December 2016, the Parties submitted a joint application to add a number of additional documents into the record,12 observing that Respondent's exhibits referred in this application were the same at issue Respondent's application of 26 November 2016 (supra, ¶ 42, last bullet). On 2 December 2016, in light of the Parties' agreement, the Tribunal authorized the introduction of these exhibits to the record.

45. From 5 to 9 December 2016, pursuant to Procedural Order No. 7 and the Tribunal's ruling of 2 December 2016, the Parties introduced into the record the following materials:

Claimants

Respondent

46. On 5 December 2016, the Parties submitted their proposed Hearing Agenda.


12 These documents were provisionally identified as exhibits C-294 to C-299, R-443 to R-446, and supplements to CLEX-056 and CLEX-124. ↩
13 The number designations do not correspond to those initially proposed by Respondent in its applications of 21 and 26 November 2016, and 2 December 2016. Respondent submitted the documents related to Procedural Order No. 7 as R-425 to R-454, and those relating to the Tribunal's letter of 2 December 2016 as R-455 to R-458. ↩

[Page 11]

47. On 6 December 2016, Respondent filed an application requesting leave from the Tribunal to introduce additional documents to the record.14 On 7 December 2016, Claimants filed a response. On 8 December 2016, Respondent filed reply observations, and requested leave from the Tribunal to submit a supplementary report by Prof. Jorge Servert. On 8 December 2016, the Tribunal ruled on this application, authorizing the submission of Prof. Servert's supplementary report and additional exhibits. Thus, on 13 December 2016, Respondent filed a Supplementary Expert Report by Prof. Jorge Servert, accompanied by exhibits JSR-011 to JSR-018, JSR-020 to JSR-030, JSRN-002, JSRN-003, JSRN-009 to JSRN-015 and JSRN-37 to JSRN-38.

48. On 9 December 2016, the Parties submitted their respective Skeleton Arguments.

49. On 11 December 2016, Claimants submitted corrected versions of two previously filed exhibits (C-151 and C-152). On 12 December 2016, the Tribunal heard both Parties orally on this matter during Day 1 of the Hearing, and took note that Respondent did not object.15 Accordingly, the revised versions of exhibits C-151 and C-152 were admitted.

50. On 13 December 2016, during Day 2 of the Hearing, Claimants submitted a corrected version of Mr. Nicolaï Witness Statement. The Tribunal heard both Parties orally on this matter that day, and the corrections were introduced into the record.16

51. On 13 December 2016, Claimants submitted corrected versions of Mr. Arechabala's three witness statements. On 14 December 2016, the Tribunal heard both Parties orally on this matter during Day 3 of the Hearing. Respondent did not object.17

52. On 16 December 2016, Claimants filed an application to add a new document to the record (namely, a draft Renewables Energies Directive published on 30 November 2016 by the European Union). The application attached a previous exchange between the Parties on that same day, including a communication from Respondent objecting to the introduction of this document with its reasons. On 17 December 2016, the Tribunal ruled


14 These documents were provisionally identified as exhibits JSR-011 to JSR-027, and JSRN-037 to JSRN-038. ↩
15 Tr. Day 1 (ENG), 10:18–12:1 (President, Mr. Santacruz, Ms. Nairn). ↩
16 Tr. Day 2 (ENG), 425:17–427:12; 428:6–429:6 (Mr. Santacruz, President, Ms. Nairn). ↩
17 Tr. Day 3 (ENG), 488:2–490:14 (President, Ms. Nairn, Mr. Santacruz). ↩

[Page 12]

on the matter orally during Day 6 of the Hearing, allowing the introduction of the document into the record.18 Thus, on 17 December 2016, Claimants introduced the document as exhibit C-304.

53. On 17 December 2016, Claimants filed a communication inquiring whether the Tribunal required the production of certain invoices, in connection with a question raised by one of the arbitrators during Day 2 of the Hearing (13 December 2016). On 18 December 2016, the Tribunal responded in the affirmative, inviting Claimants to provide the documents to the Tribunal and Respondent. On 20 December 2016, Claimants submitted the invoices in question (without designated exhibit numbers). On 21 December 2016, Respondent filed observations on these documents. On 22 December 2016, Claimants filed a response.

D. THE NON-DISPUTING PARTY APPLICATION

54. On 14 November 2014, the European Commission ("EC") filed an Application for Leave to Intervene as a Non-Disputing Party dated 12 November 2014 ("EC First Application"). The EC First Application was communicated to the Parties on the same day it was received, and to the Tribunal upon its constitution on 23 January 2015.

55. Following the First Session, pursuant to ICSID Arbitration Rule 37(2) the Tribunal invited the Parties to provide comments on the EC First Application in accordance with the Procedural Calendar set forth in Procedural Order No. 1, Annex A issued on 3 June 2015 (supra, ¶ 12).

56. On 4 June 2015, the Tribunal informed the EC that: (i) it had received the EC First Application; (ii) it had invited the Parties to provide observations thereon pursuant to ICSID Arbitration Rule 37(2); and (iii) it expected to render its decision after receipt of the Parties' observations.


18 Tr. Day 6 (ENG), 1136:7–1138:15 (President). ↩

[Page 13]

57. On 22 September 2015, the Parties filed their respective Observations on the EC First Application. Claimants' observations were accompanied with legal authorities CL-065 to CL-085.19

58. On 2 October 2015, Respondent filed a Reply to Claimants' Observations on the EC First Application.

59. On 5 October 2015, Claimants filed a Reply to Respondent's Observations on the EC First Application, accompanied by exhibit C-125.

60. On 6 January 2016, the Tribunal issued Procedural Order No. 3 ruling on the EC First Application. The Tribunal (i) authorized the EC to file a written submission on the issue of the application of the ECT to intra-EU disputes; (ii) granted the Parties an opportunity to file observations on the EC's written submission; (iii) granted the EC access to certain portions of the Parties' written pleadings relating to the issue on which the EC would make its submission, with redactions of commercially sensitive information; (iv) denied the EC's request to attend the Hearing to present oral argument, but it invited the Parties to inform the Tribunal after receipt of the EC's written submission whether they would agree to attendance of the EC to a limited portion of the Hearing for the exclusive purpose of answering any questions that the Tribunal and/or the Parties might have concerning such written submission; and (v) rejected Claimants' request that the intervention by the EC be conditioned on an undertaking to pay Claimants' costs in dealing with the EC's intervention.

61. On 13 January 2016, the Parties communicated to the Tribunal their agreed schedule for various of the procedural steps ordered in Procedural Order No. 3. On 28 January 2016, the Tribunal approved the Parties' agreement and established additional deadlines in connection with this matter. That same day, the Tribunal communicated to the EC the calendar for its written submission and the other steps pertaining to the EC.

62. On 15 August 2016, the Parties informed the Tribunal that the relevant excerpts of the pleadings could be transmitted to the EC without redactions. In addition, on 17 August


19 The legal authorities were submitted electronically on 23 September 2015. ↩

[Page 14]

2016, the Parties informed the Tribunal that they would be amenable to providing to the EC copies of the legal authorities cited in their submissions, if requested.

63. On 17 August 2016, pursuant to Procedural Order No. 3, the Tribunal transmitted to the EC certain excerpts of the Parties' pleadings, directing that the EC could use them “exclusively for the purposes of preparing its written submission in this arbitration and shall not communicate them to third parties or use them outside this arbitration.”

64. Following a request by the EC dated 31 August 2016, agreed upon by the Parties, on 2 September 2016, the Tribunal transmitted to the EC three legal authorities and three exhibits filed by the Parties, under the same condition referred to supra, ¶ 63.

65. On 5 September 2016, the EC submitted its written submission accompanied by exhibits EC-001 to EC-018 (“EC Written Submission").

66. On 11 November 2016, as part of Procedural Order No. 5 and having heard the Parties' views, the Tribunal decided that the EC would not be invited to the Hearing, in light of Claimants' objection and ICSID Arbitration Rule 32(2).

Ε. THE ORAL PROCEDURE

67. The Hearing on Jurisdiction and the Merits was held in the International Dispute Resolution Centre Ltd. (IDRC), London, United Kingdom,20 from 12-19 December 2016 ("the Hearing").21

68. The following persons were present during the Hearing:

Tribunal:

Prof. Donald M. McRae President
The Honourable L. Yves Fortier Arbitrator
Prof. Laurence Boisson de Chazournes Arbitrator

20 The venue for the Hearing was established pursuant to the Parties' agreement communicated to the Tribunal on 27 August 2015. ↩
21 The Tribunal reserved 20 December 2016 as an additional day for deliberations. ↩

[Page 15]

ICSID Secretariat:

Ms. Luisa Fernanda Torres Secretary of the Tribunal

For Claimants:

Counsel
Ms. Karyl Nairn QC Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Mr. David Herlihy Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Mr. George Zimmerman Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Ms. Sara Nadeau-Séguin Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Ms. Teresa Queirós Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Mr. Jacob Lefkowitz Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Ms. Paula Henin Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Mr. Aaron Shorr Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Ms. Carla Alves Skadden, Arps, Slate, Meagher & Flom (UK) LLP
Ms. Mónica Lasquibar Cuatrecasas Gonçalves Pereira
Mr. Luis Perez de Ayala Cuatrecasas Gonçalves Pereira
Party Representatives
Mr. Mitchell S. Ross Party Representative
Mr. Robert B. Sendler Party Representative
Mr. Fernando Bergón Party Representative
Mr. Charlie Sieving Party Representative
Mr. Mark Sorensen Party Representative
Mr. George Nicolaï Party Representative
Witnesses (*)
Mr. F. Mitchell Davidson NextEra Energy Resources, LLC (Retired)
Mr. Miguel Ignacio Arechabala NextEra Energy Resources, LLC
Ms. Rebecca Kujawa NextEra Energy Resources, LLC
Mr. George Nicolaï NextEra Energy Global Holdings Coöperatieve U.A.
Mr. Mark Sorensen NextEra Energy Resources, LLC and NextEra
Energy Global Holdings Coöperatieve U.A.
Experts
Dr. Manuel Abdala Compass Lexecon, LLC
Prof. Pablo Spiller Compass Lexecon, LLC
Mr. Henry Price Solar Dynamics, LLC
Mr. Julian Delamer Compass Lexecon, LLC
Mr. Alan Rozenberg Compass Lexecon, LLC
Mr. Jack Ghaleb Compass Lexecon, LLC

For Respondent:

Counsel
Ms. Mónica Moraleda Abogacía del Estado, Ministerio de Justicia
Mr. Diego Santacruz Abogacía del Estado, Ministerio de Justicia
Ms. Amaia Rivas Abogacía del Estado, Ministerio de Justicia
Mr. Javier Castro Abogacía del Estado, Ministerio de Justicia
Mr. José María Alonso Abogacía del Estado, Ministerio de Justicia
Mr. Antolín Fernández Abogacía del Estado, Ministerio de Justicia

[Page 16]

Party Representatives
Mr. Alfonso Olivas IDAE
Ms. Raquel Vázquez IDAE
Witnesses (*)
Mr. Carlos Montoya IDAE
Experts
Mr. Eduard Saura Accuracy
Mr. Christophe Schmit Accuracy
Mr. Stéphane Perrotto Accuracy
Ms. Laura Cózar Accuracy
Mr. Alberto Fernández Accuracy
Mr. Carlos Canga Accuracy
Mr. Jesús Casanova ETSIIM
Prof. Jorge Servert STA

Court Reporters:

Mr. Paul Pelissier DR-ESTENO
Mr. Dante Rinaldi DR-ESTENO
Mr. Dionisio Rinaldi DR-ESTENO
Ms. Diana Burden Diana Burden Ltd.
Ms. Laurie Carlisle Diana Burden Ltd.

Interpreters:

Mr. Jesús Getan Bornn
Mr. Mark Viscovi
Ms. Amalia Thaler de Klem

(*) not present before their testimony

69. The following persons were examined during the Hearing:

On behalf of Claimants: On behalf of Respondent:
Witnesses
Mr. F. Mitchell Davidson
Mr. Miguel Ignacio Arechabala
Ms. Rebecca Kujawa
Mr. George Nicolaï
Mr. Mark Sorensen
Witnesses
Mr. Carlos Montoya
Experts
Mr. Henry Price
Dr. Manuel Abdala
Prof. Pablo Spiller
Experts
Mr. Jesús Casanova
Prof. Jorge Servert
Mr. Eduard Saura
Mr. Stéphane Perrotto

[Page 17]

70. Throughout the Hearing, each Party submitted various demonstrative exhibits, as follows:

71. On 16 December 2016, during Day 5 of the Hearing, a list of areas of agreement and disagreement among the technical experts was distributed.22

72. On 10, 14 and 15 February 2017, the Parties submitted their agreed corrections to the Hearing transcripts. On 14 February 2017, the Tribunal informed the Parties that the agreed revised versions would stand as the final versions of the transcript.

F. THE POST-HEARING PROCEDURE

73. On 8 February 2017, the Tribunal formulated a Post-Hearing question to the Parties.

74. Following an extension agreed by the Parties and approved by the Tribunal, on 27 February 2017, each Party submitted its Post-Hearing Submission addressing the Tribunal's question.

75. Following authorization from the Tribunal, on 7 March 2017, Claimant filed its Post-Hearing Reply, and 8 March 2017, Respondent filed its Post-Hearing Reply.23

76. On 11 May 2017, Claimants submitted an application seeking authorization to add one additional legal authority to the record, namely: Eiser Infrastructure Limited and Energía Solar Luxembourg S.à r.l. v. Kingdom of Spain, ICSID Case No. ARB 13/36, Award (4 May 2017) (“Eiser Award”) in Spanish, requesting an order to Spain to provide the


22 Tr. Day 5 (ENG), 1096:20-1098:8. ↩
23 Following the Tribunal's instructions and Procedural Order No. 1, § 12.3, once both Parties' submissions had been received by the Secretary of the Tribunal, they were transmitted simultaneously to both Parties and the Tribunal on 8 March 2017. On 10 March 2017, the Tribunal indicated that it would respond to the requests made in these Post-Hearing submissions in due course, but in the circumstances, it decided that it was unnecessary to do so. ↩

[Page 18]

English version, and an opportunity to file submissions on this legal authority. On 17 and 18 May 2017, Respondent filed observations in response. On 23 May 2017, the Tribunal authorized the introduction of the Eiser Award into the record, invited Respondent to introduce the English version, and afforded the Parties an opportunity to file submissions on this legal authority. Accordingly, on 30 May 2017, Respondent introduced the Eiser Award into the record in English and Spanish (without a designated legal authority number).

77. Having considered the Parties' respective positions, on 8 June 2017, the Tribunal established a schedule for the Parties' submissions on the Eiser Award, later amended on 6 July 2017. Accordingly, the Parties filed their submissions as follows: on 22 June 2017, Claimants filed observations on the Eiser Award; on 11 July 2017, Respondent filed response observations on the Eiser Award; on 18 July 2017, Claimants filed reply observations on the Eiser Award; and on 25 July 2017, Respondent filed rejoinder observations on the Eiser Award.

78. On 18 July 2017, Claimants also filed a communication raising a procedural matter arising out of Spain's observations on the Eiser Award. Specifically, Claimants observed “[t]hat Spain has contended that a proper application of the Eiser award on liability requires a new and different approach to quantum, excluding each of the measures referred to in this case as Regulatory Framework II.” While opposing Respondent's contention as a matter of principle and substance, and raising procedural objections to the introduction of a new quantum defence at this stage of the proceeding, Claimants asserted that “should the Tribunal nonetheless wish to proceed to consider the long-term quantum impact of Regulatory Framework II, or any of its individual elements, the Claimants agree with Spain that this would require the parties to provide new expert reports addressing those calculations, following a procedure that ensures due process [...].” Following an invitation by the Tribunal, on 25 July 2017, Respondent provided observations on this matter as part of its rejoinder observations on the Eiser Award. It asserted inter alia that “the expert reports [...] do not reflect, in any way, the separate impact of the individual measures disputed by Claimants in this arbitration" and agreed with Claimants that the quantification of that impact would require new expert reports.

[Page 19]

79. On 25 July 2017, as part of its rejoinder observations on the Eiser Award, Respondent filed an application to introduce additional documents to the record. On 17 August 2017, Claimants submitted a response, and on 28 August 2017, Respondent submitted a reply. On 26 September 2017, the Tribunal authorized the introduction of only some of the documents to the record, namely: the Notice of Registration of Spain's annulment application of the Eiser Award, dated 28 July 2017 and its accompanying cover letter. Accordingly, on 28 September 2017, Respondent submitted those documents to the record as exhibits R-464 and R-465.

80. On 23 November 2017, Respondent filed an application to introduce an additional document to the record, namely, the EC Decision on State Aid, Case SA.40348 (2015/NN) (10 November 2017) (“the EC Decision”), and asked the Tribunal to afford the Parties an opportunity to file submissions in connection therewith. On 29 November 2017, Claimants submitted a response. On 5 December 2017, Respondent submitted a reply. On 14 December 2017, the Tribunal authorized the introduction of the EC Decision into the record, and it granted the Parties an opportunity to submit written submissions in connection therewith. Accordingly, on 15 December 2017, Respondent submitted the EC Decision, designated as RL-124.

81. On 8 January 2018, each Party filed its respective submission on the EC Decision.

82. On 5 March 2018, Claimants filed an application seeking leave to add an additional legal authority to the record, namely: Novenergía II – Energy & Environment (SCA), SICAR v. Kingdom of Spain (SCC Case No. 2015/063), Award (15 February 2018) (“Novenergía Award"). On 9 March 2018, Respondent submitted a response to Claimants' application, and in turn filed an application seeking authorization to add three additional legal authorities to the record, namely: the Ruling of the EUCJ in case C-284/16 (Achmea Case) (6 March 2018) (“Achmea Judgment”); Blusun S.A., Jean-Pierre Lecorcier and Michael Stein v. Italian Republic, ICSID Case No. ARB/14/3, Award (27 December 2016) (“Blusun Award”), and Mr. Jürgen Wirtgen, Mr. Stefan Wirtgen, Mrs. Gisela Wirtgen and JSW Solar (swei) GmbH & Co. KG v. The Czech Republic, PCA Case No. 2014-03, Award (11 October 2017). On 15 March 2018, Claimants submitted a

[Page 20]

response to Respondent's application. On 21 March 2018, Respondent submitted a reply, which also added a request to introduce into the record Spain's request for clarification and supplementation of the Novenergía Award. On 26 March 2018, the Tribunal ruled on these applications, authorizing the introduction of the Novenergía Award, the Achmea Judgment and the Blusum Award into the record, and dismissing the other requests. The Tribunal also afforded the Parties an opportunity to file submissions on these new legal authorities. Accordingly, on 28 March 2018, Claimants submitted the Novenergía Award, as legal authority CL-195; and on 29 March 2018, Respondent submitted the Achmea Judgment and the Blusun Award, as legal authorities RL-125 and RL-126.

83. In its application of 9 March 2018 referred to above, Respondent “reserve[d] its right to request that new expert reports be filed by both parties to determine the real impact of each of the disputed measures.” This statement was repeated in the reply submission of 21 March 2018. In their 15 March 2018 response, Claimants observed they “consider that they have provided the expert evidence necessary to quantify their damages resulting from Spain's violations of the ECT.”24 In its ruling of 26 March 2018, the Tribunal observed that “the Tribunal will deal with any such application if and when it is actually made."

84. On 9 April 2018, each Party filed its respective submission on the Novenergía Award, the Blusun Award and the Achmea Judgment.

85. On 16 April 2018, Claimants filed an application to add an additional legal authority to the record, namely: Novenergía II – Energy & Environment (SCA), SICAR v. Kingdom of Spain (SCC Arbitration 2015/063), Procedural Order No. 17 (9 April 2018) (“Novenergía PO 17”). On 19 April 2018, Respondent filed a response to Claimants' application, and in turn, it filed its own application seeking leave to (i) introduce a number of additional documents to the record; (ii) conduct a site visit to Claimants' domicile; and (iii) file a short expert report addressing the facts referred to in the


24 That said, Claimants also added that “if the Tribunal requires any further assistance in quantifying damages, the appropriate mechanism for receiving any such evidence would be a request from the Tribunal itself, not a quantum report submitted as an observation on the Novenergia award.” ↩

[Page 21]

application.25 On 23 April 2018, Claimants filed a reply. On 27 April 2018, Respondent filed a rejoinder. On 2 May 2018, Claimants filed a communication asking the Tribunal for a brief opportunity to respond to one of the assertions in Respondent's communication of 27 April 2018.

86. On 4 May 2018, the Tribunal issued Procedural Order No. 8 ruling on the above referenced applications. The Tribunal (i) authorized the introduction of the Novenergía PO17, and the Novenergía Annulment Notice of Registration into the record; and (ii) it rejected the requests to add other documents to the record, conduct a site visit and to file an additional expert report. Accordingly, on 9 May 2018, Claimants submitted the Novenergía PO 17, as legal authority CL-196; and on 6 June 2018, Respondent submitted the Novenergía Annulment Notice of Registration, as exhibit R-466.

87. On 16 May 2018, the EC submitted a communication stating that “in case the Tribunal would deem that useful for its deliberations, the Commission would be available to up-date its written observations in the light of the recent judgment of the European Court of Justice in Case C-284/16 Achmea v Slovak Republic, and in particular to set out its view on the consequences of that judgment for pending arbitration cases based on the Energy Charter Treaty” (“EC Second Application”). The communication was transmitted to the Parties and the Tribunal on 17 May 2018.

88. Following an invitation from the Tribunal, on 23 May 2018, each Party filed observations on the EC Second Application.

89. On 29 May 2018, the Tribunal ruled on the EC Second Application. Noting that “the Parties have already provided comprehensive comments on the Achmea decision including comments on the implications of the decision for arbitration cases based on the Energy Charter Treaty” (supra, ¶ 84), the Tribunal ruled that it did not need an update of the EC Written Submission, and so informed the EC and the Parties.


25 That is, to demonstrate that (i) “[s]ome impairments that the Solar thermal Plants recorded initially after the measures have been, due to updated valuations, reversed” and “[...] the PTEs are not in liquidation anymore but are 'going concern”; (ii) the "[d]amages calculated by Compass Lexecon have been discredited and are speculative and therefore unproven" and (iii) the "[1]ack of economic activity of the Claimants in the Netherlands and everywhere else persists." Resp. Letter, 19 April 2018; Resp. Letter, 27 April 2018. ↩

[Page 22]

90. On 28 September 2018, the Parties submitted their respective Statements of Costs. On 11 October 2018, Respondent filed a request for support of certain assertions in Claimants' Statement of Costs; on 17 October 2018, Claimants provided observations in response; and on 23 October 2018, Respondent filed a reply accepting that the matter could be resolved through a letter from Claimants' counsel. On 26 October 2018, the Tribunal wrote to the Parties, noting that it understood the matter had been resolved and needed no ruling from the Tribunal. On 29 October 2018, Claimants' counsel provided the letter requested by Respondent.

91. On 25 January 2019, Respondent filed an application seeking authorization to add an additional legal authority to the record, namely, the “Declaration of the Representatives of the Government of the Member States of 15 January [2019] on the Legal Consequences of the Judgment of the Court of Justice in Achmea and on Investment Protection in the European Union," and to authorize the Parties to file written submissions addressing this declaration. Following an invitation from the Tribunal, on 31 January 2019, Claimants filed a response. On 5 February 2019, the Tribunal authorized Respondent to introduce into the record the full set of declarations issued by the EU Member States in January 2019. On 20 February 2019, Respondent introduced the EU Member States Declarations into the record as legal authorities RL-127 to RL-129.

III. FACTUAL BACKGROUND

92. The section that follows provides an overview of the facts underlying this dispute. It does not purport to be an exhaustive narrative of all the facts that have been discussed in this proceeding or of all factual allegations made by the Parties. To the extent the Tribunal has deemed it appropriate, certain facts and factual allegations made by the Parties are also described and addressed in the course of the Tribunal's legal analysis of the claims at issue. This said, the Tribunal has considered the entirety of the Parties' submissions of fact in their written and oral submissions, whether or not they are expressly discussed in this section.

[Page 23]

A. INTRODUCTION

93. This case concerns a project for the construction of two concentrated solar power ("CSP") plants in Navalvillar de Pela (Badajoz) in the autonomous community of Extremadura in Spain by the Claimants, known as Termosol 1 and Termosol 2 (together, the "Termosol Plants").26 The dispute revolves around measures implemented by Respondent modifying the regulatory and economic regime of renewable energy projects in Spain and their effect on the Claimants' investments.

94. The Claimants were incorporated in the Netherlands in 2008. NextEra Energy Global Holdings B.V. ("NextEra Global") was incorporated on 27 March 2008;27 while NextEra Energy Spain Holdings B.V. (“NextEra Spain”) was incorporated on 7 May 2008.28

95. NextEra Global is the 100% owner of NextEra Spain, which is the 100% owner of the Spanish company NextEra Energy España S.L.U. (“NEE España”), which in turn is the 100% owner of the Spanish companies Planta Termosolar de Extremadura, S.L.U. ("PTE"), Planta Termosolar de Extremadura 2, S.L.U. (“PTE2”), and NextEra Energy España Operating Services, S.L.U (“NEEOS”). The PTEs own and operate the Termosol Plants.29

96. Since 2011, NextEra Global has been 100% owned by the Netherlands corporation NextEra Energy Global Holdings Cooperative U.A., which in turn is a subsidiary of NextEra Energy Inc., a U.S. corporation.30 Throughout these proceedings, NextEra Energy Inc. has been treated as the parent company of the Claimants.


26 Cl. Mem. Merits, ¶¶ 1, 15. ↩
27 C-037, Certificate of Incorporation of FPLE Global Asset Holdings B.V., 8 May 2008, ¶ 1. The name of the company was changed to the current name in December 2011. C-039, Minutes of the Meeting of the Board of Managing Directors of FPLE Global Asset Holdings B.V., 1 December 2011 at p. 7. ↩
28 C-038, Certificate of Incorporation of FPLE Global Asset Spain Holdings B.V., 8 May 2008, ¶ 1. The name of the company changed to the current name in December 2011. C-040, Minutes of the Meeting of the Board of Managing Directors of FPLE Global Asset Spain Holdings B.V., 1 December 2011 at p. 5. ↩
29 Cl. Mem. Merits, ¶¶ 2, 223; Cl. Skeleton, ¶ 3. ↩
30 Resp. Mem. Jur., ¶¶ 117-118; Cl. C-Mem. Jur., ¶¶ 52, 54; R-019, Annual Accounts of NextEra Energy Global Holdings Coöperative U.A. 2011, 2012, 2013. ↩

[Page 24]

97. Claimants contend that "[a]fter the Claimants' Spanish companies had irrevocably committed to constructing the Termosol Plants and had spent around 750 million euros substantially completing construction, Spain completely and retroactively altered the remuneration regime applicable to the Termosol Plants [...]."31

98. With this context, the Tribunal now proceeds to describe the regulatory framework for renewable energy investments in Spain, in particular for CSP investments, its evolution and the measures that have given rise to this dispute. The Tribunal will then describe the Claimants' investments in Spain.

B. THE REGULATORY FRAMEWORK FOR RENEWABLE ENERGY INVESTMENTS

99. As a preliminary matter, the Tribunal notes that the Parties agree that the Spanish system is formed by different types of instruments, namely, the Spanish Constitution, Organic Laws, Ordinary Laws, Royal Decree-Laws (“RDL”), Royal-Decrees (“RD”), Ministerial Orders and Resolutions.32 It is also agreed that an RDL has the force of a Law, it may be enacted by the Executive branch in extraordinary and urgent circumstances, and it must be ratified by the Legislative branch;33 an RD also emanates from the Executive, and it is of lower hierarchy vis-à-vis Laws and RDLs;34 and a Ministerial Order is a regulation adopted by one of the different Ministries, lower in the legislative hierarchy than RDs.35 Respondent has also submitted that Resolutions are instruments which emanate from competent Government bodies, lower in the hierarchy than Ministerial Orders.36

(1) The Initial Framework

100. Within the context of the 1992 United Nations Framework Convention on Climate Change ("UNFCC”), on 11 December 1997 a number of nations adopted the Kyoto Protocol, an international agreement committing its Parties by setting internationally


31 Cl. Skeleton, ¶ 7. ↩
32 See, Cl. Mem. Merits, n. 44; Resp. C-Mem. Merits, ¶ 35. ↩
33 See, Cl. Mem. Merits, n. 44; Resp. C-Mem. Merits, ¶ 35. ↩
34 See, Cl. Mem. Merits, n. 44; Resp. C-Mem. Merits, ¶ 35. ↩
35 See, Cl. Mem. Merits, n. 44; Resp. C-Mem. Merits, ¶ 35. ↩
36 Resp. C-Mem. Merits, ¶ 35. ↩

[Page 25]

binding greenhouse emission reduction targets.37 The Protocol was signed by Spain on 29 April 1998, and ratified on 31 May 2002.38 It entered into force on 16 February 2005.39

101. On 14 May 1997, the European Commission issued Communication COM(97) 196, setting a target to reduce greenhouse gas emissions by 15% by year 2010, vis-à-vis the levels existing in year 1990.40

a. The Electricity Law

102. In the above context, on 27 November 1997, Spain enacted Law 54/1997 on the Electricity Sector (“Electricity Law” or “Law 54/1997”),41 which regulated the activities for the provision of electricity in Spain.42 The Electricity Law distinguished between electricity generation under an “Ordinary Regime” (Title IV, Chapter I), and under a "Special Regime” (Title IV, Chapter II).

103. Pursuant to Article 27 of the Electricity Law, electricity generation activities were considered part of the Special Regime in a number of categories listed by the law, “whenever they [were] carried out from facilities having installed capacity of no more than 50 MW." The categories listed included facilities where “non-consumable renewable energies, bio-mass or biofuels of any type are used as primary energy,


37 C-025, UNFCC Website, Kyoto Protocol. ↩
38 United Nations Treaty Collection, Status of Treaties, Chapter XXVII, Environment, 7.a., Kyoto Protocol to the United Nations Framework Convention on Climate Change, available at https://treaties.un.org/Pages/ViewDetails.aspx?src=TREATY&mtdsg_no=XXVII-7-a&chapter=27&clang=_en. ↩
39 C-025, UNFCC Website, Kyoto Protocol. ↩
40 C-026, Communication from the European Commission: The Energy Dimension of Climate Change, COM(97) 196 Final, 14 May 1997. ↩
41 C-024 / R-003, Law 54/1997 on the Electric Power Sector, 27 November 1997, published on 28 November 1997 ("Electricity Law"). The English translation at R-003 does not correspond to the original version of the law enacted in 1997, but to the Electricity Law as amended up to 2008. Prior to Law 54/1997, Law 49/1984 of 26 December 1984 and Law 40/1994 of 30 December 1994 had governed the electricity system in Spain. R-038, Law 49/1984, 26 December 1984 (published 29 December 1984); R-039, Law 40/1994, 30 December 1994 (published 31 December 1994). Article 16 of Law 40/1994 established certain parameters for the establishment of the user tariffs and of the retribution of activities within the system. Respondent has argued that the system thereby reflected coincides with the current one. Resp. C-Mem. Merits, ¶ 105. ↩
42 C-024, Electricity Law, Art. 1. ↩

[Page 26]

provided their holder [did] not engage in generation activities under the ordinary regime.”43

104. Article 30 of the Electricity Law established the rights and obligations of producers under the Special Regime.44 Those obligations included, among others, “[t]o comply with technical generation standards as well as with the standards governing transport and the technical management of the system;” and “[t]o provide the Authorities with information concerning the generation, consumption and sale of energy and on any other points as determined."45 Article 30(4) of the Electricity Law provided that:

“4. [...] the generation of electricity via renewable energy sources (other than hydroelectric), biomass and also hydroelectric power stations with capacity of equal to or less than 10 MW will receive a premium to be set by the Government, so that the price of the electricity sold by these facilities will fall within a range of between 80% and 90% of the average electricity price, to be calculated by dividing the income generated by invoicing for electricity supplied by the energy supplied.

To calculate the premiums, consideration will be given to the voltage level where the energy enters the network, to the effective contribution to environmental improvement, primary energy savings and energy efficiency, and to any investment costs that may have been incurred, in order to achieve reasonable profitability rates by reference to the cost of money in capital markets.

[...]

On an exceptional basis, for solar energy, the Government shall be able to set a premium in addition to the limits defined in this article.”46

105. Article 31 of the Electricity Law required facilities in the Special Regime to register in an Administrative Registry for Electricity Production Facilities (“Registro Administrativo de Instalaciones de Producción de Energía Eléctrica”), in the Ministry of Industry and


43 C-024, Electricity Law, Art. 27. ↩
44 C-024, Electricity Law, Art. 30. ↩
45 C-024, Electricity Law, Art. 30(1)(b) and (d). ↩
46 C-024, Electricity Law, Art. 30(4). The Electricity Law has been subject of various modifications, including through RDL 7/2006, RDL 6/2009, RDL 14/2010, and RDL 9/2013. For example, Article 30(4) of the Electricity Law has been amended by RDL 7/2006 and by RDL 9/2013. See infra, ¶ 158. ↩

[Page 27]

Energy, specifying the remunerative regime adopted in each case.47 That registry would also include information about the conditions and the power of the facility (“condiciones” y “potencia de la instalación").48 Autonomous communities were authorized to create the local registries for the facilities located in their territory.49

b. RD 2818/1998, RD 1432/2002, RD 436/2004, RDL 7/2006

106. On 23 December 1998, Spain enacted Royal Decree 2818 (“RD 2818/1998"),50 to regulate the requirements and procedures to qualify for the Special Regime, the procedure for registration, the conditions for delivery of electricity and the applicable economic regime.51 Article 9 established the Administrative Registry for Production Facilities under the Special Regime (“Registro Administrativo de Instalaciones de Producción en Régimen Especial” or “RAIPRE”).52 Article 23 provided for a “premium or incentive" in addition to the market price, for facilities with power (potencia) equal to or less than 50MW that were registered in the RAIPRE.53 Article 32 established that the premiums would be revised every four years.54

107. The Electricity Law required that, “[i]n order for renewable energy sources to cover at least 12% of Spain's total energy demand by the year 2010,” a plan should be “drawn up to promote renewable energies and whose objectives shall be taken into account in the setting of premiums.”55 Accordingly, on 30 December 1999, Spain's Council of Ministers approved the 2000-2010 Renewable Energy Plan.56 That Plan set forth "the principal elements and guidelines [...] relevant in the articulation of a strategy [...] for


47 C-024, Electricity Law, Art. 31. See also, id. Art. 24(4). ↩
48 C-024, Electricity Law, Art. 24(4). ↩
49 C-024, Electricity Law, Art. 24(4). ↩
50 C-028 / R-058, Royal Decree 2818/1998, 23 December 1998, published on 30 December 1998 (“RD 2818/1998"). ↩
51 C-028 / R-058, RD 2818/1998, Art. 1. ↩
52 C-028 / R-058, RD 2818/1998, Art. 9. ↩
53 C-028 / R-058, RD 2818/1998, Art. 23. ↩
54 C-028 / R-058, RD 2818/1998, Art. 32. ↩
55 C-024, Electricity Law, Sixteenth Transitional Provision. ↩
56 C-020, Plan for the Development of Renewable Energy in Spain 2000-2010, December 1999 (“2000-2010 Renewable Energy Plan"). ↩

[Page 28]

the growth of each of the renewable energy areas, taken together, to cover at least 12% of primary energy in the year 2010.”57

108. On 27 September 2001, the European Parliament and Council adopted Directive 2001/77/EC on the promotion of electricity produced from renewable energy sources in the internal electricity market (“2001 Renewable Energy Directive").58 Article 3 required Member States “to take appropriate steps to encourage greater consumption of electricity produced from renewable energy sources in conformity with the national indicative targets [...].”59 Spain's indicative target for the contribution of electricity produced from renewable energy sources to gross electricity consumption by 2010 was set at 29.4.60 Recital 12 noted that “[t]he need for public support in favour of renewable energy sources is recognised in the Community guidelines for State aid for environmental protection [...],” adding that “the rules of the Treaty, and in particular Articles 87 and 88 thereof, will continue to apply to such public support.”61

109. The Electricity Law also required that every year, or when required by special circumstances, the Government would approve or amend a reference or average electricity tariff through a Royal Decree.62 Accordingly, on 27 December 2002, Spain enacted Royal Decree 1432/2002 (“RD 1432/2002"),63 which established the methodology to set the annual reference or average electricity tariff.64


57 C-020, 2000-2010 Renewable Energy Plan, Introduction. ↩
58 C-029 / R-046, Directive 2001/77/EC of the European Parliament and Council, 27 September 2001 (“2001 Renewable Energy Directive"). ↩
59 C-029 / R-046, 2001 Renewable Energy Directive, Art. 3. ↩
60 C-029 / R-046, 2001 Renewable Energy Directive, Annex. ↩
61 C-029 / R-046, 2001 Renewable Energy Directive, Recital 12. ↩
62 C-024, Electricity Law, Art. 17(2). ↩
63 C-030 / R-060, Royal Decree 1432/2002, 27 December 2002, published 31 December 2002 (“RD 1432/2002"). RD 1432/2002 was preceded by an opinion by the Spanish Council of State dated 19 December 2002. C-031, Opinion of the Council of State 3616/2002, 19 December 2002. ↩
64 C-030 / R-060, RD 1432/2002, Art. 1. ↩

[Page 29]

110. On 12 March 2004, Spain enacted Royal Decree 436/2004 (“RD 436/2004"),65 which derogated from RD 2818/1998.66 RD 436/2004 established a new “methodology for the updating and systematisation of the legal and economic regime” for production of electricity under the Special Regime. Pursuant to Article 22, producers under the Special Regime would have the option to: (i) sell to a distributor under a “regulated tariff” (“feed-in-tariff” or “FiT”) or (ii) sell on the wholesale market “through the system of offers and bids managed by the market operator” at a “sale price of the electricity [...] resulting in the organised market [...] or the price freely traded by the plant operator or representative, supplemented by an incentive and, as the case may be, by a premium [...]” (“pool + premium").67 Both options were “expressed in euro cents per kilo-watt hour;"68 and both were established by reference to a percentage of the annual reference or average electricity tariff, and therefore subject to market fluctuations.69 In addition, Article 40 established that:

“1. During 2006, [...] the tariffs, premiums, incentives and supplements defined in this Royal Decree shall undergo revision. [...]. Every four years, starting from 2006, a new revision shall take place.

2. The tariffs, premiums, incentives and supplements resulting from any of the revisions provided for in this section shall come into force on January 1st of the second year subsequent to the year that the revision has been carried out.

3. The tariffs, premiums, incentives and supplements resulting from any of the revisions provided for in this section shall apply solely to the plants that commence operating subsequent to the date of the entry into force referred to in the paragraph above and shall not have a backdated effect on any previous tariffs and premiums. [...].”70


65 C-032 / R-059, Royal Decree 436/2004, 12 March 2004, published 27 March 2004 (“RD 436/2004”). RD 436/2004 was preceded by an opinion by the Spanish Council of State dated 4 March 2004. C-033, Opinion of the Council of State 386/2004, 4 March 2004. ↩

66 C-032 / R-059, RD 436/2004, Sole Repeal Provision. ↩

67 C-032 / R-059, RD 436/2004, Art. 22(1). ↩

68 C-032 / R-059, RD 436/2004, Art. 22(1). ↩

69 C-032 / R-059, RD 436/2004, Arts. 23-24. ↩

70 C-032 / R-059, RD 436/2004, Art. 40. ↩

[Page 30]

111. On 26 August 2005, Spain's Council of Ministers approved the 2005-2010 Renewable Energy Plan,71 which revised the earlier 2000-2010 Renewable Energy Plan. The revision sought to “maintain[ ] the commitment to cover at least 12% of the total energy consumption in 2010;” and it incorporated the other two objectives for 2010, namely “29.4% electricity generated using renewable energies and 5.75% biofuels in transport.”72

112. In August 2005, the Ministry of Industry, Tourism and Commerce and the Institute for the Diversification and Saving of Energy also produced a summary of the 2005-2010 Renewable Energy Plan.73 That summary stated that “different technical and financial hypotheses [were] considered in order to determine the profitability of typical projects” and that “[r]eturns were calculated based on an Internal Rate of Return (IRR) measured in current euros for each project type of close to 7%, financed with equity (before external finance) and after tax.”74

113. On 15 December 2005, the Spanish Supreme Court ruled and rejected a challenge against RD 436/2004.75 The Supreme Court held that:

"[...] There is no legal obstacle [...] to prevent the Government, in the exercise of the regulatory powers and of the broad entitlements it has in a strongly regulated issue such as electricity, from modifying a specific system of remuneration so long as this is done within the framework established by the Electricity Law. [...].”76

114. On 23 June 2006, Spain enacted Royal Decree-Law 7/2006 (“RDL 7/2006"),77 which adopted certain urgent measures for the energy sector. Article 1(12) afforded producers in the Special Regime “[p]riority for access to the networks for the transport and


71 C-019 / R-052 / R-296, Plan for Renewable Energy in Spain 2005-2010, August 2005 (“2005-2010 Renewable Energy Plan”). ↩

72 C-019, 2005-2010 Renewable Energy Plan, Introduction. ↩

73 C-034, Summary of the Spanish Renewable Energy Plan (PER) 2005-2010, Ministry of Industry, Tourism and Commerce and Institute for the Diversification and Saving of Energy, August 2005 (“Summary 2005-2010 Renewable Energy Plan”). ↩

74 C-034, Summary 2005-2010 Renewable Energy Plan, § 7.2. ↩

75 R-147, Supreme Court, Third Chamber, Judgement, 15 December 2005; Resp. C-Mem. Merits, ¶ 191. ↩

76 R-147, Supreme Court, Third Chamber, Judgement, 15 December 2005, Legal Grounds, EIGHT. ↩

77 C-036 / R-041, Royal Decree-Law 7/2006, 23 June 2006, published 24 June 2006 (“RDL 7/2006”). ↩

[Page 31]

distribution of generated energy, always maintaining the reliability and safety of the networks.”78

115. On 25 October 2006, the Spanish Supreme Court ruled on a challenge against some amendments to RD 436/2004.79 The Supreme Court held:

“THREE [...] Article 30 of the Electricity Law [...] allows [...] companies to expect that the fixing of the premiums can be included as a factor relevant to their obtaining ‘reasonable rates of return with reference the cost of money in the capital market' or [...] ‘reasonable compensation for their investments.' However the payment regime under examination does not guarantee to special regime electricity producers that a certain level of profits or revenues will be unchanged relative to those obtained in previous years, or that the formulas for fixing the premiums will stay unchanged.”80

116. On 14 February 2007, the Spanish Comisión Nacional de Energía (“CNE”) issued Report 3/2007. That report addressed a proposed Royal Decree “for the regulation of the generation of electricity under the special regime and of specific facilities using comparable technologies under the ordinary regime.”81 The report stated:

“Minimise regulatory uncertainty. The CNE understands that transparency and predictability in the future of economic incentives reduce regulatory uncertainty, which encourages investment in new capacity and minimises the cost of financing projects, reducing the final cost to the consumer. The regulation must offer sufficient guarantees to ensure that the economic incentives are stable and predictable throughout the life of the facility, setting in such case, both transparent annual update mechanisms associated with the evolution of robust indices (such as the average or reference rate, the CPI, ten-year bonds, etc.), as well as periodic reviews, for example, every four years, which only affect new installations, in terms of investment costs, and which may affect the reduction of costs operation also to existing plants.”82


78 C-036, RDL 7/2006, Art. 1(12) (amending Art. 30(2) of the Electricity Law). See also, R-041, RDL 7/2006, Art. 1(12). ↩

79 R-057, Supreme Court, Third Chamber, Judgement, 25 October 2006, Factual Background, SECOND; Resp. C-Mem. Merits, ¶¶ 192-194. ↩

80 R-057, Supreme Court, Third Chamber, Judgement, 25 October 2006, Legal Grounds, TWO and THREE. ↩

81 C-021 / R-298, CNE Report 3/2007 (14 February 2007) (“CNE Report 2007”); Cl. Mem. Merits, ¶ 27. ↩

82 C-021, CNE Report 2007, p. 16. ↩

[Page 32]

117. On 20 March 2007, the Spanish Supreme Court ruled on a challenge against RD 2392/2004 which had set the electricity tariff for 2005. The petitioners had asked that certain provisions of RD 2392/2004 regarding the premiums for 2005 be declared null, and that RD 2818/1998 and RD 436/2004 be applied instead.83 The Supreme Court held that:

“Owners of facilities under a Special Regime are not guaranteed the intangibility of a given benefit or income regime in relation to those obtained in previous years, nor are they guaranteed the indefinite permanence of the formulas used to fix premiums.”84

(2) Regulatory Framework I85

a. RD 661/2007

118. On 25 May 2007, Spain enacted Royal Decree 661/2007 “regulating the activity of electricity production under the Special Regime” (“RD 661/2007”).86 RD 661/2007 replaced RD 436/2004.87 According to its Preamble:

“The economic framework established in the present Royal Decree develops the principles provided in Law 54/1997, of 27 November, on the Electricity Sector, guaranteeing the owners of facilities under the special regime a reasonable return on their investments, [...].”88

119. Pursuant to Article 24(1) of RD 661/2007, producers under the Special Regime continued to have the option to (a) “[s]ell the electricity to the system through the transport or distribution grid, receiving for it a regulated tariff, which shall be the same for all


83 R-062, Supreme Court, Third Chamber, Judgement, 20 March 2007, Factual Background, SECOND; Resp. C-Mem. Merits, ¶ 195. ↩

84 R-062, Supreme Court, Third Chamber, Judgement, 20 March 2007, Legal Grounds, SECOND. On 9 October 2007, the Supreme Court ruled on another challenge, this time against RD 1454/2005, which modified certain provisions of RD 436/2004. R-063, Supreme Court, Third Chamber, Judgement, 9 October 2007; Resp. C-Mem. Merits, ¶ 195. Respondent contends that this decision confirmed the principles set forth by the earlier ones. Resp. C-Mem. Merits, ¶ 195. ↩

85 Claimants have referred to the various instruments in the Spanish system for renewable energy as follows: (i) “Regulatory Framework I” including RD 661/2007, RDL 6/2009 and RD 1614/2010; (ii) “Regulatory Framework II” including Law 15/2012 and RDL 2/2013; and (iii) “Regulatory Framework III” including RDL 9/2013, RD 413/2014 and Ministerial Order IET/1045/2014. See, e.g., Cl. Mem. Merits, p. vii and Appendix A, and ¶ 162. For ease of reference, the Tribunal has adopted those denominations. ↩

86 C-017 / R-042, Royal Decree 661/2007, 25 May 2007, published 26 May 2007 (“RD 661/2007”). ↩

87 C-017 / R-042, RD 661/2007, Art. 1 and Sole Derogatory Provision. ↩

88 C-017 / R-042, RD 661/2007, Preamble. See, e.g., Cl. Mem. Merits, ¶ 61; Resp. C-Mem. Merits, ¶ 181. ↩

[Page 33]

scheduling periods expressed in Euro cents per kilowatt/hour;” (“feed-in-tariff” or “FiT”) or (b) “[s]ell the electricity in the electrical energy production market” at “the price obtained in the organised market or the price freely negotiated by the proprietor or the representative of the facility, supplemented where appropriate by a premium, in Eurocents per kilowatt/hour” (“pool + premium").89 Producers were allowed to elect either option for periods of no less than one year, and could change their selected option with notice of at least one month.90

120. Article 2 of RD 661/2007 established categories of facilities, in relation to the primary energy used, the type of technology and the energy yield. Category b.1.2 covered “[f]acilities which use thermal processes alone for the transformation of solar energy, as the primary energy, into electricity.” Those facilities were permitted to employ equipment which used “a fuel for the maintenance of the temperature of the heat transfer fluid in order to compensate for a lack of solar irradiation which may affect the planned delivery of energy,” provided that the generation of electricity from such fuel was less than 12% of the total production of electricity, or up to 15% in certain circumstances.91

121. Article 36 of RD 661/2007 dealt with the tariffs and premiums for solar energy facilities in category b. With respect to category b.1.2, it provided that “[t]he tariffs and premiums corresponding to facilities in Category b) shall be as provided in Table 3.” Table 3 provided the following in the relevant portion:92


89 C-017 / R-042, RD 661/2007, Art. 24(1). ↩

90 C-017 / R-042, RD 661/2007, Art. 24(4). ↩

91 C-017 / R-042, RD 661/2007, Art. 2(1)(b), Sub-group b.1.2. ↩

92 C-017, RD 661/2007, Art. 36. ↩

[Page 34]

Group Sub-Group Power Term Regulated tariff, c/kWh Reference premium, c/kWh Upper Limit, c/kWh Lower Limit, c/kWh
b.1 b.1.1 P≤100 kW first 25 years 44.0381
thereafter 35.2305
100 kW

first 25 years 41.7500
thereafter 33.4000
10

first 25 years 22.9764
thereafter 18.3811
b.1.2 first 25 years 26.9375 25.4000 34.3976 25.4038
thereafter 21.5498 20.3200

122. According to Article 44, “[t]he values of the tariffs, premiums, supplements, and lower and upper limits to the hourly price of the market as defined in this Royal Decree, for Category b) [...] shall be updated on an annual basis using as a reference the increase in the RPI [Consumer Price Index] less the value set out in the Additional Provision One [...],” namely, 0.25% until 31 December 2012 and 0.50% thereafter.93 Article 44(3) addressed the matter of reviews of tariffs, premiums, supplements and lower and upper limits in the following terms:

“During the year 2010, on sight of the results of the monitoring reports on the degree of fulfilment of the Renewable Energies Plan (PER) 2005-2010, and of the Energy Efficiency and Savings Strategy in Spain (E4), together with such new targets as may be included in the subsequent Renewable Energies Plan 2011-2020, there shall be a review of the tariffs, premiums, supplements and lower and upper limits defined in this Royal Decree with regard to the costs associated with each of these technologies, the degree of participation of the special regime in covering the demand and its impact upon the technical and economic management of the system, and a reasonable rate of profitability shall always be guaranteed with reference to the cost of money in the capital markets. Subsequently a further review shall be performed every four years, maintaining the same criteria as previously.

The revisions to the regulated tariff and the upper and lower limits indicated in this paragraph shall not affect facilities for which the deed of commissioning shall have been granted prior to 1 January of the second


93 C-017 / R-042, RD 661/2007, Art. 44 and Additional Provision One. ↩

[Page 35]

year following the year in which the revision shall have been performed.”94

123. For the CSP sector, the economic regime set out in RD 661/2007 would accrue to the first 500 MW of installed capacity.95

124. Facilities for the production of energy under the Special Regime were subject to “compulsory registration” in the RAIPRE.96 Moreover, “the final registration of the facility in the [RAIPRE]” was a “necessary requirement for the application of the economic regime regulated under [RD 661/2007] to such facility, with effect from the first day of the month following the date of the final deed of entry into service of the facility.”97

125. In addition to the economic regime, RD 661/2007 afforded producers under the Special Regime the rights to “enjoy priority in access and connection to the electricity grid” under certain conditions set forth in Annex XI of RD 661/2007 or in subsequent regulations; and the right to sell their electricity output via distribution companies, or to “sell all or part of their net production by way of direct lines.”98

126. On 3 and 9 December 2009, the Spanish Supreme Court ruled and rejected various claims brought by renewable energy producers against certain provisions of RD 661/2007.99 Among others, the petitioners had argued that the first transitory provision of RD 661/2007 was in breach of Article 40(3) of RD 436/2004.100

b. RDL 6/2009

127. On 23 April 2009, the European Parliament and Council adopted Directive 2009/28/EC on the promotion of the use of energy from renewable sources (“2009 Renewable


94 C-017 / R-042, RD 661/2007, Art. 44(3). ↩

95 C-017 / R-042, RD 661/2007, Art. 37. See also, Art. 17(c) and 22. ↩

96 C-017 / R-042, RD 661/2007, Art. 9. ↩

97 C-017 / R-042, RD 661/2007, Art. 14. ↩

98 C-017 / R-042, RD 661/2007, Art. 17 (b), (d) and (e); Annex XI. ↩

99 R-064, Supreme Court, Third Chamber, Judgement, 3 December 2009, Factual Background, FIRST; R-002, Supreme Court, Third Chamber, Judgement, 9 December 2009, Factual Background, FIRST. ↩

100 R-064, Supreme Court, Third Chamber, Judgement, 3 December 2009, Legal Grounds, FOURTH. ↩

[Page 36]

Energy Directive”).101 This new directive set a “target of at least a 20 % share of energy from renewable sources in the Community's gross final consumption of energy in 2020.”102

128. Shortly thereafter, on 30 April 2009, Spain adopted Royal Decree-Law 6/2009 (“RDL 6/2009”).103 The Preamble of RDL 6/2009 observed that the growing tariff deficit in Spain, that is, “the difference between collections based on the regulated rates set by the Administration and paid by consumers for their regulated supplies and access rates set on the deregulated market and the actual costs associated with those rates” was affecting the electricity system, putting at risk both “the financial situation of companies in the electricity sector” and the “sustainability of the system.”104

129. Referring to the growing impact of the Special Regime on the tariff deficit, one of RDL 6/2009's stated objectives was the introduction of measures to control the cost of that Special Regime and thereby the tariff deficit.105 Expressing concern for the financial viability of facilities already finalized, RDL 6/2009 also indicated that it was “necessary to adopt a measure of urgency to guarantee the necessary legal security for those who ha[d] made investments.”106

130. RDL 6/2009 put in place a Mechanism of Registration of Pre-assignment of Payment for the Special Regime Installations (“Mecanismo de Registro de Pre-asignación de Retribución para las Instalaciones del Régimen Especial”) (“Pre-Assignment Registry”).107 Article 4(2) of RDL 6/2009 provided that enrolment in the Pre-Assignment Registry was a “necessary condition to obtain the right to the economic scheme established in [RD 661/2007] [...].”108 Article 4(3) established a number of


101 R-009, Directive 2009/28/EC of the European Parliament and Council, 23 April 2009 (published 5 June 2009) (“2009 Renewable Energy Directive”). ↩

102 R-009, 2009 Renewable Energy Directive, Art. 3(1). ↩

103 C-044 / R-085, Royal Decree-Law 6/2009, 30 April 2009 (published 7 May 2009) (“RDL 6/2009”). ↩

104 C-044 / R-085, RDL 6/2009, Preamble, at p. 39404. ↩

105 C-044 / R-085, RDL 6/2009, Preamble, at p. 39405. ↩

106 C-044 / R-085, RDL 6/2009, Preamble, at p. 39405. ↩

107 R-085, RDL 6/2009, Art. 4. ↩

108 R-085, RDL 6/2009, Art. 4(2). ↩

[Page 37]

detailed requirements for registration in the Pre-Assignment Registry.109 In turn, Article 4(8) provided that facilities registered in the Pre-Assignment Registry had a deadline of 36 months to be definitely registered in the RAIPRE, absent which “their economic right associated with inclusion in the [Pre-Assignment Registry] shall be revoked.”110

131. Pursuant to the 4th transitory provision of RDL 6/2009, installations had a deadline of 30 days from entry into force of the RDL to submit their application for entry into the Pre-Assignment Registry (i.e. until 6 June 2009).111 In turn, the 5th transitory provision established that if the capacity of the projects registered in the Pre-Assignment Registry exceeded the objectives set in RD 661/2007:

“[...] the economic system established in [...] Royal Decree 661/2007 [...] will be applicable and will be exhausted through those registered installations. In this case, by means of a resolution from the Council of Ministers at the initiative of the Ministry of Industry, Tourism and Commerce, annual restrictions may be established on the commissioning and start-up of the registered facilities and their prioritization, to avoid compromising the technical and economic sustainability of the system, appropriately extending the maximum term established in Article 4.8 of this Royal Decree-Law, if applicable. [...].” 112

132. On 13 November 2009, the Spanish Council of Ministers entered into an Agreement to “establish [ ] the order of priority of the projects or plants presented to the administrative registry for pre-allocation of payment for the installations for the production of electrical energy, as established in [RDL 6/2009] [...].”(“Agreement of the Council of Ministers”).113 At the time, there had been 104 applications to the Pre-Assignment Registry for the CSP sector, for a total power capacity of 4,499 MW; which together with the capacity already installed exceeded the power targets of RD 661/2007.114


109 C-044 / R-085, RDL 6/2009, Art. 4(3). ↩

110 R-085, RDL 6/2009, Art. 4(8). ↩

111 C-044, RDL 6/2009, 4th Transitory Provision. ↩

112 C-044, RDL 6/2009, 5th Transitory Provision. ↩

113 C-007, Agreement of the Council of Ministers of 13 November 2009 (incorporated through a Resolution of the Secretary of Energy dated 19 November 2009, and published in the Official State Bulletin on 24 November 2009) (“Agreement of the Council of Ministers”). ↩

114 C-007, Agreement of the Council of Ministers, § III, at p. 99849. ↩

[Page 38]

133. According to the Agreement of the Council of Ministers, projects and facilities that had applied to the Pre-Assignment Registry were organized starting with those whose application and registration had occurred within the deadline established in RDL 6/2009, and in chronological order according to the date of their registration.115 The commissioning of the facilities was staggered in various phases, which were as follows for CSP: phase 1 (up to 850 MW); phase 2 (up to 1,350 MW); phase 3 (up to 1,850 MW) and phase 4 (rest of the power registered in the Pre-Assigned Registry).116 Annual restrictions were established with regard to the start-up and entry into operation of the facilities registered in the Pre-Assignment Registry, such that facilities could not begin delivering energy via the distribution or transportation network before certain dates, as follows: 1 January 2011 (for phase 2), 1 January 2012 (for phase 3) and 1 January 2013 (for phase 4).117 In addition, such facilities were required to obtain permanent registration in the RAIPRE and to commence selling energy prior to the following dates: 1 January 2013 (for phases 2 and 3), and 1 January 2014 (for phase 4).118

c. RD 1614/2010

134. On 19 November 2010, Spain adopted Royal Decree 1565/2010 “regulating and modifying certain aspects in relation to the activity of electricity production under the special regime.”119

135. A few weeks later, on 7 December 2010, Spain enacted Royal Decree 1614/2010 (“RD 1614/2010”), which “regulates and amends given aspects relative to the production of electric energy from solar thermal electric and wind power.”120 Article 4 of RD 1614/2010 provided that:

“For solar thermal electric technology facilities falling within [RD 661/2007] revisions of tariffs, premiums and upper and lower limits, referred to in Article 44.3 of [RD 661/2007], shall not affect those


115 C-007, Agreement of the Council of Ministers, § VI(1) at p. 99853. ↩

116 C-007, Agreement of the Council of Ministers, § VI(2), at p. 99853. ↩

117 C-007, Agreement of the Council of Ministers, § VI(4), at p. 99853. ↩

118 C-007, Agreement of the Council of Ministers, § VI(4), at p. 99854. ↩

119 R-065, Royal Decree 1565/2010, 19 November 2010 (published 23 November 2010). ↩

120 C-016 / R-068, Royal Decree 1614/2010, 7 December 2010 (published 8 December 2010) (“RD 1614/2010”). ↩

[Page 39]

facilities definitively registered in the [RAIPRE as] of 7 May 2009, or those that shall have been registered in the [Pre-Assignment Registry] under the fourth transitional provision of [RDL 6/2009], and shall have fulfilled the obligation envisaged in Article 4.8 thereof, extended until 31 December 2013 for those facilities associated with phase 4 envisaged in the Agreement of the Council of Ministers of 13 November 2009.”121

136. Article 2 of RD 1614/2010 reduced the allowed operating hours of plants qualifying for the Special Regime. For CSP plants of 9-hour storage, those hours were set at 4,000 a year.122 Article 2(3) went on to provide that:

“[...] The equivalent hours of reference envisaged in the preceding table shall not be revisable during their operating life for those facilities registered definitively in the [RAIPRE as] of 7 May 2009 and for those registered in the [Pre-Assignment Registry] under the aegis of the fourth transitional provision of [RDL 6/2009], and which fulfil the obligation envisaged in Article 4.8 thereof, extended until 31 December 2013 for those facilities associated with phase 4 envisaged in the [Agreement] of the Council of Ministers of 13 November 2009 [...].”123

137. In turn, Article 3 required projects to opt for the regulated “feed-in-tariff” option for the first twelve months of operation.124

138. RD 1614/2010 also allowed, under certain conditions, Special Regime facilities registered in the Pre-Assignment Registry classified under phases 2 to 4, to begin discharging energy to the grid on a trial basis 9 months before the 1 January applicable to their respective phases.125 In this case, the decree also established that the “calculation of the period during which the facility shall have the right to a premium or equivalent premium, shall take place as of the starting date of the collection of the premium or equivalent premium, as appropriate.”126 RD 1614/2010 further provided that facilities registered in the Pre-Assignment Registry that had decided not to move forward with the


121 C-016, RD 1614/2010, Art. 4. ↩

122 C-016, RD 1614/2010, Art. 2(3). Claimants contend that the Termosol Plants were the only plants in the 9h category. Cl. Mem. Merits, ¶ 161, n. 186. ↩

123 C-016, RD 1614/2010, Art. 2(3). ↩

124 C-016, RD 1614/2010, Art. 3. ↩

125 C-016 / R-068, RD 1614/2010, Transitory Provision 1. ↩

126 C-016, RD 1614/2010, Transitory Provision 1. ↩

[Page 40]

facility, had a three-month period from the entry into force of the decree to “desist from the procedure,” to avoid enforcement of the guarantees they had provided.127

(3) Other Developments in 2010-2012

a. RDL 14/2010

139. On 23 December 2010, Spain adopted Royal Decree-Law 14/2010 (“RDL 14/2010”), to adopt certain “urgent measures for the correction of the tariff deficit in the Electricity Sector.”128 According to RDL 14/2010, since RDL 6/2009 there were supervening circumstances that had a direct impact on the tariff deficit exceeding the maximum deficit limits set forth in RDL 6/2009.129 Article 1 of RDL 14/2010 (which amended Article 15 of the Electricity Law), provided that “[c]ompensation for regulated activities shall be financed through revenues collected by access fees for transmission and distribution networks, fully paid by consumers and producers.”130

b. Law 2/2011

140. On 4 March 2011, Spain enacted Law 2/2011.131 The stated purpose of the law was to “introduc[e] in the legal order the structural reforms necessary to create conditions to favour a sustainable economic development.”132 Article 78 established “[a] minimum national goal of 20% [...] for the participation of renewable energies in gross energy consumption for the year 2020.”133 Articles 77-79 dealt with principles of energy policy; national objectives for energy saving and efficiency and renewable energies; and aspects of indicative energy planning.134

141. In 11 November 2011, Spain's Council of Ministers approved the 2011-2020 Renewable Energy Plan.135 Its purpose was to “establish[ ] objectives in accordance with [the 2009


127 C-016 / R-068, RD 1614/2010, Transitory Provision 2. ↩

128 R-049, Royal Decree-Law 14/2010, 23 December 2010 (published 24 December 2010) (“RDL 14/2010”). ↩

129 R-049, RDL 14/2010, Preamble, § 2. ↩

130 R-049, RDL 14/2010, Article 1. ↩

131 R-291, Law 2/2011, 4 March 2011 (“Law 2/2011”). ↩

132 R-291, Law 2/2011, Art. 1 [Tribunal’s translation]. ↩

133 R-291, Law 2/2011, Art. 78(1). ↩

134 R-291, Law 2/2011, Arts. 77-79. ↩

135 C-075 / R-052, Renewable Energy Plan 2011-2020 (“2011-2020 Renewable Energy Plan”). ↩

[Page 41]

Renewable Energy Directive] and, pursuant to the stipulations of [RD] 661/2007, [...] and of Law 2/2011 [...].”136

142. On 19 December 2011, S.E. Mariano Rajoy gave an inaugural address to Congress as re-elected Prime Minister. Referring to an accumulated tariff deficit of EUR 22,000 million, and observing that “[e]lectricity tariffs for domestic consumers are the third most expensive in Europe, and the fifth highest for industrial consumers,” Prime Minister Rajoy stated that:

“[...] If reforms are not made, the imbalances will be unsustainable, and increases in prices and tariffs will place Spain at the greatest disadvantage in terms of energy costs in the entire developed world. We must therefore introduce policies based on putting a brake on and reducing the average costs of the system, take decisions without demagoguery, employ all the technologies available, without exception, and regulate with the competitiveness of our economy as our prime objective.” 137

143. On 28 December 2011, the CNE issued a press release concerning “the review of grid access fees and certain tariffs and premiums for facilities operating under the special regime.”138 The CNE referred to:

“[...] the need to immediately implement, amongst other measures, proposals for the regulation of activities, aimed at getting rid of the system's structural deficit and mitigating debt financing costs. Notwithstanding, to attain sufficiency it would be necessary to make larger scale additional adjustments to the costs of the activities regulated and to the tolling paid by consumers. An analysis could also be carried out of the introduction of measures to finance the costs of activities regulated externally to the access tolling.”139


136 C-075, 2011-2020 Renewable Energy Plan, at p. 5 (cover page). ↩

137 R-094, S.E. Mariano Rajoy Speech to Congress during his Inauguration as President of the Government, 19 December 2011, p. 11. ↩

138 R-095, CNE, Press Release, “The CNE Analyses the Review of Grid Access Fees and Certain Tariffs and Premiums for Facilities Operating under the Special Regime,” 28 December 2011. ↩

139 Id. ↩

[Page 42]

c. RDL 1/2012

144. On 27 January 2012, Spain adopted Royal Decree-Law 1/2012 (“RDL 1/2012”), which “suspend[ed] the procedure for the pre-assignment of payment and remov[ed] the financial incentives for new electricity generating facilities generating using cogeneration, renewable energy sources and waste.”140 RDL 1/2012 applied to facilities that had not been registered in the Pre-Assignment Registry by the time RDL 1/2012 entered into effect, namely, 28 January 2012.141

145. On that same day, the Ministry of Industry, Energy and Tourism issued a press release stating that, the decree had been adopted “to temporarily suspend” the Pre-Assignment Registry procedures and the economic incentives for new renewable energy installations, “until a reform in the electric system is implemented that avoids the tariff deficit from being generated [...].”142

146. On 27 April 2012, Spain approved its National Reform Program for 2012, which included a section discussing “measures directed towards solving the existing imbalance between revenue and costs of the electricity system.”143

147. In 2012, Spain undertook a series of additional reforms to the legal and economic regime for renewable energy investments.

(4) Regulatory Framework II

a. Law 15/2012

148. On 27 December 2012, Spain enacted Law 15/2012 “On Tax Measures for Energy Sustainability,” which entered into effect on 1 January 2013.144 This Law adopted the following measures:


140 C-088 / R-096, Royal Decree-Law 1/2012, 27 January 2012 (published 28 January 2012) (“RDL 1/2012”). ↩

141 C-088 / R-096, RDL 1/2012, Art. 2. ↩

142 R-097, Ministry of Industry, Energy and Tourism, The Government will Temporarily Suspend Premiums for New Special Regime Facilities, Press Release, 27 January 2012. ↩

143 R-102, National Reform Program, Kingdom of Spain, 2012, § III(5) 71. ↩

144 C-091 / R-024, Law 15/2012, 27 December 2012 (published 28 December 2012) (“Law 15/2012”), Fifth Final Provision. ↩

[Page 43]

149. First, it amended Article 30 of the Electricity Law, to provide that production based on natural gas would now only receive the pool price.145

150. Second, it created and regulated a Tax on the Value of the Production of Electrical Energy (“TVPEE”).146 It imposed a 7% rate on “the total amount that the taxpayer receives for the electric power production and its incorporation into the electricity system, measured at the power station busbars, for each installation, during the tax period.”147

b. RDL 2/2013

151. On 1 February 2013, Spain enacted Royal Decree-Law 2/2013 (“RDL 2/2013”), adopting “urgent measures in the electricity system and in the financial sector.”148 RDL 2/2013, adopted the following measures:

152. First, it amended the inflation index applicable under the Special Regime, from the Consumer Price Index to the “Consumer Price Index at constant rates without unprocessed food or energy products.”149

153. Second, it amended Article 36 of RD 661/2007 (Table 3), such that the reference premium for renewable energy under the Special Regime was set at zero (0).150

154. Third, Article 3 provided that Special Regime facilities that as of the effective date of RDL 2/2013 (i.e. 2 February 2013)151 had opted for the pool + premium option under Article 24(1)(b) of RD 661/2007 could not subsequently change that option.152 Further, (i) Special Regime facilities which between 1 January to 2 February 2013 had sold energy under the pool + premium option of Article 24(1)(b) of RD 661/2007 would “be paid the premium by the National Energy Commission, taking into consideration the


145 C-091, Law 15/2012, First Final Provision. ↩

146 C-091 / R-024, Law 15/2012, Arts. 1-11. ↩

147 C-091, Law 15/2012, Arts. 6(1) and 8. ↩

148 C-092 / R-125, Royal Decree-Law 2/2013, 1 February 2013 (published 2 February 2013) (“RDL 2/2013”). ↩

149 C-092, RDL 2/2013, Art. 1. ↩

150 C-092, RDL 2/2013, Art. 2(2). ↩

151 C-092, RDL 2/2013, Final Provision. ↩

152 C-092, RDL 2/2013, Art. 3. ↩

[Page 44]

energy produced during that period as if they had invoked [the feed-in-tariff option];” and (ii) Special Regime facilities which as of 2 February 2013 were selling under the pool + premium option of Article 24(1)(b) of RD 661/2007 would “automatically” be switched to the feed-in-tariff option in Article 24(1)(a) of RD 661/2007 “effective January 1, 2013, unless they expressly advise[d] the General Directorate of Energy and Mining policy of their desire to remain under [...] option b) [pool + premium] prior to February 15, 2013.” If they did so, however, they would have to “adhere to said option under the conditions regulated in [RDL 2/2013]” and in consequence could not change that option thereafter.153

155. On 19 February 2015, the Spanish Constitutional Court dismissed a constitutional challenge against RDL 2/2013;154 and on 26 March 2015, the Spanish Supreme Court also dismissed a petition asking it to bring a motion for unconstitutionality of RDL 2/2013 before the Constitutional Court.155

(5) Regulatory Framework III

a. RDL 9/2013

156. On 12 July 2013, Spain enacted Royal Decree-Law 9/2013 (“RDL 9/2013”) on “emergency measures to guarantee the financial stability of the electrical system.”156 RDL 9/2013 repealed RD 661/2007, and certain provisions of RDL 6/2009.157

157. RDL 9/2013 substituted the prior remuneration regime for renewable energy facilities for a new one, applicable both to new and existing installations.

158. Under the new regime, renewable energy producers receive: (i) a payment of the wholesale market price for the electricity produced (“Market Payment”); (ii) a payment per Mwh of electricity produced to compensate operating costs not covered by the market price (“Operating Payment”); and (iii) and a payment per MWh of installed capacity on


153 C-092, RDL 2/2013, Sole Additional Provision. ↩

154 R-126, Constitutional Court, Judgement, 19 February 2015. ↩

155 R-127, Supreme Court, Judgement, 26 March 2015, Factual Background, SECOND (ii). ↩

156 C-093 / R-113, Royal Decree-Law 9/2013, 12 July 2013 (published 13 July 2013) (“RDL 9/2013”). ↩

157 C-093 / R-113, RDL 9/2013, Sole Repeal Provision (2)(a) and (c) (repealing RD 661/2007 and Art. 4, First Add. Prov., and Fifth Trans. Provision (2) of RDL 6/2009). ↩

[Page 45]

the basis of the net investment costs of a “standard” reference plant, also referred to as an “installation type” (“instalación tipo”) (“Investment Payment”).158 The remuneration would be calculated on the basis of standard income for the sale of electricity, standard exploitation costs and a standard value of the initial investment.159 RDL 9/2013 also provided that the parameters of the regime could be revised every six years.160

159. According to RDL 9/2013, the “reasonable profitability” for facilities that as of the effective date of RDL 9/2013 “had a right to a premium economic regimen [...] shall, before taxes, be in function of the mean yield on State Bonds on the secondary market for the ten years preceding the effective date of this royal decree-law plus 300 basis points” and “without prejudice to the revision provided in the last paragraph of” Article 30(4) of Law 54/1997.161

160. RDL 9/2013 entered into effect on 14 July 2013.162 At that time, however, neither the standard reference plant categories, nor the values of the Investment Payment and the Operating Payment for each category had been determined. As a result, the feed-in-tariff regime of RD 661/2007 (but not the pool + premium option already abolished by RDL 2/2013) continued operating until June 2014, when further regulatory measures (RD 413/2014 and Ministerial Order IET 1045/2014, discussed further below) were published. The payments received during this transitional period were made, however, as a “payment on account” of the payments that would be received under the new regime.163

161. On 17 December 2015 and 18 February 2016, the Spanish Constitutional Court dismissed constitutional challenges against certain provisions of RDL 9/2013.164


158 C-093, RDL 9/2013, Art. 1 (Two) (amending Art. 30(4) of the Electricity Law); Cl. Mem. Merits, ¶ 190. ↩

159 C-093, RDL 9/2013, Art. 1 (Two). ↩

160 C-093, RDL 9/2013, Art. 1 (Two). ↩

161 C-093, RDL 9/2013, First Additional Provision. ↩

162 C-093 / R-113, RDL 9/2013, Tenth Final Provision. ↩

163 C-093 / R-113, RDL 9/2013, Third Transitory Provision. ↩

164 R-056, Constitutional Court, Judgement, 17 December 2015; R-072, Constitutional Court, Judgement, 18 February 2016; R-075, Constitutional Court, Judgement, 18 February 2016. ↩

[Page 46]

b. Law 24/2013

162. On 12 September 2013, the Spanish Council of State issued an opinion (Dictamen) on the draft of a new Electricity Law.165

163. On 26 December 2013, Spain adopted Law 24/2013 on the Electricity Sector, which eliminated the distinction between the Ordinary and the Special Regimes.166 It re-affirmed and developed the regime set forth in RDL 9/2013.

164. Article 14(4) provided that the “payment parameters” for renewable energy projects under the new regime were set for regulatory periods of six-years, which could be revised before the start of the next regulatory period. It set forth certain guidelines for the “modification of the payment parameters” applicable to renewable energy facilities, including that (i) in each regulatory period revision “modifications may be made to all payment parameters;” and between those periods “the value on which reasonable profitability will depend” can also be modified; (ii) once established, “the regulatory useful life or the standard value of the initial investment of a facility” cannot be modified; (iii) estimates of income for the sale of energy will be revised every three years, and the payment parameters adjusted in response to market price fluctuation vis-à-vis the prior three year estimate; and (iv) annual revisions of payment values for technologies whose operating costs depended on fuel prices.167

165. Article 14(7) of Law 24/2013 provided for the creation of a specific remuneration regime under which remuneration would be calculated on the basis of standard income from the energy produced, standard operating costs and a standard initial investment figure, and will provide a reasonable return for the installation type in each applicable case.168

166. In addition, Article 19 of Law 24/2013 established that “deviations occurring between electricity system income and costs” that are “not offset positively via the access tariffs


165 R-144, Council of State, Opinion 937/2013, 12 September 2013. ↩

166 C-097 / R-037, Law 24/2013, 26 December 2013 (published 27 December 2013) (“Law 24/2013”); Resp. C-Mem. Merits, ¶ 128. ↩

167 C-097, Law 24/2013, Art. 14(4). ↩

168 C-097, Law 24/2013, Art. 14(7). ↩

[Page 47]

and charges, will be financed by participants in the payment system, in direct proportion to the corresponding remuneration for their generation.”169

c. RD 413/2014 and Ministerial Order IET/1045/2014

167. In 2014 Spain adopted two further implementing regulations for the new framework. On 6 June 2014, Spain adopted Royal Decree 413/2014 (“RD 413/2014”).170 A few days later, on 16 June 2014, the Ministry of Industry, Energy and Tourism issued Order IET/1045/2014 (“Ministerial Order IET/1045/2014”).171

C. CLAIMANTS' INVESTMENT

168. The involvement of the NextEra companies with solar energy in Spain began with the agreements entered into in 2007, by a subsidiary of NextEra, relating to land easements, water rights and the development of up to four 49.9 MW CSP plants in Extremadura.172 In 2008, the Claimants were incorporated.173 Between 2008 and 2009, the Claimants devoted their efforts to development activities.174

169. On 14 May 2009, PTE applied for inscription of the first Termosol plant (“Termosol 1”) in the Pre-Assignment Registry.175 On that same day, PTE2 applied for inscription of the second Termosol plant (“Termosol 2”) in the Pre-Assignment Registry.176

170. On 11 December 2009, the Termosol Plants were registered in the Pre-Assignment Registry and assigned to Phase 3 of the timetable set forth in the Agreement of the Council of Ministers (supra, ¶¶ 132-133).177


169 C-097, Law 24/2013, Art. 19. ↩

170 C-095 / R-124, Royal Decree 413/2014, 6 June 2014 (published 10 June 2014) (“RD 413/2014”). ↩

171 C-096 / R-122, Ministerial Order IET/1045/2014, 16 June 2014 (published 20 June 2014) (“Ministerial Order IET/1045/2014”). ↩

172 Cl. Mem. Merits, ¶¶ 30-33. ↩

173 Supra, ¶ 94. ↩

174 Cl. Mem. Merits, ¶¶ 79-80. ↩

175 C-046, Letter of Application for Pre-Registration from PTE to the Directorate General for Energy Policy and Mines, Ministry of Industry, Tourism and Trade, 11 May 2009 (stamped 14 May 2009). ↩

176 C-047, Letter of Application for Pre-Registration from PTE2 to the Directorate General for Energy Policy and Mines, Ministry of Industry, Tourism and Trade, 11 May 2009 (stamped 11 May 2009). ↩

[Page 48]

171. On 16 December 2009, each of the PTEs and Sener Ingeniería y Sistemas S.A. (“Sener”) signed Engineering, Procurement Support and Construction Support Services Agreements.178

172. On 22 December 2009, each PTE and PTE2 filed an application with the Directorate General for Energy Policy and Mines to delay their construction deadlines for Termosol 1 and Termosol 2, and instead be moved to Phase 4 of the Agreement of the Council of Ministers.179

173. On 18 February 2010, the Directorate General for Energy Policy and Mines issued two resolutions approving the application to move the Termosol Plants to Phase 4 of the Agreement of the Council of Ministers.180 As a result, the Termosol Plants were then required to obtain permanent registration in the RAIPRE by 31 December 2013 (supra, ¶¶ 133, 135-136).

174. On 2 December 2010, PTE and PTE2 sent deeds waiving the date of entry into operation of Termosol 1 (1 January 2013) and Termosol 2 (15 March 2013) which had been set by virtue of the change to Phase 4 approved in the Resolution of the Directorate General for Energy Policy and Mines of 18 February 2010.181 Both deeds asked the Directorate


177 C-049, Resolution of the Directorate General for Energy Policy and Mines for Inscription in the Pre-Assignment Registry of Termosol 1 owned by PTE, 11 December 2009 (“Pre-Assignment Registration Notice Termosol 1”); and C-050, Resolution of the Directorate General for Energy Policy and Mines for Inscription in the Pre-Assignment Registry of Termosol 2 owned by PTE2, 11 December 2009 (“Pre-Assignment Registration Notice Termosol 2”). ↩

178 C-051, Engineering, Procurement Support and Construction Support Services Agreement between PTE and Sener Ingeniería y Sistemas, S.A., 16 December 2009; C-052, Engineering, Procurement Support and Construction Support Services Agreement between PTE2 and Sener Ingeniería y Sistemas, S.A., 16 December 2009. ↩

179 C-053, Application for Change in Phase filed by Mike O’Sullivan (NextEra Energy Resources, LLC) on behalf of PTE, 22 December 2009; C-054, Application for Change in Phase filed by Mike O’Sullivan (NextEra Energy Resources, LLC) on behalf of PTE2, 22 December 2009. ↩

180 C-055, Resolution of the Directorate General for Energy Policy and Mines for Termosol 1, 18 February 2010; C-056, Resolution of the Directorate General for Energy Policy and Mines for Termosol 2, 18 February 2010. ↩

181 C-070, Deed of Renunciation Regarding the Entry into Operation on a Particular Date, within the Phase Assigned to the Installation “Termosol 1” by a Resolution from the Directorate General of Energy Policy and Mines dated 15 February 2010, and Request for a Resolution Communicating the Conditions for Remuneration during the Operational Life of the Installation, 2 December 2009 (“Deed of Renunciation PTE”); C-071, Deed of Renunciation Regarding the Entry into Operation on a Particular Date, within the Phase Assigned to the Installation “Termosol 2” by a Resolution from the Directorate General of Energy Policy and Mines dated 15 February 2010, and Request for a Resolution Communicating the Conditions for Remuneration during the Operational Life of the Installation, 2 December 2009 (“Deed of Renunciation PTE2”). ↩

[Page 49]

General to “communicate the remunerative conditions for the operative life of the installation.”182

175. On 28 December 2010, the Directorate General of Energy Policy and Mines of the Ministry of Industry, Tourism and Commerce issued documents for each of the Termosol Plants.183 Among others, the Directorate General stated:184

“Two. It communicates that, at the present time, by virtue of the provisions of paragraph 1 of the fifth transitional provision of [RDL 6/2009] the remuneration applicable to the facility consists of the tariffs, premiums, upper and lower limits and complementary provisions established in Royal Decree 661/2007, of 25 May, updated annually by Order of the Ministry of Industry, Tourism and Commerce, and the values in force as from 1 January 2011 are as follows:

Term Regulated tariff c€/kWh Reference premium c€/kWh Upper limit c€/kWh Lower Limit c€/kWh
first 25 years 29.0916 27.4312 37.1483 27.4353
Thereafter 23.2731 21.9449

Reference value of complement for reactive energy for application of bonus or penalty percentages: 8.4681 c€/kWh

176. On 28 April 2011, PTE and PTE2 entered into the loan agreements with a bank syndicate of Spanish and international lenders for a credit facility up to EUR 589,200,000 to finance construction of the Termosol Plants.185

177. According to Claimants, construction of the Termosol 1 and 2 Plants proceeded in 2011-2012 without material issues.186


182 C-070, Deed of Renunciation PTE, Third; C-071, Deed of Renunciation PTE2, Third. ↩

183 C-009, Resolution of the Directorate General for Energy Policy and Mines of the Ministry of Industry, Tourism and Commerce for Termosol 1, 28 December 2010 (“2010 Resolution Termosol 1”); C-010, Resolution of the Directorate General for Energy Policy and Mines of the Ministry of Industry, Tourism and Commerce for Termosol 2, 28 December 2010 (“2010 Resolution Termosol 2”) ↩

184 C-009, 2010 Resolution Termosol 1; C-010, 2010 Resolution Termosol 2. Respondent disputes certain aspects of the translation provided by Claimants. See, Resp. C-Mem. Merits, n. 233. ↩

185 C-074, Credit Agreement between PTE and PTE2 (Borrowers) and Lenders, 28 April 2011. ↩

186 Cl. Mem. Merits, ¶ 170. ↩

[Page 50]

178. On 29 May 2013, the Termosol 1 Plant obtained final registration into the RAIPRE; and on 7 June 2013, the same was granted to the Termosol 2 Plant.187 The resolutions stated that: “[t]he economic regime applicable for invoicing the power and energy fed to the grid shall be the one established by Royal Decree 661/2007, of 25 May, which regulates the activity of production of electrical energy under the special regime.”188

179. Claimants state that NEE España entered into liquidation in 2013, although final liquidation has been avoided. In 2015 the PTEs were placed in mandatory liquidation; in August 2016, the PTEs agreed to a debt restructuring with their lenders;189 and Claimants have stated that the PTEs' liquidation has been avoided.190

IV. THE PARTIES' CLAIMS AND REQUEST FOR RELIEF

180. Claimants initially asked the Tribunal to:

“[...] [R]ender an Award:

(1) Declaring that the Tribunal has jurisdiction over the claims presented in this Memorial and in the Request for Arbitration;

(2) Declaring that the Respondent has breached its obligations under Articles 10(1) and 10(7) of the Energy Charter Treaty;

(3) Determining that each such breach has caused damages to the Claimants;

(4) Ordering the Respondent to pay to the Claimants damages based on the principle of full reparation, as determined by the Tribunal based on the expert report of Dr Manuel A. Abdala and Professor Pablo T. Spiller of Compass Lexecon, estimated in their report at €393.6 million (subject to any updating in their Reply Report, at the merits hearing and in any post-hearing submissions that may be directed by the Tribunal);


187 C-004, Resolution of the Government of Extremadura (Department of Agriculture, Rural Development, Environment and Energy) for Termosol 1, 29 May 2013 (“2013 RAIPRE Resolution Termosol 1”); C-005, Resolution of the Government of Extremadura (Department of Agriculture, Rural Development, Environment and Energy) for Termosol 2, 7 June 2013 (“2013 RAIPRE Resolution Termosol 2”). ↩

188 Id. ↩

189 Cl. Mem. Merits, ¶¶ 214-215; Cl. Reply Merits, ¶ 605. ↩

190 Cl. Letter, 23 April 2018; Tr. Day 1 (ENG), 156:16-18 (Mr. Zimmerman). ↩

[Page 51]

(5) Ordering the Respondent to pay pre-award interest, where applicable, as well as ordering post-award interest on the all [sic] sums awarded to the Claimants at the rate of 7.62%, EURIBOR +3.5%, or such other rate as the Tribunal deems appropriate, from the date of the Award until the date of full payment;

(6) Ordering the Respondent to pay the Claimants the full costs of this arbitration, including, without limitation, arbitrators' fees, the ICSID administrative costs, attorneys' fees, expert fees, and all other costs associated with these proceedings, together with interest on all sums so awarded; and

(7) Ordering any such other relief as the Tribunal may deem appropriate.”191

181. In their Reply on the Merits, Claimants updated their request for relief, asking the Tribunal to:

“[...] [R]ender an Award:

(1) Dismissing the Respondent's Preliminary Objections;

(2) Dismissing the Respondent's defences to liability and declaring that the Respondent has breached its obligations under Art. 10 of the ECT;

(3) Ordering the Respondent to pay the Claimants, in full reparation, damages in an amount to be determined by the Tribunal, based on the but for scenario or alternative but-for scenarios presented in the Second Expert Report of Compass Lexecon dated 9 August 2016;

(4) Ordering the Respondent to pay post-award interest on the above sums to the Claimants at an appropriate commercial rate, 6.84%, or alternatively, EURIBOR + 3.5%;

(5) Ordering the Respondent to pay the Claimants the full costs of this arbitration, including, without limitations, arbitrator's fees, administrative costs of the Centre, counsel fees, expert fees, and all other costs associated with these proceedings, together with post-award interest on all such sums so awarded at the rates specified in sub-paragraph (4) above; and


191 Cl. Mem. Merits, ¶ 314. ↩

[Page 52]

(6) Ordering any such other relief as the Tribunal deems appropriate.”192

182. As to jurisdiction, Claimants have asked the Tribunal to:

“[...] [D]eny each of Spain's preliminary objections; uphold its jurisdiction over the Claimants' claims; and render the relief requested in Part VII of the Claimants' Memorial and Part IX of the Reply Memorial.”193

183. Respondent, in turn, has asked the Tribunal:

“[...] [T]o render an Award:

a) Declaring that the Tribunal lacks jurisdiction over the claims of the Claimant or, where applicable, their inadmissibility, pursuant to the provisions of the Statement of Objections to Jurisdiction of the Kingdom of Spain dated 9 September 2015;

b) Additionally, should the Arbitral Tribunal decide that it has jurisdiction to hear this dispute, dismissing all of the intentions [sic] of the Claimant insofar as the merits, as the Kingdom of Spain has in no way been in breach of the ECT, as indicated in Section III of this Memorial, referring to the Merits;

c) Additionally, dismissing all of the claims regarding reparation of damages of the Claimant, as it is not entitled to compensation, pursuant to the provisions of Section IV of this Writ; and

d) Ordering the Claimant to pay all costs and expenses arising from this arbitration, including the ISCID [sic] administrative expenses, the arbitrators' fees and the attorneys' fees of the Kingdom of Spain, its experts and advisers, as well as any other cost or expenses incurred, including a reasonable rate of interest as of the date on which said costs were incurred to the date of their effective payment.”194

184. As to jurisdiction, Respondent asks that the Tribunal:


192 Cl. Reply Merits, ¶ 606. ↩

193 Cl. C-Mem. Jur., ¶ 92; Cl. Rej. Jur., ¶ 160 (adding also a request that the Tribunal “reject the observations submitted by the Commission”). ↩

194 Resp. C-Mem. Merits, ¶ 901. See also, Resp. Rej. Merits, ¶ 1240. ↩

[Page 53]

“[...] b) Declare that it lacks jurisdiction to hear the whole present arbitration or, in the alternative exclude from the scope of this arbitration the taxation and legislative measures to which D, E and F Objections refer to.

c) Directing the Claimants to pay all the costs and expenses incurred that arise from the present arbitration, including the administrative expenses incurred by ICSID, the fees of the Arbitrators and the fees of the legal representation of the Kingdom of Spain, as well as any other cost or expense incurred.”195

185. In the Reply on Jurisdiction, Respondent formulated its request for relief in slightly different terms, asking the Tribunal to:

“a) declare its lack of jurisdiction to hear the claims of the Claimants, or if applicable their inadmissibility, in accordance with what is set forth in Section III of this Memorial, referring to Jurisdictional Objections; and

d) Sentence [sic] the Claimants to pay all costs and expenses derived from this arbitration, including ICSID administrative expenses, arbitrators' fees, and the fees of the legal representatives of the Kingdom of Spain, their experts and advisors, as well as any other cost or expense that has been incurred, all of this including a reasonable rate of interest from the date on which these costs are incurred and the date of their actual payment.”196

186. The Parties' positions are summarized in the various sections below. At the outset, the Tribunal emphasizes that it has considered the entirety of the Parties' arguments in their written and oral submissions, irrespective of whether an argument is mentioned expressly in the summaries of the Parties' respective positions included in this Decision.

V. JURISDICTION

187. In the Memorial on Jurisdiction, Respondent raised six objections to jurisdiction (one of which was ultimately withdrawn). The order in which these objections were presented


195 Resp. Mem. Jur., ¶ 249. ↩

196 Resp. Reply Jur., ¶ 392. ↩

[Page 54]

was explicitly adjusted later in the Reply on Jurisdiction.197 In the sequence presented in the Reply on Jurisdiction, the objections are:


197 Resp. Reply Jur., ¶ 4. ↩

198 Resp. Mem. Jur., § III(C), ¶¶ 15, 141-170; Resp. Reply Jur., § IV(A). The contention that Claimants did not own the claimed investments was initially made in the Memorial on Jurisdiction, but it was later withdrawn in the Reply on Jurisdiction. Resp. Reply Jur., ¶ 55. ↩

199 Resp. Mem. Jur., § III(B), ¶¶ 14, 84-140; Resp. Reply Jur., § IV(B). ↩

200 Resp. Mem. Jur., § III(A), ¶¶ 13, 26-83; Resp. Reply Jur., § IV(C). ↩

201 Resp. Mem. Jur., § III(D), ¶¶ 16, 171-209; Resp. Reply Jur., § IV(D). The objection initially also encompassed claims arising out of the amendment to the Tax on Hydrocarbons, but it was later circumscribed to the claim arising out of the TVPEE, on the basis that the Tax on Hydrocarbons was not one of measures challenged by Claimants. Resp. Reply Jur., n. 124, ¶ 358. ↩

202 Resp. Mem. Jur., ¶ 20. ↩

203 Resp. Mem. Jur., § III(E), ¶¶ 17, 210-221; Resp. Reply Jur., § IV(E). Respondent had also initially included a sixth objection: that the Tribunal lacked jurisdiction ratione voluntatis with respect to the disputes concerning Law 24/2013, RD 413/2014, and Ministerial Order IET/1045/2014, due to Claimants' failure to comply with the notice and cooling off period requirements in Article 26 of the ECT; or in the alternative, that these claims were inadmissible. Resp. Mem. Jur., § III(F), ¶¶ 18, 222-237. While an introductory paragraph of the Memorial appeared ↩

[Page 55]

A. FIRST OBJECTION: LACK OF JURISDICTION RATIONE MATERIAE AND RATIONE PERSONAE–LACK OF AN INVESTMENT AND AN INVESTOR

(1) The Parties' Positions

a. Respondent's Position

(i) Lack of an “Investment” Under Article 1(6) of the ECT

188. Respondent contends that the requirement of an “Investment” as the term is defined in Article 1(6) of the ECT is lacking in this case.205 Observing that according to this provision, “‘Investment' means every kind of asset, owned or controlled directly or indirectly by an Investor [...],” Spain initially argued that Claimants had neither ownership nor control over the assets claimed to constitute the investment in this case,206 namely: (i) a 100% of the shares of NEE España, the Spanish company that in turn owns three other Spanish companies: PTE, PTE2, and NEEOS; and (ii) a bridge loan granted to the Termosol Plants by Claimants.207 According to Spain, the alleged investment included the indirect participation in PTE, PTE2 and NEEOS.208

189. Respondent's initial position was that Claimants' connection to these assets was “indirect,”209 and that the notion of indirect ownership in Article 1(6) of the ECT required finding the “real and ultimate possession of the asset.”210 That, according to Spain, corresponded to NextEra Energy Inc., Claimants' U.S. parent company.211 Therefore, neither Claimant owned the above-mentioned assets either directly or indirectly.212 In addition, Respondent argued, the assets were not controlled by Claimants directly or indirectly as required by Article 1(6) of the ECT and its


to extend this objection to claims arising out of Ministerial Order IET/1168/2014 and Ministerial Order IET/1182/2014, neither of these two measures were mentioned again in the sections developing the objection. Id., ¶ 18. The objection was expressly withdrawn with the Reply on Jurisdiction. Resp. Reply Jur., n. 1.

204 Resp. Mem. Jur., ¶ 20. ↩

205 Resp. Mem. Jur., ¶¶ 149, 168. ↩

206 Resp. Mem. Jur., ¶ 168; CL-001 / RL-055, Energy Charter Treaty (“ECT”), Art. 1(6). ↩

207 Resp. Mem. Jur., ¶ 147. ↩

208 Resp. Mem. Jur., ¶ 151. ↩

209 Resp. Mem. Jur., ¶ 154. ↩

210 Resp. Mem. Jur., ¶ 145. See also, id., ¶¶ 158, 162, 165. ↩

211 Resp. Mem. Jur., ¶ 166. ↩

212 Resp. Mem. Jur., ¶ 148 (second bullet). ↩

[Page 56]

corresponding Understanding 3, because the actual control fell again on NextEra Energy Inc., the U.S. parent company.213

190. Respondent's position was, however, amended in the Reply on Jurisdiction. There, Respondent asserted that it had been “able to effectively confirm that by means of certain internal asset transfer operations, the Claimants currently, formally and indirectly 'own' the shares in the Termosol Power Plants,” and stated that, as a result, Respondent was no longer “maintain[ing] that the Claimants do not ‘own' the assets.”214

(ii) Lack of an “Investor” Under Article 1(7) of the ECT

191. This said, Respondent argues that the conceded indirect ownership is insufficient, because for there to be an “Investment” under Article 1(6) of the ECT, the asset must be owned or controlled by an “Investor” in the sense of Article 1(7).215 Absent an “Investor,” there is no “Investment” either.216

192. According to Spain, there is no “Investor” under Article 1(7) of the ECT, because Article 1(7)(a)(ii) refers to “a company or other organization organized in accordance with the law applicable in that Contracting Party,” and neither Claimant qualifies as a “company or other organization.”217

193. In Spain's view, the terms “company or organization” should not be equated with “legal entity,” as confirmed by, the ordinary meaning of those words, EU Law and Netherlands Law, and a “systematic interpretation” of the ECT.218

194. According to Respondent, in their ordinary meaning the terms company or organization refer to “associations established according to, or for the performance of, an end or purpose” that “require the disposition or order of personal and material resources in


213 Resp. Mem. Jur., ¶¶ 146, 148 (first bullet). See also, id., ¶ 167. ↩

214 Resp. Reply Jur., ¶ 55. ↩

215 Resp. Reply Jur., ¶¶ 56, 58. ↩

216 Resp. Reply Jur., ¶¶ 56, 103-104. ↩

217 Resp. Mem. Jur., ¶ 150; Resp. Reply Jur., ¶ 102; CL-001 / RL-055, ECT, Art. 1(7). ↩

218 Resp. Reply Jur., ¶ 68. ↩

[Page 57]

order to achieve an end.”219 Claimants do not meet this ordinary meaning, Spain contends, because they have no workers, material or technical resources, and are pure holding companies.220

195. Respondent also observes that, pursuant to Article 1(7) of the ECT, Claimants must be a company or organization in accordance with the law applicable in the country where they are established, i.e. the Netherlands. In the Netherlands, EU Law is applicable and prevails over internal law,221 or must be considered part of the national law.222 Referring to EU notions in the fields of small and medium size enterprises, tax law, competition law, state aid law and jurisprudence of the Court of Justice of the European Union (“CJEU”) Respondent ultimately contends: “for an entity to be a company under EU Law, there must be an organisation whose purpose is to provide services or produce goods on the market. And an entity that simply has shares or stakes in other companies is not a company. EU Law does not accept that shell companies are undertakings.”223 Accordingly, Spain argues, Claimants are not a company or other organization established under the applicable law.224

196. Spain further maintains that the ECT distinguishes between the notions of “company” or “organization,” and those of “legal entity” or “enterprise,”225 noting that: (i) Article 17 of the ECT uses only the expression “legal entity;” and (ii) Article 26(7) of the ECT is drafted as it is to avoid the use of the expression “legal person” in Article 25(2)(b) of the ICSID Convention.226


219 Resp. Reply Jur., ¶ 70. ↩

220 Resp. Reply Jur., ¶ 73. ↩

221 Resp. Reply Jur., ¶¶ 74, 76. ↩

222 Resp. Reply Jur., ¶ 78. ↩

223 Resp. Reply Jur., ¶ 87. ↩

224 Resp. Reply Jur., ¶ 87. See also, Resp. Mem. Jur., ¶ 150 (arguing that Claimants do not comply with the structure for developing a business activity demanded by EU Law, which is applicable international and domestic law). In the context of this objection, Respondent expressly relies on the arguments concerning lack of business activity developed in the context of the denial of benefits objection, and summarized infra at ¶¶ 219 et seq. Resp. Reply Jur., ¶¶ 13-14. ↩

225 Resp. Reply Jur., ¶ 88. ↩

226 Resp. Reply Jur., ¶¶ 89, 91-94. ↩

[Page 58]

197. Finally, the object and purpose of the ECT also support this objection, given that “the Charter and the ECT aspire to promote the investment activity of companies that are actively involved in the energy market, which cannot be achieved by means of mere holding companies.”227

b. Claimants' Position

198. Claimants contend that (i) the dispute concerns Claimants' “Investments” as defined in Article 1(6) of the ECT;228 and (ii) Claimants are qualifying “Investors” under Article 1(7) of the ECT.229 Claimants point out that Respondent conflates two separate concepts (“Investment” and “Investor”) within the overall concept of jurisdiction ratione materiae.230

(i) Claimants Have an “Investment” Under Article 1(6) of the ECT

199. Answering Respondent's initial contentions in the Memorial on Jurisdiction, Claimants argued that they do own protected “Investments” in the territory of Spain.231 According to Claimants, their investments were precisely identified in their initial submissions, which referred to “Claimants' 100% equity shareholding in NEE España.” Claimants explained that “[t]o the extent that NEE España itself owns assets (such as their 100% ownership of the PTEs and NEEOS) [...] ‘these are qualifying investments under [...] the ECT [...] but they are ultimately reflected in the value of the Claimants' shareholding in NEE España and the Claimants do not seek double-recovery for those investments.”232 In Claimants' view, that 100% equity interest in NEE España, directly owned by NextEra Spain (Claimant 2) and indirectly owned by NextEra Global (Claimant 1), unquestionably qualifies within Article 1(6)(b) of the ECT.233 It also settled law that an investor can “claim for harm to the value of its shareholding if the assets of the company


227 Resp. Reply Jur., ¶ 101. ↩

228 Cl. C-Mem. Jur., ¶¶ 13-15. ↩

229 Cl. C-Mem. Jur., ¶¶ 9-12. ↩

230 Cl. Bif. ¶ 84. ↩

231 Cl. C-Mem. Jur., ¶ 13. ↩

232 Cl. Bif., ¶ 86 (referring to Cl. Mem., ¶ 223). ↩

233 Cl. Bif., ¶ 87. ↩

[Page 59]

in which it owns shares suffer harm by reason of a State's unlawful conduct.”234 For Claimants, “Spain has not disputed that the Claimants directly or indirectly own 100% of the issued share capital in NEE España” the “Investment” identified since the Request for Arbitration.235

200. Claimants also opposed Respondent's interpretation of Article 1(6) of the ECT, on the ground that: (i) it was contradicted by the ordinary meaning of the text, and it would require reading into the provision a criterion of “ultimate ownership” that was not there;236 (ii) the discussion of “control” was irrelevant because the express wording of Article 1(6) refers to two deliberate alternatives (“owned or controlled”);237 (iii) Article 17 of the ECT did not assist Spain, because that provision necessarily presupposes that an investor who is not the ultimate owner is prima facie protected until a denial is validly exercised;238 and (iv) the case law invoked by Spain did not support its position, and in fact tribunals have routinely accepted claims by intermediary subsidiaries.239

201. Given Respondent's amendment of its position, in the Rejoinder on Jurisdiction Claimants merely observed that “Spain [...] admits that Claimants' indirect participation in the capital of the Termosol Plants” is an “Investment” under Article 1(6) of the ECT, and focused on the contentions relating to Article 1(7) of the ECT.240

(ii) Claimants Are “Investors” Under Article 1(7) of the ECT

202. Observing that Article 1(7)(a)(ii) of the ECT defines “Investor” as “a company or other organization organized in accordance with the law applicable in that Contracting Party,” Claimants argue that, by its plain terms this provision imposes no further requirements;241 adding that ECT tribunals have consistently rejected attempts to alter the scope of this


234 Cl. Bif., ¶ 88. ↩

235 Cl. C-Mem. Jur., ¶ 14. ↩

236 Cl. Bif., ¶¶ 92-93. ↩

237 Cl. Bif., ¶ 90. ↩

238 Cl. Bif., ¶¶ 95-97 ↩

239 Cl. Bif., ¶¶ 98-106. See also, Cl. C-Mem. Jur., ¶ 15. ↩

240 Cl. Rej. Jur., ¶ 7. ↩

241 Cl. C-Mem. Jur., ¶ 9; CL-001 / RL-055, ECT, Art. 1(7). ↩

[Page 60]

definition.242 Claimants assert that the definition is satisfied here because “each of the Claimants is a company organised in accordance with the laws of the Netherlands” and the Netherlands is an ECT Contracting Party.243

203. In Claimants' view, Spain's contentions on the basis of the economic theory of organizations and concepts in EU tax, competition and state aid law and in the EU regulations for small and medium enterprises are “inapposite,” “irrelevant,” and “unconvincing,” and cannot alter the treaty text.244 Moreover, Claimants argue that Article 17(1) of the ECT does not assist with the interpretation of Articles 1(6) and 1(7) of the ECT; and further point out that there has been no argument of fraud or malfeasance in the ownership structure to trigger a debate over veil piercing.245

(2) The Tribunal's Analysis

a. Lack of an “Investment” under Article 1(6) of the ECT

204. Article 1(6) of the ECT provides that an “Investment” means “every kind of asset, owned or controlled directly or indirectly by an Investor,” including “a company or business enterprise.”246

205. Initially Respondent argued that in order to have an investment an investor must own the assets on which the investment was based, and it was not sufficient just to have a 100% ownership of the shares of the investment. Respondent also argued that Claimants did not control the investment. Ownership and control, in Respondent's view, rested with the American parent.247 Respondent ultimately accepted that Claimants owned the Spanish companies and did not pursue the argument that Claimants did not own the investment, and argued only that since Claimants are not “Investors” within the meaning of Article


242 Cl. C-Mem. Jur., ¶ 10 (referring to CL-114, Yukos Universal Ltd v. Russia, UNCITRAL, PCA Case No. AA 227, Interim Award on Jurisdiction and Admissibility (30 November 2009) (hereinafter “Yukos”); RL-008, Plama Consortium Limited v. Republic of Bulgaria, ICSID Case No. ARB/03/24, Decision on Jurisdiction (8 February 2005) (hereinafter “Plama Jurisdiction”); and CL-125, Petrobart Limited v. The Kyrgyz Republic, SCC Arbitration No. 126/2003, Arbitral Award (29 March 2005) (hereinafter “Petrobart”). ↩

243 Cl. C-Mem. Jur., ¶ 11. See also. Cl. Bif., ¶ 91. ↩

244 Cl. Rej. Jur., ¶ 9. ↩

245 Cl. Rej. Jur., ¶ 10. ↩

246 CL-001 / RL-055, ECT, Art. 1(6). ↩

247 Resp. Mem. Jur., § III(C). ↩

[Page 61]

1(7) of the ECT, then they cannot have an “Investment” within the meaning of Article 1(6) of the ECT.248 In the light of the conclusion below relating to Article 1(7) of the ECT on the meaning of “Investor,” this argument fails.

206. Thus, the Tribunal rejects Respondent's objection that the condition of Article 1(6) of the ECT has not been met.

b. Lack of an “Investor” under Article 1(7) of the ECT

207. Article 1(7) defines an “Investor” of a Contracting Party to include: “a company or other organization organized in accordance with the law applicable within that Contracting Party.”249

208. It is not disputed that Claimants, NextEra Global and NextEra Spain are incorporated in accordance with the law of the Netherlands. Respondent argues, nonetheless, that the words “company” and “organization” in Article 1(7) have a meaning different from legal entity. According to Spain, a company must be understood in economic terms and this means it must be engaged in economic activity itself and not just be a shell company. Thus, pure holding companies do not meet the requirements of Article 1(7). Respondent refers to EU Law and the law of the Netherlands in support of its position on the particular meaning of “company” and “organization.”

209. However, cases involving Article 1(7) of the ECT have been fairly consistent in interpreting that provision on the basis of the ordinary meaning of the words, and treating as decisive the fact that the company is organized within the territory of a Contracting Party. This was the view adopted in Yukos250 and in Charanne.251 The same view was reiterated in Saluka252 in respect of a similar provision in the Netherlands-Czech Republic BIT.


248 Resp. Reply Jur., ¶¶ 103-104; Tr. Day 1 (ENG), 182:5 ff (Ms. Rivas). ↩

249 CL-001 / RL-055, ECT, Art. 1(7). ↩

250 CL-114, Yukos, ¶ 411 (on the basis of an opinion by James Crawford). ↩

251 RL-088, Charanne BV and Construction Investment S.A.R.L. v. Kingdom of Spain, SCC Case No. 062/2012, Final Award (21 January 2016) (hereinafter “Charanne”), ¶ 414. ↩

252 RL-098, Saluka Investments B.V. v. the Czech Republic, UNCITRAL, Partial Award (17 March 2006) (hereinafter “Saluka”), ¶ 241. ↩

[Page 62]

210. Moreover, in RREEF, Spain advanced similar arguments about the nature of a company in order to show that the alleged shell company in that case was not an investor within the meaning of Article 1(7) of the ECT.253 That argument was rejected.

211. The Tribunal sees no ground for concluding that Article 1(7) of the ECT must be interpreted on the basis of a particular meaning under EU or Netherlands law. The ECT is a treaty and must be interpreted in accordance with the principles of treaty interpretation set out in Article 31-33 of the Vienna Convention on the Law of Treaties (“VCLT”). Under Article 31(1) of the VCLT, treaties are to be given their ordinary meaning in their context and in light of the object and purpose of the treaty. Applying that rule, Claimants are companies that are organized under the law of the Netherlands and thus are “Investors” within the meaning of Article 1(7) of the ECT.

212. Thus, the Tribunal rejects Respondent's objection that the condition of Article 1(7) of the ECT has not been met.

B. SECOND OBJECTION: LACK OF JURISDICTION RATIONE VOLUNTATIS – DENIAL OF BENEFITS

(1) The Parties' Positions

a. Respondent's Position

213. Respondent argues that the Tribunal does not have jurisdiction ratione voluntatis as a result of Respondent's exercise in the Memorial on Jurisdiction of its right under Article 17 of the ECT to deny the benefits of Part III to Claimants.254 This is a matter of jurisdiction, Spain says, because the consent to arbitration given in Article 26(1) of the ECT refers to disputes that “concern an alleged breach of an obligation [...] under Part III.”255 In turn, the consequence of a denial of benefits under Article 17 is the “non-application of Part III,” when the conditions set for in the provision are met, as they are


253 CL-135, RREEF Infrastructure (G.P.) Limited and RREEF Pan-European Infrastructure Two Lux S.à r.l. v. Kingdom of Spain, ICSID Case No. ARB/13/30, Decision on Jurisdiction (6 June 2016) (hereinafter “RREEF”), ¶¶ 132-134; 145-146. ↩

254 Resp. Mem. Jur., ¶¶ 84, 134. ↩

255 CL-001 / RL-055, ECT, Art. 26(1); Resp. Reply Jur., ¶¶ 108-109, 111. ↩

[Page 63]

here.256 Since there can be no obligation under Part III due to the denial of benefits, it follows that there can be no breach thereof, and consequently there is no consent to arbitration under Article 26.257

(i) The Requirements of Article 17 of the ECT Are Met

214. Respondent explains that the requirements of Article 17 of the ECT for exercising a denial of benefits are met because:258 (i) each Claimant is a legal entity incorporated in the territory of an ECT Contracting Party other than Spain;259 (ii) each Claimant is owned and controlled by citizens or nationals of the United States, a third State not party to the ECT;260 and (iii) neither Claimant performs any business activity in the Netherlands or in any other country.261

215. Legal Entity Incorporated in the Netherlands. Respondent explains that, should the Tribunal dismiss the intra-EU objection (infra, § V.C) and instead conclude that the Netherlands and Spain are separate ECT Contracting Parties, then it should find that Claimants are legal entities incorporated in the territory of an ECT Contracting Party (the Netherlands), different from Spain.262

216. Owned and Controlled by U.S. Citizens or Nationals. Respondent argues that NextEra Spain (Claimant 2) is 100% owned by NextEra Global (Claimant 1), in turn 100% owned by NextEra Energy Global Holdings Cooperative U.A., in turn 99% owned by NextEra Energy Inc. (formerly known as FPL Group International Inc.), a U.S. company, and 1% by High Group Investments LLC, a Gibraltar company.263 Further, according to Respondent, the certificates of the Dutch Registry reflect that NextEra Energy Global Holdings Cooperative U.A. administers NextEra Global (Claimant 1); while NextEra


256 Resp. Mem. Jur., ¶¶ 105, 138; Resp. Reply Jur., ¶ 115. ↩

257 Resp. Mem. Jur., ¶¶ 84, 96, 102, 108-109, 139; Resp. Reply Jur., ¶¶ 116, 148-149. ↩

258 Resp. Mem. Jur., ¶¶ 111-112, 132. ↩

259 Resp. Mem. Jur., ¶¶ 113-114. ↩

260 Resp. Mem. Jur., ¶¶ 116-121. ↩

261 Resp. Mem. Jur., ¶¶ 122-137. ↩

262 Resp. Mem. Jur., ¶¶ 113, 115. ↩

263 Resp. Mem. Jur., ¶¶ 117-118. ↩

[Page 64]

Global (Claimant 1) administers NextEra Spain (Claimant 2).264 It follows, Spain says, that NextEra Energy Inc. is not only the owner, but also the controller of both Claimants.265 This is underscored by the fact that it was the President of NextEra Energy Inc., Mr. F. Mitchell Davidson, who handled all communications on behalf of the NextEra Group with the Spanish Government during the investment process.266

217. This said, in Spain's view, it is incorrect to assert that the requirements of ownership and control by nationals of a third State in Article 17 of the ECT are cumulative.267 It is sufficient that one of them is satisfied.268 Moreover, Respondent argues, when referring to “citizens or nationals of a third state,” Article 17 is looking for the “natural persons” who own or control the legal person, for the ultimate or beneficial owner.269 And in this case, Spain argues, the “citizens or nationals” who own and control Claimants are in the United States.270

218. As to the notion of “control” in Article 17 of the ECT, Spain argues that it must be interpreted in accordance with Understanding 3 relating to Article 1(6) of the ECT. Pursuant to that Understanding, “control of an Investment means control in fact, determined after an examination of the actual circumstances in each situation.”271 Spain also maintains that the burden of proof to establish control is on Claimants;272 and argues that it is incorrect to simply attribute control of NextEra Spain to NextEra Global, and control of NextEra Global to NextEra Energy Global Holdings Cooperative U.A, since the relevant test is “control in fact.”273 In any event, Spain contends that it has been established that Claimants are controlled by “American citizens,” namely NextEra Energy Inc. and the staff in the companies in the NextEra Group in the United States, in


264 Resp. Mem. Jur., ¶ 120. ↩

265 Resp. Mem. Jur., ¶ 121. See also, Resp. Reply Jur., ¶ 108. ↩

266 Resp. Mem. Jur., ¶ 121. ↩

267 Resp. Reply Jur., ¶ 166. ↩

268 Resp. Reply Jur., ¶ 167. ↩

269 Resp. Reply Jur., ¶ 168. ↩

270 Resp. Reply Jur., ¶ 168. ↩

271 Resp. Reply Jur., ¶¶ 169-170; CL-001 / RL-055, ECT, Understandings, § 3. ↩

272 Resp. Reply Jur., ¶ 172. ↩

273 Resp. Reply Jur., ¶ 172. ↩

[Page 65]

particular the U.S. citizens serving as Directors in category A of Claimants' boards of directors.274 This is underscored by the fact that the communications relied upon as the basis for Claimants' alleged legitimate expectations were exchanged with senior management of NextEra in the United States.275

219. Lack of Any Business Activity. According to Spain, Claimants do not have “any” business activity in the Netherlands or elsewhere.276 Pursuant to their certificates of registration they are merely “financial holding” companies, classified under a category that refers to holdings not engaged in management, strategic planning or decision making of the company they hold.277 Holding shares, Spain argues, is not a business activity under EU Law, which is applicable law by virtue of Article 26(6) of the ECT, and it is also part of the national law of the Netherlands and Spain.278

220. Moreover, Respondent argues, Claimants (i) have no employees of their own, as shown by their own Commercial Registers at the Chamber of Commerce;279 (ii) have a registered office that: corresponds to the address of an entity dedicated to the creation and maintenance of companies (Intertrust Group B.V.), is shared with over 1,000 other companies, and has no footprint of Claimants in it;280 (iii) have financial statements typical of holding companies, that are short, not audited, without management or board of directors reports, with the total assets being the holdings in the NextEra Group subsidiaries, with limited liabilities and no income or cash flow statements;281 (iv) have two categories of directors in their boards (A and B), with only the U.S. directors (category A) having decision making power;282 and (v) have no footprint online, or in the


274 Resp. Reply Jur., ¶¶ 173-174, 179. ↩

275 Resp. Reply Jur., ¶ 180. ↩

276 Resp. Mem. Jur., ¶¶ 123, 126; Resp. Reply Jur., ¶¶ 13, 50, 108. ↩

277 Resp. Reply Jur., ¶¶ 20, 23, 25. ↩

278 Resp. Mem. Jur., ¶ 126. ↩

279 Resp. Mem. Jur., ¶¶ 125, 129; Resp. Reply Jur., ¶¶ 30-34. ↩

280 Resp. Mem. Jur., ¶¶ 130-131; Resp. Reply Jur., ¶¶ 38-40. ↩

281 Resp. Reply Jur., ¶ 36. ↩

282 Resp. Reply Jur., ¶¶ 41-46. ↩

[Page 66]

NextEra Group SEC filings.283 For Spain, they are mere “shell companies” through which funds flow from the United States to Spain.284

221. Respondent objects to Claimants' allegation (based in Amto) that the term “substantial” in Article 17 of the ECT should be analysed from a qualitative point of view, as opposed to a quantitative one. In Respondent's view, this interpretation is in tension with the Spanish version of Article 17, which uses the term “important” (“importantes”) when referring to the activities.285 It is also contrary to the decision in Plama, which considered the term “substantial” as a quantitative one.286 In any event, Respondent says, Amto does not assist Claimants because the finding of substantial activities there was based on facts that are not met in this case, namely, the existence of two full time employees, an office permanently leased, and investments in other countries following instructions from within the country; while the holding of a bank account was not found determinative.287

(ii) The Denial of Benefits Was Timely and the Effects Can Be Retroactive

222. Respondent argues that its denial was timely,288 because (i) there are no provisions in the ECT regarding timing for the exercise of Article 17;289 (ii) the right can only be exercised when it is known that it is being invoked, and when Respondent is made aware of the arbitration and the exact characteristics of the alleged investor;290 and (iii) Spain could only verify whether the requirements of Article 17 of the ECT were met after receiving and analysing the Memorial.291

223. It is Spain's position that the denial of benefits “may be exercised from the moment there is knowledge of the dispute being submitted, without any prior obligation to communicate


283 Resp. Reply Jur., ¶¶ 47-48. ↩

284 Resp. Reply Jur., ¶ 17. ↩

285 Resp. Reply Jur., ¶¶ 163-164. ↩

286 Resp. Reply Jur., ¶ 163 (referring to RL-008, Plama Jurisdiction, ¶ 169). ↩

287 Resp. Reply Jur., ¶ 165 (referring to CL-143, Limited Liability Company Amto v. Ukraine, SCC Case No. 080/2005, Award (26 March 2008) (hereinafter “Amto”)). ↩

288 Resp. Reply Jur., ¶ 108. ↩

289 Resp. Mem. Jur., ¶ 89; Resp. Reply Jur., ¶¶ 124-125. ↩

290 Resp. Mem. Jur., ¶ 89; Resp. Reply Jur., ¶¶ 123, 147 (a). ↩

291 Resp. Mem. Jur., ¶ 89; Resp. Reply Jur., ¶ 147. ↩

[Page 67]

said denial at the beginning of the arbitration or at the time of pre-investment.”292 Respondent observes that Plama relied on Article 1113 of NAFTA, which contains a requirement of prior communication and prior notification in connection with a denial of benefits, but has no equivalent in the ECT and it is thus not applicable.293 The absence of this provision in the ECT, Spain says, must mean that the intention of the ECT Contracting Parties was that the denial of benefits could be exercised at any time, given that other ECT provisions do contain express notice or consultation requirements.294 The position is also supported by the negotiating history of the ECT, Spain argues. According to Respondent, during the negotiations the United States had reserved the right to deny benefits at the time of the arbitration, and it was the United States' proposal that ultimately prevailed.295

224. Respondent argues that the dispute in this case arose in 2014, as the first trigger letter was sent in February 2014 and the Request for Arbitration was filed in May 2014.296 Prior to that, Spain says, the “only and first” communication sent to Spain revealing the existence of the Claimants was a letter of 15 March 2012, which for Spain only shows the “opacity in the business structure of the real investor, NextEra Energy Inc.”297 Respondent waited for the Request for Arbitration, it alleges, in order to have a correct picture of the structure used by NextEra Energy Inc., all in good faith and in accordance with the ICSID Arbitration Rules.298 And Spain did not have all the information to determine whether Article 17 of the ECT could be triggered until the Memorial was studied.299


292 Resp. Reply Jur., ¶ 133. ↩

293 Resp. Reply Jur., ¶ 126. ↩

294 Resp. Reply Jur., ¶¶ 126-128. ↩

295 Resp. Reply Jur., ¶¶ 130-131. ↩

296 Resp. Reply Jur., ¶¶ 120-121. ↩

297 Resp. Reply Jur., ¶ 122 (referring to C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012). ↩

298 Resp. Reply Jur., ¶ 147(b). ↩

299 Resp. Reply Jur., ¶ 147. Moreover, Spain says, the Spanish assets were transferred to the Dutch companies through private documents only produced to Respondent in the document production phase of this proceeding. Resp. Reply Jur., ¶¶ 122, 147(c). ↩

[Page 68]

225. In Respondent's view, both Article 41(1) of the ICSID Convention and ICSID Arbitration Rule 41(1), together with arbitral case law support the proposition that the denial of benefits was validly exercised in the Memorial on Jurisdiction.300 That is because under ICSID Arbitration Rule 41(1), objections to jurisdiction “shall be made as early as possible [...] no later than the expiration of the time limit fixed for the filing of the counter-memorial [...].”301

226. Spain further objects to the conclusion in Plama that a denial of benefits must be prospective. Relying on the decisions in Ulysseas and Guaracachi, Spain argues that Plama has been superseded by subsequent decisions that have allowed the exercise of the denial of benefits with retroactive effect.302 For Respondent, limiting the effects of a denial of benefits to the future amounts to introducing a restriction that is not reflected in the text of Article 17 of the ECT.303

227. Finally, Spain opposes Claimants' contention that the form of the denial of benefits in this case is defective, observing that the form in which the denial was activated here (an express statement in the Memorial on Jurisdiction) was completely different from that in Plama, the case on which Claimants rely.304

b. Claimants' Position

228. Claimants' first argument is that the question of application of Article 17 of the ECT is not a matter of jurisdiction, but one for the merits. By its express terms, they say, the


300 Resp. Reply Jur., ¶¶ 135-146 (referring to RL-009, Ulysseas, Inc. v. Republic of Ecuador, UNCITRAL, Interim Award (28 September 2010) (hereinafter “Ulysseas”); RL-010, Guaracachi America Inc. & Rurelec, Plc. v. Bolivia, PCA Case No. 2011-17, Award (31 January 2014) (hereinafter “Guaracachi”); RL-104, Empresa Eléctrica del Ecuador, Inc. v. Republic of Ecuador, ICSID Case No. ARB/05/9, Award (2 June 2009); CL-120, Pac Rim Cayman LLC v. El Salvador, ICSID Case No. ARB/09/12, Decision on the Respondent's Jurisdictional Objections (1 June 2012) (hereinafter “PacRim”)). ↩

301 Resp. Reply Jur., ¶ 137. ↩

302 Resp. Mem. Jur., ¶¶ 135-137 (referring to RL-009, Ulysseas; RL-010, Guaracachi). See also, Resp. Reply Jur., ¶¶ 152-159. ↩

303 Resp. Reply Jur., ¶ 152. ↩

304 Resp. Reply Jur., ¶¶ 105-106, n. 38. ↩

[Page 69]

provision is limited to the benefits in Part III of the ECT, and has no impact on the consent in Part V.305

229. In addition, Claimants argue, the objection fails for various reasons: (i) Article 17 of the ECT was not timely invoked; (ii) Spain was aware of Claimants' corporate structure several years before this arbitration begun; (iii) Claimants engage in substantial business activities in the Netherlands; and (iv) Claimants are Dutch owned and controlled.306

(i) The Exercise of Article 17 of the ECT Is Untimely and Procedurally Improper

230. In Claimants' view, the unanimous body of ICSID awards in ECT cases prevents the State from denying the benefits of the ECT to an investor after an investment has been made and a dispute has arisen;307 and the non-ECT awards relied upon by Spain are inapposite.308 Recognizing that the Tribunal is not bound by earlier decisions, Claimants observe that stability and predictability are very important in this area.309 In addition, Claimants argue, their position is supported by the ordinary meaning and context of Article 17(1) of the ECT, and the object and purpose of the ECT of promoting “long term-cooperation in the energy field.”310

231. Quoting from the decision in Khan, Claimants argue that the position adopted by the uniform body of cases makes “eminent sense,” as “[i]t is difficult to imagine that any Contracting Party [...] would refrain from exercising its right to deny the substantive protections of the ECT to an investor who has already commenced arbitration [...]" and


305 Cl. Bif., ¶ 56. ↩

306 Cl. C-Mem. Jur., ¶ 49. ↩

307 Cl. C-Mem. Jur., ¶ 51 (discussing CL-139, Ampal-American Israel Corporation et al. v. Arab Republic of Egypt, ICSID Case No. ARB/12/11, Decision on Jurisdiction (1 February 2016)); Cl. Bif., ¶¶ 57, 63 (discussing RL-008, Plama Jurisdiction; CL-114, Yukos; CL-006, Liman Caspian Oil BV and NCL Dutch Investment BV v. Republic of Kazakhstan, ICSID Case No. ARB/07/14, Excerpts of Award (22 June 2010) (hereinafter “Liman”); CL-113 / CL-140, Khan Resources Inc., et al. v. Government of Mongolia and MonAtom LLC, UNCITRAL, PCA Case No. 2011-09, Decision on Jurisdiction (25 July 2012) (hereinafter “Khan”); RL-013, Anatolie Stati, Gabriel Stati, Ascom Group SA and Terra Raf Trans Traiding Ltd v. Republic of Kazahkstan, SCC Case, Award (19 December 2013) (hereinafter “Stati”)). See also, Cl. Rej. Jur., ¶¶ 95-96. Claimants argue that Respondent’s attempt to distinguish Plama on the basis of its reference to Article 1113 of NAFTA, cannot obscure the fact that that tribunal reached its decision based on Article 17 of the ECT. Cl. Rej. Jur., ¶ 97. ↩

308 Cl. Bif., ¶¶ 77-78; Cl. C-Mem. Jur., ¶ 51. ↩

309 Cl. Bif., ¶¶ 65-67. ↩

310 Cl. Bif., ¶¶ 59-63; Cl. Rej. Jur., ¶ 98 (citing CL-006, Liman, ¶ 225). ↩

[Page 70]

“[a] good faith interpretation does not permit the Tribunal to choose a construction of Article 17 that would allow host States to lure investors by ostensibly extending to them the protections of the ECT, to then deny these protections when the investor attempts to invoke them [...].”311

232. Furthermore, Claimants contend, Spain cannot argue that it only recently acquired knowledge of the relevant facts giving rise to the denial, because: (i) Spain has known “[a]t all times” that the ultimate owner of this investment was a U.S. corporation; (ii) since 2008 prior to the construction of the Termosol Plants, it has been a matter of public record that NEE España was owned by NextEra Spain (Claimant 2), a Dutch corporation; and (iii) after NextEra officials in the United States notified Spain of a potential ECT claim by the Dutch Claimants in 2012, Spain did not invoke its right under Article 17 of the ECT, and instead, continued to encourage the investments.312 In particular, Claimants point out that:


311 Cl. C-Mem. Jur., ¶ 51 (quoting CL-140, Khan, ¶ 429). ↩

312 Cl. C-Mem. Jur., ¶ 52; Cl. Bif., ¶¶ 69-70, 73-74 (referring to C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012) and ¶ 79. ↩

313 Cl. C-Mem. Jur., ¶ 53 (citing C-048, Letter from Mitch Davidson (NextEra Energy Resources, LLC), to Pedro Marín (Secretary of State for Energy), 8 July 2009; C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009, C-058, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to José Luis Rodriguez Zapatero (President of the Government of Spain), 22 April 2010; and C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012). ↩

314 Cl. C-Mem. Jur., ¶ 54 (citing C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009; C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010; C-011, Letter from Ignacio Grangel Vicente (Chief of Staff to the Secretary of State for Energy) to John Ketchum (NextEra Energy Resources, LLC), 3 April 2012). ↩

[Page 71]

Energy Inc., as seen in the consolidated financial statements of 2008, 2009, 2010 and 2013.315

233. As a legal consequence of the foregoing: (i) Spain cannot claim that the information needed to trigger a denial of benefits is new; and (ii) Spain has “acquiesced” in the facts it now seeks to challenge, which prevents it from raising the denial ex post facto. Acquiescence, Claimants argue, is a principle of international law linked to the principle of good faith.321


315 Cl. C-Mem. Jur., ¶ 54 (citing C-124, 2013 Consolidated Financial Statements for NEE España, 22 July 2014; C-132, NEE España's 2008 Abbreviated Financial Statements, 31 March 2009; C-133, NEE España's 2009 Abbreviated Financial Statements, 31 March 2010; to C-134, NEE España's 2010 Consolidated Financial Statements, 22 July 2011). ↩

316 Cl. C-Mem. Jur., ¶ 55 (citing C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012). ↩

317 Cl. C-Mem. Jur., ¶ 55 (citing C-124, 2013 Consolidated Financial Statements for NEE España, 22 July 2014; C-132, NEE España's 2008 Abbreviated Financial Statements, 31 March 2009; C-133, NEE España's 2009 Abbreviated Financial Statements, 31 March 2010; to C-134, NEE España's 2010 Consolidated Financial Statements, 22 July 2011; C-083, Notarised Deed Corporate Resolutions adopted by NextEra Energy España, S.L., 9 June 2010; C-135, Notarised Deed Appointment of new Director, 9 June 2010). ↩

318 Cl. C-Mem. Jur., ¶ 56 (citing C-080, First Notarised Deed Corporate Resolution adopted by FPLE Solar Assets, SL, 2 June 2009; and C-083, Notarised Deed Corporate Resolutions adopted by NextEra Energy España, S.L., 9 June 2010) ↩

319 Cl. Rej. Jur., ¶¶ 99-100 (citing C-280, Annex 2 to the PTE Letter of Rectification, 25 August 2009). ↩

320 Cl. Rej. Jur., ¶¶ 101-102. ↩

321 Cl. C-Mem. Jur., ¶ 58. See also, Cl. Rej. Jur., ¶ 104; Cl. Bif., ¶ 76. ↩

[Page 72]

234. Finally, Claimants argue, the facts of this case are distinguishable from those relied upon by Respondent (Guaracachi, Ulysseas and PacRim), where there was no evidence that the State was aware of the ownership and control before the dispute arose. Indeed, Claimants say that they are not aware of any decision upholding the validity of a denial of benefits exercised during the course of an arbitration on the basis of information made available to the State beforehand.322

(ii) The Form of the Denial is Deficient

235. Relying on Plama, Claimants argue that the denial ought “necessarily be associated with publicity or other notice,” either through “a general declaration in a Contracting State's official gazette [...]; or a statutory provision in a Contracting States' investment or other laws; or even an exchange of letters with a particular investor or class of investors.”323 Plama rejected the State's exercise of the denial via two communications to the ICSID Acting Secretary General expressly indicating the intention to exercise Article 17 of the ECT, and this is analogous to Respondent's actions in the present case. It follows that the denial here is invalid as a matter of form.324

236. In response to Respondent's contention that the text of Article 17 of the ECT does not require any prior notification, publication or consultation, Claimants contend that “[t]he text of Art[icle] 17 of the ECT presupposes that the right reserved therein be expressly and unambiguously exercised outside the context of an existing arbitration with the relevant investor, which can only be done through some form of notification, publication or communication.”325

(iii) The Conditions of Article 17 of the ECT Are Not Met

237. Claimants contend that Respondent has the burden to prove the two cumulative conditions of Article 17 of the ECT.326 Dismissing Respondent's attempt to shift the burden to Claimants, they argue that as Article 17 is being raised as an exception to the


322 Cl. C-Mem. Jur., ¶ 59. ↩

323 Cl. C-Mem. Jur., ¶ 60 (quoting RL-008, Plama Jurisdiction, ¶ 157). ↩

324 Cl. C-Mem. Jur., ¶¶ 60-61; Cl. Rej. Jur., ¶ 105. ↩

325 Cl. Rej. Jur. n. 156. ↩

326 Cl. C-Mem. Jur., ¶ 62; Cl. Rej. Jur., ¶ 106. ↩

[Page 73]

applicability of Part III of the ECT, it falls on Respondent to establish that all of the elements of the exception are met.327 In Claimants' view, this burden has not been discharged, as in fact: (i) Claimants have substantial business activities in the Netherlands; and (ii) each Claimant is owned by another Dutch entity, and that ownership confers control in the ordinary way.328

238. Substantial Business Activities. Claimants argue that there is no check-list of mandatory factors, and the inquiry is qualitative, rather than quantitative, i.e. the decisive question is the “materiality, not the magnitude of the business activity.”329

239. Respondent's attempt to rely on the different adjectives used in the English and the Spanish version of the ECT (“substantial” and “importantes”) is irrelevant, because both are met. That said, Claimants argue that as both the English and Spanish texts are equally authentic, pursuant to Article 33(3) of the VCLT they should be presumed to have the same meaning. That meaning would be the meaning endorsed by Amto, which is the common denominator in the various other authentic languages of the ECT.330 Claimants add that, if the Tribunal is not satisfied, and considers that the authentic texts disclose a difference of meaning, pursuant to Article 33(4) of the VCLT, the Tribunal must (i) remove the difference applying Article 31 and 32 of the VCLT, or (ii) should that fail, adopt the meaning that “best reconciles the texts, having regard to the object and purpose of the treaty.”331 The analysis under either of those steps, Claimants contend, also leads to the meaning adopted in Amto.332

240. Claimants argue that they “exceed the standard for ‘substantial business activities,”333 and have activities in the Netherlands that are quantitatively and qualitatively substantial.334 This, they say, is demonstrated by the witness statement of Mr. George


327 Cl. Rej. Jur., ¶ 108. ↩

328 Cl. C-Mem. Jur., ¶ 63. ↩

329 Cl. C-Mem. Jur., ¶ 64 (quoting CL-143, Amto, ¶ 69). ↩

330 Cl. Rej. Jur., ¶¶ 114-117. ↩

331 Cl. Rej. Jur., ¶ 116. ↩

332 Cl. Rej. Jur., ¶¶ 117-119. ↩

333 Cl. C-Mem. Jur., ¶ 67. ↩

334 Cl. Rej. Jur., ¶ 120. ↩

[Page 74]

Nicolai and documentary evidence, showing that Claimants: (i) are incorporated in the Netherlands; (ii) have a registered office in Amsterdam, which they have use of, and have hired a company named Intertrust to provide secretarial and communication facilities; (iii) hold the vast majority of their board meetings in the Netherlands; (iv) make decisions within the Netherlands, as the board of NextEra Energy Global Holdings Cooperative U.A. can only pass resolutions if adopted by majority of both A and B directors present, and the B directors are Dutch nationals; (v) convene annual general shareholder meetings in the Netherlands; (vi) have bank accounts in the Netherlands; (vii) are Dutch residents for tax purposes; (viii) prepare and file statutory annual accounts in the Netherlands; (ix) have adopted significant business decisions concerning the investments in Spain, including purchase of equipment, equity injections, causing NextEra Spain to subscribe the shares in NEE España, reviewing operations summaries of the Termosol Plants, appointing auditors, prosecuting claims in this arbitration by hiring counsel, overseeing, assessing and assisting with the potential sale of NEE España, reviewing debt restructurings, and dealing with the potential liquidation of NEE España.335 In addition, Claimants' administrative costs for conducting business in the Netherlands exceed approximately EUR 37,000 per year and the management and corporate secretarial costs exceed EUR 85,000 per year.336 Furthermore, NextEra Global is also the holding company for large renewable energy investments in Canada, which is part of the factual matrix for determining whether this company has substantial business activities in the Netherlands.337

241. None of the factors referred to by Spain detract from the above substantial business activities. Many of Spain's contentions have already been rejected by other arbitral tribunals.338 There is no rule in investment treaty arbitration against the bona fide use of holding companies.339 There is a distinction between holding companies – which could in principle have substantial business activities – and shell companies, and even if the


335 Cl. C-Mem. Jur., ¶ 67. See also, Cl. Rej. Jur., ¶ 123; Cl. Bif., ¶ 81. ↩

336 Cl. C-Mem. Jur., ¶ 68. ↩

337 Cl. C-Mem. Jur., ¶ 68; Cl. Rej. Jur., ¶ 123 (third bullet). ↩

338 Cl. C-Mem. Jur., ¶¶ 69-70. Claimants rely on the statements of Mr. George Nicolai and Mr. Mark Sorensen to counter assertions made in the Accuracy Report on this subject. Cl. Rej. Jur., ¶ 122. ↩

339 Cl. C-Mem. Jur., ¶ 72. ↩

[Page 75]

Tribunal concluded that Claimants are shell companies, there would be no basis to deprive them of protection, as held in RREEF.340 It is also irrelevant that Claimants' Dutch annual accounts are abbreviated, because they qualify as small companies under Dutch law and are thus not required to include cash flows or board statements or audit their accounts.341 Respondent's reliance only on the filed accounts is misleading, as the accounts produced for the shareholders include more detailed information; and Claimants do hire Dutch auditors.342 Finally, the code used in the Dutch registry has the sole purpose of describing the main object of the company at the time of registration; it has no legal consequences and does not restrict the activities of the entity.343

242. Dutch Ownership and Control. Claimants contend that Dutch ownership is demonstrated because each Claimant is owned by a Dutch national: NextEra Global (Claimant 1) owns 100% of NextEra Spain (Claimant 2); and a Dutch cooperative owns 100% of NextEra Global (Claimant 1).344 Dutch control is also showed by the fact that no voting arrangements prevent these owners from “exercising control over their immediate subsidiary, in the normal way.”345 Moreover, contrary to Spain's contentions, Claimants' board of directors is not dominated or controlled by U.S. citizens, as each director has a free vote and neither of the categories (A or B) plays a more important role.346

243. Claimants also observe that, by contrast with Article 1(6) of the ECT – concerning the definition of “Investment” – Article 17 does not include any reference to indirect ownership or control. Accordingly, they say, the ordinary meaning and the context of Article 17 refer to direct ownership and direct control.347 Spain's reliance on Understanding 3 relating to Article 1(6) of the ECT is a red herring, because, had the ECT Contracting Parties wished to include within the ambit of Article 17(1) indirect ownership or control, they could have easily transposed the language from Article 1(6),


340 Cl. C-Mem. Jur., ¶¶ 74-75 (referring to CL-120, PacRim; CL-135, RREEF). See also, Cl. Rej. Jur. ¶ 121. ↩

341 Cl. C-Mem. Jur., ¶ 76. ↩

342 Cl. C-Mem. Jur., ¶ 77. ↩

343 Cl. Rej. Jur., ¶ 121. ↩

344 Cl. C-Mem. Jur., ¶ 80; Cl. Rej. Jur., ¶ 110; Cl. Bif., ¶ 82. ↩

345 Cl. C-Mem. Jur., ¶ 80; Cl. Rej. Jur., ¶ 110. ↩

346 Cl. Rej. Jur., ¶ 112. ↩

347 Cl. C-Mem. Jur., ¶ 81. ↩

[Page 76]

and they did not.348 In addition, Claimants say, Spain's view is inconsistent with the functions of Article 1(6) and Article 17 of the ECT: the first one provides a broad definition of “Investment,” while the second one provides limited exceptions to the general applicability of the ECT to those “Investments.”349

(iv) The Denial Can Only Produce Effects to the Future

244. Finally, Claimants argue that, even if the conditions of Article 17 were met, the denial could only have effect as of 9 September 2015 (date of the Memorial on Jurisdiction), when it was raised for the first time; and all the challenged measures in this case occurred prior to that date.350

(2) The Tribunal's Analysis

245. Article 17 was invoked by Respondent as a preliminary objection and argued that way. The Tribunal notes Claimants' argument that this objection is not really a jurisdictional objection since it is a challenge only to the application of Part III of the ECT. However, since the matter has been argued as a preliminary objection, the Tribunal will deal with it on this basis.

246. Article 17(1) of the ECT provides:

“Each Contracting Party reserves the right to deny the advantages of this Part to:

(1) a legal entity if citizens or nationals of a third state own or control such entity and if that entity has no substantial business activities in the Area of the Contracting Party in which it is organized; [...].”351

247. Respondent argues that Claimants are owned and controlled by the American company NextEra Energy Inc. and do not have substantial business activities in the Netherlands. It


348 Cl. Rej. Jur., ¶ 111. ↩

349 Cl. Rej. Jur., ¶ 111. ↩

350 Cl. C-Mem. Jur., ¶ 82. ↩

351 CL-001 / RL-055, ECT, Art. 17(1). ↩

[Page 77]

argues that it exercised its right under Article 17(1) to deny the benefits of Part III of the ECT to Claimants in its Memorial on Preliminary Objections.352

248. The Tribunal will deal first with the question whether Claimants are owned or controlled by the citizens or nationals of a third State, second with whether they have substantial business activities in the Netherlands, and third with whether Respondent has exercised effectively a denial of the advantages of Part III of the ECT under Article 17(1).

a. Are Claimants Owned or Controlled by the Citizens or Nationals of a Third State?

249. Claimants argue that they are 100% owned by a Dutch cooperative and control follows that ownership. The second Claimant, NextEra Spain, is registered in the Netherlands and is 100% owned by the first Claimant NextEra Global, also registered in the Netherlands, which in turn is 100% owned by NextEra Energy Global Holdings Cooperative U.A, which, too, is registered in the Netherlands. On that basis, Claimants are not controlled by the nationals of a non-ECT State. Nor, Claimants argue, do the voting arrangements prevent the Dutch owners from exercising control. In any event, Claimants argue, since there is no reference to “indirect” ownership or “indirect” control in Article 17(1) of the ECT, the word control in Article 17(1) is limited to “direct” control.

250. The Tribunal sees no basis for concluding that control in Article 17(1) of the ECT is limited to direct control. It is control in fact that counts, just as control in fact is what is meant in respect of Article 1(6) (Understanding 3). It makes no sense to say that the test for control in determining whether an investment is controlled by the nationals of another Contracting Party is different from the test for determining whether an investment is controlled by the nationals of a third State.

251. NextEra Energy, Inc., a U.S. corporation is the ultimate principal entity in the NextEra group and notwithstanding the formal provisions on voting, the reality is that the Dutch companies are controlled by the American company and the principal activities of Claimants in respect of the investments in Spain are conducted by the American


352 Resp. Mem. Jur., ¶ 138. ↩

[Page 78]

company. It was officials of the American companies who dealt with the Spanish authorities in making the investment and, as will be discussed later, all of the representations by the Spanish authorities on which Claimants rely for their legitimate expectations claim in this case were made to those officials. In short, the reality of control is with U.S. nationals.

252. In light of this, the Tribunal concludes that Claimants are controlled by the citizens or nationals of a third State and thus the first criterion in Article 17(1) is met.

b. Do Claimants Have “Substantial Business Activities” in The Netherlands?

253. Respondent argues that Claimants do not have any business activities in the Netherlands. They are essentially holding companies whose function is to hold shares not to conduct business activities. Claimants argue that there is no barrier to holding companies meeting the test of having substantial business activities and list a variety of activities which it claims show that they meet this test, including having a bank account in the Netherlands, holding meetings there, providing annual accounts and taking decisions on such matters as equipment and funding of the Spanish subsidiaries. The question according to Claimants is the materiality of the business activities not the magnitude.

254. The question of what constitutes “substantial business activities” has been dealt with in several cases, although not all related to Article 17(1) of the ECT. In Pac-Rim,353 a case brought under the Central American Free Trade Agreement (“CAFTA”), the tribunal concluded that there were no “substantial business activities” of the claimant in the United States. It simply held the shares of other companies. Apparently, it had no board of directors and no bank account in the U.S. The tribunal did say that a “traditional holding company” could be engaged in “substantial business activities.” Such a company in its view would have “a board of directors, board minutes, a continuous physical presence and a bank account.”354


353 CL-120, PacRim. ↩

354 CL-120, PacRim, ¶ 4.72. ↩

[Page 79]

255. In Amto,355 the tribunal decided that since investment activities were conducted from premises in Latvia and the claimants had a small permanent staff, they met the test of having “substantial business activities” there.356 The company also had a bank account in Latvia and paid taxes.”357

256. In the present case, the claimed “substantial business activities” of the Claimants are more substantial than those in PacRim, where there was no board of directors and no bank accounts in the United States. The Claimants in this case would also meet the requirements set out in PacRim for a “traditional holding company” in that it had “a board of directors, board minutes, a continuous physical presence and a bank account.”358

257. The facts of Amto bear some similarity to the present case, but there are differences. The principal difference is that the NextEra Claimants have no permanent employees; they contract with Intertrust, which conducts Claimants' business in the Netherlands. However, this does not seem an important distinction. Whether one operates a business through permanent employees or contracts that work out to someone else is simply a business decision about how to operate. In either case, substantive work is being done for the company. The question is whether that work constitutes substantial business activities. In this regard, the Tribunal does not give any weight to the fact that the Spanish version of the treaty refers to “important” rather than “substantial” business activities. Since it is the quality and not just the quantity of the activities that is relevant, whether the term “important” or the term “substantial” is used does not make a difference.

258. Amto provides a useful test, in that it looked to see if “investment activities” were being conducted by the Latvian claimant. Applying that approach to the present case involves


355 CL-143, Amto. ↩

356 CL-143, Amto, ¶ 68. ↩

357 In Guaracachi, the tribunal concluded that substantial business activities had not been established although it did not set out any criteria for reaching that decision. The claimant had argued that the company had offices in the US, held shareholder’s meetings and Board of Directors meetings there, and prepared minutes of those meetings. RL-010, Guaracachi, ¶ 217. ↩

358 CL-120, PacRim, ¶ 4.72. ↩

[Page 80]

asking whether Claimants were engaged in investment activities from the Netherlands. In this regard, the meetings of the Board of Directors in the Netherlands are significant. In their Counter Memorial on Jurisdiction, Claimants argue that in fact “significant” business decisions relating to their investments were taken by Claimants, including purchasing equipment for the Termosol Plants in 2008, equity injections of EUR 209 million, appointing auditors in the Netherlands, hiring counsel for these arbitration proceedings, and hiring liquidators to oversee the liquidation of NEE España in 2013.359 They also refer to reviewing operation summaries of the Termosol Plants, and reviewing proposed debt restructuring.

259. In short, Claimants' argument is that they are not shell companies in the Netherlands; through their Board of Directors they play an active role in making decisions for their investments and have been engaged in reviewing the activities of their investments.

260. The Tribunal notes that although there has not been a significant jurisprudence on the question of “substantial business activities,” the tribunals that have found such activities to exist have been prepared to do so on the basis of a relatively small number of activities both in terms of quantity and quality. And that is true of the claim to having substantial business activities in the Netherlands in the present case. As pointed out earlier, the investment activities in respect of the Spanish investment are those of the U.S. parent and Claimants have a very limited role.

261. However, in view of the decision that the Tribunal reaches in respect of denial of benefits below, it does not have to decide whether Claimants' business activities in the Netherlands were substantial. Even if they were not substantial, Respondent still failed to exercise its right to deny benefits in accordance with Article 17(1) of the ECT.

c. Assuming that Respondent Had the Right to Deny Benefits Did It Exercise that Right in a Timely Fashion?

262. Article 17 of the ECT provides no guidance on the time at which the right to deny benefits must be exercised and the cases seem to be divided on this.


359 Cl. C-Mem. Jur., ¶ 67. ↩

[Page 81]

263. In the present case, the denial was asserted by Spain on 9 September 2015 in its Memorial on Jurisdiction.360 The question is whether that is too late. Although there has been some controversy over when the right to deny benefits must be exercised, recent cases have suggested that the right must be exercised no later than the time the benefits are claimed (Ulysseas and Guaracachi). On that basis, by denying benefits in its Memorial on Jurisdiction, Respondent was responding to the attempt by Claimants to exercise ECT rights in bringing this claim.

264. However, the filing of the claim was not the first time that Respondent was aware of a potential ECT claim by NextEra. As set out above, NextEra had engaged with the Spanish authorities on its plan to invest in the solar industry as early as July 2009, both in person and through correspondence. It was clear to the government that it was dealing with an American corporation, but it was also made clear that this investment was operated through a Dutch company.361 The details of Claimants' ownership were available in public registers and Respondent must be taken to be aware of the status of Claimants. The contacts between the NextEra Energy group and the Spanish government both written and in person were extensive, up to and including the prime ministerial level. Encouragement and reassurances were provided to NextEra without any suggestion that Spain would invoke Article 17(1) of the ECT and deny the benefits of the treaty to Claimants.

265. More specifically, in a letter dated 15 March 2012 from John W. Ketchum, Vice President, NextEra Energy Resources LLC to the Minister for Industry, Energy and Tourism and the Secretary of State for Energy, the Spanish authorities were advised that the Dutch company which owned the NextEra investment in Spain was the “beneficiary of the protective provisions set forth in the Energy Charter Treaty” and that NextEra would defend their rights including through international arbitration.362


360 Resp. Mem. Jur., ¶ 138. ↩

361 Cl. C-Mem. Jur., ¶¶ 52 et seq. ↩

362 C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012. ↩

[Page 82]

266. Thus, by 15 March 2012, Respondent was aware that the NextEra Spanish investment was owned by a Dutch company, which regarded itself as having rights under the ECT, and that NextEra was willing to enforce those rights through international arbitration. The Spanish government gave no indication that it would deny those rights. Indeed, following this letter, the Spanish government made further assurances to NextEra and Claimants went ahead and completed the building of the Termosol Plants.363

267. In light of this, can Respondent then deny the benefits of Part III of the ECT once a claim has formally been made? In Khan the tribunal said:

“A good faith interpretation does not permit a tribunal to choose a construction of Article 17 to allow host states to lure investors by ostensibly extending to them the protections of the ECT, to then deny them these protections when the investor attempts to invoke them in international arbitration.”364

268. In the view of the Tribunal, once Spain became aware not just that it had a right to deny benefits but that Claimants were relying on Spain's statements and actions and were reserving a right to invoke the provisions of the ECT, it was put on notice of a potential exercise of ECT rights by NextEra. To delay until its Memorial on Jurisdiction on 9 September 2015, more than three years later, to exercise its right to deny benefits under Article 17(1) of the ECT is hardly a good faith exercise of its right as contemplated by the Khan tribunal. During that period Spain gave assurances about the protection the NextEra investment would receive in full knowledge that it was an investment that, in Claimants' view, was proceeding under and with the protections of the ECT. As a result, Claimants were justified in proceeding on the assumption that Spain would not exercise its right to deny benefits under Article 17 of the ECT.

269. Respondent was confronted on 15 March 2012 with a clear assertion that NextEra's international Dutch investment company had rights under the ECT and that NextEra planned to exercise such rights. Faced with such an assertion, and knowing that it had the right to deny the benefits that Claimants were asserting, Respondent could not stay silent,


363 Cl. Bif., ¶¶ 70 et seq. ↩

364 CL-113, Khan, ¶ 429. ↩

[Page 83]

but it did. Its conduct can only be viewed as acquiescence in Claimants' assertion of ECT rights precluding Respondent from later seeking to assert a right to deny benefits when it filed its Memorial on Jurisdiction on 9 September 2015.

270. In light of this, the Tribunal concludes that even if Claimants did not have “substantial business activities” in the Netherlands, Respondent failed to exercise its right to deny benefits under Article 17(1) in a timely fashion.

271. Accordingly, the Tribunal rejects the second preliminary objection.

C. THIRD OBJECTION: LACK OF JURISDICTION RATIONE PERSONAE – INTRA-EU OBJECTION

(1) The Parties' Positions

a. Respondent's Position

272. Spain objects to the Tribunal's jurisdiction arguing that Claimants are not protected investors under the ECT, because the dispute resolution mechanism set forth in Article 26 of the ECT does not apply to controversies arising between an investor of a EU Member State and a EU Member State (“intra-EU”).365

273. As both the Netherlands and Spain were EU Member States at the time they entered into the ECT, and the EU is a Contracting Party to the ECT, Respondent contends, Claimants are not investors of “another Contracting Party” as required by Article 26 of the ECT.366 The requirement of diversity in the Contracting Party “inevitably implies” the exclusion of intra-EU disputes.367

274. Spain has observed, however, that it does not contend that the ECT contains “an express or implied disconnection clause.”368 Relying on the EC's opinion, Respondent argues that the introduction of such clause was “entirely without relevance” “given that the


365 Resp. Mem. Jur., ¶ 13. ↩

366 Resp. Mem. Jur., ¶¶ 13, 27-28, 83; Resp. Reply Jur., ¶¶ 184, 240. ↩

367 Resp. Mem. Jur., ¶ 27. ↩

368 Resp. Reply Jur., ¶ 237. ↩

[Page 84]

agreement envisaged cover[ed] areas for which a complete harmonisation ha[d] been carried out.”369

(i) The Principle of Primacy of EU Law

275. In support of this objection, Respondent contends that:

276. Respondent emphasizes that underlying this objection is the essential principle of primacy of EU Law in intra-EU relations, pursuant to which EU Law must be applied over any other national or international law,375 regardless of whether EU Law is more favourable or not.376 It follows for Spain that “it is the [law] of the EU and not the ECT which must be applied to resolve this dispute.”377


369 Resp. Reply Jur., ¶ 238. ↩

370 Resp. Mem. Jur., ¶ 29. ↩

371 Resp. Mem. Jur., ¶¶ 30-31, 34. ↩

372 Resp. Mem. Jur., ¶ 40. ↩

373 Resp. Mem. Jur., ¶ 41. ↩

374 Resp. Mem. Jur., ¶ 31. ↩

375 Resp. Reply Jur., ¶¶ 187, 189. ↩

376 Resp. Reply Jur., ¶ 189. ↩

377 Resp. Reply Jur., ¶ 198. ↩

[Page 85]

277. For Spain, the preferential application of the EU system between EU Member States is recognized by the ECT's text, context and purpose.378

278. With respect to the text of the ECT, Respondent points out:


378 Resp. Mem. Jur., ¶ 43 et seq. ↩

379 Resp. Mem. Jur., ¶ 45; Resp. Reply Jur., ¶¶ 228-229; CL-001 / RL-055, ECT, Art. 1(3) (“‘Regional Economic Integration Organization’ means an organization constituted by states to which they have transferred competence over certain matters a number of which are governed by this Treaty, including the authority to take decisions binding on them in respect of those matters.”) ↩

380 Resp. Reply Jur., ¶¶ 226-227. ↩

381 Resp. Reply Jur., ¶¶ 230-231. ↩

382 Resp. Mem. Jur., ¶ 49; Resp. Reply Jur., ¶¶ 231-232; CL-001 / RL-055, ECT, Art. 36(7). ↩

383 Resp. Mem. Jur., ¶ 47; CL-001 / RL-055, ECT, Art. 16. ↩

384 Resp. Mem. Jur., ¶ 48; CL-001 / RL-055, ECT, Art. 25. ↩

385 Resp. Reply Jur., ¶¶ 190, 192 (highlighting the words “preferential treatment” in Art. 25). ↩

[Page 86]

Party;” and cannot give rise to obligations among EU Member States, because at the time the ECT was entered into, EU Member States had already given over their sovereignty in connection with the internal market to the EU and could not assume inter-se obligations concerning that market.386 As the consent in Article 26 of the ECT is limited to disputes arising out of alleged breaches of obligations of Part III, and EU Member States could not contract obligations among themselves under Part III, Article 26 cannot apply to intra-EU disputes.387 Further, in addition to arbitration, Article 26 provides for conciliation and recourse to national courts, without establishing an order of preference or indicating that arbitration is more favourable.388

279. Respondent dismisses Claimants' interpretation of the above-mentioned provisions, arguing that it is “literal and completely out of context.”391 Instead, Respondent urges that an effective interpretation of the ECT leads to the conclusion that the ECT recognizes the primacy of EU Law in intra-EU relations and excludes arbitration.392

280. According to Respondent, the ECT's object and purpose also support its position. That is, Spain says, because admitting the intra-EU application of the ECT would dispense with the ECT's object and purpose, as (i) it would mean that the EU and its Member States promoted the ECT to cover an area (intra-EU investments) already covered by EU Law in an exhaustive and superior manner; (ii) it would take away competences from the CJEU; and (iii) it would reflect a lack of trust in the EU system.393


386 Resp. Mem. Jur., ¶¶ 50, 58. ↩

387 Resp. Reply Jur., ¶¶ 225-226. ↩

388 Resp. Reply Jur., ¶¶ 233-234. ↩

389 Resp. Mem. Jur., ¶ 50; CL-001 / RL-055, ECT, Art. 26. See also, Resp. Mem. Jur., ¶ 78. ↩

390 Resp. Reply Jur., ¶¶ 235-236. ↩

391 Resp. Reply Jur., ¶ 222. ↩

392 Resp. Reply Jur., ¶ 224. See also, id., ¶ 236. ↩

393 Resp. Mem. Jur., ¶ 61. ↩

[Page 87]

(ii) Intra-EU Arbitration Contravenes EU Law

281. It is Spain's position that Article 26(6) of the ECT prevents intra-EU disputes, because that would contravene EU Law, which is applicable international law.394 Article 344 of the Treaty on the Functioning of the European Union (“TFEU”) prohibits the submission of questions relating to the internal electricity market to arbitration, and in this arbitration the Tribunal is being called upon to decide on the rights of a EU investor in the internal market.395 That is, Spain argues, because “the EU Directives in the area of renewable energies are the framework of [the] Spanish legislation in which the Claimants allegedly rely on making an investment” and as such “the question must be resolved in light of the interpretation of the EU law.”396 Moreover, for Spain, the dispute affects essential elements and pillars of EU Law, namely, the notions of State Aid, competition law, free movement of capital and freedom of establishment, and as such the Tribunal does not have jurisdiction to resolve it, as this power is reserved to the EU's judicial system.397

282. For Respondent, it is significant that the objection is backed by the EC – “one of the most authorised voices on interpreting the ECT” and an ECT negotiator; and by legal doctrine.398 The EC has recognized the “incompatibility of the Investment Treaties signed between EU Member States and EU Law,” and of the arbitration provisions in the ECT and EU Law, when applied to intra-EU disputes.399

283. Spain also draws significant support for this objection from the CJEU judgment in Achmea, of 6 March 2018.400 Spain contends that pursuant to this judgment “an


394 Resp. Mem. Jur., ¶ 51. ↩

395 Resp. Mem. Jur., ¶¶ 52-53; RL-021 / R-004, Treaty on the Functioning of the European Union (“TFEU”), Art. 344 (“Member States undertake not to submit a dispute concerning the interpretation or application of the Treaties to any method of settlement other than those provided for therein.”) See also, Resp. Reply Jur., ¶ 219. ↩

396 Resp. Mem. Jur., ¶ 77. ↩

397 Resp. Reply Jur., ¶ 197. See also, id., ¶¶ 193, 194, 219. In the context of this objection, in its Memorial on Jurisdiction, Respondent referred to the potential impact that a procedure initiated by the EC to evaluate the renewable energy measures in Spain captioned “SA.40348 2014/N” could have in the present arbitration. Resp. Mem. Jur., ¶ 79 et seq. Respondent's arguments on this matter are summarized infra, ¶ 510 et seq. ↩

398 Resp. Mem. Jur., ¶¶ 66-82. ↩

399 Resp. Reply Jur., ¶ 186. ↩

400 RL-125, Slovak Republic v. Achmea B.V., Preliminary Ruling of the Court of Justice of the European Union in C-284/16, 6 March 2018 (hereinafter “Achmea”). In the Reply on Jurisdiction, Respondent had anticipated that at that time there were two pending cases before the CJEU “regarding the compatibility between the BITs and EU Law,” stating that it would maintain the objection until the CJEU made a decision. Resp. Reply Jur., ¶ 186 and n. 81 ↩

[Page 88]

arbitration clause in an International Agreement concluded between EU Member States (intra-EU BIT) is incompatible with EU law and, in particular, the autonomy of the EU legal order.”401

284. Respondent first highlights that the Achmea judgment endorses the principles that: (i) the judicial system established in the EU Treaties is intended to ensure consistency and uniformity in the interpretation of the EU Law; (ii) pursuant to Article 19 of the TFEU, it falls on national courts and tribunals and on the CJEU to ensure the application of EU Law in the EU Member States; (iii) the preliminary ruling system established in Article 267 of the TFEU is intended to ensure uniformity in the interpretation of EU Law; (iv) EU Law is both part of the law of each EU Member State and also derives from an international agreement.402

285. Spain then explains that the CJEU has concluded that the above principles are not fulfilled through the establishment of an investment tribunal because: (i) the tribunal might be called to interpret or apply EU Law, without being part of the EU judicial system; (ii) not being a court or tribunal of a EU Member State within the meaning of Article 267 of the TFEU, such tribunal cannot refer a matter to the CJEU; (iii) the tribunal's decision is final and judicial review limited by national law; (iv) investment arbitration involves disputes that may concern the application or interpretation of EU Law, but that system does not allow disputes to be resolved in a way that ensures the full effectiveness of EU Law.403

286. For Spain, the above-mentioned conclusions also apply in the context of the ECT. In that regard, Respondent observes that Achmea refers to an “international agreement,” which the ECT is, and not exclusively to bilateral investment treaties.404 Spain further contends that the Achmea judgment's reasoning is fully applicable here because: (i) under Article


(citing “Preliminary Ruling C-284/16 (Achmea Case) on the Compatibility Between the BIT Signed in 1991 by the Netherlands and Slovakia (EC-13)” and “Case T-624/15 relating to the Application for Annulment of the European Commission Decision of 30 March 2015 in Case SA 38517 (Arbitral Award of Case Micula v. Romania, 11 December 2013).”) See also, Resp. Reply Jur., ¶ 202.

401 Resp. Obs. Achmea, ¶¶ 2, 3. ↩

402 Resp. Obs. Achmea, ¶ 5. ↩

403 Resp. Obs. Achmea, ¶ 6. ↩

404 Resp. Obs. Achmea, ¶ 8. ↩

[Page 89]

26(6) of the ECT tribunals are required to interpret and apply EU Law to decide all the issues in dispute, “not only as International Law, but also as internal law and as a fact;”405 (ii) EU Law applies to this dispute because the controversy affects a key institution of EU Law: State Aid;406 (iii) an ICSID tribunal “does not form part of the judicial system of EU Law” and therefore cannot request a preliminary ruling from the CJEU under Article 267 TFEU,407 and (iv) there is no certainty that in enforcement proceedings the CJEU would have full knowledge and control over the EU Law applied by the tribunal.408

(iii) The Decisions Relied Upon by Claimants are Not Dispositive or Persuasive

287. Finally, Respondent dismisses Claimants' reliance on prior decisions of other arbitral tribunals, arguing that aside from those in cases against Spain, those decisions are not dispositive of the matters at issue in this case because they: (i) “refer to Bilateral Investment Treaties which have nothing to do with a multilateral and mixed treaty promoted and signed by the EU;” or (ii) refer to States that were not EU Member States when they entered into the ECT.409 As to the cases involving Spain, Respondent contends that the decisions did not embark in a proper analysis of the principle of primacy of EU Law;410 did not consider various of the arguments made by Respondent;411 or incorrectly concluded that EU Law was not relevant.412


405 Resp. Obs. Achmea, ¶¶ 10, 13. ↩

406 Resp. Obs. Achmea, ¶ 15. ↩

407 Resp. Obs. Achmea, ¶ 23. ↩

408 Resp. Obs. Achmea, ¶ 23. ↩

409 Resp. Reply Jur., ¶ 200. ↩

410 Resp. Reply Jur., ¶¶ 200, 220 (referring to CL-134, The PV Investors v. Kingdom of Spain, PCA Case No. 2012-14, Preliminary Award on Jurisdiction (13 October 2014) (hereinafter “PV Investors”); RL-088, Charanne; CL-135, RREEF). ↩

411 Resp. Obs. Eiser, ¶ 9 (discussing Eiser Infrastructure Limited and Energía Solar Luxembourg S.à r.l. v. Kingdom of Spain, ICSID Case No. ARB/13/36, Award (4 May 2017) (hereinafter, “Eiser”), submitted to record on 30 May 2017 with no RL- designation). ↩

412 Resp. Obs. Achmea, ¶ 49 (discussing CL-195, Novenergia II – Energy & Environment (SCA), SICAR v. Kingdom of Spain, SCC Case No. 2015/063, Final Award (15 February 2018) (hereinafter “Novenergía”). ↩

[Page 90]

288. In any event, Respondent takes the view that the application of the principles set forth in the cases relied upon by Claimants, in particular those referring to intra-EU BITs and the decision in Electrabel,413 supports the conclusion that EU Law must be applied.414

289. In this context, Spain has argued that:

b. Claimants' Position

290. Claimants oppose Respondent's objection.


413 RL-001, Electrabel S.A. v. Republic of Hungary, ICSID Case No. ARB/07/19, Decision on Jurisdiction, Applicable Law and Liability (30 November 2012) (hereinafter “Electrabel”) ↩

414 Resp. Reply Jur., ¶ 204. ↩

415 Resp. Reply Jur., ¶ 214; RL-023, Vienna Convention on the Law of Treaties, 23 May 1969, published in the Official State Gazette on 17 June 1980 (hereinafter “VCLT”). ↩

416 Resp. Reply Jur., ¶ 214. ↩

417 Resp. Reply Jur., ¶¶ 215-216. ↩

418 Resp. Reply Jur., ¶ 217. ↩

419 Resp. Reply Jur., ¶ 221. ↩

[Page 91]

(i) The Text of the ECT Contradicts the Objection

291. For Claimants, the ordinary meaning of Article 26 of the ECT unambiguously demonstrates that Spain consented to arbitration of disputes with investors of all other Contracting Parties, including EU Member States.420 By its express terms, Claimants say, Article 26 permits arbitration of claims of an Investor of one Contracting Party (the Netherlands), against another Contracting Party (Spain).421

292. The plain wording of the ECT contradicts the contention that the EU and its Member States are a single Contracting Party for purposes of Article 26 of the ECT.422 The ECT is a “mixed agreement” that was entered into by the EU and its Member States, and it is binding on both; and when EU Member States become parties to a mixed agreement they enter into relations inter se.423 The competence of EU Member States to enter into the ECT was expressly recognized by the EU in 1997.424 Moreover, under EU Law, citizenship of the EU is not intended to replace national citizenship;425 Claimants are Dutch nationals under Dutch Law;426 and Claimants plainly meet the definition of “Investor” in Article 1(7)(a)(ii) of the ECT, which is deliberately different from the definition of REIO in Article 1(3).427

293. Each of the Netherlands and Spain is a distinct Contracting Party occupying its own area for purposes of the ECT; each is a State that executed and ratified the ECT in its own name and right; each is a separate subject of international law different from the EU; and each would continue to be an ECT Contracting Party even if it left the EU.428

294. The definition of “Area” in the Article 1 of the ECT is clear, and it means for each Spain and the Netherlands “the territory under its sovereignty, it being understood that territory


420 Cl. Rej. Jur., § III(3)(A). ↩

421 Cl. Bif., ¶ 38. ↩

422 Cl. Bif., § III(A)(1)(b). See also, Cl. C-Mem. Jur., § II(3)(A). ↩

423 Cl. Bif., ¶ 38; Cl. C-Mem. Jur., ¶ 20. ↩

424 Cl. C-Mem. Jur., ¶ 22. ↩

425 Cl. Bif., ¶ 39. ↩

426 Cl. Bif., ¶ 39. ↩

427 Cl. Bif., ¶ 40. ↩

428 Cl. C-Mem. Jur., ¶ 20; Cl. Rej. Jur., ¶ 20. ↩

[Page 92]

includes land, internal waters and the territorial sea;” and it is undisputed that the plants and measures at issue in this case are located or took place in Spain.429 As the decisions in PV Investors and Charanne held:

“The phrase ‘in the Areas of the former [Contracting Party]' in Article 26(1) of the ECT refers to a particular dispute initiated by the investor. If the investor commences arbitration against a member state of the EU (rather than against the EU itself) then ‘Area' means ‘with respect to a state that is a Contracting Party' the territory of that particular member state, in accordance with the first sentence of Article 1(10). In other words, the relevant area is that of the Contracting Party that is party to the dispute.”430

295. Therefore, Claimants argue, there is no question that the Netherlands or Spain can be conflated with the EU for Article 26(1) of the ECT purposes.431 To the contrary, the ordinary meaning of Article 26 of the ECT leads clearly and unambiguously to the opposite conclusion.432

296. As to Respondent's attempt to rely on other provisions of the ECT to support this objection, Claimants argue that:


429 Cl. C-Mem. Jur., ¶ 20; CL-001 / RL-055, ECT, Art. 1(10). ↩

430 Cl. C-Mem. Jur., ¶ 23 (quoting CL-134, PV Investors, ¶ 179); Cl. C-Mem. Jur., ¶ 24 (referring to RL-088, Charanne, ¶ 431). See also, Cl. Rej. Jur., ¶ 24. ↩

431 Cl. Bif., ¶ 40. ↩

432 Cl. Rej. Jur., ¶ 32. ↩

433 Cl. Rej. Jur., ¶ 22. ↩

434 Cl. Rej. Jur., ¶ 23. ↩

435 Cl. Rej. Jur., ¶ 25. ↩

436 Cl. Rej. Jur., ¶ 25. ↩

[Page 93]

depending on the circumstances,” and it is in fact Spain's position that would render nugatory the text of Article 26(1).437

(ii) The ECT Does Not Have a Disconnection Clause

297. In Claimants' view, there is no basis in the text of the ECT to contend that it does not apply intra-EU, because that would have required a reservation or an unequivocal disconnection clause.443 But the ECT contains no disconnection clause of the type Spain seeks to imply into it,444 and nothing suggests that this was inadvertent.445 The ordinary wording of the ECT should thus put an end to this argument.446

298. That said, Claimants add, the EU treaty practice, the ECT drafting history and unanimous holdings of prior ECT tribunals also contradict the theory of an implied disconnection clause.447 Claimants point out that: (i) the EU had used disconnection clauses in over 20


437 Cl. Rej. Jur., ¶ 26. ↩

438 Cl. C-Mem. Jur., ¶ 26. ↩

439 Cl. C-Mem. Jur., ¶¶ 26, 33. ↩

440 Cl. C-Mem. Jur., ¶ 27. ↩

441 Cl. C-Mem. Jur., ¶ 28. ↩

442 Cl. Rej. Jur., ¶ 25. ↩

443 Cl. Rej. Jur., § III(3)(B)(i); ¶¶ 33-34. ↩

444 Cl. Bif., § III(A)(1)(c); Cl. C-Mem. Jur., § II(3)(B); Cl. Rej. Jur., § III(3)(B)(ii). ↩

445 Cl. Bif., ¶¶ 41, 43. ↩

446 Cl. C-Mem. Jur., ¶ 29. ↩

447 Cl. C-Mem. Jur., ¶ 29. ↩

[Page 94]

occasions to ensure that a treaty did not apply in the intra-EU context, including in treaties signed prior to the ECT or that were being negotiated in parallel with the ECT;448 (ii) when the ECT Contracting Parties wished to restrict the effect of the ECT they did so expressly, for example in the declarations relating to the Svalbard Treaty, and in the EU statement in the context in Article 26(3)(b)(ii) restricting its consent in a “fork-in-the-road” situation when the dispute had already been submitted to the CJEU;449 (iii) the EC considered including a disconnection clause in the ECT and this proposal was ultimately not accepted;450 and (iv) the tribunals in Charanne and RREEF have rejected the existence of an implicit disconnection clause.451

299. Claimants contend that the EC Written Submission in this case provides no answer on these points,452 and argued in the Rejoinder on Jurisdiction that neither the EC, nor Spain had been able to produce any contemporaneous evidence or a subsequent agreement showing that the intent of the ECT was to exclude intra-EU disputes.453

300. As to Spain's assertion that its argument is not that the ECT contains a disconnection clause, because such clause was superfluous, Claimants observe that the issue remains the same whether the question is the existence of a disconnection clause, or the lack of necessity of one: had the ECT Contracting Parties sought to carve out intra-EU disputes from Article 26, they would have included express language, and they did not.454

301. Responding to the contention that a disconnection clause is only needed where the application of EU Law between EU Member States affects third parties' rights or obligations, or where derogation from a provision would be incompatible with the object and purpose of the treaty, Claimants submit that “derogating to such an enormous extent


448 Cl. Bif., ¶ 42; Cl. C-Mem. Jur., ¶ 32. ↩

449 Cl. C-Mem. Jur., ¶¶ 30-31. ↩

450 Cl. C-Mem. Jur., ¶ 35, n. 31. ↩

451 Cl. C-Mem. Jur., ¶¶ 33-34 (quoting RL-088, Charanne, ¶ 437; CL-135, RREEF, ¶¶ 86-89). ↩

452 Cl. Rej. Jur., ¶ 38. ↩

453 Cl. Rej. Jur., ¶ 40. ↩

454 Cl. Rej. Jur., ¶ 37. ↩

[Page 95]

from Parts III and V of the ECT would be incompatible with the ECT's object and purpose of promoting long-term cooperation in the energy field.”455

302. Claimants finally point out that none of the ECT Contracting Parties entered any reservation, and in fact Article 46 of the ECT excludes reservations to the ECT.456 As held in PV Investors, the consent by EU Member States expressed in Article 26 of the ECT is “unconditional” and subject only to two exceptions contained in Article 26(3), which are irrelevant for the issue at hand.457

(iii) Neither the Context of the ECT nor Supplementary Means of Interpretation Support the Objection

303. According to Claimants, the EC Written Submission invites the Tribunal to disregard the text of the ECT on the basis of the alleged treaty “context;” but such context cannot displace the treaty text and, in any event, it does not support the objection.458 In particular, referring to the principles in Article 31(3) of the VCLT, Claimants observed in the Rejoinder on Jurisdiction that:


455 Cl. Rej. Jur., ¶ 42. ↩

456 Cl. Rej. Jur., ¶ 35. ↩

457 Cl. Rej. Jur., ¶ 35. ↩

458 Cl. Rej. Jur., ¶ 43. ↩

459 Cl. Rej. Jur., ¶¶ 44-46. ↩

460 Cl. Rej. Jur., ¶ 48. ↩

461 Cl. Rej. Jur., ¶ 49. ↩

462 Cl. Rej. Jur., ¶ 50. ↩

[Page 96]

the ECT (Part V) and to invoke the substantive protections of Part III, which they consider more favourable to them than EU Law, pursuant to Article 16 of the ECT “nothing in EU Law ‘shall be construed to derogate from' these provisions of the ECT.”463

304. For Claimants, the arguments advanced by Respondent and the EC on the basis of the object and purpose of the ECT, and the circumstances of its conclusion are also unconvincing.464

305. Relying on Article 32(a) of the VCLT, Claimants first contention is that because the text of the ECT is clear, and it does not lead to manifestly absurd or unreasonable results, there is no room to resort to supplementary means of interpretation “including the preparatory work of the treaty and the circumstances of its conclusion.”465

306. As to the object and purpose, while Claimants acknowledge that Article 31(1) of the VCLT provides that the ECT must be interpreted “in the light of its object and purpose,” they argue that (i) such object and purpose must rest on more than speculation; and (ii) the VCLT makes a choice in favor of an objective and textual interpretation over a subjective one based on the intention of the parties.466 Moreover, for Claimants, nothing in Article 2 of the ECT (on the object and purpose of the treaty), suggests that the ECT provisions are waived intra-EU.467 In fact, Claimants argue, the application of the ECT intra-EU facilitated the ECT's object and purpose, as it offered companies investing in Eastern Europe continuity of protection for investments in that region, as many of those countries acceded to the EU later.468

307. Claimants also argued in the Rejoinder on Jurisdiction that there was no evidence showing that EU Member States share the position that the ECT did not produce effects intra-EU; a position that Spain adopted opportunistically in the face of numerous treaty


463 Cl. Rej. Jur., ¶¶ 50-52; CL-001 / RL-055, ECT, Art. 16. ↩

464 Cl. Rej. Jur., ¶ 53. ↩

465 Cl. Rej. Jur., ¶ 55. ↩

466 Cl. Rej. Jur., ¶¶ 56-57. ↩

467 Cl. Rej. Jur., ¶ 59. ↩

468 Cl. Rej. Jur., ¶ 61. ↩

[Page 97]

claims against it, and it never expressed between 1994-2014.469 And the arguments based on the historical context of the ECT's conclusion and those based on the negotiating history of the WTO should not serve as supplementary means of interpretation.470

(iv) Article 26 of the ECT is Not Affected by the Transfer of Competences to the EU

308. Claimants further oppose the contention that the provisions in Part III of the ECT and Article 26 fall within the competence of the EU, such that when entering into the ECT the EU Member States did not have competence to enter into inter-se obligations on the matter of investment protection.471

309. Article 25 of the ECT lends no support to the proposition that EU Law must prevail in case of conflict between the ECT and EU Law.472 For Claimants, this article is not a conflict rule giving primacy to EU Law over the ECT. It simply clarifies that the preferential treatment that applies inter-se among EU Member States cannot be extended to non-EU States via the MFN clause.473

310. Claimants equally consider “flatly irrelevant” the EC's reference to the alleged principle of international law of “liability follows competence.”474 This is a secondary rule of international law, concerning attribution for purposes of determining an international organization's responsibility for wrongful acts, and has nothing to do with the creation or extent of positive international obligations.475

311. Instead, Claimants argue that the relevant body to determine whether valid treaty obligations were entered into is the VCLT, and rely on the finding in CSP that jurisdiction “would not necessarily be affected by a finding that EU law barred the EU


469 Cl. Rej. Jur., ¶ 60. ↩

470 Cl. Rej. Jur., ¶ 62. ↩

471 Cl. Rej. Jur., ¶ 63. ↩

472 Cl. Rej. Jur., ¶¶ 64-66. ↩

473 Cl. Rej. Jur., ¶ 66. ↩

474 Cl. Rej. Jur., ¶ 67. ↩

475 Cl. Rej. Jur., ¶ 67. ↩

[Page 98]

and/or EU member states from entering into a treaty which provides for arbitration over intra-EU investments.”476

(v) There is No Ground to Invalidate Spain's Consent in Article 26 under the VCLT

312. Claimants contend that Spain's offer to arbitrate in Article 26 is valid and effective, and reject the view that such offer is invalid because (i) it would violate EU Law which must prevail over the ECT in the event of conflict, or (ii) it was modified or superseded pursuant to Articles 41(1)(b) or Article 30(4)(a) of the VCLT.477

313. Claimants explain that: (i) the sole grounds for invalidating a State's consent to be bound by a treaty are in the VCLT, and are not applicable in the present instance; (ii) even if EU Law were relevant to determining the validity of Spain's consent – which it is not – EU Law does not prohibit arbitration of intra-EU investor State disputes; (iii) arguments about the alleged primacy of EU Law substantive provisions over the ECT are irrelevant for the jurisdictional analysis, and implausible in light of Article 16 of the ECT; (iv) Articles 41(1)(b), 30(4)(a) or 59 of the VCLT do not apply here.478

314. Recalling that under Article 42(1) of the VCLT the validity of a treaty or the consent to be bound by it can only be impeached by application of the VCLT, Claimants conduct an analysis under Articles 46 and 45 of the VCLT.479 Claimants contend that EU Law forms part of Spain's domestic law, and therefore, in application of Article 46 of the VCLT “Spain may not invoke, in support of its plea of invalidity, the fact that its consent to be bound by a treaty was expressed in violation of a provision of EU law unless that violation was manifest and concerned a rule of EU law of fundamental importance.”480

315. As the ECT was negotiated and concluded by the EU and its Member States, it is implausible to argue that Spain was not competent under EU Law to conclude the treaty;


476 Cl. Rej. Jur., ¶ 68 (quoting CL-176, CSP Equity Investment S.à.r.l v. Kingdom of Spain, SCC Case No. 2013/094, Award on Jurisdiction (13 May 2016) (hereinafter “CSP”), ¶ 158). ↩

477 Cl. Rej. Jur., ¶ 70. ↩

478 Cl. Rej. Jur., ¶ 71. ↩

479 Cl. Rej. Jur., ¶¶ 72-74. ↩

480 Cl. Rej. Jur., ¶ 75. ↩

[Page 99]

and in any event, the alleged lack of competence would not be manifest, as shown by the lack of evidence to that effect contemporaneous with the negotiation and conclusion of the ECT.481 Moreover, even if there was any ground under Article 46, it would have been waived under Article 45(b) of the VCLT because Spain never questioned the validity of its consent in Article 26 of the ECT until the recent arbitrations, and has not event sought to terminate intra-EU BITs.482

316. Contrary to Spain's contentions, Claimants further argue that “nothing in EU law prohibits EU Member States from consenting to arbitrate disputes with EU investors under an investment treaty,” and that is so “even where those cases involve questions of EU law.”483

317. Noting that Spain's argument rests on Article 344 of the TFEU, Claimants point out that prior arbitral tribunals have already concluded that “Article 344 TFEU, [...] applies only to disputes involving two or more EU member states but does not prohibit the submission of disputes between other actors to a different method of settlement not contemplated in the EU treaties;”484 “[t]he scope of Article 344 TFEU cannot be so broad as to prevent Member States from submitting any dispute concerning the interpretation of EU treaties to a dispute settlement procedure different from those provided in EU legislation;”485 “it cannot be reasonably maintained that Article 344 TFEU sets up an ‘interpretative monopoly' in favour of the CJEU;”486 there is no inconsistency between the ECT and EU Law, and the exclusive jurisdiction of the CJEU does not prevent other courts or tribunals from applying EU Law.487 These conclusions were not altered by the jurisprudence of the CJEU;488 nor can the EC's own self-serving declaration in the context of the


481 Cl. Rej. Jur., ¶ 75. ↩

482 Cl. Rej. Jur., ¶ 76. ↩

483 Cl. C-Mem. Jur., ¶¶ 38, 46. See also, Cl. Rej. Jur., § III(4)(B). ↩

484 Cl. C-Mem. Jur., ¶ 39 (quoting CL-134, PV Investors, ¶ 189). ↩

485 Cl. C-Mem. Jur., ¶ 40 (quoting RL-088, Charanne, ¶ 444). ↩

486 Cl. C-Mem. Jur., ¶ 41 (quoting CL-135, RREEF, ¶ 80). See also, Cl. Rej. Jur., ¶ 81 (quoting CL-176, CSP, ¶ 164). ↩

487 Cl. Bif., ¶ 26; Cl. C-Mem. Jur., ¶¶ 42-43 (referring to RL-001, Electrabel) ↩

488 Cl. Rej. Jur., ¶ 79. ↩

[Page 100]

International Energy Charter Treaty in May 2015 provide any evidentiary support to this objection, as it was issued 20 years after the ECT's conclusion.489

318. Moreover, Claimants point out that Spain and the EC accept that national courts and arbitral commercial tribunals apply EU Law without violating Article 344 of the TFEU, and there is no reason to treat investment treaty arbitration differently.490

319. According to Claimants, all the arguments based on the alleged primacy of EU Law over the substantive protections of the ECT are, at best, relevant to the analysis of the merits, but have no bearing on jurisdiction.491 In any event, they are misplaced because there is no conflict in this regard between the ECT and EU Law, and should there be one, the ECT would prevail.492 The conflict of law rule in Article 351 of the TFEU (former Article 307 of the TEC) does not give priority to EU Law over the ECT, because the ECT is the later in time treaty: Article 351 only concerns rights and obligations in agreements concluded prior to 1 January 1958 or for acceding States, prior to their accession to the EU, and the ECT was concluded in 1994 and in force in 1998 after Spain acceded to the EU in 1986.493 Instead, should the Tribunal find a conflict, it should resolve it by straight application of Article 16 of the ECT.494

320. Lastly, Claimants assert that “the ECT, and in particular its Art[icle] 26, has been neither modified nor superseded by the provisions of later EU Treaties under either of Art[icles] 41 or 30 of the VCLT; nor did the Treaty of Lisbon lead to the termination of the ECT pursuant to Art[icle] 59 of the VCLT.”495 Claimants explain that:


489 Cl. Rej. Jur., ¶ 79. ↩

490 Cl. Rej. Jur., ¶¶ 80-81. ↩

491 Cl. Rej. Jur., ¶¶ 82-83. See also, Cl. Bif., ¶¶ 50-51. In their Observations on Bifurcation, Claimants also dismissed Respondent’s references to the investigation of the Spain measures by the EC under the State Aid regime and to the Micula case, arguing that the relevance of these issues to jurisdiction is at best unclear because: (i) jurisdiction does not depend on ease of enforcement of an award; and (ii) state aid issues should not be confused with intra-EU issues, so that, even if the EC were to decide that the Spain regime was unlawful under its State Aid rules, that “is not a bar to jurisdiction but an issue for the merits.” Cl. Bif., ¶ 54. ↩

492 Cl. Rej. Jur., ¶ 84. ↩

493 Cl. Rej. Jur., ¶ 87. ↩

494 Cl. Rej. Jur., ¶ 87. ↩

495 Cl. Rej. Jur., ¶ 71, ↩

[Page 101]

(vi) The Objection Has Been Rejected by Prior Tribunals and Legal Doctrine,502 and the Achmea Judgment Does Not Apply

321. Throughout their pleadings Claimants emphasize that “[e]very tribunal to have analysed the objection has unanimously rejected it,”503 including in other ECT cases, in cases


496 Cl. Rej. Jur., ¶ 89. ↩

497 Cl. Rej. Jur., ¶ 89. ↩

498 Cl. Rej. Jur., ¶ 90. ↩

499 Cl. Rej. Jur., ¶ 90. ↩

500 Cl. Rej. Jur., ¶ 91. ↩

501 Cl. Rej. Jur., ¶ 92. ↩

502 Cl. Bif., § III(A)(1)(a) and (d). ↩

503 Cl. Bif., ¶¶ 24, 25-36; Cl. C-Mem. Jur., ¶ 46. ↩

[Page 102]

against Spain,504 and in cases involving intra-EU BITs.505 Claimants also rely on a number of commentators supporting the view that the ECT does apply between EU Member States.506 Lastly, Claimants observe that, despite its position in this case, the EC has not been uniform in opposing the jurisdiction of tribunals hearing intra-EU disputes.507

322. As to the Achmea judgment of 6 March 2018 relied upon by Spain,508 Claimants contend that: (i) it concerns a different treaty, a bilateral investment treaty concluded prior to the accession of one of the States to the EU and not the ECT which is a multilateral treaty to which the EU is a Contracting Party,509 and (ii) it concerns different applicable law – the host State law and other agreements between the State parties to the BIT were part of the governing law according to the underlying BIT, and the ICSID Convention did not apply.510 These distinctions, Claimants say, have an important bearing on the analysis under the ECT, for various reasons:511


504 Cl. Bif., ¶¶ 26-27; Cl. C-Mem. Jur., ¶¶ 23-25, 33-34, 38, 42-45 (referring to RL-001, Electrabel; CL-076, EDF International S.A. v. Republic of Hungary, UNCITRAL Rules (Ad-hoc), GAR Article (11 December 2014); CL-134, PV Investors; RL-088, Charanne; CL-135, RREEF); Cl. Rej. Jur., ¶ 13 (referring to CL-176, CSP; and CL-177, Électricité de France (EDF) International S.A. v. Republic of Hungary, PCA Case No. 2009-13, Award (3 December 2014)); Cl. Obs. Eiser, ¶ 2.1; Cl. Obs. Achmea, ¶¶ 1.1-1.2 (referring to CL-195, Novenergía), and ¶¶ 3.5, 3.10 (referring to RL-126, Blusun S.A Jean Pierre Lecrocier and Michael Stein v. Italian Republic, ICSID Case No. ARB/14/3, Award (27 December 2016) (hereinafter “Blusun”)). ↩

505 Cl. Bif., ¶¶ 28-35 (referring to CL-072, Eastern Sugar BV v. Czech Republic, SCC Case No. 088/2004, Partial Award (27 March 2007); CL-073, Achmea (formerly known as Eureko) v. Slovak Republic, UNCITRAL, PCA Case No. 2008-13, Award on Jurisdiction, Arbitrability and Suspension (26 October 2010); CL-075, Binder v. Czech Republic, UNCITRAL, Award on Jurisdiction (6 June 2007); CL-074, European American Investment Bank AG v. Slovak Republic, PCA Case No. 2010-17, Award on Jurisdiction (22 October 2012)). ↩

506 Cl. Bif., ¶¶ 45-47. ↩

507 Cl. Bif., ¶ 44 (referring to RL-001, Electrabel; CL-084, AES Summit Generation Limited and AES-Tisza Erömü Kft. v. Republic of Hungary, ICSID Case No. ARB/07/22, Award (23 September 2010) (hereinafter “AES”). ↩

508 RL-125, Achmea. ↩

509 Cl. Obs. Achmea, ¶¶ 2.1, 2.6. ↩

510 Cl. Obs. Achmea, ¶ 2.6. ↩

511 Cl. Obs. Achmea, ¶ 2.7. ↩

512 Cl. Obs. Achmea, ¶ 2.8. ↩

[Page 103]

323. But, Claimants argue, even if Spain had demonstrated an inconsistency between EU Law and the ECT in light of the Achmea judgment, the ECT would prevail.519 The alleged principle of primacy of EU Law is an internal EU Law principle reflecting supremacy of EU Law over the law of the EU Member States, and it does not alter the hierarchy of the ECT over EU Law established by virtue of Article 16(2) of the ECT and customary international law.520 If the Tribunal concludes that the ECT and the TFEU cover the same subject matter, Article 16(2) of the ECT must be applied; if the Tribunal concludes


513 Cl. Obs. Achmea, ¶¶ 2.11-2.12. ↩

514 Cl. Obs. Achmea, ¶ 2.13. Claimants argue that, in light of that express choice in Article 26(6), the Tribunal does not have to reach the second sentence of Article 42(1) of the ICSID Convention. Cl. Obs. Achmea, ¶ 2.13. ↩

515 Cl. Obs. Achmea, ¶ 2.14. ↩

516 Cl. Obs. Achmea, ¶ 2.15. ↩

517 Cl. Obs. Achmea, ¶ 2.16. ↩

518 Cl. Obs. Achmea, ¶ 2.16. ↩

519 Cl. Obs. Achmea, ¶¶ 2.3, 2.17-2.23. ↩

520 Cl. Obs. Achmea, ¶ 2.18. ↩

[Page 104]

that they do not cover the same subject matter, there is no conflict and no predicate to apply Article 30 or 59 of the VCLT.521

324. Finally, “[t]he CJEU itself recognised the EU law is not to be treated as international law, but instead as a body of law which is ‘autonomous' and ‘independent' of both international law and the national law of each Member State, and binding domestically in (and not just on) each Member State – in contrast to the plane occupied by international law.”522 And it is a basic principle of international law recognized in Articles 7 and 32 of the International Law Commission Articles on State Responsibility (“ILC Articles on State Responsibility”) that “a State cannot invoke its own breach of its domestic law as an excuse for violating its international obligations,” and in Article 46 of the VCLT, which “prevents a State from pleading domestic law requirements to honour its international treaty commitments.”523

(2) The Non-Disputing Party's Written Submission

a. Spain's Offer to Arbitrate in the ECT Does Not Cover Investors from EU Member States

325. The EC takes the view that the ECT does not create inter se obligations and does not apply in the relationship between EU Member States that were EU Members when the ECT was ratified.524 This, it says, follows from the text of the ECT, the nature of multilateral agreements, and the object and purpose of the ECT:


521 Cl. Obs. Achmea, ¶ 2.18. ↩

522 Cl. Obs. Achmea, ¶ 2.19 (relying on RL-125, Achmea, ¶ 33). ↩

523 Cl. Obs. Achmea, ¶ 2.20. ↩

524 EC Written Submission, ¶¶ 12, 52. ↩

525 EC Written Submission, ¶¶ 16-18. ↩

526 EC Written Submission, ¶ 20. ↩

[Page 105]

interpretation deprives Article 1(3) and 1(10) of effet utile, and encourages “respondent shopping,” prohibited by ECT.527

326. But even if the ECT had created intra-EU obligations, which the EC denies, such obligations would not comprise the provisions on investment protection in Part III of the ECT or the dispute settlement provision in Article 26, because EU Member States had transferred to the EU competence on those subjects.535 Pursuant to Article 64 of the ILC Articles on Responsibility of International Organizations and case law, the principal law applicable for determining the extent of the international obligations and international


527 EC Written Submission, ¶¶ 24-25. ↩

528 EC Written Submission, ¶ 29. ↩

529 EC Written Submission, ¶ 31. ↩

530 EC Written Submission, ¶ 33. ↩

531 EC Written Submission, ¶¶ 41-42. ↩

532 EC Written Submission, ¶ 45. ↩

533 EC Written Submission, ¶ 50. ↩

534 EC Written Submission, ¶¶ 47-49. ↩

535 EC Written Submission, ¶¶ 13, 53. See also, id., ¶ 93. ↩

[Page 106]

liability of EU Member States is “liability follows competence.”536 For the EC, “protection and promotion of investments in other Member States, as well as energy, fall into the external competence of the Union.”537 Further, an inter-se investment protection treaty between EU Member States “might affect common rules or alter their scope,” that is, the EU system of investment protection.538 As such, pursuant to Article 3(2) of the TFEU, EU Member States did not have the external competence to conclude such type of treaty.539

327. EU Member States are presumed to be aware of the rules governing distribution of competences; and the ECT recognizes that the EU Member States had transferred competences to the EU on matters covered by ECT. Accordingly, all the ECT Contracting Parties were aware of the existence of the distribution of liability.540 As a result, the ECT provisions on investment promotion and protection bind the EU, but not the EU Member States inter-se.541

328. Should the Tribunal consider that the ECT is ambiguous with respect to the question of intra-EU obligations, the EC argues, it should favour an interpretation that does not conflict with EU Law, namely, that the ECT does not apply between EU Member States at all, or at least that Part III and Article 26 do not apply between them.542

b. Spain's Offer to Arbitrate Is Not Valid

329. According to the EC, even if Spain had made an offer to arbitrate to intra-EU Investors, that offer would not be valid because: (i) it would violate EU Law, which prevails over the ECT in the event of conflict pursuant to Article 351 of the TFEU;543 and (ii) that offer


536 EC Written Submission, ¶ 58. ↩

537 EC Written Submission, ¶ 65. ↩

538 EC Written Submission, ¶ 80. ↩

539 EC Written Submission, ¶ 81. Awards and academic writings taking the opposite view are flawed, in that they consider that the EU Member States internal competence for the internal market is a “shared competence” with the EU. EC Written Submission, ¶ 83. ↩

540 EC Written Submission, ¶¶ 87, 89-90. ↩

541 EC Written Submission, ¶ 94. ↩

542 EC Written Submission, ¶ 95. ↩

543 EC Written Submission, ¶¶ 97, 98-136. ↩

[Page 107]

would have been modified or superseded pursuant to Articles 41(1)(b) or 30(4)(a) of the VCLT.544

330. According to the EC: (i) the intra-EU application of the substantive protections of the ECT would violate Article 3(2) of the TFEU, because EU Law provides a complete set of rules on investment protection, and the EU Member States did not have competence on those matters;545 and (ii) treaty-based investor-State arbitration of intra-EU disputes violates Articles 19(1) of the TEU and Articles 267 and 344 of the TFEU, and the general principles of effectiveness and unity of EU Law.546 Pursuant to those provisions, the EC argues, disputes concerning the application of the EU Treaties are to be resolved before the CJEU – for disputes involving two Member States, or the national courts – for disputes between a private party and EU Member State.547 Thus, when EU Member States create a separate body for dispute resolution that is required to apply EU Law, such as Article 26 of the ECT does, they violate Article 344 of the TFEU.548 Further, for the EC, the decisions by investment tribunals holding that Article 344 only applies to disputes between EU Member States overlook that national courts are part of the EU legal order and can therefore apply EU Law, and miss distinctions between commercial arbitration and investment arbitration.549

331. The EC goes on to add that, having identified a conflict with EU Law, the applicable conflict rule would be Article 351 of the TFEU, pursuant to which the ECT provisions incompatible with EU Law (i.e. Part III and Article 26) would become inapplicable.550 But even if the matter were to be analyzed under the general rules of conflict in the


544 EC Written Submission, ¶¶ 97, 137-145. ↩

545 EC Written Submission, ¶¶ 104-106. ↩

546 EC Written Submission, ¶¶ 107-129. ↩

547 EC Written Submission, ¶ 109. ↩

548 EC Written Submission, ¶¶ 110, 120. In the alternative, the EC urged that the Tribunal stayed this proceeding until the CJEU judgement in Achmea on this point was rendered; or in the further alternative, to refer this matter to the CJEU. EC Written Submission, ¶¶ 127, 129. Claimants opposed. Cl. Rej. Jur., ¶¶ 140-151. No stay took place. The Achmea judgement was rendered during the pendency of this proceeding. See supra, ¶ 82. ↩

549 EC Written Submission, ¶¶ 111-118. ↩

550 EC Written Submission, ¶ 135. ↩

[Page 108]

VCLT, intra-EU obligations were superseded by virtue of Articles 30(4)(a) and 41(1)(b) of the VCLT.551 The EC argues in particular:

(3) The Tribunal's Analysis

332. As a preliminary remark, the Tribunal thanks the European Commission for its assistance in the current proceedings on the matter of jurisdiction regarding intra-EU investments operations.


551 EC Written Submission, ¶ 137. In its submission, the EC also observed that “Spain ha[d] notified its national support scheme for RES electricity and the subsequent adoption of various legislative and regulatory measures that affect producers of RES electricity to the Commission on the basis of Article 108(3) TFEU” on State Aid, and added that the EC decision on that matter was pending at the time. Arguing that the matter was relevant to the merits, it invited the tribunal to stay the proceeding until the EC made its ruling. EC Written Submission, ¶¶ 11, 149-150. Respondent's arguments on this matter are summarized infra ¶ 510 et seq. ↩

552 EC Written Submission, ¶ 140. ↩

553 EC Written Submission, ¶ 139. ↩

554 EC Written Submission, ¶¶ 141-142. ↩

555 EC Written Submission, ¶ 143. ↩

556 EC Written Submission, ¶ 145. ↩

557 EC Written Submission, ¶ 145. ↩

[Page 109]

333. The Tribunal wishes to approach the issue taking into account earlier cases where tribunals have upheld jurisdiction under Article 26 of the ECT,558 as well as the Achmea judgment rendered by the CJEU,559 which marked a turning point in the on-going debate surrounding the compatibility of intra-EU investment agreements with EU Law, since it found investor-State arbitration clauses in intra-EU BITs to be incompatible with EU Law.

334. Despite the notable difference that in Achmea, the CJEU was asked to determine the lawfulness of an intra-EU bilateral investment treaty, the Tribunal is mindful that the Achmea judgment is also discussed in the context of the investor-State arbitration mechanism established under the ECT.560

335. Respondent has objected to the Tribunal’s jurisdiction on the basis that the dispute resolution mechanism set forth in Article 26 of the ECT does not apply to controversies arising between an investor of the EU and another EU Member State. These objections are in line with the observations expressed by the European Commission in its EC Written Submission, which takes the view that the ECT does not create inter se obligations among EU Members States and that a correct application of the principles of supremacy and autonomy of EU Law render Spain’s offer to arbitrate invalid.

336. From the outset, the Tribunal wishes to recall that consent to jurisdiction in international adjudication must be established. In this respect, the Tribunal does not believe that the jurisdiction of a tribunal is bounded by the way in which a claimant may decide to frame its claims. It is not because an investor has solely based its claim on the ECT that the Tribunal will retain its jurisdiction. The principle of compétence de la compétence


558 RL-088, Charanne; CL-134, PV Investors; CL-135, RREEF; Eiser (submitted to the record on 30 May 2017 with no RL- designation); CL-195, Novenergía; RL-001, Electrabel. ↩
559 RL-125, Achmea. ↩
560 RL-127, Declaration of the Representatives of the Governments of the Member States on the Legal Consequences of the Judgment of the Court of Justice in Achmea and on Investment Protection in the European Union, 15 January 2019; R-128, Declaration of the Representatives of the Governments of the Member States on the Legal Consequences of the Judgment of the Court of Justice in Achmea and on Investment Protection in the European Union, 16 January 2019; R-129, Declaration of the Representatives of the Government of Hungary on the Legal Consequences of the Judgment of the Court of Justice in Achmea and on Investment Protection in the European Union, 16 January 2019. ↩

[Page 110]

requires an arbitral tribunal to establish the extent and limits of its jurisdiction objectively, on the basis of the title of jurisdiction that is conferred to the said tribunal.

337. In this case, a correct exercise of the principle of compétence de la compétence, requires the Tribunal to look into the terms of the ECT, and in particular into the terms of Article 26 setting up the dispute resolution mechanisms.

338. In light of the objections put forward by Respondent, the Tribunal finds it pertinent to address the issue of jurisdiction through the following questions: the first question is whether the ECT applies to relations inter se of EU Member States and whether the ECT Contracting Parties intended to carve out and exclude jurisdiction over intra-EU disputes (a); the second question is whether the subsequent overlap that may exist between the ECT and EU Law regarding investment operations rendered Spain’s offer to arbitrate invalid (b).

a. Whether the ECT Excludes Inter Se Obligations Among EU Member States?

339. Respondent contends that the present Tribunal lacks jurisdiction to hear intra-EU disputes because Article 26(1) of the ECT implies that the Parties must be of different nationalities and that in the present case, the diversity requirement fails since both Parties are from the European Union. Thus, Respondent objects to the Tribunal’s jurisdiction because Claimants are not from “another Contracting Party” as required by Article 26.

340. In particular, Respondent relies on Article 1(3) of the ECT defining a REIO as “an organization constituted by states to which they have transferred competence over certain matters a number of which are governed by this Treaty, including the authority to take decisions binding on them in respect of those matters,” as well as Article 1(10) defining the term “Area” of a REIO as “the Areas of the member states of such Organization, under the provisions contained in the agreement establishing that Organization.”561


561 CL-001 / RL-055, ECT, Art. 1. ↩

[Page 111]

341. It is true that the very dynamic nature and rapid evolution of EU Law may complicate the interpretation of treaties such as the ECT, and that a harmonious interpretation remains the most effective tool to avoid a conflict among the two sets of norms. But, for the purpose of establishing jurisdiction, the Tribunal remains bounded by the explicit terms of the relevant Treaty (i.e. the ECT), with due regard to its object and purpose in accordance with the VCLT.

342. The Tribunal cannot infer from the terms of Articles 1(3) and (10) of the ECT that the Contracting Parties intended to exclude intra-EU investment operations from the jurisdiction of investment tribunals. The fact that the EU is a Contracting Party to the ECT did not deprive the EU Member States of their competence to enter into obligations under the ECT at the time of its conclusion. Therefore, in absence of a disconnection clause and a revision of the ECT by the Contracting Parties, the Tribunal cannot conclude that presence of the EU as REIO consenting to the provisions of the ECT would supersede the consent given by each EU Member State individually to the ECT. Rather, a good faith interpretation of the terms of the ECT leads to the conclusion that a REIΟ, such as the EU, may have standing under the ECT in arbitration proceedings. However, concluding that Contracting Parties, taken individually, lack standing when the investment operation remains in the European Area would go beyond the terms of the Treaty.

343. As explained by the tribunal in Blusun “[t]he inter se obligations in the ECT are not somehow invalid or inapplicable because of an allocation of competence that the EC says can be inferred from a set of EU laws and regulations dealing with investment. The more likely explanation, consistent with the text of the ECT, is that, at the time the ECT was signed, the competence was a shared one.”562 The fact that it ultimately became transferred to the EU cannot be used by this Tribunal as an argument to establish or decline its jurisdiction alone. The ECT operates among Member States since it was not concluded as an agreement between the EU and its Members States but as an ordinary multilateral agreement.


562 RL-126, Blusun, ¶ 283. ↩

[Page 112]

344. Therefore, the Tribunal concludes that Claimants satisfy the literal requirement as set forth in Article 1(7)(a)(ii) to be an investor of a “Contracting Party,” and the terms of the ECT do not suggest that the Contracting Parties intended to exclude inter se obligations or that an EU investor is precluded from bringing a claim against an EU Contracting Party. A follow up question is whether the overlap existing between the ECT and the EU Law has rendered Spain’s offer to arbitrate under the ECT invalid.

b. Whether the Subsequent Overlap Between the ECT and EU Law Rendered Spain’s Offer to Arbitrate Invalid?

345. Respondent and the EC argued that Article 26(6) of the ECT directs the Tribunal to apply both international and EU Law and that, in the event of conflict, Article 344 of the TFEU and EU Law should prevail. Moreover, it was argued that Article 26 of the ECT has been superseded by the provisions of later EU treaties under either Articles 41 or 30 of the VCLT.

346. Article 344 of the TFEU provides that “Member States undertake not to submit a dispute concerning the interpretation or application of the Treaties to any method of settlement other than those provided for therein.”563

347. Article 26 of the ECT entitled Settlement of disputes between an Investor and a Contracting Party states in its relevant parts:

“(1) Disputes between a Contracting Party and an Investor of another Contracting Party relating to an Investment of the latter in the Area of the former, which concern an alleged breach of an obligation of the former under Part III shall, if possible, be settled amicably. (2) If such disputes cannot be settled according to the provisions of paragraph (1) within a period of three months from the date on which either party to the dispute requested amicable settlement, the Investor party to the dispute may choose to submit it for resolution: [...] (6) A tribunal established under paragraph 4 shall decide the issues in dispute in accordance with this Treaty and applicable rules and principles of international law.”564

563 RL-021 / R-004, TFEU, Art. 344. ↩
564 CL-001 / RL-055, Art. 26. ↩

[Page 113]

348. Respondent and the EC have found Article 26 of the ECT to be in contradiction with Article 344 of the TFEU. It was argued that in Achmea, the CJEU confirmed this approach when it concluded that “Articles 267 and 344 TFEU must be interpreted as precluding a provision in an international agreement concluded between Member States, such as Article 8 of the BIT [between the Kingdom of the Netherlands and the Czech and Slovak Federative Republic] [...].”565 According to the CJEU, Article 267 TFEU has been breached because an arbitral tribunal is not a court which belongs to one of the court systems of the Member States, which means that the Member States have given the competence to interpret EU Law to a court other than the CJEU.

349. The present Tribunal is not empowered to decide whether a dispute submitted by a European investor against a European State under the ECT falls under Article 344 or is in breach of Article 267 of the TFEU. The task of this Tribunal is to determine whether such dispute falls under the provisions of the ECT. Likewise, it is not the task of this Tribunal to determine whether the scope of this dispute concerns the application of the TFEU, but rather whether such dispute concerns the application of the substantive provisions of the ECT.

350. If the Tribunal were to follow the approach of the EC and Respondent and treat the present dispute as an “internal dispute,” it would mean that EU Law is applicable for the purpose of jurisdiction. However, the ECT and – in particular Article 26 – is the instrument governing the present Tribunal’s jurisdiction as well as Article 25 of the ICSID Convention. Therefore, through the dispute settlement mechanism of the ECT “this Tribunal is placed in a public international law context and not a national or regional context.”566 The intra-EU nature of the parties does not by itself make the present dispute into a purely European one.

351. Although the Tribunal understands that in the present case, EU Law may find application, it cannot state that overlap between the two sets of rules strips the present dispute of its international aspects. In other words, the Tribunal cannot infer its own competence – or


565 RL-125, Achmea, ¶ 60. ↩
566 RL-001, Electrabel, ¶ 4.112. ↩

[Page 114]

incompetence – from the principle of primacy of EU Law over the ECT for intra-EU disputes. The fact that there may exist a partial overlap between the two set of rules on the merits (such as FET and Fundamental Freedoms), cannot, for the purpose of jurisdiction, be resolved in favour of EU Law. This is because the questions pertaining to the Tribunal jurisdiction must be answered in light of Article 26 of the ECT.

352. Respondent and the EC have further argued that intra-EU obligations were superseded in application of Articles 41(1)(b) of the VCLT on the amendment of a treaty by a later treaty, and, that if the Tribunal were to consider that no amendment took place, Article 30(4)(a) of the VCLT on “application of successive treaties relating to the same subject matter” would operate as a rule to resolve a conflict between the two treaties. The Tribunal considers that the rule relating to “treaties relating to the same subject matter” is not applicable to the present situation where treaties negotiated by a smaller number of States, i.e., the EU founding Treaties, are claimed to modify a treaty such as the ECT. These treaties do not “relate to the same subject matter” in the sense of Article 30.567 Moreover, the Tribunal has had no evidence placed before it that would demonstrate that the subsequent EU Treaties were amending the ECT for the purpose of Article 41(1)(b) of the VCLT.

353. The Tribunal notes in this regard that the CJEU in its Achmea judgment did not rely on the aforementioned articles of the VCLT to resolve the alleged conflict between the intra- EU BIT and EU Laws.

354. The Tribunal notes that the internal constitutional laws of the EU and its constant changes and interpretations by the CJEU, as the Member States seek to minimize their mutual obligations in another context, are of no relevance for the present Tribunal.

355. In the Tribunal’s view, “the ECT’s genesis generates a presumption that no contradiction exists between the ECT and EU law,”568 and as a consequence, the Tribunal cannot retroactively construe Spain’s offer to arbitrate under the ECT as invalid.


567 RL-023, VCLT, Art. 30. ↩
568 RL-001, Electrabel, ¶ 4.134. ↩

[Page 115]

356. Respondent – not the EC – further argued that primacy of EU Law is reflected in Article 25 of the ECT entitled “Economic Integration Agreements,” which states “[t]he provisions of this Treaty shall not be so construed as to oblige a Contracting Party which is party to an Economic Integration Agreement (hereinafter referred to as ‘EIA’) to extend, by means of most favoured nation treatment, to another Contracting Party which is not a party to that EIA, any preferential treatment applicable between the parties to that EIA as a result of their being parties thereto.”569 For the Tribunal, Article 25 specifies that the treatment that may apply inter-se among EU Member States cannot be extended to non-EU Member States via the MFN clause. This does not imply that investors from Member States of the European Union are deprived of their procedural rights as recognized by Article 26 of the ECT.

357. For the above-mentioned reasons, the Tribunal is not in a position to conclude that Spain’s consent to submit ECT disputes to arbitration excluded intra-EU investment disputes and that primacy of EU Law excludes jurisdiction of the present Tribunal established under the ECT. Therefore, this Third Objection to jurisdiction is dismissed.

D. FOURTH OBJECTION: LACK OF JURISDICTION OVER CLAIMS UNDER ARTICLE 10(1) OF THE ECT ARISING OUT OF THE TVPEE AND THE TAX ON HYDROCARBONS

(1) The Parties’ Positions

a. Respondent’s Position

358. In their Memorial on Jurisdiction, Respondent objected to the Tribunal’s jurisdiction to hear claims concerning violation of Article 10(1) of the ECT as a result of the tax measures enacted in Law 15/2012, namely, the TVPEE and the amendment to the Tax on Hydrocarbons.570 The objection was later limited to the claim arising out of the TVPEE, in view of Claimants’ statement that their damages claim did not include any damages arising out of the Tax on Hydrocarbons.571


569 CL-001 / RL-055, ECT, Art. 25. ↩
570 Resp. Mem. Jur., ¶ 208. ↩
571 Resp. Reply Jur., ¶ 241, n. 124, ¶ 358. See also, Cl. Bif., ¶ 107. ↩

[Page 116]

359. Spain contends that it has not consented to arbitration of this claim, given that Article 26 of the ECT only concerns claims for violation of Part III of the Treaty, and pursuant to Article 21 of the ECT, Article 10(1) (although located in Part III) does not give rise to obligations in connection with tax measures.572 Respondent explains that “if no obligation derived from [P]art III of the ECT exists, there can be no alleged breach of it, and, thus, there is no consent of the Contracting Party to resort to arbitration and the Arbitral Tribunal lacks jurisdiction to hear the issue.”573

360. Spain explains that Article 21 of the ECT contains a general exclusion of taxation measures from the scope of the ECT (the “taxation carve-out”), with a few exceptions specifically listed in the same Article.574 None of those exceptions, Respondent says, refers to Article 10(1) of the ECT.575

361. The TVPEE is a “Taxation Measure” within the meaning of Article 21(7)(a) of the ECT, according to which the term includes: “(i) any provision relating to taxes of the domestic law of the Contracting Party or of a political subdivision thereof or a local authority therein; [...].”576 Spain notes that Law 15/2012 is a law passed by the Spanish Parliament and is thus part of its domestic law, and argues that the provisions concerning the TVPEE are “relating to taxes.”577

362. In Spain’s view, the law governing the determination of whether a provision is relating to taxes is the domestic law of the Contracting Party to the ECT.578 This is supported by (i) the wording of Article 21(7)(a)(i) of the ECT, and (ii) the Netherlands-Spain double taxation treaty, which must be taken into account pursuant to Article 31(3)(c) of the VCLT.579 That said, Respondent argues that, even if the Tribunal concluded that


572 Resp. Mem. Jur., ¶¶ 16, 171-174, 177, 184-185, 207. ↩
573 Resp. Mem. Jur., ¶ 182. See also, Resp. Reply Jur., ¶ 357. ↩
574 Resp. Mem. Jur., ¶¶ 186-187. ↩
575 Resp. Mem. Jur., ¶ 194. ↩
576 Resp. Mem. Jur., ¶¶ 199-200; Resp. Reply Jur., ¶¶ 248-315; CL-001 / RL-055, ECT, Art. 21(7)(a)(i). ↩
577 Resp. Mem. Jur., ¶¶ 202-203, 206, 207(i); Resp. Reply Jur., ¶¶ 261-262. ↩
578 Resp. Reply Jur., ¶¶ 249-250, 258. ↩
579 Resp. Reply Jur., ¶¶ 251, 254-255. ↩

[Page 117]

international law governs this question due to Article 26(6) of the ECT, the conclusion will be the same: the TVPEE is a tax.580

363. Under domestic law, Spain maintains, there can be no doubt that the TVPEE is a tax, as ratified by the Constitutional Court itself.581 It follows clearly from the text of Article 1 of Law 15/2012 that the TVPEE is a “direct tax on the performance of the activities of production and incorporation into the electrical system of electrical energy in the Spanish electrical system.”582 This is confirmed by Article 2 of Law 58/2003 on General Taxation.583 The TVPEE is a tax of general application that covers both renewable and ordinary generation facilities; its tax base is the total amount received for the production of electrical energy and its introduction into the grid in the taxable period; the rate is 7%; the taxable period is generally the calendar year; and the tax is accrued on the last day of the period.584 It is also deductible from corporate tax.585

364. There can also be no doubt that the TVPEE is a tax from the perspective of international law, Spain argues.586 It fits within the concept of tax developed by arbitral decisions because: it is established by law, and it imposes an obligation on a class of people to pay money to the State for public purposes.587 In addition, the EC has confirmed both that it is a tax, and that it conforms with EU Law.588

365. Respondent takes the view that the above is sufficient to conclude that the TVPEE is a tax, without engaging in an additional analysis of its economic effects and the good faith


580 Resp. Reply Jur., ¶¶ 257-258. ↩
581 Resp. Reply Jur., ¶¶ 263, 273. ↩
582 Resp. Reply Jur., ¶ 264. ↩
583 Resp. Reply Jur., ¶ 265. ↩
584 Resp. Reply Jur., ¶ 266. ↩
585 Resp. Reply Jur., ¶ 270. ↩
586 Resp. Reply Jur., ¶ 278. ↩
587 Resp. Reply Jur., ¶¶ 279, 280-302. ↩
588 Resp. Reply Jur., ¶¶ 279, 303-315. ↩

[Page 118]

of the measure.589 In any event, Respondent contends that the TVPEE is a bona fide taxation measure, arguing that:590

366. Respondent also points out that various tribunals have already upheld objections to jurisdiction over claims arising out of violation of Article 10(1) of the ECT resulting from the TVPEE, finding that the TVPEE is a “Taxation Measure” for purposes of the ECT.597

b. Claimants’ Position

367. Claimants contend that the objection based on the exclusion in Article 21 of the ECT is not a matter of jurisdiction.598 For Claimants, the contention that Article 21 of the ECT


589 Resp. Reply Jur., ¶¶ 317-321. ↩
590 Resp. Reply Jur., ¶¶ 245, 322-356. ↩
591 Resp. Reply Jur., ¶¶ 323-326. ↩
592 Resp. Reply Jur., ¶¶ 337-351. ↩
593 Resp. Reply Jur., ¶¶ 340-343. ↩
594 Resp. Reply Jur., ¶¶ 344-346. ↩
595 Resp. Reply Jur., ¶¶ 352-354. ↩
596 Resp. Reply Jur., ¶ 356. ↩
597 Resp Obs. Eiser, ¶ 7 (discussing Eiser); Resp. Obs. Achmea, ¶¶ 35-38 (discussing CL-195, Novenergía). ↩
598 Cl. C-Mem. Jur., ¶ 83. ↩

[Page 119]

excludes the consent in Article 26 improperly seeks to read into the later provision a specific exclusion to the ECT’s dispute settlement mechanism, which is not there.599

368. Claimants acknowledge that Article 21 of the ECT “does not directly include ‘Taxation Measures’” within the scope of Article 10(1) of the ECT, but argue that the TVPEE can be one of the Disputed Measures in this case because: (i) it is an ad valorem charge on gross revenue, and the functional equivalent a tariff cut as acknowledged by the Government, not a tax on “income or capital” within the meaning of Article 21(3) of the ECT;600 and (ii) even if the TVPEE were considered to be a tax, because it is not a tax on income or on capital, pursuant to Article 21(3) of the ECT it can be assessed under Article 10(7) of the ECT – the MFN Clause –, which applies to “Taxation Measures.”601 According to Claimants, the tribunals that have addressed the issue of jurisdiction over the claims arising out of the TVPEE have not considered these same arguments.602

369. Although in their pleadings Claimants answered the Fourth and Fifth Objections together as a whole,603 the present Section addresses the objection pertaining to claims for breach of Article 10(1) of the ECT. Claimants’ arguments pertaining to Article 10(7) of the ECT are further summarized in Section E(1)b infra.

370. To support the argument that the TVPEE is just an “ad valorem levy” and not a “tax on income or capital,” Claimants point out that: (i) in October 2012, the Ministry of Industry acknowledged that Spain could have achieved the same result as the TVPEE through a direct tariff cut; (ii) Law 15/2012 does not even describe itself as deriving its validity from the Government’s taxation power in Article 66 of the Spanish Constitution, but rather from Article 45 concerning environmental protection; and (iii) the ordinary meaning of the term “taxes on income” refers to taxes on net income.604 On this basis,


599 Cl. C-Mem. Jur., n. 91. ↩
600 Cl. Mem., ¶ 278; Cl. Mem. Jur., ¶ 86; Cl. Rej. Jur., ¶ 129. ↩
601 Cl. Mem., ¶ 278; Cl. Mem. Jur., ¶ 89; Cl. Rej. Jur., ¶ 130. ↩
602 Cl. Obs. Eiser, ¶ 2.2; Cl. Reply Eiser, ¶ 2.1. ↩
603 Cl. C-Mem. Jur., ¶¶ 83-91; Cl. Rej. Jur., ¶¶ 126-139. ↩
604 Cl. C-Mem. Jur., ¶¶ 86-87; Cl. Rej. Jur., ¶ 129. ↩

[Page 120]

Claimants argue that it is “questionable whether the 7% levy is a Taxation Measure at all for ECT purposes.”605

371. Claimants also emphasize that, in any event, if the Tribunal were to find that the TVPEE is a tax caught by the exclusion in Article 21 of the ECT, this would have a minimal impact on damages of around EUR $1.1 million on historical damages.606 They go on to explain that, given that the TVPEE is an operating cost that renewable energy producers can recover under Regulatory Framework III, the losses under Regulatory Framework III do not result from the TVPEE. Thus, the TVPEE would only be relevant to a small portion of Claimants’ historical losses, i.e. those between start of commercial operation (29 May 2013 for Termosol 1, and 7 June 2012 for Termosol 2) and the date marking the beginning of the retroactive application of Regulatory Framework III (9 July 2013).607 Further, Claimants argue, if the Tribunal does not adopt the primary “but for” analysis for quantification of damages, but instead adopts the alternative damages case based on a finding that only a “reasonable return” could be expected, damages would not need to be adjusted on account of lack of jurisdiction over the TVPEE.608

(2) The Tribunal’s Analysis

372. In the view of the Tribunal, the TVPEE is a “Taxation Measure” within the meaning of Article 21(7) of the ECT, and thus falls within the exclusion of taxation measures from the application of the ECT under Article 21(1) of the ECT. The 7% levy imposed under the TVPEE is, as Respondent points out, “established by law,” and it “imposes an obligation on a class of people” to “pay[] money to the State for public purposes.”609 It does not matter that, as Claimants argue, the economic effect of the TVPEE is functionally equivalent to a tariff cut.

373. Accordingly, the Tribunal concludes that damages could not be awarded on the basis of loss resulting from the imposition of the TVPEE. However, the Tribunal also points out


605 Cl. Rej. Jur., ¶ 129. ↩
606 Cl. Mem. Jur., ¶ 85; Cl. Rej. Jur., ¶ 126; Cl. Obs. Eiser, ¶¶ 2.3, 4.8; Cl. Obs. Achmea, ¶ 1.4. ↩
607 Cl. Mem. Jur., ¶ 85; Cl. Rej. Jur., ¶ 126. ↩
608 Cl. Obs. Eiser, ¶ 4.10. ↩
609 Resp. Reply Jur., ¶¶ 289-294. See also, Eiser, ¶ 266. ↩

[Page 121]

that, in light of its conclusions below regarding liability and damages, the impact of the TVPEE is not relevant in the assessment of damages in any event. In short, as a result of the Tribunal’s conclusion on liability, the Fourth Objection becomes moot.

E. FIFTH OBJECTION: LACK OF JURISDICTION OVER CLAIMS UNDER ARTICLE 10(7) OF THE ECT ARISING OUT OF THE TVPEE

(1) The Parties’ Positions

a. Respondent’s Position

374. Respondent contends that the Tribunal has no jurisdiction to hear Claimants’ claim that Spain has breached Article 10(7) of the ECT through the imposition of the TVPEE.610 Spain argues that, although Article 10(7) of the ECT does apply to “Taxation Measures,” pursuant to Article 21(3) of the ECT, Article 10(7) does not apply to taxes on income or on capital.611 Put another way, says Spain, Article 10(7) does not apply to direct taxes (i.e. those “levying direct manifestations of the economic capacity” that “cannot be legally passed-on” to another person), but only to indirect ones (i.e. those “levying indirect manifestations of the economic capacity of tax payers, such as consumption” that can “passed-on to another person”).612

375. According to Respondent, the TVPEE is a direct tax, and specifically a tax on income: it levies income obtained for the production and incorporation into the grid of electrical energy. As such, Article 10(7) of the ECT does not apply to it.613 It is irrelevant that the TVPEE is a tax on gross income (as opposed to net), because the definition of tax on income in Article 21(7)(b) of the ECT does not refer to net income.614

376. Because Spain’s consent to arbitration in Article 26 of the ECT refers to disputes arising out of violations of Part III of the ECT, and there is no obligation under Article 10(7)


610 Resp. Reply Jur., ¶¶ 359-361; Resp. Mem. Jur., ¶ 221. ↩
611 Resp. Reply Jur., ¶¶ 362, 367, 369; Resp. Mem. Jur., ¶¶ 211-212. ↩
612 Resp. Reply Jur., ¶¶ 371, 373. See also, id., ¶ 380; Resp. Mem. Jur., ¶ 214. ↩
613 Resp. Reply Jur., ¶ 375; Resp. Mem. Jur., ¶¶ 214-215. ↩
614 Resp. Reply Jur., ¶ 378. ↩

[Page 122]

with respect to the TVPEE, there can be no breach thereof, and therefore, there is no consent.615

377. But even if Article 10(7) of the ECT could cover the TVPEE, Spain argues, it could not impose MFN obligations in the form intended by Claimants.616 This is because pursuant to Article 21(3)(a) of the ECT, Article 10(7) “shall not apply to: (a) impose most favoured nation obligations with respect to advantages accorded by a Contracting Party pursuant to the tax provisions of any convention, agreement or arrangement described in subparagraph (7)(a)(ii) or resulting from membership of any Regional Economic Integration Organization; [...].” In turn, Article 21(7)(a)(ii) of the ECT refers to “any convention for the avoidance of double taxation or of any other international agreement or arrangement by which the Contracting Party is bound.”617

378. For Spain, the Uruguay-Spain BIT that Claimants attempt to import via the MFN clause is an international agreement to which Spain is bound, within the meaning of Article 21(7)(a)(ii) of the ECT. To the extent its substantive provisions (including FET) are applied to taxes, they are “provisions relating to taxes.”618 In consequence, Article 10(7) of the ECT cannot serve to import protections from the Uruguay-Spain BIT.619

b. Claimants’ Position

379. As noted earlier, in their pleadings Claimants answered the Fifth Objection together with the Fourth.620 The present section summarizes the arguments pertaining to the applicability of Article 10(7) of the ECT, and its consequences. To recall, as mentioned in Section D(1)b supra, Claimants’ position is that, even if the TVPEE were considered a tax, because it is not a tax on income or capital, it would fall to be assessed within the


615 Resp. Reply Jur., ¶¶ 363, 381. ↩
616 Resp. Reply Jur., ¶¶ 384, 390; Resp. Mem. Jur., ¶¶ 211, 216, 219 ↩
617 Resp. Reply Jur., ¶¶ 385-386; CL-001 / RL-055, ECT, Art. 21(3)(a) and Art. 21(7)(a)(ii) (emphasis added). ↩
618 Resp. Reply Jur., ¶ 387. ↩
619 Resp. Reply Jur., ¶ 388. ↩
620 Cl. C-Mem. Jur., ¶¶ 83-91; Cl. Rej. Jur., ¶¶ 126-139. ↩

[Page 123]

scope of Article 10(7) of the ECT (the MFN Clause), which does apply to “Taxation Measures” per Article 21(3) of the ECT.621

380. By virtue of Article 10(7) of the ECT, Claimants say, Spain is prevented from applying the TVPEE in a de facto discriminatory matter; and the TVPEE indeed discriminates against renewable energy producers in favour of conventional energy producers.622 Pursuant to Article 10(7) of the ECT, Spain is also required to give Dutch investors the same treatment that it gives to other foreign investors. Since in other investment treaties Spain has agreed to provide Fair and Equitable Treatment (“FET”) in connection with taxation, in particular, in the Spain-Uruguay BIT, then Claimants are entitled to the same FET, even if the TVPEE is considered a tax.623

381. Claimants dismiss Respondent’s allegation that the TVPEE is not covered by Article 10(7) of the ECT because it is a tax on income or capital. For Claimants, the view that Article 10(7) only applies to indirect taxes is not supported by Article 21(3) or Article 21(7)(b) of the ECT, which draw no distinction.624 It is also clear that the TVPEE is not a tax on income or capital, but rather on gross revenue for the production and transmission of electricity.625

382. Claimants also counter Respondent’s reliance on Articles 21(3)(a) and 21(7)(a)(ii) of the ECT to support the conclusion that Article 10(7) of the ECT cannot impose MFN obligations in relation to the TVPEE, thereby preventing importation of the Spain- Uruguay BIT.626 Claimants explain that the purpose of Article 21(3)(a) of the ECT is to limit the application of Article 10(7) by saying that “the advantages [...] pursuant to the tax provisions of any convention, agreement or arrangement described in subparagraph (7)(a)(ii) or resulting from membership of any Regional Economic Integration Organization” do not extend to the other ECT Contracting Parties via the MFN provision. However, the Spain-Uruguay BIT neither contains “tax provisions,” nor it is a


621 Cl. Mem., ¶ 278; Cl. Mem. Jur., ¶ 89; Cl. Rej. Jur., ¶ 130. ↩
622 Cl. Mem., ¶¶ 89-90. ↩
623 Cl. Mem., ¶ 278; Cl. Mem. Jur., ¶ 91. ↩
624 Cl. Rej. Jur., ¶¶ 133-134. ↩
625 Cl. Rej. Jur., ¶ 135. ↩
626 Cl. Rej. Jur., ¶¶ 136-139. ↩

[Page 124]

“convention, agreement or arrangement” of the types referred to in Article 21(7)(a)(ii) when defining “Taxation Measure.”627

(2) The Tribunal’s Analysis

383. The Tribunal is of the view that Article 21(3) of the ECT, which excludes taxation on capital and income from taxation measures otherwise covered under Article 10(7) of the ECT, prevents a claim on the basis of the TVPEE from being pursued under Article 10(7) of the ECT. The TVPEE is a tax on revenue derived from the supply of electricity into the Spanish grid. It is, therefore a tax on gross income. There is no basis for assuming that the reference to income in Article 21(3) of the ECT was a reference to net income. Thus, there is no basis for Claimants to pursue a claim under Article 10(7) of the ECT.

384. However, as pointed out in respect of the Fourth Objection, in light of the Tribunal’s conclusions below on regarding liability and damages, the impact of the TVPEE is not relevant to the assessment of damages in any event. In short, as a result of the Tribunal’s conclusion on liability the Fifth Objection becomes moot.

VI. APPLICABLE LAW

A. THE PARTIES’ POSITIONS

(1) Claimants’ Position

385. Claimants contend that the applicable procedural law is composed of the procedural provisions of the ECT and the ICSID Arbitration Rules.628 They argue, in turn, that the applicable substantive law pursuant to Article 26(6) of the ECT consists of (i) the ECT substantive provisions; (ii) the VCLT; and (iii) applicable rules and principles of international law.629 Lastly, according to Claimants, Spanish law is relevant as a fact to be taken into consideration in certain circumstances, but an ECT tribunal “can only


627 Cl. Rej. Jur., ¶ 138. ↩
628 Cl. Mem. Merits, ¶ 226. ↩
629 Cl. Mem. Merits, ¶ 227. ↩

[Page 125]

decide the issues in dispute in accordance with the applicable rules and principles of international law.”630

386. Claimants have also emphasized that Spain cannot invoke its own domestic law to justify breaches of international law.631 Claimants argue that “[d]omestic Spanish law principles are not ‘applicable rules and principles of international law’ and this Tribunal is not authorised to apply them as part of the applicable law.”632

387. Claimants also submit (in the context of discussing the EC Decision of 10 November 2017 on State Aid) that the Tribunal is mandated to apply the ECT over EU Law in the event of inconsistency.633

(2) Respondent’s Position

388. Respondent also espouses the view that the substantive law to be applied, pursuant to Article 26(6) of the ECT consists of (i) the ECT substantive provisions; (ii) the VCLT; and (iii) applicable rules and principles of international law.634 Spain further agrees that Spanish law is relevant as a fact to be considered in certain circumstances, but it emphasizes that “Spanish law is also decisive in shaping the legitimate expectations that any investor may have at the time of investing in Spain.”635

389. Spain also takes the view that “European Union law constitutes applicable international law for the resolution of this dispute under Article 26(6) of the ECT.”636 On those bases Respondent has argued that the EC Decision of 10 November 2017 on State Aid as part


630 Cl. Mem. Merits, ¶ 227. ↩
631 Cl. Reply Merits, § VII(1), ¶¶ 377-382. Claimants criticize Respondent’s reliance on a long description about the Spanish Electricity System, decisions of its Supreme Court, principles of Spanish law on administrative acts or retroactivity, allegations about the authority of a certain Government official to bind the State, noting that “Spain fails to explain why its own domestic law is relevant when the law applicable to the dispute is, according to Art. 26(6) ECT, the ECT itself and applicable rules and principles of international law.” Cl. Reply Merits, ¶ 378. ↩
632 Cl. Reply Merits, ¶ 378. ↩
633 Cl. Obs. EC Decision, ¶ 1.4. See also, infra, ¶ 457. ↩
634 Resp. C-Mem. Merits, ¶ 599 (quoting Cl. Mem. Merits, ¶ 227). ↩
635 Resp. C-Mem. Merits, ¶ 599; Resp. Rej. Merits, ¶ 33. ↩
636 Resp. Obs. EC Decision, ¶ 4. ↩

[Page 126]

of EU Law is also binding on tribunals where they apply EU Law, and that as a result, this Tribunal’s decision must be compatible with that EC Decision.637

B. THE TRIBUNAL’S ANALYSIS

390. In the view of the Tribunal the applicable law is the ECT and any rules of international law relevant to its interpretation and application. The Tribunal will refer to provisions of Spanish law and EU Law if appropriate. Their particular weight and relevance will be assessed in this decision in the context of the issues in respect of which they have been raised.

VII. LIABILITY

391. Claimants contend that Respondent has violated Articles 10(1) and Article 10(7) of the ECT.638 They argue that “Spain's enactment of Law 15/2012, RDL 2/2013, RDL 9/2013, RD 413/2014, and the [Ministerial] Order [IET/1045/2014], coupled with the application of those measures to the Termosol Plants and the PTEs, gives rise to a breach of Article 10(1) of the ECT through actions which violated the FET standard and breached obligations assumed by Spain towards the Claimants' investments.”639 According to Claimants, “Spain breached Article 10 ECT when it overhauled the remuneration regime pursuant to which the Claimants invested and replaced it with Regulatory Framework III.”640 Spain has breached its obligations in three ways, according to Claimants: (i) by repudiating Claimants’ legitimate expectations; (ii) by breaching its duty to provide a stable, consistent and transparent framework; and (iii) by failing to adopt reasonable, proportionate and non-discriminatory measures.641


637 Resp. Obs. EC Decision, ¶¶ 4, 33. See also, infra, ¶ 510. ↩
638 Cl. Mem. Merits, ¶ 314(2). ↩
639 Cl. Mem. Merits, ¶ 258. ↩
640 Cl. Skeleton, ¶ 33. As noted, Claimants have referred in their submissions to three different “Regulatory Frameworks,” as follows: (i) “Regulatory Framework I” including RD 661/2007, RDL 6/2009 and RD 1614/2010; (ii) “Regulatory Framework II” including Law 15/2012 and RDL 2/2013; and (iii) “Regulatory Framework III” including RDL 9/2013, RD 413/2014 and Ministerial Order IET/1045/2014. See Cl. Mem. Merits, p. vii and Appendix A. ↩
641 Cl. Skeleton, ¶ 33; Cl. Reply Merits, § VII(3)(B-D). ↩

[Page 127]

392. In turn, Respondent denies that it has breached Article 10(1) of the ECT,642 or Article 10(7) of the ECT.643 Respondent argues that (i) it has not breached Claimants’ legitimate expectations at the time of investment;644 (ii) it has not breached the commitment to provide stable conditions;645 (iii) its conduct has been transparent;646 (iv) the challenged measures are proportionate and non-discriminatory,647 were adopted for “justifiable reasons of public interest,” and are also reasonable.648

A. THE PARTIES’ POSITIONS

(1) The Standard in Article 10(1) of the ECT

a. Claimants’ Position

393. Claimants contend that the commitment to grant Fair and Equitable Treatment (“FET”) in Article 10(1) of the ECT is an “autonomous treaty standard [...] independent of the minimum standard of treatment under customary international law.”649 It is to be applied “in light of the European Energy Charter's commitment to legal stability and the environmental protection goals explicitly identified in the ECT's Preamble, Article 2 and Article 19.”650

394. According to Claimants, Article 10(1) of the ECT imposes a number of distinct, but related obligations.651 The FET standard in Article 10(1) comprises requirements for the host-State to: (i) protect “an investor’s legitimate and reasonable expectations;” (ii) “maintain reasonable stability in its legal framework;” (iii) “act in good faith;” (iv) “act proportionately;” and (v) respect due process and avoid denial of justice;652 with facets


642 Resp. C-Mem. Merits, ¶ 642. ↩
643 See, e.g., Resp. Rej. Merits, ¶¶ 726-727. ↩
644 Resp. C-Mem. Merits, § III(F)(2); Resp. Rej. Merits, § III(B)(3.1). ↩
645 Resp. C-Mem. Merits, § III(F)(3); Resp. Rej. Merits, § III(B)(3.2). ↩
646 Resp. C-Mem. Merits, § III(F)(4); Resp. Rej. Merits, § III(B)(3.3). ↩
647 Resp. C-Mem. Merits, § III(F)(5); Resp. Rej. Merits, § III(B)(3.4). ↩
648 Resp. C-Mem. Merits, ¶ 642. ↩
649 Cl. Mem. Merits, ¶ 230. See also, Cl. Reply Merits, ¶¶ 416, 435; Cl. Skeleton, ¶ 29. ↩
650 Cl. Mem. Merits, ¶ 239. See also, id., ¶¶ 236-238. ↩
651 Cl. Mem. Merits, ¶ 229 (quoting CL-001 / RL-055, ECT, Art. 10(1)). ↩
652 Cl. Mem. Merits, ¶¶ 240, 242, 250; Cl. Reply Merits, ¶¶ 416, 435. ↩

[Page 128]

(i) and (ii) being especially relevant in this case.653 Article 10(1) also guarantees transparency in actions by the State; and it precludes arbitrary, unfair, unjust, idiosyncratic, and discriminatory conduct.654

395. Protection of Legitimate and Reasonable Expectations. Claimants contend that the protection of legitimate and reasonable expectations is an integral part of the autonomous FET standard,655 and the revocation of a State’s assurances giving rise to those expectations constitutes a breach of the standard.656 Relying on Plama, Claimants argue that the legitimate expectations protected under Article 10(1) “include the conditions that were specifically offered by the State to the Investor when making the Investment and that were relied upon by the Investor to make its Investment.”657 And referring to Suez, Claimants add that investors are protected when they have “derived reasonable expectations from the laws and regulations adopted by the host country, acted in reliance upon those laws and regulations and changed their economic position as a result.”658 They add, however, that the FET standard also protects against “changes in law affecting a long-term capital intensive investment (even in the absence of the specific additional assurances provided by Spain in this case).”659

396. Stability, Consistency and Transparency of the Legal Framework. Claimants also argue that FET includes legitimate expectations of a “stable and predictable investment


653 Cl. Mem. Merits, ¶ 241. ↩
654 Cl. Reply Merits, ¶ 416. ↩
655 Cl. Mem. Merits, ¶¶ 240-241 (citing CL-018, Técnicas Medioambientales TECMED SA v. United Mexican States, ICSID Case No. ARB(AF)/00/2, Award (29 May 2003) (hereinafter “Tecmed”), ¶ 154; CL-013, Rumeli Telekom A.S. and Telsim Mobil Telekomunikasyon Hizmetleri A.S. v. Republic of Kazakhstan, ICSID Case No. ARB/05/16, Award (29 July 2008), ¶ 609; CL-022, Deutsche Bank AG v. Democratic Socialist Republic of Sri Lanka, ICSID Case No. ARB/09/02, Award (31 October 2012), ¶ 420; CL-023, Jan Oostergetel and Theodora Laurentius v. The Slovak Republic, UNCITRAL, Final Award (23 April 2012), ¶ 221). ↩
656 Cl. Mem. Merits, ¶ 244 (citing CL-024, CMS Gas Transmission Co. v. Republic of Argentina, ICSID Case No. ARB/01/8, Award (12 May 2005) (hereinafter “CMS”), ¶ 275; CL-025, CME Czech Republic BV v. Czech Republic, UNCITRAL, Partial Award (13 September 2001), ¶ 611). ↩
657 Cl. Mem. Merits, ¶ 246 (quoting CL-028 / RL-092, Plama Consortium Limited v. Republic of Bulgaria, ICSID Case No. ARB/03/24, Award (27 August 2008) (hereinafter “Plama Award”), ¶ 176). ↩
658 Cl. Mem. Merits, ¶ 248 (citing CL-030, Suez, Sociedad General de Aguas de Barcelona S.A. and Vivendi Universal v. Argentine Republic, ICSID Case No. ARB/03/19, Decision on Liability (30 July 2010), ¶ 226). ↩
659 Cl. Mem. Merits, ¶ 249 (citing CL-031, Total S.A. v. Argentine Republic, ICSID Case No. ARB/04/1, Decision on Liability (27 December 2010), ¶¶ 309(g), 333). ↩

[Page 129]

environment.”660 Article 10(1) of the ECT expressly requires States to “encourage and create stable, equitable, favourable and transparent conditions for Investors;”661 a point also reflected in the European Energy Charter (basis for the ECT), and further confirmed by the Energy Charter Conference.662 The importance of a stable legal and business environment has been recognized by tribunals in their analyses of the FET standard.663

397. In Claimants’ view, Respondent unduly restricts the scope of Article 10(1) of the ECT by arguing that it does not impose limits on a State’s regulatory power.664 Claimants explain that while they do not contend that “States should be precluded from enacting laws when the circumstances change,” such regulatory authority is not limitless, and it is also “not impervious to scrutiny under international law.”665 According to Claimants, “[b]y entering into the ECT, Spain accepted a limitation on its powers to alter the remuneration framework applicable to the Claimants’ investments.”666

398. Claimants also oppose the view that the FET standard in Article 10(1) of the ECT is limited to the Minimum Standard of Treatment under customary international law (“MST”). In their view, conflating the FET standard with MST would ignore the rules of treaty interpretation in Article 31 of the VCLT; it is not supported by the text of the ECT or by supplementary means of interpretation.667 The phrase “[i]n no case shall such Investments be accorded treatment less favourable than that required by international law, including treaty obligations” in Article 10(1) of the ECT does not alter the conclusion because: (i) it appears much later, after the FET obligation located in the first


660 Cl. Mem. Merits, ¶ 250. ↩
661 Cl. Mem. Merits, ¶ 251; CL-001 / RL-055, ECT, Art. 10(1). ↩
662 Cl. Mem. Merits, ¶¶ 251-252. ↩
663 Cl. Mem. Merits, ¶¶ 253-257 (referring to CL-035, Joseph Charles Lemire v. Ukraine, ICSID Case No. ARB/06/18, Decision on Jurisdiction and Liability (14 January 2010) (hereinafter “Lemire”), ¶ 284; CL-011, PSEG Global Inc. and Konya Ilgin Elektrik Üretim ve Ticaret Limited Şirketi v. Republic of Turkey, ICSID Case No. ARB/02/5, Award (19 January 2007), ¶¶ 250, 254; CL-024, CMS, ¶ 275; CL-036, Sempra Energy International v. Argentine Republic, ICSID Case No. ARB/02/16, Award (28 September 2007), ¶ 303; CL-027, Metalclad Corp. v. United Mexican States, ICSID Case No. ARB(AF)/97/1, Award (30 August 2000), ¶ 99). See also, Cl. Skeleton, ¶ 41. ↩
664 Cl. Reply Merits, ¶¶ 436-442. ↩
665 Cl. Reply Merits, ¶ 437. See also, Cl. Skeleton, ¶ 32. ↩
666 Cl. Reply Merits, ¶ 440. ↩
667 Cl. Reply Merits, ¶¶ 417-419; Cl. Skeleton, ¶ 30. ↩

[Page 130]

sentence, thereby confirming that the FET standard is not equivalent to MST;668 and (ii) Article 10(1) uses different words to articulate the FET obligation and MST, thereby showing that they have a different meaning.669 The opposite interpretation would not give effect to all the terms of Article 10(1).670

399. Moreover, Claimants contend, the conclusion that the FET standard in Article 10(1) of the ECT goes beyond MST is supported by decisions in ECT cases,671 and also in BIT cases referring to provisions with references to international law similar to that in Article 10(1) of the ECT.672

400. Claimants also take issue with Respondent’s reliance on Article 2 of the 1991 European Energy Charter, arguing that the fact that this provision sought to achieve non- discrimination and market-oriented price formation does not give license to ignore the text of Article 10(1). Both the ECT and the 1991 European Energy Charter indicate that their purpose is to promote investment and economic cooperation,673 and “[t]he promotion of investment and economic cooperation [...] supposes positive obligations that go beyond the [MST].”674

401. Claimants further deny that the FET standard in Article 10(1) of the ECT is limited to national treatment.675 This conclusion, Claimants argue, cannot be reconciled with (i) the text of Article 10(1) which includes a separate prohibition against discrimination in a stand-alone sentence; or (ii) the definition of “Treatment” in Article 10(3) of the ECT; or (iii) Article 10(7) of the ECT.676 If FET were limited to national treatment, these


668 Cl. Reply Merits, ¶ 420. ↩
669 Cl. Reply Merits, ¶ 421. ↩
670 Cl. Reply Merits, ¶ 422. ↩
671 Cl. Reply Merits, ¶ 429 (citing CL-006, Liman, ¶ 263). ↩
672 Cl. Reply Merits, ¶ 430 (citing CL-017, Azurix Corp. v. Argentine Republic, ICSID Case No. ARB/01/12, Award (14 July 2006), ¶ 361; CL-035, Lemire, ¶ 253). ↩
673 Cl. Reply Merits, ¶ 426. ↩
674 Cl. Reply Merits, ¶ 427. See also, Cl. Skeleton, ¶ 30. ↩
675 Cl. Reply Merits, ¶¶ 431-435. ↩
676 Cl. Reply Merits, ¶ 431; Cl. Skeleton, ¶ 31. ↩

[Page 131]

provisions would have been unnecessary; and equating them renders the provisions meaningless.677

402. Lastly, Claimants take issue with what they describe as Spain’s effort to “second-guess whether or not the granting of special privileges for foreign investors is warranted.”678 In Claimants’ view, whatever policy debates might exist, “Spain made the policy decision to accord a right of FET to qualifying energy sector investors in its territory, on the basis that Spanish investors would benefit from the same rights in the Netherlands and in all other ECT Contracting States,” which was “not a one-sided policy choice” but rather “one based on reciprocity;” freely made and not open to the Tribunal to second-guess.679

b. Respondent’s Position

403. Respondent contends that the aim and purpose of the ECT is to grant foreign investors national or non-discriminatory treatment.680 Spain denies that the ECT affords higher protection than MST, or that it offers protection directly related to the support of renewable energy investments.681

404. According to Spain, the ECT’s investment protection system is aimed at achieving an energy open market in Europe based on the principle of non-discrimination.682 Thus, the ECT’s principal investment protection objective is to afford “domestic treatment” or “non-discrimination” once an investment has already been made.683 This objective, Spain argues, is not breached by the adoption of measures that are (i) proportionate; (ii) justified by public interest; and (iii) applied erga ommes to both foreign and domestic


677 Cl. Reply Merits, ¶ 431. ↩
678 Cl. Reply Merits, ¶ 442. ↩
679 Cl. Reply Merits, ¶ 442. ↩
680 Resp. C-Mem. Merits, § III(E)(1). See also, Resp. Rej. Merits, ¶¶ 32, 1114. ↩
681 Resp. C-Mem. Merits, ¶ 603. ↩
682 Resp. C-Mem. Merits, ¶ 607. See also, Resp. Rej. Merits, ¶ 1015. ↩
683 Resp. C-Mem. Merits, ¶¶ 611-612, 618. ↩

[Page 132]

investors.684 Subsidies that distort competition in the energy market (such as those Claimants’ seek) are incompatible with the ECT.685

405. Further, in Spain’s view, the obligation in Article 10(1) of the ECT to afford treatment “[i]n no case [...] less favourable than that required by international law, including treaty obligations” refers to MST under customary international law, with “domestic treatment” or “national treatment” being the maximum protection granted to foreign investments when more favourable.686 Put another way, as the objective of the ECT is to achieve non-discrimination, “[o]nly when the absence of discrimination does not guarantee the investors treatment in accordance with the minimum standards of International law do these standards go into effect to ensure their protection.”687

406. Respondent goes on to argue that the protection afforded by Article 10(1) of the ECT varies depending on the stage at which the investment is at. The “commitment to accord at all times to Investments of Investors of other Contracting Parties fair and equitable treatment” applies during the “making [of the] investment,” because this particular sentence of Article 10(1) refers to the preceding one dealing with “conditions [...] to make Investments in its Area.”688 But, once an investment has been made, Article 10(1) offers protection “against discriminatory and irrational measures that affect the management, maintenance, use, enjoyment, and disposal of the investment,” setting as a minimum that “[i]n no case shall such Investments be accorded treatment less favourable than that required by international law, including treaty obligations.”689 Further, national treatment protection contains an exception in the field of State aid, as shown in Article 10(8) of the ECT.690


684 Resp. C-Mem. Merits, ¶ 618. ↩
685 Resp. Rej. Merits, ¶ 1017. ↩
686 Resp. C-Mem. Merits, ¶¶ 613, 619. ↩
687 Resp. Rej. Merits, ¶ 1007. See also, id., ¶ 1016; Resp. Skeleton, ¶ 21. ↩
688 Resp. Rej. Merits, ¶ 1021. ↩
689 Resp. Rej. Merits, ¶ 1022. ↩
690 Resp. Rej. Merits, ¶ 1024. ↩

[Page 133]

407. Spain denies that its interpretation of Article 10(1) of the ECT renders Article 10(7) meaningless, observing that Article 10(7) also includes an MFN guarantee, in addition to national treatment.691

408. According to Respondent the ECT does not guarantee sustainable energy development at any cost, as it has to be both economic and environmental.692 Respondent argues that the purpose of the ECT is stated in Article 2, and that Article 19 on environmental protection is of minor importance.693 For Spain, while Article 19 provides that the ECT Contracting Parties shall “have particular regard to Improving Energy Efficiency” and “to developing and using renewable energy sources,” it does not mandate the granting of “petrified” public subsidies, and the ECT respects the State’s regulatory power in the area of State aid.694

409. Spain also takes the view that, while the ECT requires the creation of stable and transparent conditions for investment, it does not prevent the adoption of justified and non-discriminatory macroeconomic control measures by a State.695 The ECT does not require Contracting Parties to maintain a regulatory framework stable and predictable throughout the whole investment, as Article 10(1) refers to stable “conditions” and not to a stable “regulatory framework.”696 Further, the ECT does not “cancel or limit to the extreme” the State’s regulatory power, nor provide an insurance policy to investors against regulatory changes.697 The only limit to the State regulatory power in the ECT is MST, and an objective of non-discrimination.698

410. In Respondent’s view, the context and subject matter of the ECT support its interpretation. Because the ECT concerns investments in a highly regulated and strategic sector such as the energy sector, Spain says, “[i]t is not very realistic” to interpret it as an


691 Resp. Rej. Merits, ¶ 1023. ↩
692 Resp. C-Mem. Merits, ¶ 623. ↩
693 Resp. C-Mem. Merits, ¶ 624. ↩
694 Resp. C-Mem. Merits, ¶ 623. ↩
695 Resp. C-Mem. Merits, § III(E)(2), ¶ 610. See also, Resp. Rej. Merits, ¶¶ 1027, 1115; Resp. Skeleton, ¶ 21. ↩
696 Resp. C-Mem. Merits, ¶ 628; Resp. Rej. Merits, ¶¶ 1031, 1033. ↩
697 Resp. C-Mem. Merits, ¶ 610. ↩
698 Resp. C-Mem. Merits, ¶ 632; Resp. Rej. Merits, ¶ 1035. ↩

[Page 134]

insurance policy for foreign investors “against regulatory reforms adopted for reasons of public interest.”699 The obligations in Article 10 of the ECT must be “tempered” by the provisions in Part IV referring to sovereignty and the State’s economic regulatory power, tax veto and attribution rules.700

411. Finally, Spain also argues that arbitral awards interpreting the FET standard in the ECT support its position, in particular the notion that “in the absence of a specific commitment to stability, an Investor cannot have an expectation that a regulatory framework such as the one discussed in this arbitration will not be amended.”701

(2) Article 10(1) of the ECT: Repudiation of Legitimate and Reasonable Expectations

a. Claimants’ Position

412. Claimants contend that Respondent “actively induced [them] to invest by offering a long- term and stable remuneration system, backed by repeated assurances from the most senior Spanish government officials addressed specifically to NextEra representatives.”702

413. According to Claimants, they held legitimate expectations that the Termosol Plants would benefit from the remuneration regime in RD 661/2007 “as stabilised in RDL 6/2009 and RD 1614/2010” (“Regulatory Framework I”703) for their entire useful life, and that they relied on those expectations to invest in Spain.704 For Claimants, Regulatory Framework I “guaranteed specific tariffs and premiums, operating hours, and upper and lower remuneration limits for the lifetime of their plants,”705 and Claimants “moved their


699 Resp. Rej. Merits, ¶ 1032. ↩
700 Resp. Rej. Merits, ¶ 1033 (quoting RL-056, T.W. Wälde, Arbitration in the Oil, Gas and Energy Field: Emerging Energy Charter Treaty Practice, 1 TDM (2004)). ↩
701 Resp. Rej. Merits, ¶¶ 1028-1030 (referring to RL-092, Plama Award, ¶ 219; RL-024, AES Summit Generation Limited and AES-Tisza Erömü Kft. v. Republic of Hungary, ICSID Case No. ARB/07/22, Award (23 September 2010) (hereinafter “AES”), ¶ 9.3.25; RL-091, Electrabel S.A. v. Hungary, ICSID Case No. ARB/07/19, Award (25 November 2015) (hereinafter “Electrabel”), ¶¶ 165-166; RL-088, Charanne, ¶¶ 493, 510). ↩
702 Cl. Mem. Merits, § II.3. See also, Cl. Reply Merits, ¶¶ 12-13. ↩
703 Cl. Mem. Merits, p. vii and Appendix A. ↩
704 Cl. Skeleton, ¶ 34; Cl. Mem. Merits, ¶¶ 259-261. ↩
705 Cl. Skeleton, ¶ 35. ↩

[Page 135]

investments forward only after they had clear assurances from Spain they would earn the specific revenues of Regulatory Framework I.”706 Without a framework that provided legal certainty, Claimants say, they would have never invested.707

414. Respondent breached those expectations, Claimants argue, by “dismantling Regulatory Framework I via Regulatory Framework III,”708 which is (i) fundamentally different from Regulatory Framework I; and (ii) yields a very different rate of return (from an anticipated 11.6% post-tax to a 1.9% post-tax).709

(i) Claimants’ Expectations

415. More specifically, Claimants contend that they legitimately expected that the Termosol Plants:710


706 Cl. Skeleton, ¶ 39. ↩
707 Cl. Mem. Merits, ¶¶ 25, 124. ↩
708 Cl. Skeleton, ¶ 34. See also, id., ¶ 40. ↩
709 Cl. Skeleton, ¶ 40. ↩
710 Cl. Mem. Merits, ¶ 259. ↩
711 Cl. Mem. Merits, ¶ 259 (citing C-017, RD 661/2007, Art. 44 and Additional Provision One). Claimants note, however, that the first year of operations was limited to the regulated tariff. Cl. Mem. Merits, n. 316. ↩
712 Cl. Mem. Merits, ¶ 259 (citing C-016, RD 1614/2010, Art. 4). ↩
713 Cl. Mem. Merits, ¶ 259 (citing C-016, RD 1614/2010, Art. 2). Claimants assert that the they built the Termosol Plants with a 9-hour storage facility with support fuel only because under the law applicable at the time the plants were designed, the plants were allowed to generate up to 4,000 hours of annual electronical output, and were allowed to derive a % of their qualifying production from a support fuel. Cl. Mem. Merits, ¶ 21. ↩

[Page 136]

(ii) Source of the Expectations

416. Those expectations were formed, Claimants say, from: (i) the terms of Regulatory Framework I; (ii) the registration of the Termosol Plants in the Pre-Assignment Registry of 11 December 2009 (iii) two Ministerial Resolutions of 28 December 2010; (iv) “uniquely explicit and specific assurances of stability concerning the Termosol Plants” by the highest levels of the Spanish Government to NextEra officials; and (v) the final registration in the RAIPRE of 29 May and 7 June 2013.718 In addition, the capital- intensive nature of a CSP-investment in which the Government alone can drive success or failure also served as basis of Claimants’ expectations.719

417. Claimants argue that Spain’s laws up to 2012 provided “clear commitments to maintain its production-based remuneration regime for the long term.”720 These laws, Claimants say, “did not envisage, or provide any warning of, the fundamental changes that Spain


714 Cl. Mem. Merits, ¶ 259 (citing C-017, RD 661/2007, Arts. 24.1(a), 24.1(b), 2.1(b)). ↩
715 Cl. Mem. Merits, ¶ 259 (citing C-017, RD 661/2007, Art. 17 and Annex XI). ↩
716 Cl. Mem. Merits, ¶ 259 (citing C-017, RD 661/2007, Preamble). ↩
717 Cl. Mem. Merits, ¶ 259 (citing C-017, RD 661/2007, Art. 36). ↩
718 Cl. Mem. Merits, ¶ 259; Cl. Skeleton, ¶ 35. ↩
719 Cl. Skeleton, ¶ 35. ↩
720 Cl. Mem. Merits, ¶ 262 (referring to C-024, Electricity Law; C-028, RD 2818/1998, Preamble; C-030, RD 1432/2002, Preamble; C-032, RD 436/2004, Preamble and Art. 1; C-017, RD 661/2007, Preamble, and Art. 36; C- 044, RDL 6/2009, General Provisions, and 5th Transitory Provision; C-016, RD 1614/2010, General Provisions, and Art. 4). ↩

[Page 137]

eventually passed in 2012 and 2013,”721 and on the contrary show that when Spain preserved the ability to change the scheme, it did so expressly.722

418. More specifically, Claimants assert that “Regulatory Framework I expressly committed to provide long-term certainty around the premiums and tariffs available to CSP plants that had been admitted by Spain within its Pre-Assignment Registry,” and in particular, argue that:723


721 Cl. Mem. Merits, ¶ 263. ↩
722 Cl. Mem. Merits, ¶ 263. Claimants note, for example, that Article 44.3 of RD 661/2007 “made it clear that the values of tariffs, premiums, supplements, and upper and lower limits of the regulated tariff and premiums would be updated annually, and that there could be changes to the applicable tariffs and premiums every four years [...] for plants which it had not approved for pre-registration under the deadlines in RDL 6/2009 [...].” Id. ↩
723 Cl. Reply Merits, ¶¶ 49, 446. ↩
724 Cl. Reply Merits, ¶¶ 49, 58, 66-67. ↩
725 Cl. Reply Merits, ¶¶ 53, 56. ↩
726 Cl. Reply Merits, ¶¶ 54-66, 472. ↩

[Page 138]

419. Claimants argue that, contrary to Respondent’s allegations, the assurances in Regulatory Framework I are sufficient to ground Claimants’ expectations.727 According to Claimants, “[i]t is now well-established that the legal framework surrounding an investment may contribute to the creation of legitimate expectations for investors.”728

420. In any event, Claimants argue, their expectations were “reinforced” by specific assurances given by the Spanish Government that induced them to invest, and in particular, to proceed with construction of the Termosol Plants in December 2010.729 According to Claimants, those assurances were provided in:


727 Cl. Reply Merits, ¶ 444. Claimants have argued elsewhere that Respondent has ultimately conceded that investors can derive legitimate expectations from the framework surrounding their investment. Cl. Skeleton, ¶ 36. ↩
728 Cl. Reply Merits, ¶ 449. Claimants distinguish the present case from Charanne arguing, inter alia, that that PV case lacked the critical stabilization commitments given to the CSP sector in RDL 6/2009 and RD 1614/2010, and go on to contend that this decision cannot stand as authority for the proposition that regulatory frameworks can never ground legitimate expectations. Cl. Reply Merits, ¶¶ 452-453. ↩
729 Cl. Mem. Merits, ¶ 264. See also, Cl. Reply Merits, ¶¶ 125-129, 448, 473-474. ↩
730 CWS-Davidson First, ¶ 15. ↩
731 C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009. ↩
732 C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009. ↩
733 C-007, Agreement of the Council of Ministers, 13 November 2009. See also, Cl. Reply Merits, ¶ 473 (3d bullet). ↩
734 C-049, Pre-Assignment Registration Notice Termosol 1, 11 December 2009; C-050, Pre-Assignment Registration Notice Termosol 2, 11 December 2009. ↩
735 Cl. Reply Merits, ¶¶ 70-77, 484. ↩
736 Cl. Reply Merits, ¶ 484. ↩

[Page 139]

421. To the above, Claimants add that “[t]he Termosol Plants’ final registration in the RAIPRE constituted an additional assurance that the Termosol Plants would benefit from the remuneration of RD 661/2007 throughout their operational life.”743 For Claimants, this registration, which took place on 29 May 2013 (Termosol 1) and 7 June 2013 (Termosol 2), qualified the installations under the Special Regime and made them legally entitled to the incentives set out in RD 661/2007, as confirmed by the registration


737 C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010. ↩
738 CWS-Davidson First, ¶ 36; C-013, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 21 April 2010. ↩
739 CWS-Arechabala First, ¶¶ 47, 53; C-057, Email from Mike Arechabala (NextEra Energy España, S.L.) to Antonio De Juan Fernandez (Pöyry Consulting), 12 May 2010. ↩
740 C-065, Agreement with the Solar Thermal Industry (Acuerdo con el Sector Termosolar), 2 July 2010; C-066, Ministry for Industry, Tourism and Trade, Press Release, Industry Ministry Reaches an Agreement with the Wind and Solar Thermal Sectors for the Revision of their Payment Framework, 2 July 2010. ↩
741 C-009, 2010 Resolution Termosol 1, 28 December 2010; and C-010, 2010 Resolution Termosol 2, 28 December 2010. ↩
742 C-011, Letter from Ignacio Grangel Vicente (Chief of Staff to the Secretary of State for Energy) to John Ketchum (NextEra Energy Resources, LLC), 3 April 2012. ↩
743 Cl. Reply Merits, ¶ 82. See also, Cl. Mem. Merits, ¶ 259. ↩

[Page 140]

resolutions.744 It is also similar to a license granted by the host-State and amounts to a stabilization guarantee.745

422. Spain’s commitments, Claimants argue, were also echoed as the Government’s policy during “roadshows” by the Ministry of Industry, Tourism and Trade and InvestInSpain.746 According to Claimants, Spain engaged in a “worldwide campaign aimed at enticing international investors” conducted by InvestInSpain, including presentations which describe the tariffs set in RD 661/2007 as “guaranteed” for the life of the asset in an initial period of 25 years and an indefinite period thereafter.747 In addition, between 2007-2010, the CNE, “consistently represented to investors that Spain was committed to providing regulatory stability, in the form of economic support mechanisms that were [...] subject of a ‘warranty by law’, and that the revisions to tariffs and premiums foreseen at four-year intervals in Art. 44 of RD 661/2007 would apply only to new plants, not to existing ones.”748

423. Claimants oppose Respondent’s analysis of these assurances arguing: first, that Spain isolates them and omits some of them, contrary to “a well-settled principle [...] that the existence of legitimate expectations must be assessed in the light of the ‘totality of the circumstances’ of a case;”749 second, that the clear text of the letters and witness evidence contradict Spain’s interpretation,750 and third, that any allegation of ambiguity in the assurances fails as a matter of law because “it is the host State, not the investor, who bears the consequences of any ambiguity in its representations to foreign investors.”751


744 Cl. Reply Merits, ¶¶ 78-83 (referring to C-004, 2013 RAIPRE Resolution Termosol 1, 29 May 2013; C-005, 2013 RAIPRE Resolution Termosol 2, 7 June 2013). Claimants contend that these resolutions distinguish the present case from Charanne. Cl. Reply Merits, n. 101. ↩
745 Cl. Reply Merits, ¶ 484. ↩
746 Cl. Mem. Merits, ¶¶ 32, 265. ↩
747 Cl. Reply Merits, ¶¶ 31-33 (discussing C-023, InvestInSpain: Opportunities in Renewable Energy In Spain, Manuela García (November 2008); C-172, InvestInSpain, Presentations (January, November 2008; March 2009, April 2009). See also, Cl. Reply Merits, ¶ 473 (7th bullet). ↩
748 Cl. Reply Merits, ¶¶ 35, 46. See also, id., ¶¶ 36-45, 473 (8th bullet). ↩
749 Cl. Reply Merits, ¶ 476. ↩
750 Cl. Reply Merits, ¶ 478 (referring to CWS-Davidson Second, ¶¶ 6-18). ↩
751 Cl. Reply Merits, ¶ 479. ↩

[Page 141]

(iii) The Timeline of the Investment and Expectations

424. Claimants have argued that the timeline of their investments is marked by three phases: (i) a first exploratory phase, “predicated on the tariffs, and premiums set in RD 661/2007 being available,” but with Claimants not going beyond the initial project outlay due to flaws in RD 661/2007; (ii) a second phase in which Claimants increased their investment “[p]ursuant to further assurances including RDL 6/2009,” which came to a halt in April 2010 amid rumours of a cut in tariffs and premiums; and (iii) a third and final phase, commencement of construction in December 2010, “marked by the conclusion of a process which culminated in the passing of RD 1614/2010.”752

425. Claimants contend that when approached in early 2007 by Casas de Hitos to co-develop a solar energy project, the project had an “initial interest” because at the time “Spain was [...] actively encouraging foreign investments in renewable generation through long term incentives [...].”753 Claimants say that, while they viewed these initial incentives as insufficient, they did engage in discussions with this company and signed an initial set of contracts in December 2007, which did not require the development of the Termosol Plants, but were “a framework for doing so if the Spanish regulatory conditions improved.”754

426. According to Claimants, prior to their decision to proceed with construction of the Termosol Plants in December 2010, Spanish law had already started offering a framework intended to provide regulatory certainty and to promote and develop renewable energy, “based around a commitment to provide a clear, transparent regime which ensured a reasonable profit for investors, through payments based on the amount of electricity produced.”755 Such framework was formed by the 1997 Electricity Law, RD 2818/1998, the 2000-2010 Renewable Energy Plan, RD 1432/2002, RD 436/2004,


752 Cl. Reply Merits, ¶ 131. See also, Cl. Skeleton, ¶ 5 (arguing that Claimants’ “ultimate decision to proceed with building the Termosol Plants was made in December 2010 [...].”) ↩
753 Cl. Mem. Merits, ¶ 32. ↩
754 Cl. Mem. Merits, ¶ 33. ↩
755 Cl. Mem. Merits, ¶ 35. ↩

[Page 142]

the 2005-2010 Renewable Energy Plan, RDL 7/2006, and RD 661/2007.756 Claimants argue that, at the time of their initial development contracts in December 2007, the two key legal instruments were the 1997 Electricity Law and RD 661/2007.757

427. Claimants contend that RD 661/2007 was deliberately intended to stimulate investment,758 “by prescribing specific long-term premiums and tariffs that it committed to provide to developers within the Special Regime.”759 Referring to Article 36, Claimants argue that “Spain committed to deliver these tariffs and premiums throughout a plant’s operational life, with no fixed time limit.”760 In addition, Claimants argue that, while Article 44(3) contemplated a review of the tariffs in 2010, it “assure[d] investors that future cuts to the remuneration system would affect only new plants, not plants that had been constructed within the first 500 MW of CSP capacity” if they had “started operations within two years of the changes [...].” Claimants add, however, that this “did not cure the uncertainty over whether or not any given plant would be among the first 500 MW of installed capacity [...].”761 Claimants also highlight that RD 667/2007 provided that tariffs and premiums would be updated for inflation annually by reference to the Consumer Price Index, less a reduction of 0.25% until 31 December 2012 and 0.5% after (Article 44 and Add. Provision 1); allowed the use of a support fuel to produce electricity not exceeding 12% of the total annual production (regulated tariff option) and 15% (pool + premium option) (Article 2); and granted priority of access and dispatch (Article 17 and Annex XI).762

428. According to Claimants, however, Spain’s assurances of a “reasonable return” were not sufficient to attract them, and they “proceeded with their investment” only because Spain


756 Cl. Mem. Merits, ¶¶ 34, 37-73; Cl. Reply Merits, ¶ 15. According to Claimants, the 2005-2010 Renewable Energy Plan was enacted to attract foreign investment, and it contradicts Respondent’s case in this arbitration in many respects. Cl. Reply Merits, ¶¶ 18-21 (discussing R-052, Plan for Renewable Energy in Spain 2005-2010). ↩
757 Cl. Mem. Merits, ¶ 37. ↩
758 Cl. Mem. Merits, ¶ 60. See also, Cl. Reply Merits, ¶¶ 16, 22. ↩
759 Cl. Mem. Merits, ¶ 61. See also, id. ¶ 62. ↩
760 Cl. Mem. Merits, ¶¶ 64-66. ↩
761 Cl. Mem. Merits, ¶¶ 70-71. Elsewhere, Claimants state that “Art. 44(3) stated that a review of the feed-in tariffs would take place in 2010 but went on to state that adjustments to the regulated tariffs and the lower and upper thresholds would not affect pre-registered plants.” Cl. Reply Merits, ¶ 467 (5th bullet). ↩
762 Cl. Mem. Merits, ¶¶ 67-68. ↩

[Page 143]

went further in 2009 and 2010 offering a system which guaranteed an express and pre- defined long-term tariff and premium, i.e. a “commitment to a specific revenue level.”763 In other words, Claimants say that “[b]y itself [...] RD 661/2007 was not enough to entice [them] to take their investment beyond the exploratory stage,” and “Spain had to provide (and did subsequently provide) an express commitment to adhere to the tariffs and premiums being offered thereunder for plants constructed in reliance on RD 661/2007.”764 Claimants argue nonetheless that “RD 661/2007 (as further stabilised through laws enacted in 2009 and 2010) was a key factor in the [...] decision to invest in Spain.”765

429. RDL 6/2009 led Claimants to “further increase[] their initial investments in Spain,”766 they argue, because: (i) the Pre-Assignment Registry established therein provided certainty, given that Article 4(2) established that pre-registered plants would receive “the right to the economic regime established by Royal Decree 661/2007;”767 (ii) it “expressly stabilised the existing economic regime for qualifying plants whose applications for entry in the Pre-Assignment Registry were filed within a defined deadline [6 June 2009],” which the Termosol Plants did on 14 May 2009;768 (iii) it reassured investors that, if the targets for CSP electricity were oversubscribed, Spain would address that matter before investors commenced construction not after;769 and (iv) through RDL 6/2009, Spain also committed to gradually reduce its tariff deficit levels and eliminate any further increase in the deficit by 2013.770

430. Claimants add, however, that despite the assurances in RDL 6/2009, they required more certainty to proceed with construction, because the decree “arguably left open a question whether the four-yearly reviews under RD 661/2007 were indirectly imported into RDL


763 Cl. Mem. Merits, ¶ 36. ↩
764 Cl. Mem. Merits, ¶ 77. See also, Cl. Reply Merits, ¶ 131. ↩
765 Cl. Mem. Merits, ¶ 73. ↩
766 Cl. Mem. Merits, ¶ 95. See also, Cl. Reply Merits, ¶ 131. ↩
767 Cl. Mem. Merits, ¶ 89. ↩
768 Cl. Mem. Merits, ¶¶ 90-91, 98 (referring to C-044, RDL 6/2009, Transitory Provisions 4th and 5th). ↩
769 Cl. Mem. Merits, ¶ 93 (referring to C-044, RLD 6/2009, Transitory Provision 5th). ↩
770 Cl. Mem. Merits, ¶ 94 (referring to C-044, RLD 6/2009, Art. 1). ↩

[Page 144]

6/2009.”771 Thus, according to Claimants: (i) from “July to November 2009, Spanish officials [gave] NextEra specific assurances that Spain [would] not change the regulatory regime applicable to the Termosol Plants;”772 (ii) the Spain Council of Ministers provided further reassurances and support for the expansion of renewable energy in the agreement dated 13 November 2009,773 which “reaffirmed Spain’s commitment to providing the economic benefits promised under RD 661/2007 and RDL 6/2009, even though uptake on the Special Regime under RDL 6/2009 greatly exceeded Spain’s initial target of 500 MW of installed power for CSP facilities;”774 and (iii) between December 2009-February 2010 Spain accepted the Termosol Plants into the Pre-Assignment Registry and provided further assurances of regulatory stability.775

431. Claimants say that they put their investments on hold in April 2010 amid rumours that Spain may cut the applicable tariffs and premiums,776 and that the PTEs only commenced construction in December 2010 after Spain provided further assurances of regulatory stability.777 In this regard, Claimants refer to:


771 Cl. Mem. Merits, ¶ 99. ↩
772 Cl. Mem. Merits, § II(3)(G)(a), ¶¶ 99-106 (referring to C-048, Letter from Mitch Davidson (NextEra Energy Resources, LLC), to Pedro Marín (Secretary of State for Energy), 8 July 2009; C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009; an October 2009 conference described at CWS-Davidson First, ¶¶ 22-23; C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009). ↩
773 Cl. Mem. Merits, § II(3)(G)(b), ¶¶ 107-115 (referring to C-007, Agreement of the Council of Ministers, 13 November 2009). ↩
774 Cl. Mem. Merits, ¶ 109. ↩
775 Cl. Mem. Merits, § II(3)(G)(c), ¶¶ 116-125 (referring to C-049, Pre-Assignment Registration Notice Termosol 1, 11 December 2009; C-050, Pre-Assignment Registration Notice Termosol 2, 11 December 2009; C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010; a meeting with President Zapatero, described at CWS-Davidson First, ¶ 35 and C-013, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 21 April 2010; C-057, Email from Mike Arechabala (NextEra Energy España, S.L.) to Antonio De Juan Fernandez (Pöyry Consulting), 12 May 2010). ↩
776 Cl. Mem. Merits, § II(3)(H), ¶¶ 126-132. See also, Cl. Reply Merits, ¶ 131. ↩
777 Cl. Mem. Merits, ¶ 132. See also, id., ¶¶ 7, 154, 163; Cl. Reply Merits, ¶ 131. ↩
778 Cl. Mem. Merits, ¶¶ 142-144 (referring to C-065, Agreement with the Solar Thermal Industry, July 2010); Cl. Reply Merits, ¶ 84. ↩

[Page 145]


779 Cl. Mem. Merits, ¶ 146 (referring to C-066, Ministry for Industry, Tourism and Trade, Press Release, Industry Ministry Reaches an Agreement with The Wind and Solar Thermal Sectors for the Revision of Their Payment Framework, 2 July 2010). ↩
780 Cl. Reply Merits, ¶¶ 84-117, 480. ↩
781 Cl. Reply Merits, ¶ 480. ↩
782 Cl. Mem. Merits, ¶ 154. See also, id., ¶¶ 147-150. ↩
783 Cl. Mem. Merits, § II(3)(I)(a). ↩
784 Cl. Mem. Merits, ¶ 158. ↩
785 Cl. Mem. Merits, ¶ 159 (referring to C-016, RD 1614/2010, Art. 4). ↩
786 Cl. Mem. Merits, ¶¶ 158, 159 (referring to C-016, RD 1614, Art. 2.3). ↩
787 Cl. Mem. Merits, ¶ 172 (referring to C-004, 2013 RAIPRE Resolution Termosol 1, 29 May 2013; C-005, 2013 RAIPRE Resolution Termosol 2, 7 June 2013). ↩

[Page 146]

6/2009.”788 Claimants reject Respondent’s contention that these resolutions only informed of the remuneration applicable to the plants “at the present time” but did not ensure that it would be constant throughout the Termosol Plants operating life, and argue that Respondent’s position is contradicted by the text of the resolutions, and the context in which they were issued.789 Moreover, Claimants argue that whether or not the Directorate that issued them had power to bind the Government under domestic law is not material because “[i]nternational law recognises the competence of State officials and agencies to bind their State by unilateral statements without regard to any internal authorisation process under municipal law.”790

432. Claimants go on to argue that Spain’s reassurances continued while construction was on- going, referring to the 2011-2020 Renewable Energy Plan, which “confirmed the existing legislative framework to promote the use of energy from renewable sources, including RD 661/2007, RDL 6/2009 and RD 1614/2010.”791

433. Claimants lastly contend that the history of Claimants’ capital contributions to NEE España illustrate the reliance placed on Spain’s assurances, as shown by a table of their contributions starting in 2008 until December 2013.792 According to Claimants, the table shows “comparatively modest contributions in 2009, followed by increased contributions in March 2010, one further contribution in July 2010 as Spain began to put flesh on the proposals that became RD 1614/2010” with “the most significant expenditures coming from April 2011 onwards [...].”793

434. In response to Respondent’s allegations, Claimants deny that there are any contradictions in their case resulting from the above timeline. Thus, Claimants explain that:


788 Cl. Mem. Merits, ¶¶ 165-167 (referring to C-009, 2010 Resolution Termosol 1, 28 December 2010; and C-010, 2010 Resolution Termosol 2, 28 December 2010). ↩
789 Cl. Reply Merits, ¶¶ 118-124, 481. Claimants argue that Spain had conditioned enactment of RD 1614/2010 on CSP developers providing formal deeds of renunciation waiving the right to commence commercial operations prior to certain dates, which were provided by the PTEs on 2 December 2010. And in those deeds, the PTEs had asked the Ministry for express confirmation of the remuneration that the Termosol Plants would receive for their operating life, a confirmation that, Claimants say, was negotiated as part of the agreed compromise, and that was given in the 28 December 2010 resolutions. Cl. Mem. Merits, ¶¶ 151-153; Cl. Reply Merits, ¶ 123; C-070, Deed of Renunciation PTE, 2 December 2010; C-071, Deed of Renunciation PTE2, 2 December 2010. ↩
790 Cl. Reply Merits, ¶ 482. ↩
791 Cl. Mem. Merits, ¶ 171. ↩
792 Cl. Mem. Merits, ¶ 175 (Table of Equity Contributions from NextEra Spain to NEE España). ↩
793 Cl. Mem. Merits, ¶ 175. ↩

[Page 147]

435. Finally, referring to Spain’s allegation that 2011 is the proper year for measuring the Claimants’ expectations, Claimants contend that Spain has therefore admitted that “2011 is the correct year” and that the analysis must include the commitments made in RD 1614/2010.796 That said, during the Hearing, Claimants clarified that their position is that the date of the investment is December 2010 (not April 2011).797

(iv) Expectation of the Specific Revenues of RD 661/2007, Not of a Variable “Reasonable Return”

436. Claimants deny that Regulatory Framework I only guaranteed a “reasonable return” for their investments as a dynamic concept subject to change.798 Claimants’ view is that (i) such concept is “irrelevant” because Spain did guarantee that the Termosol Plants would receive the regime in Regulatory Framework I; and (ii) as a matter of Spanish law, the concept of “reasonable return” was a directive to the regulator, superseded by the specific tariffs and premiums set forth in RD 661/2007.799

437. Claimants say that they would have never invested in Spain if Respondent had merely committed to providing an amorphous “reasonable return” to the Termosol Plants. But even if “reasonable return” had been the only guarantee, at the time of investment Spain had effectively quantified such reasonable return at 7.6%-11% after-tax for CSP


794 Cl. Reply Merits, ¶ 132. ↩
795 Cl. Reply Merits, ¶ 133. ↩
796 Cl. Reply Merits, ¶¶ 50, 134. ↩
797 Tr. Day 2 (ENG), 375:18-376:24 (Ms. Nairn). ↩
798 Cl. Reply Merits, ¶¶ 178-179; Cl. Skeleton, ¶ 36. ↩
799 Cl. Reply Merits, ¶¶ 462, 468; Cl. Skeleton, ¶ 36. ↩

[Page 148]

investments, and 7% after-tax for renewable energy investments in general (not at the 7% pre-tax that Spain now claims is a “reasonable return” under Regulatory Framework III).800 In the alternative, Claimants argue, by committing to the regime in RD 661/2007, Spain is deemed to have accepted that the return that Claimants would have earned under that regime (expected to be between 11.5% and 11.9%) was reasonable, lawful and appropriate.801 In either case, in Claimants’ view Spain is now estopped from asserting a contrary position in this proceeding.802 More specifically, Claimants contend that Spain cannot now argue that Claimants’ expected project Internal Return Rate (“IRR”) was unreasonable, or that they were being overcompensated.803

438. Claimants also object to the contention that any commitments to preserve the regime in RD 661/2007 would be invalid under Spanish law for being incompatible with the dynamism inherent in the notion of “reasonable return.” Claimants argue that they relied on “unique specific assurances” by senior Spanish Government officials that the Termosol Plants would receive the specific revenues in RD 661/2007 (not a “reasonable return”), which they were entitled to assume were in accordance with Spanish law, and a State cannot rely on domestic law to justify breach of international obligations.804

(v) Legitimacy of the Expectations: Due Diligence and Supreme Court Case Law

439. Claimants reject Respondent’s contention that they misunderstood Spanish law in believing that Spain had committed itself to stabilize the tariff regime, and that Claimants were imprudent investors.805

440. Claimants argue that they conducted extensive technical and legal due diligence before investing in Spain,806 which “confirmed that Spain was a safe place to invest and that the


800 Cl. Reply Merits, ¶¶ 13, 183-184. See also, id., ¶¶ 185-199, 462. Other times, Claimants argue that Spain had regarded a return of up to 11.6% after-tax as reasonable, lawful and appropriate for CSP investments. Id., ¶¶ 192, 196, 198, 200. ↩
801 Cl. Reply Merits, ¶¶ 200-203. ↩
802 Cl. Reply Merits, ¶¶ 199, 203, 408-413. ↩
803 Cl. Reply Merits, ¶ 412. ↩
804 Cl. Skeleton, ¶¶ 50-51. ↩
805 Cl. Reply Merits, ¶ 130. ↩

[Page 149]

commitments provided to the Claimants were likely to be honoured.”807 Claimants add that their legal due diligence included meetings with and letters with senior Spanish officials, to confirm their understanding of the regulatory regime in place.808

441. Claimants also argue that Respondent's allegations about insufficient due diligence are both unfair and misguided as a matter of international law. According to Claimants, “[i]nsufficient due diligence by investors (which was not the case here) does not relieve the host States of their obligations, including their positive duty ‘to ensure investors are not misled and are made to realise where the 'true' directions of government policy for the issue at stake.'”809

442. Claimants also deny that they knew that Spain would alter the remuneration system applicable to the Termosol Plants.810 In particular, Claimants argue that (i) they were not put on notice that “reasonable return” was an overriding concept and the only guarantee – a notion that is an objective for the Spanish legislator and not a mandated form of return that overrides other commitments, and which was superseded by the specific tariffs and premiums set forth in RD 661/2007;811 (ii) the prior regulatory interventions in the PV sector did not foreshadow the changes to the remuneration system applicable to the Termosol Plants – the dynamics of the PV and CSP sectors were very different, and “[w]hen the PV sector was hit with cuts, the Government specifically promised to the


806 Cl. Reply Merits, § III(2)(B), ¶¶ 135-144 (referring to CLEX-009, Alatec, Technical Evaluation of the Thermoelectric Plant with Parabolic Trough Collectors “Termosol 1” Sited in Navalvillar de Pela (Cáceres), 26 April 2011; CLEX-062, RWB, Independent Engineer's Report. NextEra Energy Resources, LLC. Termosol I Solar Power Project, 27 April 2011; CLEX-63, RWB, Independent Engineer's Report. NextEra Energy Resources, LLC Termosol II Solar Power Project, 27 April 2011; CLEX-106, Alatec, Technical Evaluation of the Thermoelectric Plant with Parabolic Trough Collectors "Termosol 2" Sited in Navalvillar de Pela (Cáceres), 26 April 2011; C-202, Pöyry, Current and Future Trends in the Spanish Solar Industry, An ILEX Energy Report to FPL, November 2008 (hereinafter “2008 Pöyry Report”); C-203, Pöyry, Spanish Energy Markets: A Presentation to NextEra Energy Resources, November 2010). ↩

807 Cl. Reply Merits, ¶ 144. ↩

808 Cl. Reply Merits, ¶ 142 (referring to C-048, Letter from Mitch Davidson (NextEra Energy Resources, LLC), to Pedro Marín (Secretary of State for Energy), 8 July 2009; C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009; C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012). ↩

809 Cl. Reply Merits, ¶ 486. ↩

810 Cl. Reply Merits, § III(2)(C), ¶¶ 145-171. ↩

811 Cl. Reply Merits, ¶¶ 147-148; Cl. Skeleton, ¶ 36. ↩

[Page 150]

CSP sector that it would not be similarly affected;”812 (iii) their letters provide no evidence of Claimants' knowledge and acceptance of future change;813 and (iv) they put in place normal risk mitigation measures in their contracts with commercial partners, which do not mean that Claimants believed that the risk would materialize.814

443. Claimants go on to argue that “even if it could be established that the Claimants knew about a possible regulatory risk, they did not accept it.”815 Moreover, “[e]ven if the Claimants had assumed the risk of regulatory change (they did not), that risk would have been taken on the assumption that any deprivation would be accomplished in a fair manner and with compensation.”816

444. Claimants further oppose Spain's reliance on the jurisprudence of the Spanish Supreme Court to demonstrate that the Court has allowed certain changes to the renewable energy regime (in other situations). In particular, Claimants argue that: (i) the question of breach of the FET is to be resolved under the ECT (not Spanish law); and (ii) even taking Spanish law as a fact, the decisions of the Supreme Court do not diminish Claimants' legitimate expectations.817

445. More specifically, Claimants contend that: (i) “[n]one of the Supreme Court decisions interpreting deviations from the remuneration system in RD 661/2007 had been rendered by the time that the Claimants committed to build the Termosol Plants (December 2010),” so Claimants could not have been aware of them;818 (ii) the “Supreme Court decisions rendered during the construction of the Termosol Plants (in 2011 and 2012) considered only the 2010 cuts to PV remuneration (cuts that the CSP sector had agreed to through the July 2010 Agreement);”819 (iii) none of the Supreme Court decisions questioned the validity of the stabilization commitments given to the CSP sector,


812 Cl. Reply Merits, ¶¶ 149-151. ↩

813 Cl. Reply Merits, ¶¶ 152-157. ↩

814 Cl. Reply Merits, ¶¶ 158-171, 487. ↩

815 Cl. Reply Merits, ¶ 487. ↩

816 Cl. Reply Merits, ¶ 488. ↩

817 Cl. Reply Merits, ¶¶ 172, 463. ↩

818 Cl. Reply Merits, ¶ 173. ↩

819 Cl. Reply Merits, ¶ 174. ↩

[Page 151]

including Article 4 of RD 1614/2010 or the specific assurances given to the NextEra officials;820 (iv) the Supreme Court decisions relied upon by Spain are distinguishable on the facts as those claims failed given that there were no specific assurances.821 In fact, Claimants argue, Spanish law recognizes and protects legitimate expectations arising out of Government's conduct.822

(vi) The Self-Sufficiency Excuse Fails in Fact and Law

446. Claimants oppose Spain's reliance on the Electricity Law to import the principle of self-sufficiency of the system in the analysis of Claimants' expectations.823 Claimants (i) deny that the Spanish electricity system was designed to be self-sufficient or closed, and argue that this was not the case at the time they invested since the principle was introduced as a binding parameter in December 2012, and it is not an absolute one;824 (ii) argue that it is Respondent who “determines (in large part) the costs and revenues of the system” so that “if there is a shortfall, it is because Spain has decided to price electricity at a level that does not reflect its true cost, or because Spain has included in the basket of electricity system costs other measures that [...] could have been financed from the State budget [...],” and as such, Spain can hardly invoke its self-generated insufficiency to justify a breach of the ECT;825 (iii) contend that “Spain had previously assured investors that the costs of the Special Regime had to be assessed in light of its enormous benefits” of renewable energy, but it now forgets that, and “weighs the costs of the system without balancing them against these critical wider benefits;”826 and (iv) argue that Regulatory Framework III goes too far and imposes excessive cuts, even by the “self-sufficiency” standard.827


820 Cl. Reply Merits, ¶ 175. ↩

821 Tr. Day 7 (ENG), 1410:6-17 (Ms. Nairn). ↩

822 Cl. Reply Merits, ¶ 176. ↩

823 Cl. Reply Merits, ¶¶ 217, 464. ↩

824 Cl. Reply Merits, ¶¶ 213, 218-225, 464. ↩

825 Cl. Reply Merits, ¶¶ 213, 226-230, 464. ↩

826 Cl. Reply Merits, ¶¶ 213, 231. ↩

827 Cl. Reply Merits, ¶ 232. ↩

[Page 152]

(vii) The Installed Capacity Excuse Fails in Fact and Law

447. Claimants argue that the final registration into the RAIPRE entitled the Termosol Plants to receive the benefits of the Special Regime contained in RD 661/2007, and oppose Respondent's allegation that the Termosol Plants are not entitled to benefit from that regime because each plant has an installed capacity in excess of 50 MW.828 Claimants explain that the issue revolves around Article 27 of the Electricity Law, which provides that electricity generation activities can fall under the Special Regime “whenever they are carried out from facilities having installed capacity of no more than 50 MW,” and RD 661/2007 which addresses the conditions the plants qualifying for the Special Regime must meet, and deals with power of the facilities in Article 3(1).829 Claimants contend that:


828 Cl. Reply Merits, ¶ 254. ↩

829 Cl. Reply Merits, ¶¶ 255-256. ↩

830 Cl. Reply Merits, ¶¶ 254, 255-261. ↩

831 Cl. Reply Merits, ¶¶ 254, 262-268. ↩

832 Cl. Reply Merits, ¶¶ 264, 267. ↩

833 Cl. Reply Merits, ¶¶ 254, 269-271. ↩

[Page 153]

Special Regime was confirmed by various administrative organs of the Spanish State in full knowledge of the actual capacity of the generators at the Termosol Plants,” and (ii) inspections carried out in September 2014 by the CNMC for the express purpose of checking compliance with the Special Regime presupposed that a net output of 49.9MW was compliant.834

448. Claimants have also submitted that Respondent's installed capacity argument has already been denied by another tribunal ruling on the Spanish measures.836

449. As a result of allegations made at the Hearing, Claimants further opposed the contention that the Termosol Plants should not be compensated for all the electricity they deliver to the grid, but instead, some should be reclassified as internal consumption.837 For Claimants, that contention is logically flawed,838 inconsistent with Spanish law,839 and procedurally improper giving its timing.840 In addition, Claimants also deny that they have always been aware that Termosol Plants were only permitted to export 44.9 MW to the grid under the Special Regime, and have deliberately sought to receive an overpayment.841 According to Claimants, this submission ignores that Spanish officials were made aware of the capacity of the Termosol Plants.842 Claimants contend that they legitimately expected that the Termosol Plants would be able to deliver 49.9 MW under the Special Regime for their lifetime.843


834 Cl. Reply Merits, ¶¶ 254, 272-278. See also, id., ¶¶ 394-398. ↩

835 Cl. Reply Merits, ¶ 397. ↩

836 Cl. Obs. Eiser, ¶ 3.12 (referring to Eiser). ↩

837 See, Cl. PH Mem., ¶¶ 9-11, 16-17. ↩

838 Cl. PH Mem., ¶¶ 12-17. ↩

839 Cl. PH Mem., ¶¶ 18-22. ↩

840 Cl. PH Mem., ¶¶ 23-27. ↩

841 Cl. PH Reply, ¶ 2. ↩

842 Cl. PH Reply, ¶¶ 7-11. ↩

843 C1. PH Reply, ¶ 10. ↩

[Page 154]

(viii) Breach of the Expectations

450. Claimants argue that, contrary to the commitments given to them stressing legal stability, Spain has “retroactively rewritten the legal framework” basis of the Claimants' investment, with changes that are so severe that have more than decimated the value of their equity in NEE España, and do not provide the expected return on their investment.844

451. In particular, Claimants point out that: (i) RD 661/2007 and RD 1614/2010 have been abolished; (ii) the regulated feed-in-tariff and the pool + premium option have been abolished; (iii) the market price remuneration is subject to a new 7% levy on revenue; (iv) electricity generated through natural gas only receives the prevailing market price; (v) the revenue-based remuneration system has been replaced with a “retroactive system of payments based on installed capacity;” (vi) Regulatory Framework III produces unfair and inequitable results;845 (vii) the remuneration is no longer payable for the life of the plant, but is limited to a 25 year regulatory useful life; (viii) indexation of the tariffs to the Consumer Price Index has been abolished; and (ix) the return has been reduced to 7.4% pre-tax and is calculated over a cost base that excludes important costs.846

452. In Claimants' view, Regulatory Framework III is a complete departure from Regulatory Framework I, as recognized by the CNE, with changes so far-reaching that they crossed the threshold of unfair treatment for purposes of Article 10(1) of the ECT.847

453. For Claimants, the results of Regulatory Framework III are unfair and inequitable, because the new framework: (i) fixes the Net Value of the Asset (“NVA”) of the Termosol Plants at levels far below their actual investment costs and applying it retroactively; (ii) excludes from the NVA reasonable costs such as financing costs during construction;848 (iii) ignores Claimants' actual costs for plants that are the only type in


844 Cl. Mem. Merits, ¶¶ 267-268. See also, id., ¶¶ 8-9. ↩

845 Cl. Mem. Merits, ¶ 268. See also, id., ¶ 209; Cl. Reply Merits, ¶ 283. ↩

846 Cl. Reply Merits, ¶ 283. ↩

847 Cl. Reply Merits, § VI(1), ¶¶ 281-284. ↩

848 Claimants argue that it is unfair of Spain to exclude from the NVA financing costs, capitalized intercompany costs, and the investment in the Valdecaballeros station; and that by rejecting these categories Spain is effectively denying Claimants the possibility of a return in their investment. Cl. Reply Merits, ¶¶ 333-351. ↩

[Page 155]

their regulatory category; (iv) introduces arbitrary limits on operating hours and regulatory useful lives of the plants; (v) subjects the NVA to a rate of return of 5.2% after-tax which is well below a reasonable return, and even below the minimum 7% after-tax rate that Spain had previously admitted as reasonable; (vi) yields revenues insufficient to meet the PTEs' debt obligations triggering events of default and mandatory liquidation; (vii) caused NEE España to write off its equity investment in the PTEs, thereby making Claimants' equity investments “virtually worthless.”849

454. According to Claimants, as of June 2014 the value of their equity in NEE España had been cut from EUR 397.4 to EUR 15.5 million.850 Those figures were later updated, and in its latest expert report, Claimants' experts stated that the drop in value of equity in NEE España as of June 2016 had been from EUR 450.6 to EUR 41.7 million.851 Claimants further contend the revenues of the Termosol Plants have been cut “in the order of 36%.”852

(ix) The EC Decision of 10 November 2017 on State Aid

455. Claimants argue that, contrary to Spain's allegations, the EC Decision of 10 November 2017,853 which approved Regulatory Framework III from a State Aid perspective, does not alter Respondent's violation of Claimants' legitimate expectations in breach of Article 10(1) of the ECT.854

456. First, Claimants contend that the EC Decision is irrelevant to the assessment of Spain's liability because it contains no substantive analysis of Regulatory Framework I, or the critical factors giving rise to Claimants' expectations.855 It decides only that Regulatory


849 Cl. Mem. Merits, ¶ 268 (referring to id., ¶ 209). See also, Cl. Mem. Merits, ¶¶ 209-211, 214-215; Cl. Reply Merits, ¶ 352. ↩

850 Cl. Mem. Merits, ¶ 216; CER-Compass Lexecon First, ¶ 11, Table I. ↩

851 CER-Compass-Lexecon Third, ¶ 4, Table I. ↩

852 Cl. Reply Merits, ¶ 489. See also, id., ¶ 330. ↩

853 RL-124, EC Decision on State Aid, Case SA.40348 (2015/NN) (10 November 2017) (“the EC Decision”). ↩

854 Cl. Obs. EC Decision, § 1, ¶¶ 1.1-1.9. ↩

855 Cl. Obs. EC Decision, ¶ 1.1. ↩

[Page 156]

Framework III does not violate the EU State Aid regime, but declines to assess Regulatory Framework I given that such framework has been replaced.856

457. In addition, in Claimants' view, the EC generic remarks about legitimate expectations of investors under EU Law are obiter, out of context of the facts of this case, and without reference to principles of international law.857 Claimants deny that EU Law trumps the ECT in the event of inconsistency, and instead argue that the Tribunal is mandated to apply the ECT over EU Law in the event of inconsistency.858 Claimants deny that under EU Law, Spain's failure to notify the EC of Regulatory Framework I in 2007 forecloses any claim of legitimate expectations.859 According to Claimants, Spain's alleged failure to notify State Aid cannot affect liability under Article 10(1) of the ECT, because (i) a State cannot invoke its own breach of domestic law as an excuse for violating international law (ILC Articles on State Responsibility, Articles 7 and 32); and (ii) investors protected by a treaty are entitled to assume that an EU Member State is acting lawfully when it enacts legislation intending to attract investment.860

458. In any event, Claimants argue, it is also wrong to assume that State Aid principles are engaged with respect to Regulatory Framework I, for reasons of: (i) timing – neither Spain, nor investors considered Regulatory Framework I a source of notifiable State Aid until 2014; and (ii) substance – in Regulatory Framework I the funds were paid by the private consumers, not the State.861 For Claimants, this is significant because the Parties are in agreement that the legitimate expectations are to be assessed at the time of the investment,862 and as of December 2010 no reasonable investor could have been aware that Spain might have acted unlawfully.863 And, since Claimants' case on legitimate expectations under the ECT is not substantively inconsistent with State Aid rules, the


856 Cl. Obs. EC Decision, ¶ 1.2. ↩

857 Cl. Obs. EC Decision, ¶ 1.2. ↩

858 Cl. Obs. EC Decision, ¶¶ 1.4-1.5. ↩

859 Cl. Obs. EC Decision, ¶ 1.4. ↩

860 Cl. Obs. EC Decision, ¶ 1.7. ↩

861 Cl. Obs. EC Decision, ¶ 1.8. ↩

862 Cl. Obs. EC Decision, ¶ 1.9. Claimants contend elsewhere that Spain has admitted that 2011 is the correct year for judging the expectations. Cl. Reply Merits, ¶¶ 50, 134. ↩

863 Cl. Obs. Decision, ¶ 1.9. ↩

[Page 157]

Tribunal need not address the issue of priority between the ECT and EU Law in this respect.864

459. Second, Claimants contend that, even if Claimants' expectations were to be determined under EU Law rather than the ECT (which they don't accept), the EC Decision shows no inconsistency between EU Law and Claimants' case under the ECT.865

460. Claimants argue that no diligent businessman would have foreseen that Regulatory Framework I was notifiable State Aid, given that between 2007-2014 the EC never directed Spain to notify Regulatory Framework I as State Aid, and the notification was only made in December 2014.866 Claimants acted diligently in 2010 believing that Spain had acted lawfully in enacting Regulatory Framework I, and their legitimate expectations at the time of their investment are not affected by the CJEU Elcogas ruling of October 2014 which obliged the notification of the support measures for renewable energy, or by Spain's failure to notify.867

461. Furthermore, the EC Decision does not conclude that Regulatory Framework I was incompatible with the levels of aid permitted under State Aid law guidelines at the relevant time, and indeed EU Law permits and indeed encourages State aid to facilitate renewable energy.868 Even if there was a formal defect due to Spain's failure to notify Regulatory Framework I, Claimants argue, “substantively there is nothing unlawful in the type of remuneration which the Claimants seek in this proceeding” vis-à-vis State Aid rules.869 Far from ordering Spain to terminate Regulatory Framework I, the EC criticized Spain for dismantling it, and Spain never asserted at the time that the 2013-2014 changes were necessary to comply with State Aid rules.870


864 Cl. Obs. Decision, ¶ 1.9. ↩

865 Cl. Obs. EC Decision, § 2, ¶¶ 2.1-2.5. ↩

866 Cl. Obs. EC Decision, ¶ 2.1. ↩

867 Cl. Obs. EC Decision, ¶ 2.2. See also, id., ¶ 1.8. ↩

868 Cl. Obs. EC Decision, ¶ 2.3. ↩

869 Cl. Obs. EC Decision, ¶ 2.4. ↩

870 Cl. Obs. EC Decision, ¶ 2.4. ↩

[Page 158]

462. Claimants add that Spain is estopped from asserting State Aid as a defence, because at the time of the investment the EC had been fully aware of Regulatory Framework I for three years and had taken no step to investigate it or to assert any violation of State Aid law.871

463. Third, Claimants argue that “[e]ven if Spain had proven: (i) that RF I was substantively in breach of EU State aid rules, and (ii) that Spain repealed RD 661/2007 for State aid reasons (neither of which it has established), the Spanish Government was still under an ECT obligation to respect the Claimants' legitimate expectations through alternative measures, insofar as State aid rules allowed.”872

464. Finally, in Claimants' view, matters of enforcement of an Award in this case are not a relevant consideration for the Tribunal, and the EC is wrong to suggest that enforcement of an Award in favour of Claimants would violate EU Law.873

b. Respondent's Position

465. Respondent denies that it has breached any legitimate expectations.874

(i) The Regulatory Framework and Circumstances at the Time of Investment

466. Respondent contends that a finding of breach of the FET standard necessitates a determination of the expectations that Claimants had or should have had at the time of investment, and whether those were reasonable and legitimate in light of the regulatory framework at that time.875 At the time of investment, Respondent argues, an investor must be aware of the host-State's regulatory framework (both rules and case law), its application, and its effect on the investment.876 It should also be aware of the risks of


871 Cl. Obs. EC Decision, ¶ 2.5. ↩

872 Cl. Obs. EC Decision, ¶ 3.1. In the Reply on the Merits, Claimants opposed Spain's attempt to argue that compliance with State Aid concerns motivated Regulatory Framework III. Claimants argued that even if Regulatory Framework III complies with State Aid guidelines, that does not mean Regulatory Framework I did not, and submitted that when introducing Regulatory Framework III, Respondent did not seek to claim that it was motivated by a need to reduce compensation for State Aid reasons. Cl. Reply Merits, ¶ 377. ↩

873 Cl. Obs. EC Decision, § 4, ¶¶ 4-1-4.2. ↩

874 Resp. C-Mem. Merits, ¶ 731; Resp. Rej. Merits, ¶ 34. ↩

875 Resp. C-Mem. Merits, ¶ 647; Resp. Rej. Merits, ¶ 1051. ↩

876 Resp. C-Mem. Merits, ¶¶ 648, 654. See also, Resp. Rej. Merits, ¶¶ 1051-1052, 1055. ↩

[Page 159]

making an investment and assume them.877 Moreover, legitimate expectations must be “objective” and “derived from the specific circumstances at the time of investing in the host state.”878

467. For Respondent, the ECT is not an insurance policy against regulatory changes: (i) it is necessary to establish “specific commitments” made to an investor that a regulation will remain unchanged; (ii) expectations must be reasonable and justified in connection with changes in the host-State laws; (iii) an investor is required to conduct a preliminary and comprehensive analysis of the legal framework applicable to its investment, taking into account the due diligence it has conducted, anticipating that circumstances can change, and structuring its investment to be able to adapt to potential changes in the legal framework.879

468. Respondent further submits that Claimants' expectations should be assessed as of 28 April 2011, namely, the date on which the financing contracts for the projects were signed.880

469. Regulatory Framework. Respondent argues that Claimants' depiction of the regulatory framework in Spain at the time of investment is partial, biased and decontextualized.881

470. According to Spain, the framework was established on the basis of certain essential principles that would form the “objective legitimate expectations of any investor,” namely: (i) the principle of hierarchy of rules; (ii) the notion that the 1997 Electricity Law was the basis of the system, with regulations being subject to that law and to the case law of the Supreme Court; (iii) the fundamental principle that the subsidies of the Special Regime are a cost to the electricity system, subordinated to the principle of economic sustainability of that system; (iv) the principle that the remuneration system for the Special Regime seeks to provide renewable energy producers a “reasonable return”


877 Resp. C-Mem. Merits, ¶ 648. ↩

878 Resp. C-Mem. Merits, ¶ 657. ↩

879 Resp. C-Mem. Merits, ¶ 649. See also, id., ¶¶ 723-729 (discussing case law); Resp. Rej. Merits, ¶ 1063. ↩

880 Resp. Rej. Merits, ¶¶ 60, 1044 (referring to Cl. Reply Merits, ¶¶ 50, 134). See also, Resp. Skeleton, ¶ 23; Tr. Day 2 (ENG), 299:2-13 (Ms. Moraleda). ↩

881 Resp. C-Mem. Merits, ¶ 641(a). ↩

[Page 160]

according to the capital market and considering the investment costs for the type of facility; (v) the principle of “reasonable return,” and the resulting dynamic character of the remuneration system under the Special Regime; (vi) the notion that premiums were calculated based on changes in demand and other economic data; (vii) the notion that regulatory changes in the Special Regime system – including some prior to Claimants' investment – were motivated by the need to correct overcompensation, or to correct strong alteration of the economic data that served as basis for the initial configuration of the system.882

471. In light of these principles, Respondent says, Claimants could not have legitimately expected that the State would refrain from adopting measures to resolve an economic imbalance impacting the sustainability of the system, or to resolve situations of over-remuneration.883

472. Respondent emphasizes that the renewable energy system in Spain has always been built around the principle of “reasonable return,” set forth in Article 30(4) of the 1997 Electricity Law, and which remains in Article 14(7) of Law 24/2013.884 And this principle, Respondent contends, is characterized by (i) balancing the costs of the premiums with the return to the investor; (ii) being dynamic, meaning that it can be adapted to the circumstances; (iii) providing a guarantee to the investor; (iv) being referenced, meaning that it may not be arbitrarily set by the Government but rather, it must be referenced to the “cost of money in capital markets;” and (v) imposing on the regulator an obligation of concrete result, while not requiring a particular set mechanism.885 According to Respondent, the various regulations that have developed the 1997 Electricity Law (referring to, RD 2818/1998, RD 436/2004, RD 661/2007, and RD 1614/2010) “have had the objective of setting at each historical moment the ‘reasonable


882 Resp. C-Mem. Merits, ¶ 655 (referring to id., § III(A)-(D)). See also, id., ¶ 7; Resp. Rej. Merits, ¶¶ 1086-1087. ↩

883 Resp. Rej. Merits, ¶¶ 1087-1088. ↩

884 Resp. C-Mem. Merits, ¶ 11. See also, id. ¶¶ 50, 106-112, 150, 159. ↩

885 Resp. C-Mem. Merits, ¶¶ 160-176. ↩

[Page 161]

return' in function of the forecasted costs and revenues in specific macroeconomic situations.”886

473. Spain further contends that “the existing regulatory framework, at the time when the Claimant made its investment, allowed regulatory changes to existing facilities, while maintaining the principle of reasonable return.”887 The Spanish regulatory framework, Spain says, contained no specific commitment to the immutability of the regime in RD 661/2007, RDL 6/2009 and RD 1614/2010.888 The only commitment assumed by Spain was to maintain a “reasonable return.”889 And, as reasonable return is an end that can be achieved through various means, no investor could have a legitimate expectation to a specific formula.890 The Spanish regulation for the Special Regime was never enacted to attract foreign investment.891

474. Respondent thus denies that any of the rules relied upon by Claimants “contain any reference to or guarantee of the freezing of a particular subsidy scheme.”892 In particular, Respondent argues the following with respect to the various instruments:


886 Resp. C-Mem. Merits, ¶ 177. See also, id., ¶¶ 178-184; Resp. Rej. Merits, ¶ 17. ↩

887 Resp. C-Mem. Merits, ¶ 668. ↩

888 Resp. Rej. Merits, ¶¶ 1065-1074. ↩

889 Resp. Rej. Merits, ¶ 42. ↩

890 Resp. Rej. Merits, ¶¶ 245-249. ↩

891 Resp. Rej. Merits, ¶ 64. ↩

892 Resp. C-Mem. Merits, ¶¶ 671-672. ↩

893 Resp. C-Mem. Merits, ¶ 671. ↩

894 Resp. C-Mem. Merits, ¶ 671. ↩

[Page 162]

475. Moreover, Respondent says, other regulatory instruments not mentioned by Claimants also serve to support Respondent's case:


895 Resp. C-Mem. Merits, ¶ 671. See also, id., ¶ 14. ↩

896 Resp. C-Mem. Merits, ¶¶ 671, 248-254; Resp. Rej. Merits, ¶¶ 162-163, 588-597, 1065, 1067. ↩

897 Resp. C-Mem. Merits, ¶ 671. ↩

898 Resp. C-Mem. Merits, ¶ 246; Resp. Rej. Merits, ¶ 18. ↩

899 Resp. C-Mem. Merits, ¶ 671 (citing CWS-Davidson First, ¶¶ 41, 43). See also, id., ¶¶ 276-281. ↩

900 Resp. C-Mem. Merits, ¶ 267. ↩

901 Resp. C-Mem. Merits, ¶ 263. ↩

902 Resp. C-Mem. Merits, ¶ 671. See also, id., ¶¶ 299-301, 317; Resp. Rej. Merits, ¶¶ 156, 627-633, 1070. ↩

[Page 163]

476. According to Respondent, Claimants' case ignores that a diligent investor should have been aware that rights and duties are imposed by different regulations, which are structured hierarchically. As a result, regulations cannot contradict the provisions of a higher-ranking norm, such as a Law.905 As RD 661/2007 and RD 1614/2010 were subordinate to the 1997 Electricity Law, they could not contradict its provisions.906 And given that the 1997 Electricity Law pivots on the principle of sustainability of the Spanish Electricity System, a diligent investor should have known that RD 661/2007 could not freeze the remuneration regime as this would infringe that principle;907 nor could a diligent investor expect stability of a regime generating levels of profitability that were not reasonable, as that would be contrary to the principle of “reasonable return” enshrined in the 1997 Electricity Law.908

477. Respondent rejects Claimants' contention that the principle of reasonable return was superseded by the system in RD 661/2007, and instead argues that such principle “sets out any rights or expectations of investors in the Spanish regulatory framework.”909

478. Respondent also takes the view that the regulatory evolution in fact demonstrates that there was no commitment to stability. Thus, Spain observes that prior to Article 44(3) of RD 661/2007, RD 436/2004 contained a similar provision in Article 40(3), which did not prevent the modification of the regime through RD 661/2007. In addition, after RD 661/2007, other amendments were made through RD 1578/2008, RDL 6/2009, RD


903 Resp. C-Mem. Merits, ¶ 331; Resp. Rej. Merits, ¶ 1071. ↩

904 Resp. Rej. Merits, ¶¶ 509-510, 1073. ↩

905 Resp. Rej. Merits, ¶¶ 94-95. See also, Resp. C-Mem. Merits, ¶¶ 35-41. ↩

906 Resp. Rej. Merits, ¶¶ 97, 106. ↩

907 Resp. Rej. Merits, ¶¶ 100, 106. ↩

908 Resp. Rej. Merits, ¶¶ 101, 106. See also, id., ¶¶ 598-599. ↩

909 Resp. Rej. Merits, § III(A)(1.4), ¶¶ 190-193, 197-198, 214. ↩

[Page 164]

1614/2010, RD 1565/2010 and RDL 14/2010, affecting the remuneration of the already existing facilities despite the wording of Article 44 (3) of RD 661/2007.910

479. Moreover, Respondent argues, Claimants did not believe that RD 661/2007, RDL 6/2009 or RD 1614/2010 contained a stabilization clause, nor could they have legitimately done so. Respondent observes that (i) 2007 and 2008 reports by the CNE and the Attorney General's Office reflect Claimants' awareness that regulatory changes could impact existing plants; (ii) no due diligence has been provided confirming the existence of these stabilization clauses; (iii) the enactment of RD 1614/2010 and RDL 14/2010 showed that the Government would not hesitate to introduce modifications to the regime to ensure the sustainability of the system; (iv) after the alleged commitments in RD 1614/2010, Claimants entered into several contracts that included change in law protections; (v) Claimants and Protermosolar pushed for the introduction in RD 1614/2010 of language incorporating an obligation of the Secretary of State to issue individual decisions determining the compensation regime for the life of the facility, which was ultimately not accepted;911 and (vi) in March 2011, before the financing agreements were entered into, the Government enacted Law 2/2011, which announced necessary and desired reforms to the Spanish Electricity System.912

480. Domestic Case Law. Respondent contends that the Supreme Court case law is significant to determine the extension and limits of Claimants' rights and expectations at the time of their investments.913 Thus, Respondent submits that the principle of “reasonable return” has been the subject of numerous cases in Spanish courts, which have “established that this principle does not imply that the remuneration set a certain point cannot be changed” and instead hold that “the characteristic of this principle is its dynamism [...].”914 Put differently, according to Respondent, “[t]he Supreme Court has [...]


910 Resp. Rej. Merits, ¶¶ 601-604. ↩

911 Resp. Rej. Merits, ¶¶ 638-650, 656-659, 661. ↩

912 Resp. Rej. Merits, ¶ 660. ↩

913 Resp. Rej. Merits, ¶¶ 12, 145. ↩

914 Resp. C-Mem. Merits, ¶¶ 154-155 (citing R-054, Supreme Court, Third Chamber, Judgement, 25 September 2012; R-055, Supreme Court, Third Chamber, Judgement, 19 June 2012), ¶ 157 (citing R-056, Constitutional Court, Judgement, 17 December 2015). According to Respondent, the principle was also known and invoked by Protermosolar and the producers in the Spanish thermosolar sector. Resp. C-Mem. Merits, ¶ 158. ↩

[Page 165]

enshrined that the content of this right does not grant producers an unchangeable acquired right of always receiving the same remuneration amount for its generation activity.”915

481. Respondent emphasizes that when ruling on the validity of amendments to the regime in RD 436/2004 in a judgment in 2006, the Supreme Court “expressly denied the investors the right to the payment of an unchangeable tariff,” it only acknowledged the right to a reasonable return,916 and it also confirmed that amendments to the remuneration system did not contradict the principles of legal certainty or legitimate expectations.917 According to Respondent, the Supreme Court subsequently confirmed that there was no acquired right to a premium in two judgments in 2007;918 and later, in a series of three judgements in 2009, it also confirmed that there was no right to the economic immutability of the system in RD 436/2004, despite the provisions in Article 40(3) of that decree,919 and reiterated the same principle in the context of appeals against the remuneration framework in RD 661/2007.920

482. It follows, Respondent argues, that “[e]very diligent investor was aware and should be aware that the remuneration for electricity generation under the [Special Regime], from renewable sources in Spain, is based on an essential principle [...] of ‘reasonable return'.”921 Moreover, “[n]o diligent investor could ignore either the principle of ‘reasonable return' or its interpretation made by the Supreme Court Case Law;”922 and in light of the judgments that pre-date the alleged investment, “[a] diligent investor [...]


915 Resp. C-Mem. Merits, ¶ 190. See also, id., ¶¶ 191-195 (referring to R-147, Supreme Court, Third Chamber, Judgement, 15 December 2005; R-057, Supreme Court, Third Chamber, Judgement, 25 October 2006; R-062, Supreme Court, Third Chamber, Judgement, 20 March 2007; R-063, Supreme Court, Third Chamber, Judgement, October 2007). See also, Resp. C-Mem. Merits, ¶ 175 (citing R-057). ↩

916 Resp. C-Mem. Merits, ¶ 192 (referring to R-057, Supreme Court, Third Chamber, Judgement, 25 October 2006). ↩

917 Resp. C-Mem. Merits, ¶ 194. ↩

918 Resp. C-Mem. Merits, ¶ 195 (referring to R-062, Supreme Court, Third Chamber, Judgment, 20 March 2007; R-063, Supreme Court, Third Chamber, Judgment, October 2007). ↩

919 Resp. C-Mem. Merits, ¶¶ 198-199, 201-202 (referring to R-064, Supreme Court, Third Chamber, Judgement, 3 December 2009). ↩

920 Resp. C-Mem. Merits, ¶¶ 203-204 (referring to R-002, Supreme Court, Third Chamber, Judgement, 9 December 2009). ↩

921 Resp. C-Mem. Merits, ¶ 157. ↩

922 Resp. C-Mem. Merits, ¶ 187. ↩

[Page 166]

could not base a claim relating to the right or legitimate expectations to which the premium regime remains indefinitely unchanged in any economic circumstances.”923

483. Respondent goes on to add that the case law on the limits of the principle of reasonable return was further reiterated by the Supreme Court in a long series of judgements rendered from April to November 2012, in the context of challenges to the amendments to RD 661/2007 via RD 1565/2010 and RDL 14/2010.924 Spain highlights that, in those judgments, the Court ruled that the principle of reasonable return did not guarantee a right to a regulated tariff for a given period of time, or to receive a certain remuneration throughout the entire operational lifetime of a facility,925 and also denied the notion that a certain rate of return could remain unaltered.926 Those rulings, Spain says, have also been reiterated in 2013 and 2016 judgements dealing with challenges related to RD 1565/2010 and RDL 14/2010,927 and in judgments of the Constitutional Court in 2015 and 2016 in connection with RDL 9/2013, which confirm that the amendments to the system conformed to the principles of legal certainty and legitimate expectations, regulatory hierarchy and non-retroactivity.928 Respondent explains that the judgements that post-date the investment are still relevant in that they confirm the principles previously established in the earlier cases.929

484. Responding to Claimants' contention that the judgements of the Supreme Court are not applicable here because Article 4 of RD 1614/2010 introduced grandfathering commitments that prior regulations did not include, Spain contends that Article 4


923 Resp. C-Mem. Merits, ¶ 196. ↩

924 Resp. C-Mem. Merits, ¶ 206 (citing R-074, Supreme Court, Third Chamber, Judgement, 12 April 2012; R-162, Supreme Court, Third Chamber, Judgement, 20 December 2011; R-163, Supreme Court, Third Chamber, Judgement, 24 September 2012; R-164, Supreme Court, Third Chamber, Judgement, 12 April 2012; R-066, Supreme Court, Judgements, 2011-2012; R-067, Supreme Court, Judgement, 12 April 2012; R-069, Supreme Court, Judgement, 19 June 2012). ↩

925 Resp. C-Mem. Merits, ¶¶ 209-210. ↩

926 Resp. C-Mem. Merits, ¶ 211. ↩

927 Resp. C-Mem. Merits, ¶¶ 212-213 (citing R-070, Supreme Court, Judgement, 25 June 2013; R-071, Supreme Court, Judgement, 21 January 2016). ↩

928 Resp. C-Mem. Merits, ¶¶ 215-225 (citing R-056, Judgement of the Constitutional Court, 17 December 2015, num. 5347/2013; R-072, Judgement of the Constitutional Court, 18 February 2016, num. 5582-2013 and R-075, Judgement of the Constitutional Court, 18 February 2016, num. 6031-2013). ↩

929 Resp. Rej. Merits, ¶ 148. ↩

[Page 167]

contains no such commitment.930 Respondent further contends that several key players, including the Supreme Court itself, the CNE, and Protermosolar recognize the importance of the Supreme Court case law, contradicting Claimants' contentions.931

485. Lastly, Respondent observes that, in Charanne, the tribunal concluded that RD 661/2007 did not contain a specific commitment towards claimants' investments; absent a specific commitment, an investor could not have legitimate expectations that RD 661/2007 would remain unchanged throughout the life of the plant; and the decisions of the Supreme Court were relevant facts to reach these conclusions.932 In addition, relying on AES, Respondent further submits that in the ECT context, a stability clause cannot be deduced from a general regulatory framework.933

486. Economic Circumstances. Respondent further maintains that Spain was facing a difficult economic situation well known to the solar thermal sector, which required safeguarding the sustainability of the Spanish Electricity System. The remuneration system for the Special Regime was not reflecting the standard of “reasonable return.” These elements, Respondent argues, were the driving force behind the measures taken, and were recognized in the rules immediately preceding Claimants' investment, i.e. RDL 6/2009 and RDL 14/2010.934 Respondent adds that the memoranda for RDL 6/2009 and RDL 14/2010 “demonstrate that the Claimant was fully aware that (i) the system of incentives for renewable energies under no circumstances could allow for over remuneration against the principle of reasonable return, (ii) the overall costs of the Special Regime had contributed significantly to the deficit, (iii) the difficulties of [the Spanish Electricity System] should be resolved internally and (iv) Spain had taken and would continue to take measures to ensure the sustainability of [the Spanish Electricity System].”935 According to Respondent, Claimants were also aware that these same motives lay behind


930 Resp. Rej. Merits, ¶ 156. ↩

931 Resp. Rej. Merits, ¶¶ 152(iv), 165-184. ↩

932 Resp. C-Mem. Merits, ¶¶ 673-675 (citing RL-088, Charanne, ¶¶ 491-499; 504-508). See also, Resp. C-Mem. Merits, ¶¶ 227-228; Resp. Rej. Merits, ¶¶ 185-186, 1066-1067. ↩

933 Resp. C-Mem. Merits, ¶ 685 (citing RL-024, AES, ¶¶ 9.3.29, 9.3.31). ↩

934 Resp. C-Mem. Merits, ¶¶ 658-662. ↩

935 Resp. C-Mem. Merits, ¶ 665. ↩

[Page 168]

RD 1614/2010.936 In these circumstances, Respondent says, no diligent investor could expect that while the tariff deficit was unresolved Spain would stop taking measures.937

487. It follows, Respondent argues, that Claimants were aware that in 2009 and 2010 (prior to the Claimants' investments) the Government had already corrected imbalances in the system of renewable energy (including thermosolar), and knew that these actions were based on the guiding principle of ensuring the sustainability of the system.938 Claimants were also aware, Respondent argues, that the imbalance in other technologies (PV) had caused the regulator to take action to restore the “reasonable return,” and were aware that adjustments would continue to be adopted as long as the sustainability of the system remained at risk or situations of overcompensation affected the principle of reasonable return.939

(ii) Source of the Expectations

488. In addition to the alleged errors in the description of the Spanish regulatory framework, Respondent also denies that the other sources presented by Claimants could have validly served as basis for the expectations they allege to have had.

489. Pre-Assignment Registry of RDL 6/2009. According to Spain, the purpose of RDL 6/2009 was to confront the tariff deficit, not to freeze the legal system; and entry into the Pre-Assignment Registry “did not grant by itself a right to the economic regime laid-down by Royal Decree 661/2007.”940 Moreover, the regime was subordinate to the dynamism of the concept of “reasonable return.”941

490. The 28 December 2010 Resolutions. Respondent denies that these documents confirm any commitment or constitute any new commitment to maintain the RD 661/2007 regime. According to Spain, they (i) merely informed what the current regime was at the time the communication was being issued with respect to two issues (payment conditions


936 Resp. C-Mem. Merits, ¶ 666. ↩

937 Resp. C-Mem. Merits, ¶ 667. ↩

938 Resp. C-Mem. Merits, ¶ 15. ↩

939 Resp. C-Mem. Merits, ¶¶ 16-17. ↩

940 Resp. C-Mem. Merits, ¶ 678. See also, Resp. Rej. Merits, ¶ 705. ↩

941 Resp. C-Mem. Merits, ¶ 678. ↩

[Page 169]

and discharge capacity), but contained no promise of stability of RD 661/2007;942 (ii) were issued by the Director General of Energy Policy and Mines who had no power to bind the State on regulatory matters, and as such could not form the basis of legitimate expectations;943 and (iii) were merely communications, not an administrative resolution.944 Moreover, Spain adds, these resolutions in fact demonstrate that Claimants did not believe that RD 1614/2010 contained any commitment to stability, because otherwise, the Termosol Plants would have never sought the additional commitment they hoped to get with these resolutions.945

491. Alleged Assurances by High Government Officials. Respondent argues that (i) none of the communications relied upon by Claimants in this proceeding were authored by Claimants or addressed to them; (ii) the communications authored by Spain answered to NextEra U.S letters, but were not sent on Spain's initiative; (iii) the communications cannot be interpreted outside of their context, and some are authored by NextEra U.S. officials attributing statements to the Government of Spain that have not been verified; (iv) the letters of 21 and 22 April 2010 to the Minister for Industry and to the Prime Minister were not answered by Spain, and accordingly, Spain has not confirmed the interpretation of the legal regime embodied in those letters; (v) the number of letters sent contradicts the notion that the letters generated any expectations of stability; (vi) Claimants' actions subsequent to these letters also confirm that the communications did not generate such expectations; (vii) the letter sent on 15 March 2012 by a high ranking NextEra Energy Resources official reveals the true expectations generated by these letters, referring to “regulatory uncertainty.”946 According to Respondent, this last letter


942 Resp. C-Mem. Merits, ¶¶ 681-682. See also, id., § III(C)(7), ¶¶ 335-359; Resp. Rej. Merits, ¶¶ 73, 664-694. ↩

943 Resp. C- Mem. Merits, ¶ 683 (citing RL-089, ECE Projektmanagement International GmbH and Kommanditgesellschaft PANTA Achtundsechzigste Grundstücksgesellschaft mbH & Co v. Czech Republic, PCA Case No. 2010-5, Award, 19 September 2013, ¶ 4.771). ↩

944 Resp. Rej. Merits, ¶ 671. ↩

945 Resp. Rej. Merits, ¶ 73. ↩

946 Resp. C-Mem. Merits, ¶ 688. See also, Resp. Rej. Merits, ¶¶ 70-71. ↩

[Page 170]

evidences that Claimants did not believe in the existence of any commitments to stability, and they knew in March 2012 that a new reform was forthcoming.947

492. Discussing the communications individually, Respondent denies that each did or could have validly generated any expectation of stability.948 Among others, Respondent argues that (i) the Engineering, Procurement and Construction Contract, signed in December 2009 after one of the letters was sent, expressly foresees that the rates in Article 36 of RD 661/2007 might be modified;949 (ii) an amendment to the Development Agreement, signed in December 2010 after another of the letters was sent and even after RD 1614/2010 was enacted included a clause for regulatory risk; and the credit agreement with the bank syndicate signed in April 2011 contemplates “regulatory changes” and “changes in law;”950 (iii) one of the communications is of 3 April 2012, after the bank financing contract had been entered into in April 2011, and as such could not have had much impact on the decision to invest.951 Respondent further contends that: (i) all the letters pre-date the approval of RD 1614/2010, RDL 14/2010 and Law 2/2011, and therefore, Claimants could hardly believe in view of the enactment of those norms that no measures to protect the sustainability of the system would be adopted;952 and (ii) in May


947 Resp. Rej. Merits, ¶ 1112 (referring to C-090, Letter from John Ketchum (NextEra Energy Resources, LLC) to José Maria Soria López (Minister for Industry, Tourism and Trade) and Fernando Martí Scharfhausen (Secretary of State for Energy), 15 March 2012). ↩

948 Resp. C-Mem. Merits, ¶¶ 690-709 (referring to C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009; C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010; C-013, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 21 April 2010; C-058, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to José Luis Rodriguez Zapatero (President of the Government of Spain), 22 April 2010; C-011, Letter from Ignacio Grangel Vicente (Chief of Staff to the Secretary of State for Energy) to John Ketchum (NextEra Energy Resources, LLC), 3 April 2012). See also, id., ¶ 282-283 (discussing C-008); Resp. Rej. Merits, ¶ 1084 (referring to C-008, C-013 and C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009). ↩

949 Resp. C-Mem. Merits, ¶¶ 690-694 (discussing C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009; and C-051, Engineering, Procurement Support and Construction Support Services Agreement between PTE and Sener Ingeniería y Sistemas, S.A., 16 December 2009; and C-052, Engineering, Procurement Support and Construction Support Services Agreement between PTE2 and Sener Ingeniería y Sistemas, S.A., 16 December 2009). See also, Resp. C-Mem. Merits, ¶ 285. ↩

950 Resp. C-Mem. Merits, ¶¶ 700-706 (discussing C-013, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 21 April 2010; CLEX-034, CdH Amendment to Project Development Agreement, 10 December 2010). See also, Resp. C-Mem. Merits, ¶¶ 321-327; 360-366. ↩

951 Resp. C-Mem. Merits, ¶¶ 708-709 (discussing C-011, Letter from Ignacio Grangel Vicente (Chief of Staff to the Secretary of State for Energy) to John Ketchum (NextEra Energy Resources, LLC), 3 April 2012). ↩

952 Resp. Rej. Merits, ¶ 72. See also, id., ¶ 641. ↩

[Page 171]

2010, before this dispute arose and before RD 1614/2010 was enacted, Claimants were indeed aware that a reform of the system was imminent and did not believe that there was a commitment to the petrification of RD 661/2007.953

493. RAIPRE Registration. Relying on Charanne, Respondent argues that no diligent investor could have legitimately expected that registration into the RAIPRE entitled it to the freezing of the RD 661/2007 regime, as the RAIPRE was merely an administrative requirement to sell energy.954 Respondent also contends that Claimants' argument as to the RAIPRE is based only on Article 4 of RD 1614/2010, overseeing that the regulatory regime included also the 1997 Electricity Law, other regulations and the case law of the Supreme Court, which make it clear that the only guarantee was of a return on the investment, but not of a specific system.955

494. Agreement with the Thermosolar Sector. Respondent denies that this alleged agreement of 2 July 2010 could have been source of expectations, arguing that Protermosolar's actions thereafter in 2012 did not refer to any such agreement, nor did the PTEs do so during the consultation process for RD 1614/2010.956 Respondent further denies that the enactment of RD 1614/2010 was the result of a negotiation with the sector, or that there was ever an agreement with the sector, arguing that the alleged negotiation process on which Claimants rely was simply the normal consultation procedure for the enactment of the decree, and that the 2 July 2010 “agreement” was simply a part of that process.957

495. Foreign Investment Campaign. Respondent denies that a worldwide campaign to attract foreign investment was launched by Spain.958 Spain (i) maintains that Claimants have never demonstrated that the presentations of InvestinSpain or the CNE on which they rely were ever known and relied upon by Claimants to invest; (ii) argues that the presentations pre-date the alleged investment by several years; and (iii) disputes Claimants'


953 Resp. C-Mem. Merits, ¶¶ 293-294. ↩

954 Resp. C-Mem. Merits, ¶ 680 (citing RL-088, Charanne); Resp. Rej. Merits, ¶¶ 696-700; 1080-1082. ↩

955 Resp. C-Mem. Merits, ¶¶ 710-711. ↩

956 Resp. C-Mem. Merits, ¶ 714. ↩

957 Resp. C-Mem. Merits, ¶¶ 309-313. See also, Resp. Rej. Merits, ¶¶ 64, 487-489. ↩

958 Resp. Rej. Merits, ¶¶ 65, 1085. ↩

[Page 172]

interpretation of the content of the presentations.959 Respondent further submits that InvestinSpain was a private law entity without public prerogatives, and that the CNE presentations were merely educational and not for advertising or investment development.960

496. Change of Law Provisions. According to Respondent, Claimants “never believed” in the alleged commitments that they now invoke, as shown by contracts signed after the enactments of RD 661/2007, RDL 6/2009 and RD 1614/2010.961 Respondent refers to (i) the Project Development Agreement with Casas de Hitos, which Respondent says contemplates the possibility that RD 661/2007 might be repealed or replaced;962 (ii) the Engineering, Procurement and Construction Contract, signed in December 2009, foreseeing that the rates in Article 36 of RD 661/2007 might be modified;963 (iii) an amendment to the Development Agreement, signed in December 2010 including a clause for regulatory risk;964 and (iv) the credit agreement with the bank syndicate signed in April 2011, which contemplates “regulatory risk” and “changes in law.”965

497. Respondent further submits that other evidence submitted by Claimants serves to refute the allegations of legitimate expectations, including a proposal submitted by Protermosolar to the Ministry in June 2010 concerning measures to address the tariff deficit, containing a proposal for amendment of Article 44(3) of RD 661/2007 and recognizing State liability in the event of change, which was ultimately not accepted –


959 Resp. Rej. Merits, ¶¶ 65, 711-713. ↩

960 Resp. Rej. Merits, ¶¶ 714-715. ↩

961 Resp. Rej. Merits, ¶¶ 44, 1095; Resp. Rej. Merits, ¶¶ 74-77; Resp. Skeleton, ¶ 36. ↩

962 Resp. Rej. Merits, ¶¶ 1096-1098 (discussing CLEX-019, CdH Project Development Agreement, 10 December 2007). ↩

963 Resp. Rej. Merits, ¶¶ 1099-1101 (discussing C-051, Engineering, Procurement Support and Construction Support Services Agreement between PTE and Sener Ingeniería y Sistemas, S.A., 16 December 2009; and C-052, Engineering, Procurement Support and Construction Support Services Agreement between PTE2 and Sener Ingeniería y Sistemas, S.A., 16 December 2009). ↩

964 Resp. Rej. Merits, ¶¶ 1102-1104 (discussing CLEX-034, CdH Amendment to Project Development Agreement, 10 December 2010). ↩

965 Resp. Rej. Merits, ¶¶ 1105-1107 (discussing C-074, Credit Agreement, 28 April 2011). ↩

[Page 173]

thereby showing the sector's awareness that RD 1614/2010 did not stabilize RD 661/2007.966

(iii) The Timeline of the Investment and Expectations

498. Referring to Claimants' depiction of the timeline of their equity contributions to NEE España, Respondent highlights that by March 2010 the Government had already announced its intention to amend the regime for CSP installations in RD 661/2007, and nonetheless Claimants allegedly made significant equity contributions.967 Spain further denies that the 2011-2020 Renewable Energy Plan provided any certainty about the regime, and it argues that, in fact it acknowledged the possibility of future amendments to tariffs and premiums.968

499. Recalling that, in its view, the expectations must be assessed as of 28 April 2011 (date of the bank financing contracts),969 Respondent observes that by then numerous facts had occurred that undermine Claimants' legitimate expectations case: (i) RDL 14/2010 of 23 December 2010 had already been enacted, introducing toll access fees for all renewable energy producers, thereby reducing the remuneration and undermining Claimants' allegation of immutability of the returns;970 (ii) Law 2/2011 had just been enacted, announcing an imminent reform to the electricity sector;971 (iii) it was public knowledge that the first international arbitration arising out of the measures in the PV sector had been brought;972 (iv) neither the CSP sector or the wind sector had argued the immutability of the regime;973 (v) the renewable energy target in the 2005-2010 Renewable Energy Plan had already been fulfilled.974


966 Resp. C-Mem. Merits, ¶¶ 718-719. See also, id., ¶¶ 318-321. ↩

967 Resp. C-Mem. Merits, ¶¶ 367-368 (referring to Cl. Mem. Merits, ¶ 175). ↩

968 Resp. C-Mem. Merits, ¶¶ 369-371. ↩

969 Resp. Rej. Merits, ¶ 60. ↩

970 Resp. Rej. Merits, ¶ 61(a) (referring to R-049, RDL 14/2010). See also, id., ¶¶ 503-504. ↩

971 Resp. Rej. Merits, ¶ 61(b). ↩

972 Resp. Rej. Merits, ¶ 61(c). ↩

973 Resp. Rej. Merits, ¶ 61(d). ↩

974 Resp. Rej. Merits, ¶ 61(e). ↩

[Page 174]

500. In addition, Respondent argues, in January 2011, the Minister of Industry, Tourism and Trade advised that the measures taken during 2009 and 2010 were not sufficient, and that further measures had to be taken.975

501. Lastly, since 2007 and 2008, Respondent contends, Claimants were aware of the risk that “the Spanish Regulatory Framework, while respecting acquired rights, could establish reforms going forwards that are applicable to pre-existing situations such as plants in operation,” and they still decided to make their investment in 2011.976

(iv) No Legitimate Expectations: Due Diligence and Supreme Court Case Law

502. Respondent contends that Claimants have failed to show that at the time of investment in April 2011, Claimants had conducted due diligence with respect to the alleged commitments under RD 661/2007, RDL 6/2009 and RD 1614/2010.977 After criticizing Claimants for relying on legal privilege to avoid producing their due diligence reports, Spain contends that the reports that have been produced were issued much earlier than the Claimants' investment.978

503. One of those reports (2008 Pöyry Report), Respondent argues, warned Claimants that the renewable energy support mechanisms were contingent upon the economic sustainability of the system; referred to the changes in the PV sector, and advised Claimants that the risk now lied with the CSP sector.979 According to Spain, the report further warned Claimants about “(1) the effects that the increase in the tariff deficit might have, and (2) the Government's commitment to provide a Reasonable rate of return through subsidies” and it “does not contain a single mention of the existence of any stabilisation clause in RD 661/2007.”980


975 Resp. Rej. Merits, ¶ 508. ↩

976 Resp. Rej. Merits, ¶¶ 584-585 (referring to C-021, CNE Report 3/2007, 14 February 2007; C-175, CNE Report 30/2008, 29 July 2008; C-210, Opinion of the State Attorney, about the proposal of RD 661/2007, 29 March 2007). ↩

977 Resp. Rej. Merits, ¶ 1057. See also, Resp. Skeleton, ¶ 38. ↩

978 Resp. Rej. Merits, ¶ 68. ↩

979 Resp. Rej. Merits, ¶¶ 134-135, 215-217 (referring to C-202, 2008 Pöyry Report). See also, Resp. Rej. Merits, ¶¶ 280-288. ↩

980 Resp. Rej. Merits, ¶ 538. ↩

[Page 175]

504. Respondent further takes issue with the contention that the case law of the Supreme Court was not relevant in the formation of the expectations, and argues that as a result of Claimants' disregard of this case law their expectations were neither real nor objective.981 Moreover, Respondent contends that the evidence indeed shows that Claimants were aware of the case law of the Supreme Court, but there is no evidence that they examined it or requested due diligence about it.982

(v) No Legitimate Expectations: The Installed Capacity of the Termosol Plants

505. Respondent contends that the Termosol Plants have an installed capacity that exceeds 50 MW, and as result are not entitled to the economic regime set forth in Article 36 of RD 661/2007 (instead, they are only entitled to the regime in Article 45 of that decree). In consequence, Respondent argues, Claimants could not have legitimate expectations that their plants would receive the regime in Article 36 of RD 661/2007 for 30 years.983

506. According to Spain, Claimants knew or should have known that the installed power of the installations could not exceed 50MW.984 Respondent points out that Article 27 of the 1997 Electricity Law required as an “essential condition” that in order to qualify for the regime in Article 36 of RD 661/2007 the installations had an “installed capacity [...] no greater than 50MW.”985 In addition, the CNE was also clear about the requirement, when answering public questions about the regime in a 2008 report.986

507. Emphasizing the term “installed” power, Respondent argues that the requirement also excluded installations with an installed power exceeding 50MW, with necessary management to ensure delivery of only 49.99 MW to the grid.987 Respondent refutes Claimants' contention that the notion of “installed power” should be determined by


981 Resp. Rej. Merits, ¶ 1061. See also, id., ¶ 145. ↩

982 Resp. Rej. Merits, ¶ 79 (referring to R-396, Email from Joana Sánchez, 21 April 2010). See also, id., ¶¶ 140, 575. ↩

983 Resp. C-Mem. Merits, ¶¶ 122, 126; Resp. Rej. Merits, ¶¶ 45, 91, 961-982; Resp. Skeleton, ¶ 56; Resp. PH Mem., ¶¶ 8-9. ↩

984 Resp. C-Mem. Merits, ¶ 121; Resp. Rej. Merits, ¶¶ 961-966. ↩

985 Resp. C-Mem. Merits, ¶¶ 113-116 (quoting R-003, Electricity Law, Art. 27). ↩

986 Resp. C-Mem. Merits, ¶¶ 118-120 (citing R-043, CNE Report, 28 February 2008). ↩

987 Resp. C-Mem. Merits, ¶ 121; Resp. Rej. Merits, ¶ 964. ↩

[Page 176]

reference to Article 3 of RD 661/2007 referring to the specifications in the name plate of the motor or alternator, observing that the CNE contradicts this contention.988

508. According to Respondent, the technical due diligence attached to Claimants' own expert reports shows that Claimants were not in compliance with the requirement, as they have installed power greater than 50MW.989 In addition, Respondent argues, the data for electricity production discharged to the network also confirms it;990 and Claimants themselves have admitted that the plants are over the power limits.991 The expert opinion of Mr. Jesús Casanova further supports the argument.992 This said, Respondent emphasizes that it has never verified or calculated empirically the installed power of the Termosol Plants, because Claimants have not allowed it.993

509. Spain also opposes the contention that the principle of estoppel prevents Spain from raising this argument. According to Respondent, Spain has never stated that the Termosol Plants were not overpowered (and in fact, it has never verified the installed capacity empirically).994 Moreover, Respondent contends, (i) estoppel is not a principle recognized in Spain, and is also not applicable here as it is already embodied in the FET standard; (ii) the registration in the RAIPRE was based on compliance with administrative requirements (not technical ones); (iii) the CNE verified only that the plants had the documents and permits necessary to operate, but did not conduct an empirical power test; (iv) the “Electricity System” is a technical operator and not an administrative control body, and as such, it does not do verifications of the economic


988 Resp. Rej. Merits, ¶¶ 968-971. ↩

989 Resp. C-Mem. Merits, ¶ 123 (citing CLEX-062, RWB, Independent Engineer's Report. NextEra Energy Resources, LLC. Termosol I Solar Power Project, 27 April 2011; CLEX-063, RWB, Independent Engineer's Report. NextEra Energy Resources, LLC, Termosol II Solar Power Project, 27 April 2011); Resp. Rej. Merits, ¶ 967. ↩

990 Resp. Rej. Merits, ¶ 967. ↩

991 Resp. Rej. Merits, ¶ 968. ↩

992 Resp. Rej. Merits, ¶ 977. ↩

993 Resp. Rej. Merits, ¶ 974. ↩

994 Resp. Skeleton, ¶ 55; Resp. Rej. Merits, ¶¶ 29, 974. ↩

[Page 177]

regime a facility had or should have had;995 and (v) Claimants have concealed their real installed power on the nameplate, thereby preventing Respondent from verifying it.996

(vi) The EC Decision of 10 November 2017 on State Aid

510. According to Respondent, the EC Decision is binding not only on Spain, but also on this Tribunal, because EU Law is international law applicable pursuant to Article 26(6) of the ECT, and EC decisions are part of EU Law.997

511. On this basis, Respondent contends that the FET standard cannot have a broader scope than the EU notions of legal certainty and legitimate expectations in the context of a State Aid regime;998 and the CJEU's doctrine on legitimate expectations, legal certainty, transparency and retroactivity is to be taken into account when determining the content of the standard in Article 10(1) of the ECT.999

512. In Respondent's view, any investor in the renewable energy sector in Spain should have known that the support scheme for renewable energy: (i) constituted State Aid, and as such no investor could expect that it would be preserved; (ii) must be compliant with the rule of proportionality; (iii) was aimed at achieving a reasonable return until the plants reached a level playing field; (iv) was limited in its duration until such level playing field was achieved; and (v) was subject to continue State review.1000 This follows, Respondent says, from the fact that the renewable energy scheme was passed in accordance with EU Directives 2001/77 and 2009/28, which recognized the need for State Aid in favour of renewable energy.1001

513. These EU guidelines, Respondent adds, demonstrate that Spain was required to guarantee the reasonability and proportionality of the rates of return by renewable energy


995 Resp. Rej. Merits, ¶ 973. See also, Resp. Rej. Merits, ¶¶ 983, 987, 995-996. ↩

996 Resp. Rej. Merits, ¶ 997. ↩

997 Resp. Obs. EC Decision, ¶¶ 4-5, 33. ↩

998 Resp. Obs. EC Decision, ¶ 5. ↩

999 Resp. Obs. EC Decision, ¶ 6. ↩

1000 Resp. Obs. EC Decision, ¶ 12. ↩

1001 Resp. Obs. EC Decision, ¶¶ 11-12. ↩

[Page 178]

generators, and to adapt the remuneration regime to ensure both objectives.1002 Accordingly, renewable generators “could not seek to obtain, sine die, the tariffs and premiums of RD 661/2007.”1003

514. Spain further points out that the EC Decision concludes that the subsidies granted by Spain constitute State Aid within the meaning of Article 107(1) of the TFEU, and that there is no right to State Aid. It follows, Respondent says, that the rights Claimants allege to have are inexistent both under international law or domestic law.1004 Relying on the EC Decision, Respondent emphasizes that “a recipient of State aid cannot, in principle, have legitimate expectations in the lawfulness of aid that has not been notified to the Commission” and, goes on to argue that, a diligent business man should have been able to determine whether the State Aid procedure had been followed.1005

515. Respondent further submits that: (i) the EC Decision ratified the proportionality and rationality of the challenged measures;1006 (ii) confirmed that the regulatory lifetime set forth in the current regime is correct;1007 and (iii) welcomed the transparency of the new regime and Spain's commitment to periodic assessments to guarantee proportionality.1008

516. Finally, Respondent observes that the EC Decision dismisses the contention that there has been an infringement of the FET standard under the ECT; and argues that this Tribunal's decision must be “compatible” with the EC's Decision, given its role as applicable international law, domestic law, paramount fact and relevant interpretation criterion.1009


1002 Resp. Obs. EC Decision, ¶ 14. ↩

1003 Resp. Obs. EC Decision, ¶ 14. ↩

1004 Resp. Obs. EC Decision, ¶¶ 16-19. ↩

1005 Resp. Obs. EC Decision, ¶¶ 19-20. ↩

1006 Resp. Obs. EC Decision, ¶ 23. ↩

1007 Resp. Obs. EC Decision, ¶ 27. ↩

1008 Resp. Obs. EC Decision, ¶ 29. ↩

1009 Resp. Obs. EC Decision, ¶ 32. ↩

[Page 179]

(vii) No Legitimate Expectations Were Breached

517. According to Respondent, all the challenged measures were foreseeable and consistent with the principles underlying the Spanish Electricity System.1010 Contrary to Claimants' assertions, the new remuneration model does not entail a complete revision from the prior one; and a number of elements were present since the 1997 Electricity Law.1011 In particular, Respondent contends that the new framework:

(3) Article 10(1) of the ECT: Failure to Provide a Stable, Consistent and Transparent Framework

a. Claimants' Position

518. Claimants argue that Article 10(1) of the ECT requires Contracting Parties to “encourage and create stable, equitable, favourable and transparent conditions for Investors,” and


1010 Resp. Rej. Merits, ¶ 718. ↩

1011 Resp. Rej. Merits, ¶ 782. ↩

1012 Resp. Rej. Merits, ¶¶ 783-785. ↩

1013 Resp. Rej. Merits, ¶¶ 786-798. ↩

1014 Resp. Rej. Merits, ¶ 796. ↩

1015 Resp. Rej. Merits, ¶¶ 799-809. ↩

1016 Resp. Rej. Merits, ¶¶ 812-818. ↩

1017 Resp. Rej. Merits, ¶¶ 819-837. ↩

1018 Resp. Rej. Merits, ¶¶ 838-865. ↩

1019 Resp. Rej. Merits, ¶¶ 894-905. ↩

[Page 180]

this is both a stand-alone obligation, and one that informs the interpretation of the FET standard in the ECT.1020

519. In Claimants' view, the rollercoaster of legal changes in Spain from 2012 to 2014 cannot be reconciled with Spain's ECT obligation to provide a stable legal framework, nor were the measures “sufficiently transparent.”1021

(i) Failure to Provide a Stable and Consistent Framework

520. Claimants submit that Respondent breached this standard by “substantially” modifying the legal framework basis for their investment, making the new regime retroactive.1022 According to Claimants, the changes are so far-reaching that they do not even preserve their equity outlay.1023 Regulatory Framework III is retroactive, Claimants say, because it applies not only to new plants, but also to existing ones, and it does affect acquired rights of owners of pre-registered plants.1024

521. Lack of Stability. For Claimants the changes introduced through Regulatory Framework III are the antithesis of stability:1025 (i) they completely changed the applicable remuneration system leaving Claimants with a negative return on their investments; (ii) they claim to correct overcompensation but there is no evidence that such overcompensation existed; and (iii) they effectively penalize Claimants for a tariff deficit of Spain's own making.1026 Claimants emphasize that while a State has a right to change its laws, “that right must be exercised consistently with the commitments it has undertaken with respect to particular investments and its ECT obligations.”1027

522. Claimants argue that Respondent's defences to this head of claim lack merit because (i) it is not true that Regulatory Framework I only guaranteed a “reasonable return,” in fact it


1020 Cl. Reply Merits, ¶ 490. ↩

1021 Cl. Mem. Merits, ¶ 269. See also, Cl. Reply Merits, ¶ 491. ↩

1022 Cl. Mem. Merits, ¶ 267; Cl. Skeleton, ¶ 42. ↩

1023 Cl. Mem. Merits, ¶ 268 (further discussed supra, ¶¶ 450-454). ↩

1024 Cl. Skeleton, ¶ 44. ↩

1025 Cl. Reply Merits, § VII(3)(C)(b), ¶¶ 493-499. ↩

1026 Cl. Reply Merits, ¶ 493. Claimants have also argued that Spain is estopped from arguing that Claimants were being overcompensated, or from using the tariff deficit as an excuse. Cl. Reply Merits, ¶¶ 412, 407. ↩

1027 Cl. Reply Merits, ¶ 494. ↩

[Page 181]

“guaranteed specific revenues;” (ii) it is not true that under the new regime Claimants continue to receive a “reasonable return” on their investment, in fact their return is negative and their equity has been eviscerated; (iii) a State's sovereign right to enact legislation must be exercised in accordance with any commitments undertaken towards investors, including those in the ECT; (iv) it is factually incorrect that Regulatory Framework III was needed to preserve sustainability of the system and eliminate overcompensation.1028

523. Retroactivity. Claimants contend that Regulatory Framework III is retroactive in character.1029 Claimants argue that: (i) Article 1 of RDL 2/2013 reduced the inflation indexing substituting the Consumer Price Index with a new index, applying the change retroactively to 1 January 2013;1030 (ii) RDL 9/2013 entered into effect on 14 July 2013, but it only put in place a basic framework that left undefined key concepts (standard reference plants, the Investment Payment and the OPEX) which were only defined in June 2014, which meant that the regulated tariff option continued to apply for almost a year but subject to a claw-back that operated retroactively from 9 July 2013;1031 (iii) Regulatory Framework III applies to plants already designed, optimized and built in reliance on Regulatory Framework I, which makes it especially unfair;1032 or put another way, (iv) RD 413/2014 and Ministerial Order IET/1045/2014 apply to plants already installed and pre-registered, not only to plants commissioned in the future.1033 According to Claimants:

“This retroactivity is apparent from the text of RD 413/2014 and Ministerial Order IET/1045/2014, which provides that they apply retroactively to 13 July 2013, when RD 9/2013 first abolished the feed-in-tariff and feed-in-premium based renewable remuneration schemes that had been in place since RD 661/2007, although they were passed in June 2014. In practice, for generators that had started producing before 13 July 2013, the retroactivity of Regulatory Framework III goes even further

1028 Cl. Skeleton, ¶ 43. ↩

1029 Cl. Reply Merits, § VII(3)(C)(c), ¶¶ 500-504. ↩

1030 Cl. Mem. Merits, ¶ 187, n. 213; Cl. Reply Merits, ¶ 503 (3d bullet). ↩

1031 Cl. Mem. Merits, ¶¶ 193-194; Cl. Reply Merits, ¶ 503 (3d bullet). ↩

1032 Cl. Mem. Merits, ¶ 209(iii); Cl. Reply Merits, ¶ 503 (2d bullet). ↩

1033 Cl. Reply Merits, ¶ 354; Cl. Reply Merits, ¶ 503 (1st bullet). ↩

[Page 182]

as: Regulatory Framework III is not only retroactive to 13 July 2013, as indicated by the text of the regulation, but goes all the way back to the first moment of commercial operation, regardless of the date on which commercial operations commenced.”1034

524. Finally, Claimants argue that Regulatory Framework III is retroactive in that there are still considerable uncertainties about how it will evolve, including that Spain: (i) retains the right to add additional parameters to the notion of “standard plant” every three or six years; (ii) is able to revise and adjust the rate of return every six years; and (iii) retains the right to withdraw remuneration payment to plants before their estimated useful life, if it determines that the standard plant has already earned a reasonable return.1035

525. Claimants dispute Respondent's reliance on the case-law of the Spanish Constitutional Court in support of the contention that Regulatory Framework III is not retroactive, arguing that: (i) Spain cannot rely on its own domestic law to justify an international law breach; and (ii) the Constitutional Court only ruled on a Spanish law question which is completely different from the factual question before the Tribunal.1036 Claimants also oppose Spain's reliance on Charanne, arguing that such award relates to a different sector and is factually different.1037 Lastly, Claimants submit that international institutions have openly criticized Spain for the retroactivity of the measures.1038

(ii) Failure to Provide a Transparent Framework

526. Claimants contend that Spain's conduct also fell short of the transparency standard imposed by Article 10(1) of the ECT.1039 Claimants articulate that standard by reference to the decisions in Tecmed, Electrabel and Plama.1040


1034 Cl. Reply Merits, ¶ 355. ↩

1035 Cl. Reply Merits, ¶ 503 (4th bullet). ↩

1036 Cl. Reply Merits, ¶¶ 356, 501. In addition, in response to Respondent's allegations, Claimants argue that the change for wind producers from RD 436/2004 to RD 661/2007 does not evidence that Spanish law allows for retroactive changes, because the later decree maintained the core features of the regime for the farms registered in the RAIPRE, improved the remuneration mechanism and only effected a slight retroactive change, and was implemented in a way that confirms that the legislator knows that retroactive changes could not be introduced abruptly. Cl. Reply Merits, ¶ 357. ↩

1037 Cl. Reply Merits, ¶ 504. ↩

1038 Cl. Reply Merits, ¶¶ 358-367. ↩

1039 Cl. Reply Merits, ¶ 513. ↩

[Page 183]

527. In Claimants' view, Regulatory Framework III violates the ECT requirement of transparency for a number of reasons, including:1041

528. Claimants also argue, in particular, that Respondent (i) did not hold proper consultations in the lead to RDL 9/2013, and that to the extent it held formal consultations with respect to RD 413/2014 and Ministerial Order IET/1045/2014 it did not meaningfully engage with the industry participants;1045 (ii) left investors in the dark for almost a year while it determined several concepts (standard plant categories, capital investment values and OPEX payments);1046 (iii) set several criteria behind closed doors (operating hour limits and criteria for a “well-managed” operator).1047 The industry and the Spanish regulator itself criticized the lack of transparency in certain parameters of the new regime;1048 and Respondent refused to disclose documents and technical studies upon which it intended to base the parameters in Regulatory Framework III (including the BCG and Roland Berger Reports).1049


1040 Cl. Reply Merits, ¶¶ 506-508 (citing CL-018, Tecmed; RL-091, Electrabel; CL-028, Plama Award). ↩

1041 Cl. Mem. Merits, ¶¶ 209, 275. See also, Cl. Reply Merits, ¶ 286. ↩

1042 Cl. Mem. Merits, ¶ 209(iv). ↩

1043 Cl. Mem. Merits, ¶ 209(v). ↩

1044 Cl. Mem. Merits, ¶ 209(vi). ↩

1045 Cl. Reply Merits, ¶¶ 291, 295, 510; Cl. Skeleton, ¶ 45. ↩

1046 Cl. Reply Merits, ¶ 510; Cl. Skeleton, ¶ 45. ↩

1047 Cl. Reply Merits, ¶ 510; Cl. Skeleton, ¶ 45. ↩

1048 Cl. Reply Merits, ¶ 510 (referring to criticism by the CNE); Cl. Skeleton, ¶ 45. ↩

1049 Cl. Reply Merits, ¶¶ 286, 302-316, 512; Cl. Skeleton, ¶ 45. ↩

[Page 184]

529. Claimants also (i) deny that Spain gave prior notice of the changes it implemented in 2013 since the general election in November 2011 or with the CNE Report of 7 March 2012; (ii) argue that even the initial measures in 2012 did not reveal the magnitude of the change forthcoming; and (iii) contend that, in any event the purported events of notice occurred well after Claimants had committed to the investment.1050

b. Respondent's Position

(i) No Failure to Provide a Stable and Consistent Framework

530. Stability. Respondent denies that it has breached any obligation to provide a stable legal framework. According to Spain, the challenged measures have maintained the essential characteristics of the framework under which Claimants made their investment,1051 and the regulatory framework for renewable energy has remained stable.1052 Respondent maintains that the changes enacted are not arbitrary, disproportionate or abusive, and were approved to preserve the “reasonable return” mandated by the 1997 Electricity Law.1053

531. In particular, Respondent contends that the following key elements are maintained: (i) the essential principles of the Spanish Electricity System; (ii) the principle of economic sustainability of the Spanish Electricity System; and (iii) “the specific model of remuneration to [Renewable Energies] (integration in [the Spanish Electricity System], perception of market price plus subsidy, subsidy as [...] costs [of the Spanish Electricity System] and a reasonable return objective).”1054 Further, according to Respondent, the basic principles of priority of access and priority of dispatch are also maintained;1055 the historic methodology to determine reasonable return (involving standard facilities and common standards) has been maintained; and the new framework continues to guarantee


1050 Cl. Reply Merits, ¶¶ 317-323. ↩

1051 Resp. C-Mem. Merits, ¶ 733. See also, Resp. Rej. Merits, ¶ 35. ↩

1052 Resp. C-Mem. Merits, ¶¶ 746, 765; Resp. Rej. Merits, ¶ 1131. ↩

1053 Resp. C-Mem. Merits, ¶¶ 733, 746, 765. ↩

1054 Resp. C-Mem. Merits, ¶¶ 737-738. See also, Resp. Rej. Merits, ¶ 22 (a-g). ↩

1055 Resp. C-Mem. Merits, ¶ 19. See also, Resp. Rej. Merits, ¶¶ 22(c), 1129. ↩

[Page 185]

a reasonable return (the return being better that the discount rate of the sector and of Claimants themselves).1056

532. Respondent contends that the ECT does not grant investors a right to freezing the regulatory framework.1057 Relying on Plama, Respondent alleges that a “regulatory framework in itself does not constitute a specific commitment.”1058 And relying on AES, Respondent argues that the provision of the ECT referring to stable conditions is not a stability clause, as a legal framework is subject to change by definition.1059 Thus, Respondent contends that “although investors can reasonably and legitimately expect a host State to provide them with stable conditions for investment,” that “cannot prevent a host State [...] [from] undertaking regulatory, legitimate and reasonable reforms imposed by justified circumstances.”1060

533. Respondent denies Claimants' characterizations of Regulatory Framework III presented in support of their allegations of lack of stability.1061 In particular, Respondent contends that:


1056 Resp. Rej. Merits, ¶ 22 (h-i). ↩

1057 Resp. C-Mem. Merits, ¶ 747. ↩

1058 Resp. C-Mem. Merits, ¶ 740 (citing RL-092, Plama Award). ↩

1059 Resp. C-Mem. Merits, ¶ 741 (citing RL-024, AES, ¶ 9.3.29). ↩

1060 Resp. C-Mem. Merits, ¶ 744. See also, id. ¶ 747; Resp. Rej. Merits, ¶ 1126. ↩

1061 Resp. C-Mem. Merits, ¶ 750 (discussing Cl. Mem. Merits, ¶ 268). ↩

1062 Resp. C-Mem. Merits, ¶ 750(i). ↩

1063 Resp. C-Mem. Merits, ¶ 750(ii) ↩

[Page 186]

534. According to Respondent, the ECT standard of stability allows the “adoption of reasonable and proportionate macroeconomic control measures, provided that they are motivated by a reasonable cause.”1069 No instability has occurred here, as “the changes made have been aimed precisely (1) to apply the principle of reasonable return; (2) to correct situations of over-compensation not covered by this principle; (3) to solve imbalanced situations with [the Spanish Electricity System], which endangered the economic sustainability of the same institution and (4) strengthen the stability of the regulatory framework by raising through a legal rule some aspects previously governed by a regulation.”1070 According to Spain, after the disputed measures, investors still receive the value of their investment, long-term costs and a reasonable rate of return.1071


1064 Resp. C-Mem. Merits, ¶ 750(iii). ↩

1065 Resp. C-Mem. Merits, ¶ 750(iv). ↩

1066 Resp. C-Mem. Merits, ¶ 750(v). ↩

1067 Resp. C-Mem. Merits, ¶ 750(vi). ↩

1068 Resp. C-Mem. Merits, ¶ 750(vii). ↩

1069 Resp. C-Mem. Merits, ¶ 752. See also, Resp. Rej. Merits, ¶ 1115; Resp. Skeleton, ¶ 42. ↩

1070 Resp. C-Mem. Merits, ¶ 764 (emphasis omitted). See also, Resp. Rej. Merits, ¶ 1130; Resp. Skeleton, ¶ 43. ↩

1071 Resp. Rej. Merits, ¶ 1117. ↩

[Page 187]

535. Respondent distinguishes the case law relied upon by Claimants, arguing that it refers to cases involving concession agreements or licenses expressly limiting reforms in the agreement.1072 Moreover, Respondent contends that, even if measured under the standard of stability in the arbitral doctrine invoked by Claimants, no breach has occurred as: (i) the legislation was adopted in the exercise of legislative power, with full respect for established procedures and with the aim of preserving the balance and sustainability of the system; (ii) no legitimate expectations have been breached since investors should have known the regulatory framework and how it had been applied in case law;1073 (iii) there has been no complete transformation or significant change of the legal framework.1074

536. Non-Retroactivity. Respondent denies that the new regime is retroactive, both under international law, and under Spanish law.1075 It contends that the effects of the disputed measures “only unfold towards the future, as they have to respect the payments made prior to the[ir] entry into force.”1076

537. As to international law, relying on Nations Energy, Respondent contends that a norm would be retroactive only if it affects “acquired rights,” but not when the rules apply to future events without affecting existing rights.1077 And Claimants, Spain argues, have never had an “acquired right” to a fixed remuneration feed-in-tariff system.1078 Put another way, according to Respondent, international law allows a rule to apply to situations originated before the rule came into effect, but only with regard to future effects.1079 Respondent also submits that the Charanne tribunal has already ruled that the measures taken by Spain were not retroactive, holding that “unless there are specific commitments in place such as those stemming from a contract, there is no principle of


1072 Resp. C-Mem. Merits, ¶ 753. ↩

1073 Resp. C-Mem. Merits, ¶ 758. ↩

1074 Resp. C-Mem. Merits, ¶ 762. ↩

1075 Resp. C-Mem. Merits, ¶ 766; Resp. Rej. Merits, ¶¶ 87, 547-567. ↩

1076 Resp. C-Mem. Merits, ¶ 771. See also, Resp. Skeleton, ¶ 44. ↩

1077 Resp. C-Mem. Merits, ¶¶ 767-768 (citing RL-069, Nations Energy Inc. et al. v. Republic of Panama, ICSID Case No. ARB/06/19, 24 November 2010, ¶¶ 642, 644, 646). ↩

1078 Resp. Rej. Merits, ¶¶ 542, 558, 1134. ↩

1079 Resp. Rej. Merits, ¶¶ 556-557. ↩

[Page 188]

international law preventing a State from adopting regulatory measures with immediate effect on ongoing situations.”1080

538. As to domestic law, Spain argues that its Constitutional Court has already ruled that RDL 9/2013 was not retroactive, in judgements of 17 December 2015 and 18 February 2016;1081 and its Council of State (Consejo de Estado) has also ratified that the legality of the measures, which apply to the future without affecting acquired rights.1082

539. Respondent argues that Regulatory Framework III applies only to the future and does not impact subsidies previously paid; and there is no retroactivity in the notion that granted subsidies are offset with future profit.1083 According to Spain, what the regulator has done is to establish “a reasonable rate of return in the useful activity of the facility as a whole,” which “makes it possible to take into consideration the remunerations already received from the facility commissioning date, for the purpose of calculating the future subsidies to be received outside of the market, without incurring in retroactivity.”1084 Moreover, according to Respondent “if the subsidies already received in the past were not taken into account in the calculation of future subsidies, excess remuneration for the plants could occur, thus distorting the market rules comprising illegal State Aid, with an infraction of EU Law.”1085

540. And according to Respondent, Claimants were aware that the measures were not retroactive, as they were advised since 2007, 2008 and 2010 that reforms could be introduced affecting the remuneration for existing installations.1086


1080 Resp. C-Mem. Merits, ¶ 769 (citing RL-088, Charanne, ¶¶ 546, 548). ↩

1081 Resp. C-Mem. Merits, ¶ 772 (citing R-056, Judgement of the Constitutional Court, 17 December 2015, num. 5347/2013; R-075, Judgment of the Constitutional Court, 18 February 2016, num. 6031/2013; R-072, Judgement of the Constitutional Court, 18 February 2016, num. 5582/2013). ↩

1082 Resp. C-Mem. Merits, ¶ 774 (citing R-144, Opinion 937/2013, Permanent Commission of the State Council, 12 September 2013); Resp. Rej. Merits, ¶¶ 560-567. ↩

1083 Resp. Rej. Merits, ¶ 1139. ↩

1084 Resp. Rej. Merits, ¶ 1139 (emphasis omitted). ↩

1085 Resp. Rej. Merits, ¶ 565. ↩

1086 Resp. Rej. Merits, ¶ 87 (referring to C-202, 2008 Pöyry Report; R-396, Email from Joana Sánchez, 21 April 2010). ↩

[Page 189]

541. Finally, Respondent contends that Claimants have not been able to articulate which protection in Article 10(1) is breached by the alleged retroactivity.1087

(ii) No Failure to Provide a Transparent Framework

542. Respondent alleges that the Memorial failed to properly articulate the claim for alleged lack of transparency.1088 That said, Respondent contends that it has acted transparently, and has not breached the obligation to provide transparent conditions in Article 10(1) of the ECT. Spain argues that it: “(i) [...] justified and publicised the need for reforms, (ii) has followed the legally established procedures and ensured participation in the regulatory process of the holders of legitimate rights (iv) has not incurred contrary retroactivity into national law (v) has not withheld any information that would affect the development of reforms and (vi) has approved a regulatory system enabled with foreseeability and dynamism.”1089

543. First, according to Respondent, the need for reform of the electricity sector was announced years before, as reflected in RDL 6/2009, RDL 14/2010 and announcements of a new Electricity Law made "continuously since December 2011."1090 It was known to Claimants prior to their investment.1091 Respondent further highlights that on 7 March 2012, the CNE issued a report referring to the need for reform in the regime.1092

544. Second, for Respondent, the development of its laws was transparent, and all stakeholders had timely access to information and for the submission of comments.1093 For example, Respondent mentions that the enactment of RD 413/2014 and Ministerial Order IET/1045/2014 (i) complied with all the formalities required by Spanish law; (ii) followed several public hearings, and a report from the Council of State among other entities; (iii) counted with the participation of Protermosolar; (iv) hundreds of claims by producers and industry associations were heard, and Claimants themselves participated


1087 Resp. Rej. Merits, ¶ 1135. ↩
1088 Resp. C-Mem. Merits, ¶¶ 777-778. ↩
1089 Resp. C-Mem. Merits, ¶ 779. See also, id., ¶¶ 800-801; Resp. Rej. Merits, ¶ 1142. ↩
1090 Resp. C-Mem. Merits, ¶ 782. See also, Resp. Rej. Merits, ¶¶ 38, 1148-1149. ↩
1091 Resp. Rej. Merits, ¶¶ 1148, 1150. ↩
1092 Resp. Rej. Merits, ¶ 1150. ↩
1093 Resp. C-Mem. Merits, ¶ 783; Resp. Rej. Merits, ¶ 1151. ↩

[Page 190]

actively via Protermosolar.1094 In fact, Respondent argues, some parameters of Ministerial Order IET/1045/2014 were modified in response to allegations made by the Termosol Plants during the consultation process.1095 Respondent further explains that Claimants' complaint that there was no consultation process during the enactment of RDL 9/2013 overlooks that RDLs are measures of extraordinary and urgent need that do not allow for a consultation process, and in any event, it was a transitory measure superseded by Law 24/2013, RD 413/2014 and Ministerial Order IET/1045/2014.1096

545. Third, Respondent contends that there was “[a]bsolute transparency” regarding all relevant information.1097 Referring to Claimants' specific allegations of lack of transparency with regard to certain reports commissioned by the Government to determine the parameters of the new regulation by Boston Consulting and Roland Berger, Spain argues that neither report was crucial in the development of the regulations, nor did Claimants request them during the process of enactment of the norms.1098 Respondent explains that the Boston Consulting contract was terminated before a report had been delivered to Spain, and the Roland Berger report was received after the enactment of RD 413/2014 and the Ministerial Order IET/1045/2014. It was not a prerequisite for the regulation, but rather technical support to IDEA in the analysis of costs of the plants, and Claimants have had access to it.1099 For Respondent, failure to deliver documents that were not taken into account during the drafting process of the regulation cannot entail a breach of the ECT.1100

546. Fifth, Respondent takes issue with Claimants' allegation that they were in the dark with respect to certain concepts of the new framework. In particular, Respondent contends that (i) the new rate of return of 7,398 was indeed proposed by the renewable energy sector in 2009; (ii) the 10-year bond was considered a good index since the 2007 CNE


1094 Resp. C-Mem. Merits, ¶¶ 784-790. See also, Resp. Rej. Merits, ¶¶ 37, 84, 1153-1154. ↩
1095 Resp. Rej. Merits, ¶ 83. ↩
1096 Resp. Rej. Merits, ¶ 1152. ↩
1097 Resp. C-Mem. Merits, §III(F)(4)(3). ↩
1098 Resp. C-Mem. Merits, ¶ 794. ↩
1099 Resp. C-Mem. Merits, ¶¶ 792-793. See also, Resp. Rej. Merits, ¶ 1159. ↩
1100 Resp. Rej. Merits, ¶ 1158. ↩

[Page 191]

Report 3/2007, and indeed other regulated activities have also been remunerated using the same index;1101 (iii) the hour reduction was a function of eliminating production with gas; and (iv) the concept of a well-managed company is inherent in Government standards for State Aid.1102

547. Finally, Respondent contends that contrary to Claimants' allegations, the new system establishes predictable regulatory periods (not discretionary ones) aimed at ensuring a reasonable return during the regulatory life cycle.1103

(4) Article 10(1) of the ECT: Unreasonable, Disproportionate and Discriminatory Measures

a. Claimants' Position

(i) Spain's Measures Were Unreasonable, Disproportionate and Discriminatory

548. Claimants argue that Regulatory Frameworks II and III do not meet the independent standards of proportionality and non-discrimination, which “further contributes to a finding of liability under Article 10(1) of the ECT.”1104

549. Unreasonable. Relying on BG Group, Claimants submit that Regulatory Framework III is “unreasonable” because the unilateral withdrawal of undertakings given to investors as inducements to invest is, by definition, unreasonable.1105

550. Claimants further argue that although Spain seeks to defend the reasonability and proportionality of the measures relying on the tariff deficit, the fall in electricity demand and the notion of overcompensation in the renewable energy sector, it has not demonstrated the necessary connection between these alleged circumstances and the dismantling of Regulatory Framework I.1106 Claimants argue that: (i) the tariff deficit


1101 Resp. Rej. Merits, ¶ 1156. ↩
1102 Resp. Rej. Merits, ¶ 1157. ↩
1103 Resp. C-Mem. Merits, ¶¶ 797, 799. ↩
1104 Cl. Mem. Merits, ¶ 270; Cl. Reply Merits, ¶ 514. ↩
1105 Cl. Mem. Merits, ¶ 275, n. 350 (citing CL-032, BG Group PLC. v. Republic of Argentina, UNCITRAL, Final Award (24 December 2007), ¶¶ 343-346). ↩
1106 Cl. Skeleton, ¶ 46. ↩

[Page 192]

cannot justify Spain's actions because there were many other ways open to Spain to address it;1107 (ii) the drop in electricity demand cannot assist Spain because it was Respondent itself who decided how much electricity capacity it wanted, Spain was on notice of the drop in electricity demand before it affirmed the timetable for CSP roll out in RD 1614/2010, and Spain had other means to deal with over-capacity;1108 and (iii) the allegation that Claimants were overcompensated is unsubstantiated – the IRR expected by Claimants did not change materially before December 2012 when Law 15/2012 was introduced, and therefore is not credible to assert that a 36% cut in revenues is reasonable.1109

551. Disproportionate. In addition, Claimants argue that, even if Spain had not committed to stable revenues for the Termosol Plants and regardless of tariff deficit or capacity difficulties, Regulatory Framework III breached Article 10(1) of the ECT “because it inflicts a disproportionate level of harm to the Claimants' investments by virtually wiping out the value of the Claimants' equity as a means to extract Spain from a budgetary shortfall of Spain's own making."1110 In Claimants' view, there were less restrictive alternatives that Respondent could have deployed in pursue of its policies, while still meeting the ECT.1111

552. Claimants contend that Spain's measures “have reduced the value of the Claimants' equity in NEE España from €397.4 million to €15.5 million and imposed other losses on NEE España's loans to the PTEs and the Claimants' indirect equity interest in NEEOS (further losses of €4.4 million) as well as lost historical cash flows of €7.3 million producing a total loss of €393.6 million.”1112 These amounts were later updated by


1107 Cl. Reply Merits, ¶ 521. Claimants also argue that Spain is estopped from using the tariff deficit as an excuse. Cl. Reply Merits, ¶ 407. ↩
1108 Cl. Reply Merits, ¶¶ 519-520. ↩
1109 Cl. Reply Merits, ¶ 522. See also, id. ¶ 523. Claimants also maintain that Spain is estopped from arguing that Claimants were being overcompensated. Cl. Reply Merits, ¶ 412. ↩
1110 Cl. Mem. Merits, ¶ 271. See also, Cl. Skeleton, ¶ 46. ↩
1111 Cl. Skeleton, ¶ 46. ↩
1112 Cl. Mem. Merits, ¶ 274 (emphasis in original). Claimants note that, while the severity of the impact is sufficient to be considered a “substantial deprivation" of their investment within the expropriation test under customary international law, in their view the measure of damages should be the same as Claimants' case on FET, and therefore they are not presenting a claim for breach of Article 13 of the ECT. Cl. Mem. Merits, ¶ 279. ↩

[Page 193]

Claimants. Thus, in their last expert report, Claimants argued that the reduction in value of the Claimants' equity in NEE España was from EUR 450.6 to EU 41.7 million; and that their total loss was of EUR 521.4 million.1113 They also observe that there has been a 36% cut to the Termosol Plants revenues, which cannot be considered proportionate.1114 Claimants also add that “the return presently given to the Project by the Regulatory Framework III is insufficient to allow the recovery of the Claimants' investment” and they “are now facing a near total loss of their equity investment of €209.6 million.”1115 In addition, the PTEs and NEE España have also suffered severe financial consequences as a result of Regulatory Framework III, and while the PTEs difficulties have been alleviated to a certain extent after agreements with the project lenders in August 2016, Claimants are still facing a “near total loss of their equity."1116

553. For Claimants, severity of effect is a good indication of whether there is an FET violation, since the FET standard requires States to act proportionately in their dealings with foreign investors.1117 Tribunals have recognized the need for a reasonable relation of proportionality between the alleged regulatory aim, the means taken to achieve it and the burden on the investor.1118

554. Spain fails to meet this test, Claimants argue, because there is no rational connection between the measures and the public purpose that Spain invokes: (i) Spain, not Claimants, was responsible for accumulating the tariff deficit and the alleged over-capacity; and (ii) Spain has not demonstrated the rational connection between the measures and the alleged overcompensation to CSP investors.1119 In addition, the


1113 CER-Compass Lexecon Third, ¶ 4, Table I. ↩
1114 Cl. Reply Merits, ¶ 533. ↩
1115 Cl. Skeleton, ¶ 48. ↩
1116 Cl. Skeleton, ¶ 49. ↩
1117 Cl. Mem. Merits, ¶ 272. See also, Cl. Reply Merits, ¶ 524. ↩
1118 Cl. Reply Merits, ¶¶ 526, 528. ↩
1119 Cl. Reply Merits, ¶ 529. See also, Cl. Reply Merits, ¶¶ 407, 412 (arguing that Spain is estopped from arguing the tariff deficit or overcompensation as an excuse). ↩

[Page 194]

measures taken are not the least restrictive measure Spain could have deployed to achieve its stated goals, in Claimants' view.1120

555. Discriminatory. Claimants argue that the new regime is discriminatory because it penalizes high quality and productive plants built in reliance on Regulatory Framework I, in breach of Article 10(1) of the ECT.1121 Claimants make clear that this particular one is not a standalone claim of discrimination under Article 10(7) of the ECT, as it is not based on MFN treatment or national treatment.1122

556. Claimants argue that: (i) “[t]he capacity-based payment system, compounded by Spain's application of its ‘standard' NVA and the new cap on operating hours, discriminates against the Termosol Plants,” because they were designed to maximize electricity output on the basis of Regulatory Framework I, and under the new system only a small portion of the remuneration is based on electricity production;1123 (ii) “[t]he new 'regulatory useful life' [of 25 years] further discriminates against the Claimants,” as they built their plants with the intention that they would last 30 years or longer;1124 and (iii) “Regulatory Framework III also discriminates against the Termosol Plants by failing to differentiate among CSP plants that have very different investment costs and operating expenditures on the basis of the size of thermal storage.”1125

557. Claimants observe that Respondent's reliance on Article 10(8) of the ECT to argue that Claimants have not been guaranteed the maximum standard of non-discrimination is irrelevant, because this claim is being asserted under Article 10(1) of the ECT.1126 Claimants also argue that Spain's response that the measures are of general application has no merit in law, because it is well established that de facto discrimination entails a breach of the standard.1127 Finally, Claimants argue that Spain cannot defend arguing


1120 Cl. Reply Merits, ¶ 530 (referring to id., § V(2) and V(3)). ↩
1121 Cl. Mem. Merits, ¶ 270. See also, e.g., Cl. Mem. Merits, ¶ 209 (x-xi). ↩
1122 Cl. Reply Merits, ¶ 535. ↩
1123 Cl. Mem. Merits, ¶ 209 (x); Cl. Reply Merits, ¶ 536 (1st bullet). ↩
1124 Cl. Mem. Merits, ¶ 209 (xi); Cl. Reply Merits, ¶ 536 (2d bullet). ↩
1125 Cl. Reply Merits, ¶ 536 (3d bullet). ↩
1126 Cl. Reply Merits, ¶ 515. ↩
1127 Cl. Reply Merits, ¶ 537. ↩

[Page 195]

that the Termosol Plants are not penalized since they can produce above the limit and sell at market price, because such market price is so much lower that it will never permit the PTEs to recover their sunk costs.1128

(ii) The Tariff Deficit and Over-Capacity Excuses Fail in Fact and Law

558. Claimants contend that neither the tariff deficit, nor the overcapacity of the system can justify Spain's actions.1129

559. Tariff Deficit. Claimants oppose Respondent's reliance on the tariff deficit, arguing that such deficit: (i) does not rise to the level of necessity in customary international law, and has not been invoked as such;1130 (ii) "arose from Spain's failure to comply with its own law and a political decision to prioritise cheap electricity;”1131 (iii) "was known to Spain at all relevant times prior to the investment” and Spain assured NextEra officials it could manage it without threat to the stability of the RD 661/2007 regime, such that Spain is estopped from invoking it;1132 and (iv) could have been addressed through many alternative ways while still honouring Spain's ECT commitments.1133

560. Over-Capacity. Claimants contend that Respondent's excuses relating to the alleged over-capacity in the renewable sector are unavailing because: (i) it was Spain (not Claimants) who determined how much capacity to build; (ii) by nature renewable technologies require an excess in capacity and in fact, Spain approved more plants than were built; (iii) the issue is not unique to Spain; (iv) Spain still does not produce more renewable electricity than it consumes; and (v) Spain has other ways of dealing with any over-capacity.1134

561. Necessity. Responding to Spain's allegations that the reforms in Regulatory Framework III were reasonable, proportionate and non-discriminatory in light of the need to respond


1128 Cl. Reply Merits, ¶ 538. ↩
1129 Cl. Reply Merits, ¶ 212. ↩
1130 Cl. Reply Merits, ¶¶ 235(i), 236. ↩
1131 Cl. Reply Merits, ¶¶ 214, 235(ii), 237-239. ↩
1132 Cl. Reply Merits, ¶¶ 214, 235(iii), 240; 399-407. ↩
1133 Cl. Reply Merits, ¶¶ 214, 235 (iv), 241-247. ↩
1134 Cl. Reply Merits, ¶ 215. See also, id., ¶¶ 248-253. ↩

[Page 196]

to macro-economic conditions allegedly threatening the sustainability of the system, Claimants contend that: (i) Spain has not sought to bring its action under the security interests provision in Article 24 of the ECT, nor has Spain raised a necessity defence under customary international law, thereby acknowledging that the measures were not the only way to preserve an essential interest of the State from a grave or imminent peril;1135 (ii) even if Spain had raised a necessity defence, it could have never been successful as the elements in Article 25 of the ILC Articles on State Responsibility have not been demonstrated; and (iii) even if it had been demonstrated as of 2013, a state of necessity would only provide temporary absolution while it lasted, which would no longer be the case as Spain has experienced three years of growth.1136

b. Respondent's Position

562. Spain denies that the measures it has adopted were disproportional, excessive, irrational or discriminatory.1137 It highlights that Article 10(8) of the ECT does not guarantee Claimants the maximum standard of non-discrimination.1138

563. Reasonability. Respondent argues that the measures were reasonable in light of the circumstances at the time of their adoption. In particular, Respondent refers to (i) the drop in the demand for electricity; (ii) the existence of an excess remuneration in the renewable energy sector; and (iii) the tariff deficit; all of which, according to Respondent, contributed to making the system unsustainable.1139 According to Respondent, these reasons were foreseeable to a diligent investor, and indeed, Claimants were so informed in a due diligence report in 2008.1140

564. Respondent takes issue with Claimants' contention that the CSP sector did not contribute to the tariff deficit, arguing that the Claimants' theory is deceitful, and based on 2012 figures which are not significant in light of the staggered commissioning of CSP


1135 Cl. Reply Merits, ¶ 518. See also, Cl. Skeleton, ¶ 52. ↩
1136 Cl. Skeleton, ¶ 52. ↩
1137 Resp. C-Mem. Merits, ¶ 803; Resp. Rej. Merits, ¶ 1194. ↩
1138 Resp. C-Mem. Merits, ¶ 804. ↩
1139 Resp. C-Mem. Merits, ¶ 805. See also, Resp. Rej. Merits, ¶¶ 1174-1177. ↩
1140 Resp. Rej. Merits, ¶ 36. ↩

[Page 197]

plants.1141 Moreover, Respondent contends, while Claimants argue that there were other alternatives to resolve the tariff deficit, they have not established the viability of those other alternatives.1142

565. Respondent further opposes Claimants' contention that estoppel prevents raising the deficit as a defence, arguing that there was never a promise to Claimants that the deficit would not affect their remuneration conditions.1143

566. Spain further maintains that the disputed measures have been considered reasonable and attractive by domestic and foreign investors, as shown by the “massive influx of new investors,” as well as by international authorities such as the European Commission, the International Monetary Fund and the International Energy Agency.1144

567. According to Respondent, the measures were reasonable with the aim of ensuring investors a "reasonable return.”1145 The reasonableness is shown, Respondent says, by (i) reference to certain generally accepted criteria, including the opportunity cost, which was calculated among 6.38% and 6.86% (below the 7.398% granted by the new regime); (ii) comparison with the profitability of other activities of the same risk level; and (iii) comparison with the profitability levels given by banks.1146 Moreover, Respondent says, that 7.398% profitability was that requested by the sector from the Government in 2009.1147

568. Respondent opposes Claimants' reliance on the principle of estoppel with respect to the rate of return, arguing that there is no evidence that Spain promised or guaranteed a return of 11.6% for thirty years.1148


1141 Resp. Rej. Merits, ¶ 1173(1). ↩
1142 Resp. Rej. Merits, ¶ 1173(3). ↩
1143 Resp. Rej. Merits, ¶¶ 29, 998. ↩
1144 Resp. C-Mem. Merits, ¶¶ 808-813. ↩
1145 Resp. Rej. Merits, ¶¶ 1178-1186. ↩
1146 Resp. Rej. Merits, ¶¶ 1180-1182, 1186. ↩
1147 Resp. Rej. Merits, ¶ 1184. ↩
1148 Resp. Rej. Merits, ¶¶ 349, 999-1002. ↩

[Page 198]

569. Proportionality. Respondent also rejects Claimants' reliance on the test of proportionality endorsed by the tribunal in Occidental, arguing that the cases are distinguishable. In particular, Spain argues that the disputed measures in this case are a clear exercise of the State's regulatory power, not comparable to those at issue in Occidental.1149

570. Respondent contends that Claimants' allegations of lack of proportionality overlook that (i) proportionality is measured by the relation between the need for the measures and the sacrifice of the investor; (ii) the measures impacted all agents in proportion to their contribution to the deficit; (iii) the impact is measured with regard to typical plants, not specific ones; (iv) the IRR of 11% included in the Financial Report for RD 661/2007 was a maximum return.1150

571. Non-Discrimination. Respondent contends that Claimants have not shown how the new regime penalizes and discriminates against plants built under Regulatory Framework I. Ministerial Order IET/1045/2014 does consider the special characteristics of Claimants' plants, including their larger solar park and their greater storage capacity, and are afforded greater investment costs.1151

572. Referring to the test for discriminatory conduct endorsed by the tribunal in EDF, Respondent contends that none of those criteria are met in this case. In particular, Respondent argues that (i) the purpose of the measures was legitimate, aimed at redressing an imbalance in the system; (ii) the measures fully respected existing regulations and the case law of the Supreme Court, and they are general in scope; (iii) the reasons put forward for the adoption of the measures, namely, to guarantee sustainability of the system, were the reasons behind the measures; (iv) the measures were not taken in wilful disregard of due process, and indeed followed the legally established procedures


1149 Resp. C-Mem. Merits, ¶¶ 814-816 (referring to CL-039, Occidental Petroleum Corporation, Occidental Exploration and Production Company v. Republic of Ecuador, ICSID, Case no. ARB/06/11, Award (5 October 2012)). ↩
1150 Resp. Rej. Merits, ¶ 1168. ↩
1151 Resp. C-Mem. Merits, ¶¶ 817-818. ↩

[Page 199]

for the enactment of the regulations on the standard of remuneration in the electricity sector.1152

573. In addition, Respondent argues that the disputed measures also meet the standard for reasonable and non-discriminatory conduct set forth in AES.1153 Specifically, Respondent contends that (i) the measures respond to a rational policy and a public economic objective – restoring the balance in the system reducing excessive profits by investors and lessening the burden on Spanish consumers that was playing a key role in the tariff deficit;1154 (ii) the measures were reasonable in light of the objective of the public policy sought – they impacted all the actors in the system (consumers, producers, distributors),1155 and were proportionate as they allow producers to reach a reasonable return of 7.398% over its investment costs, while restoring the equilibrium vis-à-vis consumers and the sustainability of the system.1156 In short, for Respondent, the measures responded to rational policy implemented via a reasonable action.1157

574. Respondent further observes that Claimants' contention is one for discrimination against the Termosol Plants, rather than the investor or its investment, and as such it does not fall under the protection of the ECT.1158 But, in any event, Spain contends, the alleged discrimination does not exist because (i) there is no evidence of extraordinary characteristics of the Termosol Plants (with storage capacity and larger solar field being the only distinguishing factors that resulted in the creation of a specific category for them in Ministerial Order IET/1045/2014);1159 (ii) there is no evidence that the Termosol Plants will have an life beyond 25 years;1160 and (iii) financing costs have never been


1152 Resp. C-Mem. Merits, ¶ 824 (referring to RL-062, EDF (Services) Limited v. Romania, ICSID Case No. ARB/05/13, Award (8 October 2009)). ↩
1153 Resp. C-Mem. Merits, ¶¶ 826-839 (referring to RL-024, AES). ↩
1154 Resp. C-Mem. Merits, ¶¶ 828, 830. ↩
1155 Resp. C-Mem. Merits, ¶ 833. ↩
1156 Resp. C-Mem. Merits, ¶¶ 834, 836. ↩
1157 Resp. C-Mem. Merits, ¶ 838. ↩
1158 Resp. Rej. Merits, ¶ 1188. ↩
1159 Resp. Rej. Merits, ¶¶ 1190-1191. ↩
1160 Resp. Rej. Merits, ¶ 1192. ↩

[Page 200]

considered when establishing subsidies, and Claimants have not shown the origin and applicability of the intra-group operational costs it claims should be considered.1161

(5) Article 10(1) of the ECT: Breach of Obligations Assumed Towards Claimants' Investments

a. Claimants' Position

575. In their Memorial on the Merits, Claimants stated that "Spain's enactment of Law 15/2012, RDL 2/2013, RDL 9/2013, RD 413/2014, and the [Ministerial] Order [IET/1045/2014], coupled with the application of those measures to the Termosol Plants and the PTEs, gives rise to a breach of Article 10(1) of the ECT through actions which [...] breached obligations assumed by Spain towards the Claimants' investments."1162 At the Hearing, Claimants argued that this statement amounted to a claim under the umbrella clause of Article 10(1) of the ECT.1163

b. Respondent's Position

576. Respondent protested that no umbrella clause claim has been raised by Claimants in the course of the proceeding,1164 and emphasized that no such claim was developed in Claimants' written submissions.1165

(6) Article 10(1) of the ECT and Article 10(7) of the ECT: Breach Due to the TVPEE in Law 15/2012

577. The Parties' positions on this issue have already been summarized in the context of Respondent's jurisdictional objections, and the Tribunal refers to that more detailed summary.1166


1161 Resp. Rej. Merits, ¶ 1193. ↩
1162 Cl. Mem. Merits, ¶ 258. ↩
1163 Tr. Day 7 (ENG), 1539:14–20 (Ms. Nairn) (also referring to Cl. Mem. Merits, ¶ 229 and Cl. Rej. Jur., ¶ 35). ↩
1164 Tr. Day 7 (ENG), 1482:9–21 (Ms. Moraleda). ↩
1165 Tr. Day 7 (ENG), 1540:11–1541:9 (Mr. Santacruz). ↩
1166 Supra, §§ V(D)(1) and V(E)(1). ↩

[Page 201]

a. Claimants' Position

578. In short, Claimants' contention is that the TVPEE (i) can be assessed under Article 10(1) of the ECT because it is an ad valorem levy on gross revenues, not a tax on “income or capital" within the meaning of Article 21(3) of the ECT; but that (ii) even if it were a tax, since it is not a tax on income or capital, it can be assessed under Article 10(7) of the ECT which applies to "Taxation Measures" pursuant to Article 21(3). Article 10(7) prohibits discriminatory taxation, and the TVPEE discriminates renewable energy producers in favour of conventional energy producers. In addition, Article 10(7) of the ECT allows Claimants to import the FET provision from the Spain-Uruguay BIT.1167

b. Respondent's Position

579. In turn, Respondent's contention is that neither Article 10(1), nor Article 10(7) of the ECT apply to the TVPEE, because (i) pursuant to Article 21 of the ECT, Article 10(1) of the ECT does not give rise to obligations with respect to “Taxation Measures,” and the TVPEE is one; and (ii) pursuant to Article 21(3) of the ECT, Article 10(7) does not apply to taxes on income or capital, and the TVPEE is a tax on income. Respondent further denies that Article 10(7) of the ECT can serve to import the FET provisions from another treaty for purposes of applying that substantive provision to a tax measure.1168 In any event, Respondent also submits that the TVPEE does not discriminate against foreign investors in favour of domestic ones, and instead applies to all producers of renewable and conventional energy.1169

B. THE TRIBUNAL'S ANALYSIS

(1) The Standard in Article 10(1) of the ECT

580. The Tribunal notes the views of the Parties on the objectives of the ECT and the intended scope of Article 10. In the view of the Tribunal there is little value in establishing at this stage an overall view of the objectives of the ECT. Article 10 is a treaty provision and has to be interpreted in accordance with Articles 31 and 32 of the VCLT. That


1167 Supra, §§ V.D(1)b and V.E(1)b. ↩
1168 Supra, §§ V.D(1)a and V.E(1)a. ↩
1169 Resp. Rej. Merits, ¶¶ 728-729. ↩

[Page 202]

interpretative process requires the Tribunal to look at the words used in Article 10 in their context and in light of the object and purpose of the treaty as a whole. Thus, while the objectives of the ECT may enter into the interpretative process this does not require an overall perspective by the Tribunal of the objectives of the ECT.

581. Article 10(1) is a broad-ranging provision which includes obligations to “encourage and create stable, equitable, favourable and transparent conditions for Investors," to accord to investments “fair and equitable treatment,” to provide investments with “the most constant protection and security,” not to impair investments “by unreasonable or discriminatory measures," and to accord investments treatment that is “no [...] less favourable than that required by international law, including treaty obligations."1170 Several of these obligations have been raised in this case and the Tribunal will address each one as appropriate.

(2) Article 10(1) of the ECT: Repudiation of Legitimate and Reasonable Expectations

582. Claimants' primary claim is that Respondent failed to provide fair and equitable treatment by failing to protect Claimants' legitimate expectations. The Tribunal accepts that the protection of legitimate expectations is an essential element of the provision of fair and equitable treatment and this applies under Article 10 of the ECT.

583. Their legitimate expectations, Claimants argue, were founded on the terms of Regulatory Framework I, registration of the Termosol Plants in the Pre-Assignment Registry and in the RAIPRE, the Ministerial Resolutions of 28 December 2010, and specific statements or representations made to NextEra by Spanish officials.1171

584. The Tribunal is not convinced that in the circumstances of the present case the mere fact of Regulatory Framework I was a sufficient basis for the expectation that Claimants would be guaranteed the terms of Regulatory Framework I. The Framework was based on legislation and legislation can be changed. As Respondent has pointed out, Claimants should have been aware that changes could be made to the regulatory regime. Thus, on


1170 CL-001 / RL-055, ECT, Art. 10(1). ↩
1171 Cl. Mem. Merits, ¶¶ 259, 264. ↩

[Page 203]

its own, Regulatory Framework I could not reasonably have been the basis for an expectation by Claimants that they would be entitled to receive precisely the benefits that such Regulatory Framework prescribed.

585. Equally, the Tribunal does not consider that registration in the Pre-Assignment Registry or in the RAIPRE, while a necessary part of the process for obtaining the benefits of the regulatory regime, did of itself grant any right to the economic regime set out in RD 661/2007.1172 As the Charanne tribunal said, “registration with the RAIPRE was a mere administrative requirement in order to be able to sell energy, and by no means implied that registered facilities had a vested right to a certain remuneration.”1173

586. Nor is the Tribunal persuaded that the Ministerial Resolutions of December 2010 themselves provide a reasonable basis for a legitimate expectation that there was a guarantee of the terms of Regulatory Framework I. The resolutions reiterate the applicable terms of Regulatory Framework I. If Regulatory Framework I was not a guarantee of its terms, then the Ministerial Resolutions could not do what the legislation to which they applied had not done.

587. While none of these claims individually constitute a basis for Claimants' legitimate expectations claim, they do provide context for that claim. The primary basis for the claim, however, is that statements and assurances were made directly to NextEra by Spanish authorities and that these created expectations about the economic regime that would apply to Claimants in respect of their investment. In other words, the terms of Regulatory Framework I, and the circumstances surrounding the registration of NextEra's investment, provide a context in which the representations and assurances of the Spanish authorities could be the basis for a legitimate expectations claim.

588. The statements and assurances on which Claimants rely fall into five categories:


1172 Resp. C-Mem. Merits, ¶¶ 678, 680. ↩
1173 RL-088, Charanne, ¶ 510. ↩

[Page 234]

  1. Statements made in writing to NextEra by Spanish officials.1174
  2. Statements made in writing by NextEra representatives to Spanish officials that were not contradicted or disagreed with by Spanish officials (although not responded to or agreed to).1175
  3. NextEra's internal memoranda reporting on meetings with the Spanish officials.1176
  4. Witness statements indicating NextEra's understanding of the Spanish position.1177
  5. Statements made to industry,1178 and statements made to the PTEs.1179

589. The Tribunal notes that the statements relied on have various levels of probity. Indeed, Spain argued that the statements evidenced no commitments on behalf of the Spanish government and, in many instances they constituted a unilateral understanding of Claimants that had never been confirmed by the Spanish authorities. Letters written by Spain were often not initiated by it but were responses to letters from NextEra.

590. In the view of the Tribunal, statements made in writing by Spanish officials constitute the best evidence of Spanish assurances that could be the basis for legitimate expectations. The rest are unilateral statements by NextEra officials of their understanding of Spain's position. However, although Respondent attempted to cast doubt on the weight that could be attached to those statements, it never denied that the statements were made even when the statements were recorded only in NextEra's own documents or in the witness statements of Mr. Davidson and Mr. Arechabala. Respondent did not cross-examine


1174 C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009; C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010. ↩
1175 C-014, Letter from Mitch Davidson (NextEra Energy Resources, LLC) to Miguel Sebastián (Minister for Industry, Tourism and Trade), 9 December 2009. ↩
1176 C-057, Email from Mike Arechabala (NextEra Energy España, S.L.) to Antonio De Juan Fernandez (Pöyry Consulting), 12 May 2010. ↩
1177 CWS-Davidson First, ¶¶ 15, 36; CWS-Arechabala First, ¶¶ 47, 53. ↩
1178 C-065, Agreement with the Solar Thermal Industry, July 2010; C-066, Ministry for Industry, Tourism and Trade, Press Release, Industry Ministry Reaches an Agreement with the Wind and Solar Thermal Sectors for the Revision of their Payment Framework, 2 July 2010. ↩
1179 C-009, 2010 Resolution Termosol 1, 28 December 2010; C-010, 2010 Resolution Termosol 2, 28 December 2010. ↩

[Page 205]

those witnesses on what they said had been told to them by Spanish officials.1180 As a result, what NextEra claims to be assurances of Spanish officials was not contradicted by Respondent and thus can be relied upon by the Tribunal.

591. What, then, was being assured and what was the scope of the legitimate expectations that could have been reasonably held by Claimants? As mentioned above, Claimants could not have had the expectation that the RD 661/2007 regime was frozen and could not be changed. But the broader question is whether, in light of the assurances that they were given by Spain, Claimants had a legitimate expectation that the regime would not be changed in a way that would undermine the security that Claimants had in respect of the economic regime set out in RD 661/2007.

592. The assurances on which such an expectation can be based include the letter from Secretary Marin to Mr. Davidson, which said, “the absolute vocation of said legislation is to preserve the legal security of all investments currently underway, thereby guaranteeing the forecasts under which said investments are to be made;”1181 and the subsequent letter from Secretary Marin to Mr. Davidson, which said, “the new framework for the promotion of renewable energies is governed by the principles of judicial and regulatory stability and visibility, and that the actual pre-assignment in the registry guarantees the promoter the benefits of the economic regime under which it made its investment decision.”1182 The Tribunal does not see these as “commitments” by Spain, but “legitimate expectations” can exist in the absence of actual formal commitments.

593. The question is whether what was said could reasonably give rise to expectations about the future conduct of the government. In the present context, the use of terms such as “guaranteeing” and “preserv[ing] legal security,” in letters from a Spanish minister can reasonably be taken as statements that the Spanish government had no intention of making significant changes to the investment regime set out in RD 661/2007 and that this could be relied on by an investor. That NextEra took these statements, and other


1180 Tr. Day 7 (ENG), 1375:3-12 (Ms. Nairn). ↩
1181 C-006, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 3 September 2009. ↩
1182 C-008, Letter from Pedro Marín (Secretary of State for Energy) to Mitch Davidson (NextEra Energy Resources, LLC), 11 January 2010. ↩

[Page 206]

statements reportedly made by Spanish officials, as assurances of the “long-term tariff and premium stability” they were looking for is evidenced in the witness statements of Mr. Davidson and Mr. Arechabala.1183

594. The process by which RD 1614/2010 came into effect would also have engendered the expectation that Spain would not unilaterally make changes to the regime without consultation with the solar energy sector. This process had involved extensive consultations with industry with amendments being proposed by NextEra among others and accepted by the Spanish government.1184 This process also would have reinforced the expectation that Claimants could expect that there would be no radical changes made to the economic regime based on RD 661/2007 as modified in RD 1614/2010.

595. Respondent argues that “lack of due diligence prevents the expectations [...] from being considered to be real and objective” and that Claimants did not do proper due diligence.1185 However, the Tribunal is not convinced that a lack of due diligence has been established. Claimants had the Poyry consultant reports and Claimants refer to legal opinions they received on Spanish law. The fact that Claimants refused to waive their privilege in respect those legal opinions should not lead to any adverse inferences. Non-disclosure means that Respondent and the Tribunal have not had access to the content of those opinions, but the fact that Claimants received legal advice is not really contested. In short, the Tribunal does not consider that the assertion that there was a lack of due diligence on the part of Claimants has been established.

596. The Tribunal concludes that on the basis of the assurances given to them by the Spanish authorities, in the broader context of the specific terms of Regulatory Framework I, registration in the Pre-assignment Registry and the Ministerial Resolutions of 28 December 2010, Claimants had a legitimate expectation that the regulatory regime in RD 661/2007 would not be changed in a way that would undermine the security and viability of their investment.


1183 CWS-Davidson First, ¶¶ 16-20; CWS-Arechabala First, ¶ 36. ↩
1184 CWS-Arechabala First, ¶ 68. ↩
1185 Resp. Rej. Merits, ¶ 1061. ↩

[Page 207]

597. The changes made to the economic regime under Regulatory Framework III were substantial. They included that, the Termosol Plants were now to be paid on the basis of capacity, not on the basis of the amount of electricity produced; the regulated FiT and the pool + premium options were abolished; remuneration was no longer payable for the life of the plants but was limited to a 25-year “regulatory useful life”; indexation of tariffs to the CPI was abolished; electricity generated through natural gas as a support fuel now received no payment other than the prevailing market price whereas under RD 661/2007 (confirmed by RD 1614/2010), plants had been entitled to use natural gas as a support fuel for up to 12% or 15% of their annual production (depending on whether they sold at a feed-in option or they sold through the pool + premium option); and the market price remuneration was subject to a new 7% levy on gross revenues.

598. While individually these changes might not have constituted a denial of fair and equitable treatment, collectively the economic regime under Regulatory Framework III is substantially different from that under Regulatory Framework I. As the CNE put it, Regulatory Framework III “completely changes the remuneration mechanism applicable to date."1186

599. In short, the regime was fundamentally and radically changed. Claimants were deprived of the security and certainty that, in light of the assurances they had received from Spanish authorities about guaranteeing the legal security of investments underway as well as the forecasts under which the investments were made and affirming legal and regulatory stability, they could have expected. The changes went beyond anything that might have been reasonably expected by Claimants when they undertook their investment.

600. Respondent argues, however, that all that could have been expected by Claimants was a reasonable return on their investment. In other words, the change from Regulatory Framework I to Regulatory Framework III was a change on the form of delivery of benefits, but under both regimes the objective was to deliver a reasonable return and that is all Claimants could have expected. However, the assurances made by the Spanish


1186 Cl. Reply Merits, ¶ 282 (quoting C-238, CNE Report 18/2013, 4 September 2013). ↩

[Page 208]

authorities were not about a reasonable return; they were about the regulatory certainty and stability that NextEra could expect. The denial of legitimate expectations is based on the failure to provide that certainty and security by changing fundamentally the regime under which remuneration was to be calculated.

601. In light of this failure by Respondent to protect Claimants' legitimate expectations, the Tribunal concludes that there has been a denial of fair and equitable treatment and hence a violation of ECT Article 10.

(3) Other Claims

602. In view of the decision reached by the Tribunal in respect of the above breach of Article 10 of the ECT, in the exercise of judicial economy the Tribunal considers it unnecessary to consider the additional arguments of Claimants regarding the breach of Article 10(1) of the ECT, namely: the failure to provide a stable, consistent and transparent framework; unreasonable, disproportionate and discriminatory measures; and the breach of obligations assumed towards the Claimants' investments. It equally finds it unnecessary to consider Claimants' arguments regarding the breach of Articles 10(1) and 10(7) due to the TVPEE in Law 15/2012. The TVPEE has been dealt with already in the jurisdictional findings.

VIII. DAMAGES

A. THE PARTIES POSITIONS

(1) Claimants' Position

a. Standard of Compensation

603. Claimants assert that due to Spain's breach of Article 10 of the ECT, they are entitled to full reparation or restitutio in integrum, as the standard has been articulated by the Permanent Court of International Justice's Judgment in Chrozów Factory and embodied in Article 31 of the ILC Articles on State Responsibility, and affirmed by arbitral tribunals.1187 Full reparation can be achieved either through restitution or, if restitution is


1187 Cl. Mem. Merits, ¶¶ 281-284; Cl. Reply Merits, ¶ 543. ↩

[Page 209]

impossible or imposes a disproportionate burden on the State, the payment of compensation;1188 and compensation should cover all financially assessable damages caused by the wrongful act, including lost profits according to Article 36 of the ILC Articles on State Responsibility.1189 Furthermore, full reparation requires comparing the situation of the injured party in a scenario absent the wrongful act and the actual situation of that party as a result of the wrongful act.1190 Claimants submit that, as Article 10(1) of the ECT does not prescribe a treaty standard for reparation, customary international law applies to the quantification of damages.1191

b. Method of Valuation

604. Arguing that Spain has “not made reparation by reapplying Regulatory Framework I to the Claimants' investments and compensating the Claimants for any damages not covered through restitution,” Claimants plead their case as one for compensation.1192 The requested compensation has been calculated, Claimants argue, by “compar[ing] the current value of the Claimants' investment under Regulatory Framework III against the but-for value of those investments under Regulatory Framework I, together with historical losses prior to the valuation date (taken as the date of the Tribunal's award)."1193 Claimants initially chose a valuation date of 30 June 2014, this being the date of the last audited accounts of the PTEs.1194 The calculations were later updated as of 30 June 2016.1195 In the alternative, Claimants have also argued that, should the Tribunal decide to assess damages as of the date of injury, 30 June 2014 would be the appropriate date, as the last of the “cumulative measures” giving rise to Spain's liability (Ministerial Order IET/1045/2014) was enacted on 20 June 2014.1196


1188 Cl. Mem. Merits, ¶ 285; Cl. Reply Merits, ¶ 543. ↩
1189 Cl. Mem. Merits, ¶ 286. ↩
1190 Cl. Mem. Merits, ¶ 286; Cl. Reply Merits, ¶ 543. ↩
1191 Cl. Mem. Merits, ¶ 287. ↩
1192 Cl. Mem. Merits, ¶ 288. ↩
1193 Cl. Mem. Merits, ¶ 288. See also, Cl. Reply Merits, ¶¶ 540, 548. ↩
1194 Cl. Mem. Merits, ¶ 289. ↩
1195 Cl. Reply Merits, ¶ 540. ↩
1196 Cl. Mem. Merits, ¶ 289. ↩

[Page 210]

605. Claimants' view, however, is that the date of award is the more reliable touchstone because it takes into account the latest information on PTEs revenues, free cash flows to NEE España and the impact of debt restructuring.1197

606. Claimants contend that international tribunals have regularly adopted the fair market value (“FMV”) standard for breaches of FET and, in this case, the most appropriate way to determine the FMV is through the Discounted Cash Flow (“DCF”) method.1198 This requires, Claimants argue, “project[ing] the future cash flows that an asset would have generated for equity-holders in the absence of the alleged wrongful government conduct, and then discount[ing] them back to the valuation date at a rate that accounts for the risk associated with those cash flows."1199 Claimants' experts applied the free cash flows to equity approach which allows the Tribunal to assess the equity value of a company directly, and thus argue that the discount rate applicable is the cost of equity.1200

607. Claimants submit that the DCF method has been widely endorsed by arbitral tribunals in determining compensation both for expropriation and other international law breaches.1201 It is also “the most appropriate method in this case” because: (i) “[...] a forward looking valuation is more appropriate to investments which stem from the anticipated future cash flows;” (ii) “is based on fundamental principles of economics and finance;” (iii) “is one of the most generally accepted and used techniques [...];” and (iv) “is particularly suited to valuing companies whose projected revenues are defined by law or regulation, because their future cash flows are less volatile and more predictable than those of an unregulated business.”1202

608. Claimants further submit that DCF is appropriate here because: (i) the CSP technology used in the Termosol Plants has been successfully in operation for decades, the Termosol Plants are the most mature of the four categories of CSP plants, and their technology is


1197 Cl. Obs. Eiser, ¶ 4.14. See also, Cl. Reply Eiser, ¶ 6.12. ↩
1198 Cl. Mem. Merits, ¶¶ 290-291, 294; Cl. Reply Merits, ¶ 549. ↩
1199 Cl. Mem. Merits, ¶ 291. ↩
1200 Cl. Mem. Merits, ¶ 293. ↩
1201 Cl. Mem. Merits, ¶ 292. ↩
1202 Cl. Mem. Merits, ¶ 294; Cl. Reply Merits, ¶ 549. ↩

[Page 211]

commercially proven;1203 (ii) there is a track record of experience in operating and maintaining plants similar to the Termosol Plants, as the technology used in the Termosol Plants had already been used in 9 projects in Spain, and a number of projects with that technology have been in operation for 8 years and more are being built and developed;1204 (iii) there is no uncertainty in the revenue and cost projection calculations, as shown by the fact that the projections were assessed and regarded as credible in the financial model agreed between Claimants and their project lenders (the “Bank Model");1205 and there is little risk in the revenue projections given that RD 661/2007 provided "a predictable tariff adjusted by an inflation factor."1206 In addition, the projected costs are predictable, Claimants argue, as the historic costs are sunk and known, and many of the operational costs are the subject of long-term agreements, and the financing costs are known.1207

609. Claimants further contend that it is no answer to state that the Termosol Plants had been operational for only one year as of 30 June 2014, given that the task is to perform a valuation as of the date of the award, and as of 30 June 2016 there were already two further years of actual operation data, which is closely in line with the Bank Model and underscores the reliability of those projections.1208

c. Damages Valuation

610. Claimants explain that their expert's valuation (i) assumes a 30-year operational life for the Termosol Plants;1209 (ii) calculates but-for-revenues based on the pool + premium option under Regulatory Framework I, as this would have been the logical operating choice for the PTEs;1210 (iii) forecasts the electricity generation of the Termosol Plants and sale levels based on the Bank Model;1211 (iv) calculates the debt costs based on the


1203 Cl. Reply Merits, ¶¶ 552-553. ↩
1204 Cl. Reply Merits, ¶ 554. ↩
1205 Cl. Reply Merits, ¶ 555. ↩
1206 Cl. Reply Merits, ¶ 556. ↩
1207 Cl. Reply Merits, ¶ 556. ↩
1208 Cl. Reply Merits, ¶ 557. ↩
1209 Cl. Mem. Merits, ¶ 295. ↩
1210 Cl. Mem. Merits, ¶ 296. ↩
1211 Cl. Mem. Merits, ¶ 296. ↩

[Page 212]

actual loans made to the PTEs;1212 (v) determines operating expenses based on the Bank Model.1213

611. As to the discount rate, Claimants use the Capital Asset Pricing Model (“CAPM”), which in their view is a standard method in the industry.1214 Based on this method, Claimants' experts "assess a cost of equity for the Claimants' investments in Spain of 7.62% and a cost of debt of 5.79% pre-tax (which translates to a rate of 4.05% post-tax).”1215

612. On this basis, the Memorial on the Merits asserted total losses of EUR 393.6 million as Claimants' primary case, composed as follows:1216

613. In their updated calculation as of 30 June 2016, presented with Claimants' Reply on the Merits, Claimants' experts “assess damages [...] at €503.5 million as of 30 June 2016, comprised of €60.4 million in historical cash flow damages from the implementation of the Measures up to 30 June 2016 and a loss of €443.1 million in the fair market value of the Claimants' equity investments on that date.”1217

614. In a further updated calculation presented on 19 August 2016 after the Reply on the Merits to reflect the impact on damages resulting from the PTE's agreed restructuring of


1212 Cl. Mem. Merits, ¶ 297. ↩
1213 Cl. Mem. Merits, ¶ 297. ↩
1214 Cl. Mem. Merits, ¶ 298. ↩
1215 Cl. Mem. Merits, ¶ 298. ↩
1216 Cl. Mem. Merits, ¶ 299. ↩
1217 Cl. Reply Merits, ¶ 540 (emphasis added). ↩

[Page 213]

their debt with the project lenders,1218 Claimants submitted that, using the DCF methodology their damages would be EUR 521.4 million:1219

Table I. Summary of Updated Damages to Claimants – in € million as of June 30, 2016

Updated Damages to Claimants
A&S Second Report A&S Addendum
But-For
(a)
Actual
(b)
Damages
(a) - (b)
Actual
(c)
Damages
(a) - (c)
FMV of Claimants Investments in NEEE 487.2 44.0 443.1 26.1 461.0
NEEE Equity Value in PTEs 450.6 8.1 442.4 41.7 408.9
NEEE Intercompany Loans to PTEs 29.4 29.5 0.0 0.0 29.4
NEEE Equity Value in NEEOS 7.2 6.4 0.7 -31.8 39.0
Value of New Management Fee to NEEE 0.0 0.0 0.0 16.2 -16.2
Historical Cash Flows 47.1 -13.3 60.4 -13.3 60.4
Total Damages 534.3 30.7 503.5 12.8 521.4

Source: Updated DCF Valuation Model – Including Actual Debt Restructuring (CLEX-283).
Note: The table includes only the value of Claimants' investments affected by the Measures. "A&S" stands for Abdala & Spiller.

615. While reiterating that its primary case is based on a present day (“date of award") valuation, because the date of award is a more reliable date, Claimants also submit that if the Tribunal were to be minded to adopt the approach of other tribunals “by excluding historical losses during the period up to 30 June 2014, this would reduce the Claimants' €521.4 million damages figure by €7.3 million” with “[t]otal damages [...] then be[ing] €514.1 million, excluding interest from 30 June 2016."1220

616. Claimants have also presented an “alternative but-for-scenario” for the event that the Tribunal were to conclude that Claimants could only have a legitimate expectation of a “reasonable return” on their investment, rather than the FiT and pool + premium options in Regulatory Framework I.1221 Claimants have emphasized, however, that their main position is that their legitimate expectations were of the specific tariffs and premiums in RD 661/2007, and not just rooted on a “reasonable return.”1222 Claimants assert that the


1218 See Cl. Reply Merits, ¶ 605; CER-Compass Lexecon Third, ¶ 1. ↩
1219 CER-Compass Lexecon Third, Table I, p.5; Cl. Skeleton, ¶ 54. ↩
1220 Cl. Obs. Eiser, ¶ 4.17. ↩
1221 Cl. Mem. Merits, ¶ 301; Cl. Reply Merits, ¶ 573; Cl. Skeleton, ¶ 58. ↩
1222 Cl. Mem. Merits, ¶ 300. ↩

[Page 214]

alternative but-for scenario would apply “in the event that the Tribunal were to conclude that Spain was lawfully entitled to terminate Regulatory Framework I and to replace it with a tariff regime as set up by Regulatory Framework III.”1223 Claimants have further explained that in this scenario, their experts have assumed that Regulatory Framework III applies, but “they correct two components of that framework which are unfair and depart from standard regulatory conduct,"1224 namely, the allowable project costs and the allowed rate of return.1225

617. The alternative scenario is “based on an investment allowance equal to the Claimants' independently-audited capitalized costs of the project (€720.6 million)” to which they “apply a return based on the WACC of the Termosol Plants plus 300 (bps),” finally grossed up to take account of taxation.1226 Under this scenario, Claimants initially claimed in the Memorial total losses of EUR 357.6 million, as follows:1227

618. With the Reply on the Merits, Claimants “updated the alternative damages case as of 30 June 2016,” and argued that “damages payable to the Claimants are €398.4 million, comprised of €63.8 million in historical cash flow damages from the implementation of the Measures up to 30 June 2016 and a loss of €334.6 million in the fair market value of the Claimants' equity investments on that date.”1228


1223 Cl. Reply Merits, ¶ 541. ↩
1224 Cl. Reply Merits, ¶ 573. ↩
1225 See, Cl. Reply Merits, ¶ 575. ↩
1226 Cl. Mem. Merits, ¶ 301; Cl. Reply Merits, ¶¶ 541, 574; Cl. Skeleton, ¶ 60. ↩
1227 Cl. Mem. Merits, ¶ 302 (emphasis in original); CER-Compass Lexecon First, ¶ 109, Table V. ↩
1228 Cl. Reply Merits, ¶ 541; CER-Compass Lexecon Second, ¶ 20, Table IV. See also, Cl. Reply Merits, ¶ 574. ↩

[Page 215]

619. And in the further updated calculation presented on 19 August 2016 after the Reply on the Merits to reflect the impact on damages resulting from the PTE's agreed restructuring of their debt with the project lenders,1229 Claimants submitted that their damages under the alternative but-for scenario would be EUR 416.3 million.1230

Table II. Summary of Updated Damages to Claimants under the Alternative But-For Scenario - in € million as of June 30, 2016

Updated Damages to Claimants
A&S Second Report A&S Addendum
But-For
(a)
Actual
(b)
Damages
(a) - (b)
Actual
(c)
Damages
(a) - (c)
FMV of Claimants Investments in NEEE 378.6 44.0 334.6 26.1 352.5
NEEE Equity Value in PTEs 342.8 8.1 334.7 41.7 301.1
NEEE Intercompany Loans to PTEs 29.4 29.5 0.0 0.0 29.4
NEEE Equity Value in NEEOS 6.4 6.4 0.0 -31.8 38.2
Value of New Management Fee to NEEE 0.0 0.0 0.0 16.2 -16.2
Historical Cash Flows 50.5 -13.3 63.8 -13.3 63.8
Total Damages 429.1 30.7 398.4 12.8 416.3

Source: Updated DCF Valuation Model – Including Actual Debt Restructuring (CLEX-283).
Note: The table includes only the values of Claimants' investments affected by the Measures. "A&S" stands for Abdala & Spiller.

620. Claimants submit that other than an inappropriate dismissal of Claimants' method of valuation, Respondent has not challenged a number of valuation parameters. Thus, Claimants argue that (i) Spain “does not dispute that the net effect of the regulatory changes at issue in this case is a 36% reduction in the annual revenues that the PTEs expected;" (ii) there is no substantial dispute over the fact that “the Claimants injected €210 million in equity into NEE España and this is worth significantly less now," with Claimants' experts valuing that equity stake as of 30 June 2016 at EUR 44 million, and Spain's experts implicitly conceding that, as of 30 June 2016, the value of Claimants' equity stake under the new framework has at least fallen between EUR 64.2 and 80.1 million.1231


1229 See Cl. Reply Merits, ¶ 605; CER-Compass Lexecon Third, ¶ 1. ↩
1230 CER-Compass Lexecon Third, Table II, p. 6; Cl. Skeleton, ¶ 58. ↩
1231 Cl. Reply Merits, ¶ 544. ↩

[Page 216]

621. Claimants further submit that Spain's objections to the specifics of Claimants' DCF calculations are unavailing.1232 In particular, Claimants submit that:

622. Similarly, Claimants dismiss Spain's objections to the calculation of the alternative but-for scenario, arguing that:


1232 Cl. Reply Merits, § VIII(3). ↩
1233 Cl. Reply Merits, ¶¶ 560-561. ↩
1234 Cl. Reply Merits, ¶ 561. ↩
1235 Cl. Reply Merits, ¶ 564. ↩
1236 Cl. Reply Merits, ¶ 565. ↩
1237 Cl. Reply Merits, ¶ 566. ↩
1238 Cl. Reply Merits, ¶ 568. ↩
1239 Cl. Reply Merits, ¶¶ 568-569. ↩
1240 Cl. Reply Merits, ¶ 569. ↩
1241 Cl. Reply Merits, ¶ 571. ↩
1242 Cl. Reply Merits, § VIII(4)(A), ¶¶ 577-582. ↩

[Page 217]

actual historical costs;1243 (ii) this is apposite when the “rate of return” regime is applied retroactively after an investor has already incurred costs;1244 (iii) Spain's selection of EUR 644 million as investment costs is flawed because it disallows several elements, in particular, EUR 72.3 million in financing costs incurred during construction.1245

623. Claimants also argue that Spain's application of the DCF method in its subsidiary calculations for assessing damages is flawed. For Claimants, Spain's calculations applied a wrong discount rate, made incorrect adjustments to the projection parameters and applied a liquidity discount without basis.1251


1243 Cl. Reply Merits, ¶ 578. ↩
1244 Cl. Reply Merits, ¶ 579. ↩
1245 Cl. Reply Merits, ¶¶ 580-581. ↩
1246 Cl. Reply Merits, § VIII(4)(B), ¶¶ 583-596. ↩
1247 Cl. Reply Merits, ¶¶ 584-586. ↩
1248 Cl. Reply Merits, ¶¶ 588-592. ↩
1249 Cl. Reply Merits, ¶ 592. ↩
1250 Cl. Reply Merits, ¶ 595. ↩
1251 Cl. Reply Merits, ¶ 599. ↩

[Page 218]

d. Impact of the TVPEE

624. Claimants contend that “neither side's quantum experts attributed any specific loss in future revenues to the TVPEE.”1252 According to Claimants, “the effect of declining jurisdiction over the TVPEE” is that “it would reduce their historical damages by €1.1 million (which is the loss resulting from the application of the levy from the dates that the Termosol Plants started operation (19 May 2013 and 7 June 2013) until 9 July 2013, when Regulatory Framework III took effect).”1253 Claimants argue that this quantification has not been challenged.1254 Therefore, Claimants submit that, since they have quantified damages applying the DCF methodology at EUR 521.4 million as of 30 June 2016, which includes lost historical cash flows as of that date (EUR 60.4 million), if the Tribunal rules that it has no jurisdiction over the TVPEE “the historical loss component for the period up to 20 June 2014 during the temporary application of Regulatory Framework II would be reduced by €1.1 million, resulting in total damages of €520.3 million as of 30 June 2016."1255

625. Claimants add, however, that if the Tribunal were to conclude "that the Claimants could only expect a ‘reasonable return,' there would be no need to make any adjustments for the TVPEE,” because this “alternative applies Regulatory Framework III but uses the independently-audited capitalised investment costs of the Termosol Plants and the return of WACC + 300 bps identified as reasonable by Spain under Regulatory Framework I."1256 Thus, “in that alternative but-for, the TVPEE is reimbursed on all electricity revenues in accordance with the principle enshrined in Ministerial Order IET/1045/2014."1257


1252 Cl. Obs. Eiser, ¶ 4.8. ↩
1253 Cl. Obs. Eiser, ¶ 4.8. ↩
1254 Cl. Obs. Eiser, ¶ 4.8. ↩
1255 Cl. Obs. Eiser, ¶ 4.15. ↩
1256 Cl. Obs. Eiser, ¶ 4.10. ↩
1257 Cl. Obs. Eiser, ¶ 4.10. ↩

[Page 219]

e. Interest

626. Claimants assert interest is an integral component of full compensation under customary international law.1258 According to Claimants, if the Tribunal applies the principle of full reparation as of the date of the award, including historical losses, pre-award interest would not be necessary. However, if the Tribunal decides to apply a valuation date prior to the date of the award, pre-award interest would be owed from that date onwards until the date of the award.1259 In addition, Claimants submit, they are entitled to post-award interest from the date of the award until the date of payment, “at a commercial rate established on a market basis.”1260 According to Claimants, while this is mentioned in the ECT in the context of expropriation, “there is no logical reason for applying a different approach to interest in respect of a breach of Art. 10(1) of the ECT.”1261

627. Claimants submit that it would be appropriate to award a “rate reflecting the cost of equity applicable to the underlying investment,” on the ground that this compensates the cost of raising the equity funds of which they have been deprived.1262 In particular, Claimants initially requested an interest rate of 7.62% in the Memorial on the Merits,1263 and later in the Reply on the Merits requested a rate of 6.84% as of 30 June 2016.1264 In the alternative, Claimants request interest at “commercial interest rate prevailing in Spain for credit risk similar to the Termosol projects,” such as the interest rate of EURIBOR + 3.5% prescribed in the credit agreement negotiated between the PTEs and their project lenders.1265 Claimants further submit that interest should be compounded.1266


1258 Cl. Mem. Merits, ¶ 303. ↩
1259 Cl. Mem. Merits, ¶ 304. ↩
1260 Cl. Mem. Merits, ¶ 305. ↩
1261 Cl. Mem. Merits, n. 386. ↩
1262 Cl. Mem. Merits, ¶ 306. ↩
1263 Cl. Mem. Merits, ¶ 310. ↩
1264 Cl. Reply Merits, ¶ 602. ↩
1265 Cl. Mem. Merits, ¶ 311; Cl. Reply Merits, ¶ 602. ↩
1266 Cl. Mem. Merits, ¶¶ 312-313; Cl. Reply Merits, ¶ 543. ↩

[Page 220]

628. Claimants dismiss Spain's approach to the subject of interest rates, arguing that it does not provide "any convincing substantiation," and argues that using a rate equivalent to the cost of equity ensures full reparation.1267

(2) Respondent's Position

629. Spain's primary contention is that, as there has been no violation, no damages are due.1268 That said, Spain also opposes Claimants' damages case, arguing that: (i) it is speculative; (ii) the DCF method is inappropriate in this case; (iii) the arguments on the alternative case are inaccurate; and (iii) the requested interest rates are not correct.1269

a. Method of Valuation

630. Respondent argues that the DCF method is inappropriate in the circumstances of this case,1270 because: (i) there is insufficient financial record (less that one year); (ii) this is a capital intensive business with a significant asset base, with no relevant intangibles to be valued; (iii) the solar thermal industry lacks maturity; (iv) cash flows are highly dependent on volatile and unpredictable elements such as the pool price; (v) weakness of the non-recourse project finance agreed; (vi) the long term for the forecast: 30 years; (vii) there is a contradiction between such timespan, and the average life cycle of the Termosol Plants in their official accounting (20-25 years); (viii) there is disproportion between the track record of one year and the forecasts to 30 years; (ix) there is disproportion between the alleged investment and the amount claimed.1271

631. According to Spain, the appropriate method would be one based on cost of the asset.1272

b. Damages Valuation

632. For Respondent, the damages assessed by Claimants are speculative.1273 Spain argues that a calculation based in the difference between historic and future cash flows, on an


1267 Cl. Reply Merits, ¶ 603. ↩
1268 Resp. C-Mem. Merits, ¶ 842. ↩
1269 Resp. C-Mem. Merits, ¶ 844. ↩
1270 Resp. C-Mem. Merits, ¶¶ 859, 878. ↩
1271 Resp. C-Mem. Merits, ¶ 859. ↩
1272 Resp. C-Mem. Merits, ¶¶ 861-864. ↩

[Page 221]

arbitrary valuation date of 30 June 2014, ignores the basic concepts of the regulatory life cycles, and overlooks the “joint consideration of past and potential cash flows to guarantee a reasonable return of the investments made.”1274 Furthermore, the comparison between the real and counterfactual scenarios is simplistic, hypothetical and unrealistic, as it “presume[s] that the ‘real' scenario will be maintained over forthcoming decades and overlook[s] the fact that the governing principle of the system is formed by the guaranteed reasonable return.”1275 The calculation is speculative, Respondent argues, due to its long time horizon and the fact that there is no guarantee that the remuneration will remain petrified in the current form.1276

633. Respondent further submits that the but-for valuation is exaggerated if compared to the book value;1277 and the implicit IRR in Claimants' valuation is an unjustifiable 36.6%, when compared to the 16.6% foreseen at the time of investment, and the 7.62% discount rate calculated by Claimants' expert.1278

634. Respondent further criticizes Claimants' valuation, arguing that “[t]here is a large disparity (+84.7%) between the Plant's value in Lexecon's But For (€1.1625 billion) and the value of investment (€629.3 million)” which given the “barely 3 years of operations cannot be justified by economic motives that are intrinsic to the business.”1279 Moreover, for Respondent, the shareholder's exit IRR of 30.4%, and the project's exit IRR of 16.5% “are extraordinarily high and therefore unimaginable in a regulated market that provides protection to the players."1280 In addition, Respondent argues that Claimants' calculations include a series of payments as “investment or operating costs when they are


1273 Resp. C-Mem. Merits, ¶ 845; Resp. Rej. Merits, ¶ 1199. ↩
1274 Resp. C-Mem. Merits, ¶ 847; Resp. Rej. Merits, ¶ 1210. ↩
1275 Resp. C-Mem. Merits, ¶ 849; Resp. Rej. Merits, ¶ 1201. ↩
1276 Resp. Rej. Merits, ¶ 1202. ↩
1277 Resp. C-Mem. Merits, ¶ 871. ↩
1278 Resp. C-Mem. Merits, ¶¶ 873-876. ↩
1279 Resp. Rej. Merits, ¶ 1217 (quoting RER-Accuracy Second Economic, § 1.4). ↩
1280 Resp. Rej. Merits, ¶ 1217 (quoting RER-Accuracy Second Economic, § 1.4). ↩

[Page 222]

actually, [...] either dividends disguised as management fees paid to the NextEra group or ‘promote or success fees' outside the market paid to linked entities.”1281

635. Respondent also contends that Claimants' alternative but-for scenario errs in various ways: (i) it replaces the appropriate investment basis (standard investment costs of standard facilities) with the costs declared by Claimants; (ii) it fixes a rate of return ad eternum, overlooking the dynamic nature of the notion of “reasonable return;" (iii) it calculates reasonable return unjustifiably adding 300 bps to the WACC; and (iv) it errs in calculating the post-tax WACC, as it applies the nominal tax rate to its pre-tax WACC.1282 According to Respondent, the applicable effective rate of return of 7.398% (pre-tax) guaranteed by the current regime, leads to a reasonable return of 6.5% to 6.9% post-tax.1283

636. Lastly, while objecting to the use of the DCF, Spain presents its own DCF calculation as a “subsidiary contention.” In the initial calculations presented with the Counter-Memorial on the Merits, Respondent argued that the results ranged from an increase of EUR 19.3 million in Claimants' investment (a positive impact on Claimants) to a negative impact on Claimants' investment of EUR 34.5 million.1284 In the updated calculation filed with the Rejoinder on the Merits, Respondent reiterated that the current regime is more beneficial in purely financial terms, arguing that the impact of the dispute measures is a positive impact of EUR 32.5 million.1285

637. Respondent further submits that Claimants have erroneously applied the premium of Article 36 of RD 661/2007, which only “applies to facilities of no more than 50 MW,” while the Termosol Plants "have more than 50 MW" and are thus under the "lower premium of Article 45 [...]."1286 But according to Spain, even applying the regime in


1281 Resp. Rej. Merits, ¶ 1218. ↩
1282 Resp. C-Mem. Merits, ¶ 888. See also, id., ¶¶ 883-886; Resp. Rej. Merits, ¶¶ 1223-1225. ↩
1283 Resp. C-Mem. Merits, ¶ 887. ↩
1284 Resp. C-Mem. Merits, ¶ 892. ↩
1285 Resp. Rej. Merits, ¶ 1231. ↩
1286 Resp. Rej. Merits, ¶ 1232. At the Hearing and in Post-Hearing submissions, Respondent further argued that, "[b]y having an installed capacity over 50 MWs, the Termosol Plants are receiving the payments of Article 36 of RD 661/2007 for the MWs that should be destined to their self-consumption.” Resp. PH Mem., ¶ 16. This is because, if the installed capacity of the Termosol Plants were actually 50 MW, their output would be 44.9MW after deducting ↩

[Page 223]

Article 36 of RD 661/2007, the results would remain significantly below Claimants' calculations. Respondent's expert calculated the impact in this scenario as a negative impact of EUR 23.1 million.1287

638. Respondent also takes issue with other parameters in Claimants' valuation, arguing that: (i) the appropriate life cycle of the plants is 25 years and not 30 years;1288 and (ii) the but-for-scenario would involve a higher risk than the actual scenario.1289 It goes on to submit that, “in purely financial terms, the current scheme might be more beneficial to the Claimants than RD 661/2007, depending on the parameters and hypothesis considered."1290

639. Finally, referring to the issue of the impact of the date of valuation, Respondent submits that the question has a great effect on quantum, and argues that it cannot accept a date of award valuation.1291 Respondent further opposes Claimants' allegation that if the Tribunal were to adopt the approach of other tribunals “by excluding historical losses during the period up to 30 June 2014” the effect would be a reduction in Claimants' claim of EUR 7.3 million.1292 Respondent contends that the expert reports simply do not address the separate impact of the individual disputed measures.1293

c. Impact of the TVPEE

640. With regard to the effect of the TVPEE on damages calculations, Respondent submits that to eliminate the TVPEE's impact is not enough to eliminate the “historical damages.”1294 Moreover, for Respondent, “even though in the Actual world the TVPEE tax is neutralized (as recognized by both parties), [...] for damages calculation, it must


MWs for self-consumption. Resp. PH Mem., ¶ 5. But Respondent has also explained that the effect of this on quantum is not to subtract the payment from those excess MWs, but rather, to apply to the Termosol Plants the economic regime in Article 45 of RD 661/2007 in the but-for-scenario. Resp. PH Mem., ¶¶ 16-17.
1287 Resp. Rej. Merits, ¶ 1234. ↩
1288 Resp. C-Mem. Merits, ¶ 893; Resp. Rej. Merits, ¶ 1236. ↩
1289 Resp. C-Mem. Merits, ¶ 894; Resp. Rej. Merits, ¶ 1237. ↩
1290 Resp. C-Mem. Merits, ¶ 890. ↩
1291 Resp. Reply Eiser, ¶ 63. ↩
1292 Resp. Obs. Eiser, ¶¶ 67-70. ↩
1293 Resp. Obs. Eiser, ¶ 71. ↩
1294 Resp. Obs. Eiser, ¶ 45. ↩

[Page 224]

be deducted from the But-for value, since that measure implies, by definition, an expense of 7% of plants' revenues” while “the Actual value remains the same, since it is not affected by any Tribunals' declaration regarding jurisdiction or liability."1295 In Spain's view, however, neither Party's experts reports reflect the separate impact of the individual measures, and new expert reports would be required if that impact needs to be assessed.1296

d. Interest

641. For Spain, the interest rates proposed by Claimants lack grounds and are intended to compensate risks never effectible borne.1297 According to Spain, at most, the applicable rate should be “equivalent to the Spanish sovereign bond,"1298 which according to Respondent's experts would be a rate of 0.9%.1299 For pre-award interest, Spain further submits that, instead of a 10-year bond, Respondent's experts have applied an interest equivalent to the bond for the period between the appraisal date and the estimated date of award. For Spain, the same criteria must apply to post-award interest.1300

B. TRIBUNAL ANALYSIS

642. While Respondent takes issue with the entitlement of the Claimants to any damages in this case and disputes the approach of the Claimants to the measurement of damages, it does not dispute the proposition of the Claimants that the principles set out in the Chrozów Factory Case and in Article 31 of the ILC Articles on State Responsibility, are applicable to the measurement of damages. Thus the arguments before the Tribunal related to the correct way to assess any loss determined by the Tribunal to have occurred.

(1) The DCF Method for Determining Damages

643. The Tribunal recognizes that the DCF method is frequently invoked in investor-State arbitrations and has been applied by tribunals. However, a critical element in the


1295 Resp. Obs. Eiser, ¶ 48. ↩
1296 Resp. Obs. Eiser, ¶ 48. ↩
1297 Resp. C-Mem. Merits, ¶ 898. ↩
1298 Resp. C-Mem. Merits, ¶ 899. ↩
1299 Resp. C-Mem. Merits, ¶ 900. ↩
1300 Resp. Rej. Merits, ¶¶ 1238-1239. ↩

[Page 225]

application of the DCF method is finding an appropriate base for the forecast of future earnings. The difficulty in this case is that the Termosol Plants had been in operation for less than one year when the breach occurred. As Respondent points out, Claimants were relying on less than a year of profits in order to project long-term earnings for the next 30 years.

644. Claimants argue that this is not a problem in this case, because Regulatory Framework I provides the basis for calculating future profits. The report of Dr. Abdala and Professor Spiller calculate the “but for” revenues on the basis of the “pool + premium" option set out in Regulatory Framework I.1301

645. However, the Tribunal is not convinced that Regulatory Framework I provides an appropriate basis for what might have happened in the absence of Regulatory Framework III. The assumption that in the absence of Regulatory Framework III Claimants would be entitled to Regulatory Framework I is based on the view that there was an entitlement to the terms of Regulatory Framework I. But, as pointed out earlier (supra, ¶¶ 591, 596) Claimants could not have had a legitimate expectation of an entitlement to Regulatory Framework I; they just had a legitimate expectation that there would not be a substantial or fundamental change to Regulatory Framework I.

646. Other changes to Regulatory Framework I might have occurred. For example, if Respondent had changed the options and abolished the pool + premium approach and provided only the FiT option leaving everything else intact, that might have been a legitimate exercise of regulatory authority involving no denial of FET. If that was possible then why should the pool + premium option be the appropriate basis for the “but for" analysis in determining loss?1302

647. In the absence of Regulatory Framework I as the touchstone, there is no obvious starting point for the “but for” analysis under a DCF approach. What is left is less than one year


1301 Cl. Mem. Merits, ¶¶ 295-296. ↩
1302 There is a similar problem with relying on the 2011 Bank Model (the financial model agreed with Claimants' lenders, which was equally based on Regulatory Framework I). ↩

[Page 226]

of actual profits as the basis for the DCF calculation. In the Tribunal's view, this is not a sufficient basis for the application of the DCF method in this case.

(2) An Alternative Basis for a Damages Assessment

648. Having rejected the DCF method of valuation in the circumstances of this case, the Tribunal must now find another valuation method. As an alternative approach to the calculation of loss, Claimants expert, Compass Lexecon has provided an “alternative but-for scenario" on the basis of a “reasonable rate of return."1303 This approach was not dissimilar from the asset-value approach, proposed by Respondent, based on the value of the assets and a reasonable return.1304

649. The Tribunal notes that the Parties are not completely in accord on this alternative method of valuation and they disagree on how it should be applied, each producing results that are substantially different from each other.

650. Nonetheless, the Tribunal is of the view that in this case this “alternative" valuation discussed by the Parties in their pleadings, based on a calculation of the value of the assets and a reasonable return on that value is an appropriate method for valuation of loss in this case.

(3) The Quantification of Loss

651. The disagreement of the Parties on quantification relates to the valuation of the assets, whether there should be an additional 300 bps added to the WAAC, and how the impact of taxation should be calculated.

a. Value of Assets

652. In their initial pleadings both Parties valued assets as of 30 June 2014.1305 However, in its second report, Compass Lexecon updated its valuation to 30 June 2016.1306 Although Respondent continued to criticize the figures in Claimants' alternative but-for approach,


1303 Cl. Mem. Merits, ¶¶ 301-302. ↩
1304 Resp. Rej. Merits, ¶ 1197 (claiming is less speculative and easier to apply); Resp. C-Mem. Merits, ¶ 862. ↩
1305 CER-Compass Lexecon, First, ¶ 109, Table V; RER-Accuracy Second Economic, ¶ 329. ↩
1306 CER-Compass Lexecon Second, ¶ 20, Table IV; and CER-Compass Lexecon Third, ¶ 5, Table II. ↩

[Page 227]

it did not raise any objection to the 30 June 2016 valuation date. Accordingly, the Tribunal will use that date for its analysis.

653. Claimants derive the value of the assets from their actual value relying on Claimants' “independently-audited capitalized costs of the project."1307 Respondent disagrees with basing the asset value on costs actually incurred, arguing, “a model of a reasonable return must in all cases take into account the standard costs of cost effective standard facilities." They object to the inclusion of capitalized intercompany costs and investments in related companies, arguing that there was insufficient information to justify either.1308

654. In the Tribunal's view, Respondent's argument that the standardized costs of efficient cost-effective facilities should be the basis for any calculation might be relevant for devising a regulatory regime based on a reasonable return. The regulatory regime would then set out what return is being offered and investors could decide whether or not to invest on the basis of the return they could receive for their investment. But that is not the situation here.

655. The task for the Tribunal is to determine what loss Claimants suffered as a result of Respondent's breach of its obligation to provide fair and equitable treatment. Claimants did not suffer a notional loss based on the “standard costs of cost effective standard facilities." They had actual sunk costs and those costs have to be the basis for assessing their loss.

656. The principal difference between the Parties in the valuation of assets is whether financing costs should be included.1309 Respondent's expert, Accuracy, argues that financing costs are not really part of the investment. They are the personal decision of the investor on its financing scheme and have no implications for the generation of power.1310 Claimants see the financing of an investment as an integral part of the


1307 Cl. Mem. Merits, ¶ 301. ↩
1308 RER-Accuracy First Economic, ¶ 417. ↩
1309 Cl. Reply Merits, ¶ 581. ↩
1310 RER-Accuracy First Economic, ¶ 417. ↩

[Page 228]

investment. Long-term investments like the Termosol Plants could not occur without financing arrangements.1311 Moreover, Claimants argue that Spain was well aware that projects would be funded from third party funding. Its own energy plan for 2005-2010 had a line for financing from external sources.1312

657. The Tribunal considers that Respondent once again is conflating what might be devised in a regime established to provide a reasonable return with the losses suffered by an investor in the event of breach of its obligations under the ECT. An investment regime might be based on the exclusion of financing costs in calculating a reasonable return under that regime. Indeed Respondent's expert Accuracy, in criticizing the use by Claimants' expert Lexecon of financing costs in its alternative but-for model, says “the profitability model of a regulated activity must, in any case, be based on efficient, standardized cost and be independent of financing costs.”1313 That is a reference to devising a model for a reasonable return, not in assessing loss resulting from Respondent's breach of its obligations towards the investor.

658. The question before the Tribunal is not how a regulated activity should determine what constitutes a reasonable return, but what loss the Claimants suffered. On undertaking an investment an investor would reasonably expect that the returns from the investment would cover all the costs of making that investment. The examples given by Claimants where regulatory regimes do include financing costs in determining a reasonable rate of return reinforce the reasonableness of this expectation.1314 No rational investor would sink money into a project that did not offer a return that would cover its costs. And, the financing of projects of this size and duration inevitably involves a regime with third party financing.

659. In its first report Respondent's expert, Accuracy, also objected to the inclusion in the Claimants' valuation of assets capitalized intercompany costs and investment in related


1311 Cl. Reply Merits, ¶ 581. ↩
1312 Tr. Day 1 (ENG), 132:19–133:16 (Mr. Zimmerman). ↩
1313 RER-Accuracy First Economic, ¶ 418. ↩
1314 Cl. Reply Merits, ¶¶ 578, 581. ↩

[Page 229]

companies.1315 In its second report, Accuracy changed its position and included investment in related companies1316 following Claimants’ expert Compass Lexecon’s explanation that the company in question EVC, had been developed by Claimants and the PTEs “to deliver their electricity production to the Spanish national grid.”1317

660. As far as intercompany costs are concerned, as Compass Lexecon pointed out, these costs relate to technical, legal and financial services related to the construction of the plants. If these services were not provided by companies of the NextEra group they would have had contracted for from outside.1318 In the Tribunal’s view, these were therefore costs incurred in the construction of the Termosol Plants and should be included in the calculation of Claimants’ losses.

661. Accordingly, the Tribunal concludes that financing costs, intercompany costs and investments in related companies should be included in determining the valuation of Claimants’ assets. Thus, the Tribunal accepts Claimants’ figure of EUR 720.6 million for the capitalized costs of the project for the purpose of calculating a reasonable rate of return.

b. What Constitutes a Reasonable Rate of Return?

662. The Tribunal notes that the Parties agree that the WACC of the Termosol plants provides the appropriate basis for determining a reasonable rate of return in an assessment not based on the DCF method. The difference between them is whether the WACC should be supplemented by 300bps. Spain had chosen to provide a return under Regulatory Framework I that was significantly higher than the WACC in order to attract “accelerated investment in renewables.”1319 Claimants’ expert, Compass Lexecon, also points out that a premium above WACC is common in regulatory regimes in European


1315 RER-Accuracy First Economic, ¶ 417. ↩
1316 RER-Accuracy Second Economic, ¶ 340. ↩
1317 CER-Compass Lexecon Second, ¶ 102. ↩
1318 CER-Compass Lexecon Second, ¶ 101. ↩
1319 Cl. Reply Merits, ¶ 590. ↩

[Page 230]

jurisdictions.1320 CNE supported an IRR of WACC plus 300bps when providing advice on the development of the regulatory regime that became Regulatory Framework I.1321

663. Taking account of these considerations, the Tribunal considers that a premium in addition to the WACC is appropriate in determining the loss that would be suffered under a reasonable rate of return approach to measuring damages. The question is whether 300bps over the WACC is the appropriate rate.

664. For the reasons given earlier, the Tribunal considers that Regulatory Framework I is not the proper basis for determining loss in this case. Thus, the premium that was proposed for Regulatory Framework I could not be presumed automatically to be the appropriate premium for this damages calculation. On the information provided to the Tribunal, there is no consistent practice of fixing the premium at 300bps in European jurisdictions that provide for a premium when calculating a return on investment in regulated sectors.

665. In determining the appropriate bps to be added to the WACC, the Tribunal took into in account the desire to encourage entrants into the Spanish solar energy system as well as the view expressed by CNE that a premium over WACC was a reasonable expectation of return.

666. Taking all of this into account, the Tribunal concludes that the appropriate return on investment for the calculation of loss should be WACC plus 200bps.

c. The Taxation Issue

667. The Tribunal notes the difference between the Parties over whether taxation should be taken into account by converting a post-tax rate of return into a pre-tax rate of return on the basis of a nominal tax rate of 30%, or whether the rate of conversion should an effective rate rather than a nominal rate. In considering this, the Tribunal took account of the fact that the statement of Compass Lexecon that the use of the nominal rate is “accepted regulatory practice” was not contradicted by Respondent and noted the


1320 CER-Compass Lexecon Second, ¶ 132, Table XVI; Tr. Day 1 (ENG), 136:24–137:6 (Mr. Zimmerman). ↩
1321 CER-Compass Lexecon Second, ¶ 108(c). ↩

[Page 231]

difficulty of calculating an “effective rate” for each year if a nominal rate were not to be used.

668. The Tribunal concludes, therefore, that the use of a nominal tax rate is appropriate for the purpose of converting the post-tax rate of return into a pre-tax rate of return in the circumstances of this case.

d. The Effect of Debt Restructuring

669. The Tribunal does not consider that the effect of debt restructuring is an appropriate consideration to include in the valuation of Claimants’ investment. The decision to restructure the debt and to accept the arrangement that was finally concluded was a decision of the Claimants. There is no objective way for the Tribunal to determine whether that was the best arrangement for restructuring the investment or whether another arrangement might have been made to minimize the impact on the value of the Claimants’ investment.

670. Accordingly, the Tribunal has not included the effect of debt restructuring in its calculation of damages.

e. Interest

671. The Tribunal accepts that interest is appropriate in this case. However, the ECT makes no provision for calculating interest in cases of violation of Article 10. In the case of expropriation, the ECT provides in Article 13, that interest is to be provided “at a commercial rate established on a market basis.”1322 This is consistent with the purpose of interest, which is to compensate Claimants for their loss of the opportunity to use their capital, and is applicable to both pre-judgment and post-judgment periods.

672. Claimants propose an interest rate of 7.62% based on a calculation of a notional cost of capital for the purposes of their DCF approach to the determination of damages. In other words, it is a rate based on certain assumptions, including market and country risk


1322 CL-001 / RL-055, ECT, Art. 13. ↩

[Page 232]

premiums.1323 It is not based on empirical evidence of what rate could actually be obtained in the market. Their alternative proposal for interest of EURIBOR + 3.5%, is based in what the PTEs negotiated with the project lenders. This rate suffers from the fact that it is Claimants themselves who are effectively setting the rate.

673. Respondent argues that interest must be based on the rate that would apply in the case of a risk-free asset, Spanish sovereign bonds, on the basis of the rate that would apply during the period between date of valuation and the Award. The tribunal in Novenergia adopted 10-year Spanish sovereign bonds as the appropriate basis for setting the interest rate.1324 The tribunal in Eiser stated that in the interest of encouraging early payment of the award, it set prejudgment interest at 2.07 % and post-judgment interest at 2.50%.1325

674. The Tribunal notes that the only evidence before it of a market rate is the rate of Spanish sovereign bonds. This may not be a commercial rate, but in the absence of any evidence of a commercial rate other than what Claimants managed to negotiate with respect to the project lenders, there is nothing for the Tribunal to go on in setting a rate that can be described as a market rate. Thus, the Tribunal accepts the rate on 5-year Spanish sovereign bonds at the date of the Award as the appropriate interest rate in this case.

675. Claimants argue that interest should be compounded; Respondent makes no specific submission on this point. The Tribunal accepts that compound interest is commonly awarded in investment arbitrations and considers it appropriate in this case.

676. Accordingly, the Tribunal decides that the interest rate will be based on 5-year Spanish sovereign bonds at the date of the Award, compounded monthly. This rate will apply to pre-judgment interest calculated from the date of valuation, 30 June 2016, to the date of the Award, and to post-judgment interest from the date of the Award until the date of payment.


1323 CER-Compass Lexecon First, pp. 70-71, ¶ 132, Table VI. ↩
1324 CL-195, Novenergía, ¶ 846. ↩
1325 Eiser, ¶ 478. ↩

[Page 233]

f. Other Issues

677. The Tribunal notes that since it has based its damages calculation on a valuation of assets and a reasonable return, the arguments of the Parties relating to damages based on a DCF calculation are no longer relevant and have not been dealt with in this Decision.

g. Conclusion

678. The Tribunal has concluded that Claimants are entitled to damages based on a return on the capitalized value of their assets as of 30 June 2016 on the basis of the WAAC of the Termosol Plants plus a premium of 200bps. In its Reply on the Merits, Claimants calculated their loss on the basis of a premium of 300bps. That amount prior to debt restructuring came to EUR 398.4 million.1326 Since the Tribunal has accepted the arguments of the Claimants with respect to the valuation of assets and taxation and rejected its arguments on debt restructuring the amount of EUR 398.4 million has to be recalculated on the basis of WACC plus 200 bps instead of WACC plus 300 bps.

679. The Tribunal has also concluded that both pre-judgment and post-judgment interest are to be awarded on the basis of 5-year Spanish sovereign bonds as at the date of the Award, compounded monthly.

680. The Tribunal invites Claimants to recalculate their damages claim of EUR 398.4 million in the light of a premium of WACC plus 200 bps and advise the Tribunal and Respondent of this recalculated amount within 10 days of the receipt of this Decision.

IX. COSTS

681. The Tribunal reserves the determination of costs until its Award.

X. DECISION

682. The Tribunal decides:

  1. (i) That it has jurisdiction over this dispute.

1326 Cl. Reply Merits, ¶ 541. ↩

[Page 234]

  1. (ii) That Respondent did not comply with its obligation under Article 10(1) of the ECT to provide fair and equitable treatment in that it failed to protect Claimants’ legitimate expectations.
  2. (iii) That Claimants are entitled to damages based on a return on the capitalized value of their assets as of 30 June 2016 on the basis of the WACC of the Termosol Plants plus a premium of 200bps, together with pre-judgment interest on the basis of 5-year Spanish sovereign bonds as at the date of the Award, compounded monthly.
  3. (iv) That Claimants are to recalculate their damages claim of EUR 398.4 million in the light of a premium of WACC plus 200 bps and advise the Tribunal and Respondent of this recalculated amount within 10 days of the receipt of this Decision.
  4. (v) That Claimants are entitled to post-judgment interest from the date of the Award on the basis of 5-year Spanish sovereign bonds as at the date of the Award, compounded monthly, until payment.

[Page 235]

Signature

The Honourable L. Yves Fortier, P.C., C.C., O.Q., Q.C.

Arbitrator

Signature

Professor Laurence Boisson de Chazournes

Arbitrator

Signature

Professor Donald M. McRae, C.C.

President